ML20134L661

From kanterella
Revision as of 14:43, 14 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Application for Amends to Licenses DPR-57 & NPF-5,revising Tech Spec Tables 3.7.4 & 3.6.3-1 Re Primary Containment Isolation Valves to Reflect Drywell Pneumatic Sys Mods.Fee Paid
ML20134L661
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/23/1985
From: Beckham J
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20134L663 List:
References
1961N, NED-85-553, TAC-59558, TAC-59559, TAC-59588, TAC-59589, NUDOCS 8509030370
Download: ML20134L661 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _

Georgia Power Company 333 Piedmont Avenue

.I.

  • Atlanta Georg:a 30308 Telephone 404 526-7020 Mailing Address:

Post Of fice Box 4545 Atlanta, Georgia 30302 Georgia Power J. T. Beckham, Jr. the southern electnc system Vice President and General Manager Nuclear Operations 1961N August 23, 1985 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Rea. tors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 REQUEST TO REVISE TECHNICAL SPECIFICATIONS DRYWELL PNEUMATIC MODIFICATIONS Gentlemen:

In accordance with the provisions of 10 CFR 50.90 as required by 10 CFR 50.59(c)(1), Georgia Power Company hereby proposes changes to the Hatch Units 1 and 2 Technical Specifications, Appendix A to Operating iicenses DPR-57 and NPF-5.

The proposed changes revise the tables of primary containment isolation valves to reflect drywell pneumatic system modifications.

Attachment 1 provides a detailed description of the proposed change and circumstances necessitating the change request.

Attachment 2 details the basis for our determination that the proposed change does not constitute an unreviewed safety question.

Attachment 3 details th'e basis for our determination that the proposed change does not involve significant hazards considerations.

Attachment 4 provides page change instructions for incorporating the proposed change.

The proposed changed Technical Specification pages follow Attachment 4.

Payment of filing fee is enclosed. 1 l I

d /

8509030370 850823 PDR P ADOCK 05000321 "

PDR $

t s\ d

r-Georgia Power A Director of NJclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 August 23, 1985 Page Two In order to allow time for procedure revision and orderly incorporation into copies of. the Technical Specifications, we request that the proposed amendment, once approved by the NRC, be issued with an effective n,te to be no later than 30 days from the date of issuance of the amendment.

Pursuant to the requirements of 10 CFR 50.91, Mr. J. L. Ledbetter of the Environmental Protection Division of the Georgia Department of Natural Resources will be sent a copy of this letter and all applicable attachments.

J. T. Beckham, Jr. states that he is Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.

GEORGIA POWER COMPANY By: --

=

J. T. Beckham, Jr.

Sworn to nd subscribed be ore me this 23rd day of August, 1985.

f Notary Public, Gwrgia, State at Large

& , ~~ gg/ g/ My Commission Expires Sept.18,1987 Notary Public JH/mb Enclosure xc: Mr. H. C. Nix, Jr.

Senior Resident Inspector Dr. J. N. Grace, (NRC-Region II)

Mr. J. L. Ledbetter i

f i

uns

. _ _ ___