05000249/FIN-2014002-01 | 2014Q1 | | Failure to Maintain Secondary Containment Integrity During Outage Demobilization Activities |
05000237/FIN-2014403-01 | 2014Q1 | | Security |
05000237/FIN-2014007-01 | 2014Q1 | H.12 | Failure to Adequately Incorporate GE Operating Experience into Vendor Manual |
05000237/FIN-2014008-01 | 2014Q2 | H.12 | Inadequate Applicability Reviews of Configuration Changes for De-Energizing Safety-Related Valves |
05000237/FIN-2014008-02 | 2014Q2 | H.5 | Failure to Seismically Secure Nitrogen Bottles |
05000237/FIN-2014003-01 | 2014Q2 | H.8 | Failure to Take Appropriate Corrective Action When a Maintenance Rule Performance Goal for the Standby Coolant System was Not Met |
05000237/FIN-2014004-02 | 2014Q3 | H.7 | Inadequate Evacuation Time Estimate Submittals |
05000237/FIN-2014004-01 | 2014Q3 | H.6 | Failure to Perform an Adequate 10 CFR 50.59 Evaluation for Procedure DOP 130002 |
05000249/FIN-2014005-02 | 2014Q4 | P.5 | Failure to Ensure Continued Operability of Unit 3 Electromatic Relief Valve 302033E Following Implementation of Extended Power Uprate Plant Conditions |
05000249/FIN-2014005-01 | 2014Q4 | H.9 | Unit 3A LPCI Heat Exchanger Supports Returned to Service with Unacceptable Indications |
05000249/FIN-2014005-03 | 2014Q4 | H.14 | Failure to Maintain Configuration Control in the Unit 3 Containment Pressure Suppression System |
05000237/FIN-2014408-02 | 2014Q4 | | Licensee failed to ensure data linked to potentially disqualifying information about an individual was retained in the shared database |