|
---|
Category:Annual Operating Report
MONTHYEARL-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report L-PI-22-032, CFR 50.46 LOCA Annual Report2022-06-16016 June 2022 CFR 50.46 LOCA Annual Report L-PI-21-027, 2020 10 CFR 50.46 LOCA Annual Report2021-06-28028 June 2021 2020 10 CFR 50.46 LOCA Annual Report ML21134A0052021-05-14014 May 2021 2020 Annual Radioactive Effluent Report and Offsite Dose Calculation Manual ML20184A1002020-06-29029 June 2020 2019 10 CFR 50.46 LOCA Annual Report ML19164A0272019-06-10010 June 2019 2018 10CFR 50.46 LOCA Annual Report ML18177A2522018-06-22022 June 2018 2017 10 CFR 50.46 LOCA Annual Report L-PI-17-051, Submittal of Summaries of Safety Evaluations for Changes, Tests, and Experiments, December 20172017-12-28028 December 2017 Submittal of Summaries of Safety Evaluations for Changes, Tests, and Experiments, December 2017 L-PI-17-030, Transmittal of 2016 10CFR 50.46 LOCA Annual Report2017-06-28028 June 2017 Transmittal of 2016 10CFR 50.46 LOCA Annual Report L-PI-16-002, Submittal of 50.59 Evaluation Summary Report2016-01-20020 January 2016 Submittal of 50.59 Evaluation Summary Report L-PI-15-061, Submittal of 2014 10 CFR 50.46 LOCA Annual Report2015-06-30030 June 2015 Submittal of 2014 10 CFR 50.46 LOCA Annual Report L-PI-14-060, Annual Report of Changes and Errors to the Emergency Core Cooling System (ECCS) Evaluation Models2014-06-23023 June 2014 Annual Report of Changes and Errors to the Emergency Core Cooling System (ECCS) Evaluation Models ML14175B1922014-05-0909 May 2014 Enclosure 1 - Off-Site Radiation Dose Assessment, January 1, 2013 - December 31, 2013 L-PI-13-029, Annual Report of Individual Monitoring2013-04-18018 April 2013 Annual Report of Individual Monitoring L-PI-12-046, Annual Report of Corrections to the Emergency Core Cooling System (ECCS) Evaluation Models2012-06-26026 June 2012 Annual Report of Corrections to the Emergency Core Cooling System (ECCS) Evaluation Models ML12135A2882012-05-11011 May 2012 Independent Spent Fuel Storage Installation - Submittal of 2011 Annual Radiological Environmental Monitoring Program (REMP) Report ML12135A4292012-05-11011 May 2012 Independent Spent Fuel Storage Installation - Submittal of 2011 Annual Radioactive Effluent Report and Offsite Dose Calculation Manual (ODCM) L-PI-11-043, Corrections to Emergency Core Cooling System (ECCS) Evaluation Models2011-06-28028 June 2011 Corrections to Emergency Core Cooling System (ECCS) Evaluation Models L-PI-11-036, 2010 Annual Radioactive Effluent Report and Offsite Dose Calculation Manual (ODCM)2011-05-12012 May 2011 2010 Annual Radioactive Effluent Report and Offsite Dose Calculation Manual (ODCM) L-PI-10-028, Annual Radioactive Effluent Report and Offsite Dose Calculation Manual (ODCM)2010-05-12012 May 2010 Annual Radioactive Effluent Report and Offsite Dose Calculation Manual (ODCM) ML1013803022010-05-12012 May 2010 Independent Spent Fuel Storage Installation, Submittal of 2009 Annual Radiological Environmental Monitoring Program Report L-PI-09-055, 2008 Annual Radioactive Effluent Report and Offsite Dose Calculation Manual2009-05-12012 May 2009 2008 Annual Radioactive Effluent Report and Offsite Dose Calculation Manual L-PI-07-033, 2006 Annual Radioactive Effluent Report and Offsite Dose Calculation Manual2007-05-14014 May 2007 2006 Annual Radioactive Effluent Report and Offsite Dose Calculation Manual L-PI-07-035, 2006 Annual Radiological Environmental Monitoring Program (REMP) Report2007-05-0707 May 2007 2006 Annual Radiological Environmental Monitoring Program (REMP) Report L-PI-06-037, Annual Radiological Environment Environmental Monitoring Program (REMP) Report2006-05-0606 May 2006 Annual Radiological Environment Environmental Monitoring Program (REMP) Report ML0236104322002-12-20020 December 2002 Corrections to ECCS Evaluation Models 2023-06-14
[Table view] Category:Letter type:L
