IR 07200201/1990001

From kanterella
Revision as of 15:42, 11 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Super Asphalt Pavement Corp., NRC Form 591M Part 1, Inspection Report No. 03035472/2019001
ML19171A302
Person / Time
Site: 07200201, 03031172
Issue date: 05/20/2019
From: Michael Reichard
NRC Region 1
To: Roldan H
Super Asphalt Pavement Corp
References
IR 2019001
Download: ML19171A302 (1)


Text

This document becomes an NRC Official Agency Record once it is signed by the Branch Chief NRC FORM 591 M PART 1 (07-20 1 2)* 10 CFR 2.201 U.S. NUCLEAR REGULATORY COMMISSION SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION LICENSEE/LOCATION INSPECTED: NRC/REGIONAL OFFICE Super Asphalt Pavement Corp. P.O. Box 1849 Guaynabo, PR 00970-1849 U.S. Nuclear Regulatory Commission Region I, 2100 Renaissance Blvd, Suite 100 King of Prussia, Pennsylvania 19406-2713 REPORT NUMBER(S) 201 9-00 1 DOCKET NUMBER(S) LICENSE NUMBER(S) DATE(S)

OF INSPECTION 030-35472 52-25537-01 May 20, 2019 LICENSEE: The inspection was an examination of the activities conducted under your license as they relate to radiation safety and to compliance with the Nuclear Regulatory Commission (NRC) rules and regulations and the conditions of your licens The inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspecto The inspection findings are as follows:

X Based on the inspection findings, no violations were identifie . Previous violation(s) close . The violation(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were self

- identified, non-repetitive, and corrective action was or is being taken, and the remaining criteria in the NRC Enforcement Policy, to exercise discretion, were satisfie Non-cited violation(s)

were discussed involving the following requirement(s) an d corrective action(s): During this inspection

, certain of your activities, as described below and/or attached, were in violation of NRC requirements and are being cited in accordance with the NRC Enforcement Policy. This form is a NOTICE OF VIOLATION, which may be subject to posting in accordance with 10 CFR 19.1 (Violations and Corrective Actions)

Statement of Corrective Actions I hereby state that, within 30 days, the actions described by me to the Inspector will be taken to correct the violations identifie This statement of corrective actions is made in accordance with the requirements of 10 CFR 2.201 (corrective steps already taken, corrective steps which will be taken, date when full compliance will be achieved). I understand that no further written response to NRC will be required, unless specifically requeste Title Printed Name Signature Date LICENSEE'S REPRESENTATIVE NRC INSPECTOR Michael Reichard 6/10/2019 XMichael ReichardMichael ReichardSigned by: Michael C. Reichard NA BRANCH CHIEF Arthur Burritt 6/17/2019 XArthur L BurrittArthur BurrittSigned by: NRC-PIV N/A *NRC FO RM 591 M PART 1 (07-201 2) (RI Rev. 0 9/12/201 3) G:\WBL Documents

\WBL Inspection Records

\R52-25537-01.2019001.591M-Part1 DigitalSig-Public B1.doc SUNSI Review Completed By:

Michael Reichard X Public X Non-Sensitive