ML13059A019

From kanterella
Jump to navigation Jump to search
2012 PNPS Annual Review Report
ML13059A019
Person / Time
Site: Pilgrim
(DPR-035)
Issue date: 02/28/2013
From:
Entergy Nuclear Generation Co
To:
Office of Nuclear Security and Incident Response
Shared Package
ML130590034 List:
References
Download: ML13059A019 (2)


Text

2012 PNPS ANNUAL REVIEW REPORT WAIVER DISTRIBUTION BY TYPE OF LIMIT WORK HOUR LIMIT OPERATIONS MAINTENANCE SECURITY HP / RADPRO CHEMISTRY FIRE BRIGADE (B)

Max ceilings:

Online Outage Online Outage Online Outage Online Outage Online Outage Online Outage 16h max in 24h 0

0 1

0 0

0 0

0 0

0 1

0 26h max in 48h 1

0 5

0 0

0 0

0 0

0 0

0 72 max in 7d 1

0 25 0

0 0

0 0

0 0

0 0

Rest Breaks:

Online Outage Online Outage Online Outage Online Outage Online Outage Online Outage 10h between work periods 0

0 4

0 0

0 0

0 0

0 1

0 34h in any 9-days 1

0 6

0 0

0 0

0 0

0 0

0 Minimum Days Off -

Online:

1 MDO /wk; 8h shift 0

0 0

0 0

0 2 MDO /wk; 10h shift 1

0 0

0 0

0 2 MDO /wk; 12 hr shift 0

2.5 MDO /wk; 12 hr shift 0

0 0

0 3 MDO /wk; 12 hr shift 27 2

Minimum Days Off -

Outage:

1 MDO / 7 days (rolling) 0 3 MDO / 15 day period 0

0 0

0 4 MDO / 15 day period 0

NUMBER OF WAIVERS PER INDIVIDUAL EMPLOYEE NUMBER OF WAIVERS OPERATIONS MAINTENANCE SECURITY HP / RADPRO CHEMISTRY FIRE BRIGADE (B) 1 1

20 8

0 0

4 2

0 8

8 0

0 0

3 1

0 1

0 0

0 4

0 0

0 0

0 0

5 0

1 0

0 0

0 6

0 0

0 0

0 0

Highest number of waivers for an individual employee 3

5 3

0 0

1