MONTHYEARL-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report L-PI-23-010, Annual Report of Individual Monitoring2023-04-27027 April 2023 Annual Report of Individual Monitoring L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2023-03-28028 March 2023 Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-23-005, CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2023-03-0303 March 2023 CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) L-PI-23-001, Day Steam Generator Tube Inspection Report2023-01-30030 January 2023 Day Steam Generator Tube Inspection Report L-PI-22-047, Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report2022-12-21021 December 2022 Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report L-PI-22-020, Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2022-12-0202 December 2022 Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-22-040, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0606 October 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-037, Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts2022-09-20020 September 2022 Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts L-PI-22-032, CFR 50.46 LOCA Annual Report2022-06-16016 June 2022 CFR 50.46 LOCA Annual Report L-PI-22-033, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles2022-06-10010 June 2022 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-024, Supplement to Application for License Amendment to Implement 24-Month Operating Cycle2022-03-0707 March 2022 Supplement to Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-047, Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 22021-12-0707 December 2021 Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 2 L-PI-21-045, Response to Request for Additional Information Cooling Water System License Amendment Request2021-11-0404 November 2021 Response to Request for Additional Information Cooling Water System License Amendment Request L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.12021-10-0707 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1 L-PI-21-006, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions2021-10-0202 October 2021 License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions L-PI-21-032, Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island2021-09-30030 September 2021 Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island L-PI-21-016, Application for License Amendment to Implement 24-Month Operating Cycle2021-08-0606 August 2021 Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-027, 2020 10 CFR 50.46 LOCA Annual Report2021-06-28028 June 2021 2020 10 CFR 50.46 LOCA Annual Report L-PI-21-023, Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report2021-05-14014 May 2021 Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report L-PI-21-007, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes2021-04-19019 April 2021 Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes L-PI-20-050, Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic2020-10-0707 October 2020 Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic L-PI-20-051, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2020-09-28028 September 2020 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-20-026, Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiativ2020-09-0101 September 2020 Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 L-PI-20-035, = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule2020-07-28028 July 2020 = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule L-PI-20-023, Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI)2020-06-10010 June 2020 Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI) L-PI-20-014, Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI2020-04-29029 April 2020 Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI L-PI-20-004, License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.132020-03-30030 March 2020 License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.13 L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-16016 December 2019 License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency L-PI-19-038, Submittal of Revised Pressure and Temperature Limits Report2019-09-19019 September 2019 Submittal of Revised Pressure and Temperature Limits Report L-PI-19-037, Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals2019-09-16016 September 2019 Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals L-PI-19-025, Request to Approve Site-Specific Probabilistic Risk Assessment (PRA) Model for Flowserve N-Seal Abeyance Seal and Dynamic Testing for the Prairie Island Nuclear Generating Plant (PINGP)2019-08-27027 August 2019 Request to Approve Site-Specific Probabilistic Risk Assessment (PRA) Model for Flowserve N-Seal Abeyance Seal and Dynamic Testing for the Prairie Island Nuclear Generating Plant (PINGP) L-PI-19-029, Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For...2019-08-0505 August 2019 Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For... L-PI-19-002, 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 