ENS 53698
From kanterella
Revision as of 21:51, 29 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Where | |
---|---|
Clinton Illinois (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
Time - Person (Reporting Time:+3.95 h0.165 days <br />0.0235 weeks <br />0.00541 months <br />) | |
Opened: | David Livingston 08:57 Oct 28, 2018 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Oct 28, 2018 |
53698 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 53698\u003C/a\u003E - \u003Ca href=\"/Clinton\" title=\"Clinton\"\u003EClinton\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EAutomatic Reactor Scram During a Reactor Shutdown\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 53698 - Clinton\n","link":"","lat":40.17286111111111,"lon":-88.8332,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | A/R |
Before | Startup (1 %) |
After | Hot Shutdown (0 %) |
WEEKMONTHYEARENS 563282023-02-01T05:43:0001 February 2023 05:43:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Scram Due to Turbine Trip ENS 541972019-08-03T07:26:0003 August 2019 07:26:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge En Revision Imported Date 8/7/2019 ENS 536982018-10-28T05:00:00028 October 2018 05:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram During a Reactor Shutdown ENS 531102017-12-09T19:48:0009 December 2017 19:48:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Manual Reactor Scram Due to Loss of Division 1 Ac Power to Numerous Components ENS 528002017-06-11T03:56:00011 June 2017 03:56:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Loss of Feedwater Heating ENS 527772017-05-31T01:38:00031 May 2017 01:38:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram ENS 499582014-03-26T00:42:00026 March 2014 00:42:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Loss of Condenser Vacuum ENS 496322013-12-13T23:57:00013 December 2013 23:57:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Trip During Feed Pump Swap ENS 496172013-12-09T02:27:0009 December 2013 02:27:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Manual Scram Due to Loss of Division 1 480 Vac Power Causing Loss of Instrument Air to Containment and Scram Air Header ENS 489742013-04-26T13:55:00026 April 2013 13:55:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Rapidly Decreasing Level in the Ehc Oil Reservoir ENS 488122013-03-07T13:56:0007 March 2013 13:56:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram on Generator Trip/Turbine Trip ENS 474892011-11-29T23:28:00029 November 2011 23:28:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Unit Experienced an Automatic Reactor Scram During a Planned Shutdown ENS 454332009-10-15T10:37:00015 October 2009 10:37:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Reactor Recirculation Pump Trip ENS 439762008-02-11T04:07:00011 February 2008 04:07:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Increasing Reactor Vessel Level ENS 428072006-08-27T22:05:00027 August 2006 22:05:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Trip Due to Reactor High Water Level ENS 424302006-03-20T10:53:00020 March 2006 10:53:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Main Turbine Trip Caused Reactor Scram ENS 408682004-07-13T21:10:00013 July 2004 21:10:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to Possible Adverse Weather ENS 406042004-03-23T01:31:00023 March 2004 01:31:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Scram from 93% Power Due to Generator Trip ENS 403682003-12-02T22:58:0002 December 2003 22:58:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Scram Due to Low Reactor Water Feed Pump Suction Pressure 2023-02-01T05:43:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_53698&oldid=1159627"