.: * . j 3/4.8 ELECTRICAL POWER SYSTEMS )
SURVEILLANCE REQUIREMENTS (Continued)
- 2. For the 69 kV SMECO offsite power circuit, within one hour of substitution for a 500 kV offsite power circuit, and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter during use by verifying correct breaker alignments and indicated power availability; and 6 E FOEuNrr .ToTERVAL
- b. Demonstrated OPERABLE at least once per -18 ;rsrthe during shutdown i by manually transferring unit power supply from the normal circuit to the alternate circuit.
4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE:
- a. At least once per 31 days on a 3TAGGERED TEST BASIS by:
- 1. Verifying the fuel level in the day fuel tank.
- 2. Verifying the fuel level in the fuel storage tank.
- 3. Verifying the fuel transfer pump can be started and transfers fuel from the storage system to the day tank.
- 4. Verifying the diesel starts and accelerates to at least 900 rpm with generator voltage and and 60 1 1.2 Hz, respectively., frequency at 41601420 volts
- 5. Verifying the generator is synchronized, loaded to 31250 kW, and operates for E 60 minutes.
- 6. Verifying the diesel generator is aligned to provide standby power to the associated emergency busses.
- 7. Verifying that the automatic load sequencer timer is OPERABLE with the interval between each load block within i 10% of its design interval.
- b. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank is within the acceptable limits specified in Table 1 of ASTM D975-81 when checked for viscosity, water and sediment.
All engine starts for the purpose of this Surveillance Requirement i
may be preceded by an engine prelube period and/or other warmup procedures recommended by the manufacturer so that mechanical wear and stress on the diesel engine is minimized.
CALVERT CLIFFS - UNIT 1 3/4 8-4 Amendment No. -l&
9406130247 940608 PDR P
ADOCK 05000317 PDR
.. .- 1 A'ITACIIMENT (2)
I l
UNIT 2 TECHNICAL SPECIFICATION MARKED-UP PAGE 3/48-4
r-
/ - ,
3/4.8 ELECTRICAL POWER SYSTEMS
, SURVEILLANCE REQUIREMENTS (Continued) f
- 2. For the 69 kV 1.200 offsite power circuit, within one hour of ,
substitution for a 500 kV offsite power circuit, and at least l' once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter during use by verifying correct breaker alignments and indicated power availability; and REFusuwr raTeAv6L
- b. Demonstrated OPERABLE at least once per 18 :: th: during shutdown l by manually transferring unit power supply from the normal circuit to the alternate circuit. ,
4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE: :
- a. At least once per 31 days on a STAGGERED TEST BASIS by: ;
- 1. Verifying the fuel level in the day fuel tank. ,
- 2. Verifying the fuel level in the fuel storage tank.
- 3. Verifying the fuel transfer pump can be started and transfers !
fuel from the storage system to the day tank. -
- 4. Verifying the diesel starts and accelerates to at least 900 !
rpm with generator voltage and 4160 1 420 volts and 6011.2 Hz, respectively., frequency at
- 5. Verifying the generator is synchronized, loaded to 21250 kW, and operates for E 60 minutes.
- 6. Verifying the diesel generator is aligned to provide standby j power to the associated emergency busses. ;
i
- 7. Verifying that the automatic load sequencer timer is OPERABLE with the interval between each load block within i 10% of its design interval. l l
- b. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank is within the acceptable limits l specified in Table 1 of ASTM D975-81 when checked for viscosity, l water and sediment. l l
l 1
l All engine starts for the purpose of this Surveillance Requirement t may be preceded by an engine prelube period and/or other wannup procedures reconnended by the manufacturer so that mechanical wear and stress on the diesel engine is minimized.
CALVERT CLIFFS - UNIT 2 3/4 8-4 Amendment No. -149- ,