22019-06-13013 June 2019 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 2 L-PI-19-014, Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-04-29029 April 2019 Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-PI-19-003, Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule for Prairie Island Nuclear Generating Plant (PINGP)2019-02-0404 February 2019 Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule for Prairie Island Nuclear Generating Plant (PINGP) L-PI-19-006, Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements2019-01-29029 January 2019 Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements L-PI-19-005, Online Reference Portal for NRC Review of License Amendment Request to Implement 10 CFR 50.692019-01-15015 January 2019 Online Reference Portal for NRC Review of License Amendment Request to Implement 10 CFR 50.69 L-PI-18-063, Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 8052018-12-0606 December 2018 Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 805 2024-01-02
[Table view] |
Text
fl Xcel Energy 1717 Wakonade Drive Welch, MN 55089 June 14, 2023 L-PI-23-016 10 CFR 50.46 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed Facility Operating License Nos. DPR-42 and DPR-60 2022 10 CFR 50.46 LOCA Annual Report
References:
- 1) Westinghouse Letter NSPM-LOCA-TM-A5-000002 Prairie Island Units 1 and 2 10 CFR 50.46 Annual Notification and Reporting for 2022, dated February 10, 2023
- 2) Westinghouse Letter PWR-LOCA-TM-A5-000011 Revised 10 CFR 50.46 Reporting Page for ASTRUM & CQD EM NON-CONSERVATION OF ENERGY IN THE GENERALIZED ENERGY DEPOSITION MODEL, dated March 9, 2023 Pursuant to 10 CFR 50.46(a)(3)(ii), Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter NSPM), hereby submits the 2022 annual report of changes and errors associated with the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2 Emergency Core Cooling System (ECCS) analyses (Enclosure 1).
The peak cladding temperature (PCT) for PINGP Unit 1 and Unit 2 were unchanged since the last annual report for the LOCA analyses. The plant specific changes and errors (absolute value) since the last annual report are summarized below:
LBLOCA Unit 1 None SBLOCA Unit 1 None LBLOCA Unit 2 None SBLOCA Unit 2 None
L-Pl-23-016 Page 2 contains Reference 1 with the exception that page 3 of 10 of the enclosure is a replacement page from Reference 2.
If you have any questions about this submittal, please contact Carrie Seipp, Senior Regulatory Engineer, at 612-330-5576.
Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
Timothy P. Borgen Plant Manager, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure (1) cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC
ENCLOSURE 1 1 of 10
Westinghouse Non-Proprietary Class 3
@westinghouse Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, Pennsylvania 16066 USA Direct tel: (412) 374-3054 e-mail: landon.conner@westinghouse.com Our ref: NSPM-LOCA-TM-A5-000002 Prairie Island Units 1 and 2 10 CFR 50.46 Annual Notification and Reporting for 2022
Dear Sir or Madam:
This is a notification of 10 CFR 50.46 reporting information pertaining to the Westinghouse Electric Company Evaluation Models/analyses. As committed to in WCAP-13451, Westinghouse Methodology for Implementation of 10 CFR 50.46 Reporting, Westinghouse is providing an Annual Report for Emergency Core Cooling System (ECCS) Evaluation Model changes and errors for the 2022 model year. All necessary standardized reporting pages for any changes and errors for the Evaluation Models utilized for your plant(s) are enclosed, consistent with the commitment following the NUPIC audit in early 1999. Peak Clad Temperature (PCT) summary sheets are enclosed. All necessary revisions for any non-zero, non-discretionary PCT changes have been included. Changes with estimated PCT impacts of 0°F may not be presented on the PCT summary sheet. The Evaluation Model changes and errors (except any plant-specific errors in the application of the model) have been provided to the NRC via Westinghouse letter.
This information is for your use in making a determination relative to the reporting requirements of 10 CFR 50.46. The information that is provided in this letter was prepared in accordance with Westinghouse's Quality Management System (QMS). Please contact your LOCA plant cognizant engineers (PCEs), Samuel Gonsowski (412-374-2408) and Tristan Gibbons (412-374-2232), if there are any questions concerning this information.
