ENS 41175
From kanterella
Revision as of 21:22, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ENS Event | |
---|---|
15:11 Nov 5, 2004 | |
Title | Inadvertent Loss of "B" Train Site Power During Testing |
Event Description | At 09:11 a.m. CST on November 5, 2004, an inadvertent "B" Train Loss of Site Power occurred when the normal power supply breaker to the 1G 4160V bus opened during testing. The 1B Emergency Diesel Generator started and powered up the 1G 4160V Bus as required and the Loss of Site Power Sequencer started all "B" Train LOSP Loads as required. Abnormal Operating Procedures for the LOSP and Loss of Train "A" or "B" Train RHR were completed as required for the event. The "A" Train RHR pump was manually started to provide core cooling and circulation flow as required for Mode 6. Core alterations were in progress for reload which were suspended immediately upon the event
Systems which did not function as required: Upon the auto start signal for the 1B Motor Driven Auxiliary Feedwater Pump, the 4160V power supply breaker tripped open. The flag on the breaker indicated it was due to a time delay over current on one of the phases. Investigation into this problem is in progress. Spent Fuel Pool cooling was not lost because it was being powered from "A" Train. Site power was restored to "B" Train 4160V bus at 0959 CST. An event investigation is being performed by the licensee. The NRC Resident Inspector has been informed of this event by the licensee. |
Where | |
---|---|
Farley Alabama (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-0.82 h-0.0342 days <br />-0.00488 weeks <br />-0.00112 months <br />) | |
Opened: | Chris Thornell 14:22 Nov 5, 2004 |
NRC Officer: | John Mackinnon |
Last Updated: | Nov 5, 2004 |
41175 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 41175\u003C/a\u003E - \u003Ca href=\"/Farley\" title=\"Farley\"\u003EFarley\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EInadvertent Loss of \"B\" Train Site Power During Testing\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 41175 - Farley\n","link":"","lat":31.223047222222224,"lon":-85.11253055555555,"icon":"/w/images/1/14/Southern_Nuclear_icon.png"}],"imageoverlays":null} | |
WEEKMONTHYEARENS 569712024-02-16T11:34:00016 February 2024 11:34:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip and Automatic Actuation of Auxiliary Feedwater System ENS 568522023-11-14T16:41:00014 November 2023 16:41:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip ENS 563292023-02-01T15:56:0001 February 2023 15:56:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due and Automatic Actuation of Auxiliary Feedwater System ENS 560282022-08-03T17:58:0003 August 2022 17:58:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Loss of Power to START-UP Transformer ENS 542872019-09-21T13:00:00021 September 2019 13:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Trip Due to Reactor Coolant Pump Vibration Alarm ENS 540402019-05-01T21:43:0001 May 2019 21:43:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation En Revision Imported Date 5/9/2019 ENS 523952016-11-27T06:26:00027 November 2016 06:26:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip with Automatic Auxiliary Feedwater System Actuation Due to Voltage Oscillations ENS 523562016-11-08T06:00:0008 November 2016 06:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Steam Generator Reduced Feedflow ENS 522742016-10-01T10:12:0001 October 2016 10:12:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Trip Due to Inadvertent Closure of Main Steam Isolation Valve ENS 519182016-05-11T11:53:00011 May 2016 11:53:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Farley Unit 2 Trip on Hi Hi Steam Generator Level ENS 510432015-05-05T09:22:0005 May 2015 09:22:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Auxiliary Feedwater Pump Auto Start Signal Initiated During Startup ENS 506182014-11-15T09:53:00015 November 2014 09:53:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Actuation of the Reactor Protection System for Abnormal Rod Position Indication ENS 505332014-10-14T08:41:00014 October 2014 08:41:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of a Start-Up Transformer ENS 491062013-06-12T02:05:00012 June 2013 02:05:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 1 Automatic Reactor Trip Due to the Loss of a Start-Up Transformer ENS 478132012-04-06T19:44:0006 April 2012 19:44:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Load Shed Signal Occurred Due to Loss of the 1B Startup Transformer ENS 478092012-04-05T17:20:0005 April 2012 17:20:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unplanned Systems Actuations While Performing a Surveillance Test ENS 466612011-03-07T07:40:0007 March 2011 07:40:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Inadvertant Auto-Start Signal to the 1B Diesel Generator During Testing ENS 459462010-05-22T21:34:00022 May 2010 21:34:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of Steam Generator Water Level Control ENS 458892010-05-01T02:00:0001 May 2010 02:00:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Inadvertent System Actuation Occurred During a Surveillance Test ENS 448552009-02-16T22:55:00016 February 2009 22:55:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Inadvertent Relay Actuation Results in Auto Start of 1C Emergency Diesel Generator ENS 436872007-10-03T19:10:0003 October 2007 19:10:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Trip on Loss of Forced Flow to Rcs Loop "a ENS 411752004-11-05T15:11:0005 November 2004 15:11:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Inadvertent Loss of "B" Train Site Power During Testing ENS 405582004-03-01T11:22:0001 March 2004 11:22:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 1 Experienced a Reactor Trip on Turbine Trip Due to a Feedwater System Problem ENS 403092003-11-10T16:36:00010 November 2003 16:36:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to False Rcp Breaker Open Signal 2024-02-16T11:34:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_41175&oldid=428270"