November 24, 2004
SUBJECT:
ERRATA SURRY POWER STATION - NRC INTEGRATED INSPECTION REPORT NOS. 5000280/2004004, AND 5000281/2004004 AND OFFICE OF INVESTIGATIONS CASE NUMBER 2-2003-075
Dear Mr. Christian:
September 25, 2004
SUBJECT:
SURRY POWER STATION - NRC INTEGRATED INSPECTION REPORT NOS.
5000280/2004004, AND 5000281/2004004 AND OFFICE OF INVESTIGATIONS CASE NUMBER 2-2003-075
Dear Mr. Christian:
On September 25, 2004, the United States Nuclear Regulatory Commission (NRC) completed an inspection at your Surry Power Station, Units 1 and 2. The enclosed integrated inspection report documents the inspection findings which were discussed on October 12, 2004, with Mr.
Blount and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
This report documents one NRC identified finding. The finding was determined to involve a violation of NRC requirements. However, because of the very low safety significance and because the violation was entered into your corrective action program, the NRC is treating the finding as a non-cited violation (NCV) consistent with Section VI.A of the NRC Enforcement Policy. Additionally, two licensee-identified violations which were determined to be of very low safety significance (Green) are listed in Section 4OA7 of this report. If you contest any non-cited violation in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the United States Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Resident Inspector at the Surry Power Station.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Kerry D. Landis, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37
Enclosure:
Integrated Inspection Report 5000280,281/2004004 w/Attachments:
Supplemental Information and Synopsis
REGION II Case No. 2-2003-075