Author: (Electronically Approved)* Verifier: (Electronically Approved)*
Landon A. Conner Heather McMillen Approved: (Electronically Approved)*
Amy J. Colussy
Attachment:
10 CFR 50.46 Reporting Text and PCT Summary Sheets (8 Pages)
- Electronically approved records are authenticated in the electronic document management system.
© 2023 Westinghouse Electric Company LLC All Rights Reserved 2 of 10
- This record was final approved on 2/10/2023, 7:50:15 AM. (This statement was added by the PRIME system upon its validation)
Westinghouse Non-Proprietary Class 3 of PWR-LOCA-TM-A5-000011, Revision 0 NON-CONSERVATION OF ENERGY IN THE GENERALIZED ENERGY DEPOSITION MODEL
Background
The Generalized Energy Deposition Model (GEDM) used within -WCOBRA/TRAC is described in Section 8-6-2 of WCAP-12945-P-A [1] and Section 8-6-2 of WCAP-16009-P-A [2]. Non-conservation of the deposited energy was discovered to exist, whereby a very small fraction of the redistributed energy was not being included in the core balance rods. The energy deposited to the hot rod and hot assembly was confirmed to be conserved and correct. This item represents a Non-Discretionary Change in accordance with Section 4.1.2 of WCAP-13451.
Affected Evaluation Model(s) 1996 Westinghouse Best Estimate Large Break LOCA Evaluation Model 2004 Westinghouse Realistic Large Break LOCA Evaluation Model Using ASTRUM Estimated Effect The error was qualitatively evaluated, and the nature of the error leads to an estimated peak cladding temperature impact of 0°F.
Reference(s)
- 1) WCAP-12945-P-A, Revision 2 Volume 1, and Revision 1 Volumes 2 - 5, Code Qualification Document for Best Estimate LOCA Analysis, March 1998.
- 2) WCAP-16009-P-A, Revision 0, Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment Of Uncertainty Method (ASTRUM), January 2005.
2023 Westinghouse Electric Company LLC All Rights Reserved 316ofof1017
- This record was final approved on 3/9/2023, 11:31:37 AM. (This statement was added by the PRIME system upon its validation)
Attachment to NSPM-LOCA-TM-A5-000002 Page 2 of 8 LOCA Peak Cladding Temperature (PCT) Summary Plant Name: PRAIRIE ISLAND 1 EM: NOTRUMP AOR
Description:
Appendix K Small Break Summary Sheet Status: Current PRAIRIE ISLAND 1 NSP_LOCA-50.46_NSP_Base_Appendix_K_SBLOCA - 1.2 V.V PCT (°F) Reference # Note #
ANALYSIS-OF-RECORD 959 1 AOR + ASSESSMENTS PCT = 959.0 °F REFERENCES 1 LTR-LIS-08-158, Transmittal of Future Prairie Island Units 1 and 2 PCT Summaries, February 2008.
NOTES:
(a) None Version: PRAIRIE ISLAND 1 NSP_LOCA-50.46_NSP_Base_Appendix_K_SBLOCA - 1.2 V.V 2023 Westinghouse Electric Company LLC All Rights Reserved 4 of 10
- This record was final approved on 2/10/2023, 7:50:15 AM. (This statement was added by the PRIME system upon its validation)
Attachment to NSPM-LOCA-TM-A5-000002 Page 3 of 8 LOCA Peak Cladding Temperature (PCT) Summary Plant Name: PRAIRIE ISLAND 1 EM: ASTRUM (2004)
AOR
Description:
Best Estimate Large Break Summary Sheet Status: IFBA/Gad PRAIRIE ISLAND 1 NSP_LOCA-50.46_NSP_IFBA_GAD_ASTRUM - 1.3 V.V PCT (°F) Reference # Note #
ANALYSIS-OF-RECORD 1765 1 Delta PCT Reporting ASSESSMENTS* (°F) Reference # Note # Year**
- 1. Revised Heat Transfer 2013
-2 3 Multiplier Distributions
- 2. Error in Burst Strain Application 25 4 2013
- 3. Evaluation of the Introduction of 2018 0 2 IFBA Fuel
- 4. Evaluation of Fuel Pellet 2012 Thermal Conductivity 227 5 (a)
Degradation and Peaking Factor Burndown AOR + ASSESSMENTS PCT = 2015.0 °F
- The licensee should determine the reportability of these assessments pursuant to 10 CFR 50.46.
