ML13059A019

From kanterella
Revision as of 21:42, 4 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2012 PNPS Annual Review Report
ML13059A019
Person / Time
Site: Pilgrim
Issue date: 02/28/2013
From:
Entergy Nuclear Generation Co
To:
Office of Nuclear Security and Incident Response
Shared Package
ML130590034 List:
References
Download: ML13059A019 (2)


Text

2012 PNPS ANNUAL REVIEW REPORT WAIVER DISTRIBUTION BY TYPE OF LIMIT WORK HOUR LIMIT OPERATIONS MAINTENANCE SECURITY HP / RADPRO CHEMISTRY FIRE BRIGADE (B)

Max ceilings:

Online Outage Online Outage Online Outage Online Outage Online Outage Online Outage 16h max in 24h 0 0 1 0 0 0 0 0 0 0 1 0 26h max in 48h 1 0 5 0 0 0 0 0 0 0 0 0 72 max in 7d 1 0 25 0 0 0 0 0 0 0 0 0 Rest Breaks:

Online Outage Online Outage Online Outage Online Outage Online Outage Online Outage 10h between work 0 0 4 0 0 0 0 0 0 0 1 0 periods 34h in any 9-days 1 0 6 0 0 0 0 0 0 0 0 0 Minimum Days Off -

Online:

1 MDO /wk; 8h shift 0 0 0 0 0 0 2 MDO /wk; 10h shift 1 0 0 0 0 0 2 MDO /wk; 12 hr shift 0 2.5 MDO /wk; 12 hr shift 0 0 0 0 3 MDO /wk; 12 hr shift 27 2 Minimum Days Off -

Outage:

1 MDO / 7 days (rolling) 0 3 MDO / 15 day period 0 0 0 0 4 MDO / 15 day period 0 NUMBER OF WAIVERS PER INDIVIDUAL EMPLOYEE NUMBER OF WAIVERS OPERATIONS MAINTENANCE SECURITY HP / RADPRO CHEMISTRY FIRE BRIGADE (B) 1 1 20 8 0 0 4 2 0 8 8 0 0 0 3 1 0 1 0 0 0 4 0 0 0 0 0 0 5 0 1 0 0 0 0 6 0 0 0 0 0 0 Highest number of 3 5 3 0 0 1 waivers for an individual employee