- The Reporting Year refers to the annual reporting year in which this assessment was included.
REFERENCES 1 WCAP-17783-P, Best-Estimate Analysis of the Large-Break Loss-of-Coolant Accident for Prairie Island Units 1 and 2 with Replacement Steam Generators Using ASTRUM Methodology, June 2013.
2 LTR-LIS-15-287, Rev. 1, Prairie Island Units 1 and 2, 10 CFR 50.46 Notification and Reporting for the Revised Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown Evaluation and the Introduction of IFBA Fuel, September 2015.
3 LTR-LIS-13-366, Revision 1, Prairie Island Units 1 and 2 10 CFR 50.46 Report for Revised Heat Transfer Multiplier Distributions, August 2013.
4 LTR-LIS-14-50, Prairie Island Units 1 and 2 10 CFR 50.46 Report for the HOTSPOT Burst Strain Error Correction, January 2014.
5 LTR-LIS-12-414, Prairie Island Units 1 and 2, 10 CFR 50.46 Notification and Reporting for Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown, September 2012.
Version: PRAIRIE ISLAND 1 NSP_LOCA-50.46_NSP_IFBA_GAD_ASTRUM - 1.3 V.V 2023 Westinghouse Electric Company LLC All Rights Reserved 5 of 10
- This record was final approved on 2/10/2023, 7:50:15 AM. (This statement was added by the PRIME system upon its validation)
Attachment to NSPM-LOCA-TM-A5-000002 Page 4 of 8 NOTES:
(a) This evaluation credits peaking factor burndown, see Reference 5.
Version: PRAIRIE ISLAND 1 NSP_LOCA-50.46_NSP_IFBA_GAD_ASTRUM - 1.3 V.V 2023 Westinghouse Electric Company LLC All Rights Reserved 6 of 10
- This record was final approved on 2/10/2023, 7:50:15 AM. (This statement was added by the PRIME system upon its validation)
Attachment to NSPM-LOCA-TM-A5-000002 Page 5 of 8 LOCA Peak Cladding Temperature (PCT) Summary Plant Name: PRAIRIE ISLAND 2 EM: NOTRUMP AOR
Description:
Appendix K Small Break Summary Sheet Status: Current PRAIRIE ISLAND 2 NRP_LOCA-50.46_NRP_Base_Appendix_K_SBLOCA - 1.2 V.V PCT (°F) Reference # Note #
ANALYSIS-OF-RECORD 959 1,2 a AOR + ASSESSMENTS PCT = 959.0 °F REFERENCES 1 LTR-LIS-08-158, Transmittal of Future Prairie Island Units 1 and 2 PCT Summaries, February 2008.
2 LTR-LIS-13-274, Prairie Island Units 1 and 2, 10 CFR 50.46 Summary Sheets for the Evaluation to Support the Unit 2 Installation of AREVA Model 56/19 Replacement Steam Generators (RSGs), June 2013.
NOTES:
(a) The Unit 1 AOR is applicable to Unit 2 with the RSGs installed.
Version: PRAIRIE ISLAND 2 NRP_LOCA-50.46_NRP_Base_Appendix_K_SBLOCA - 1.2 V.V 2023 Westinghouse Electric Company LLC All Rights Reserved 7 of 10
- This record was final approved on 2/10/2023, 7:50:15 AM. (This statement was added by the PRIME system upon its validation)
Attachment to NSPM-LOCA-TM-A5-000002 Page 6 of 8 LOCA Peak Cladding Temperature (PCT) Summary Plant Name: PRAIRIE ISLAND 2 EM: ASTRUM (2004)
AOR
Description:
Best Estimate Large Break Summary Sheet Status: IFBA/Gad PRAIRIE ISLAND 2 NRP_LOCA-50.46_NRP_IFBA_GAD_ASTRUM - 1.5 V.V PCT (°F) Reference # Note #
ANALYSIS-OF-RECORD 1765 1 Delta PCT Reporting ASSESSMENTS* (°F) Reference # Note # Year**
- 1. Revised Heat Transfer Multiplier
-2 3 2013 Distributions
- 2. Error in Burst Strain Application 25 4 2013
- 3. Evaluation of the Introduction of 0 2 2019 IFBA Fuel
- 4. Evaluation of Fuel Pellet Thermal Conductivity Degradation and 227 5 (a),(b) 2012 Peaking Factor Burndown AOR + ASSESSMENTS PCT = 2015 °F
- The licensee should determine the reportability of these assessments pursuant to 10 CFR 50.46.
- The Reporting Year refers to the annual reporting year in which this assessment was included.
REFERENCES 1 WCAP-17783-P, Best-Estimate Analysis of the Large-Break Loss-of-Coolant Accident for Prairie Island Units 1 and 2 with Replacement Steam Generators Using ASTRUM Methodology, June 2013.
2 LTR-LIS-15-287, Rev. 1, Prairie Island Units 1 and 2, 10 CFR 50.46 Notification and Reporting for the Revised Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown Evaluation and the Introduction of IFBA Fuel, September 2015.
3 LTR-LIS-13-366, Revision 1, Prairie Island Units 1 and 2 10 CFR 50.46 Report for Revised Heat Transfer Multiplier Distributions, August 2013.
4 LTR-LIS-14-50, Prairie Island Units 1 and 2 10 CFR 50.46 Report for the HOTSPOT Burst Strain Error Correction, January 2014.
5 LTR-LIS-12-414, Prairie Island Units 1 and 2, 10 CFR 50.46 Notification and Reporting for Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown, September 2012.
Version: PRAIRIE ISLAND 2 NRP_LOCA-50.46_NRP_IFBA_GAD_ASTRUM - 1.5 V.V 2023 Westinghouse Electric Company LLC All Rights Reserved 8 10 of 10 of 17
- This record was final approved on 2/10/2023, 7:50:15 AM. (This statement was added by the PRIME system upon its validation)
Attachment to NSPM-LOCA-TM-A5-000002 Page 7 of 8 NOTES:
(a) This evaluation credits peaking factor burndown, see Reference 5.
(b) The reporting text and line item originally identified for Unit 1 in Reference 5 is applicable to Unit 2 with RSGs.
Version: PRAIRIE ISLAND 2 NRP_LOCA-50.46_NRP_IFBA_GAD_ASTRUM - 1.5 V.V 2023 Westinghouse Electric Company LLC All Rights Reserved 9 of 11 of 10 17
- This record was final approved on 2/10/2023, 7:50:15 AM. (This statement was added by the PRIME system upon its validation)
Attachment to NSPM-LOCA-TM-A5-000002 Page 8 of 8 10 CFR 50.46 Reporting SharePoint Site Check:
EMs applicable to Prairie Island:
Realistic Large Break - ASTRUM (2004)
Appendix K Small Break - NOTRUMP 2022 Issues Transmittal Letter Issue Description None None 10 of 10
- This record was final approved on 2/10/2023, 7:50:15 AM. (This statement was added by the PRIME system upon its validation)