|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20052B5181982-04-28028 April 1982 Responds to 820112 Generic Ltr 82-01 Re Plans for Submittal of Application & Requests for Review Prior to 841231.Early 1983 Application Planned to Extend 810209 Preliminary Design Authorization Request ML19345F5731981-02-10010 February 1981 Informs That PA Wild Has Responsibility for S&W Std Ref Design Described in S&W Std SAR ML19339D0501981-02-0909 February 1981 Requests 2-yr Extension for Existing Preliminary Design approvals,PDA-4,PDA-6 & PDA-8.Extension Is Preferable to Submittal of New Application.Also Requests Status Rept & Schedule for BSAR-205 ML19312D4111980-03-25025 March 1980 Forwards Affidavit Attesting to Distribution of Amend 42 to SWESSAR-P1 ML19290E5511980-03-17017 March 1980 Forwards Amend 42 to SWESSAR-P1 for NRC Review ML19207C0081979-08-30030 August 1979 Forwards Affidavit of Distribution for Amend 41 to S&W Std SAR,SWESSAR-P1 ML19249A5571979-08-17017 August 1979 Forwards Amend 41 to SWESSAR-P1,revising App 3C in Response to NRC Comments on Amend 40 ML19242A3251979-07-18018 July 1979 Forwards Affidavit of Distribution of Amend 40 to SWESSAR-P1 ML19241B7261979-07-16016 July 1979 Forwards Amend 40 to SSAR,SWESSAR-P1 ML19269C8451979-01-26026 January 1979 Responds to NRC 781117 Ltr Re NRC Position on Cold Shutdown Requirements for SWESSAR-P1/BSAR-205.NRC Position Has No Effect on Design.Believes Preliminary Design Approval Can Be Issued W/O Further Delay ML19270F2111979-01-24024 January 1979 Forwards List of Category I-IV Matters Applicable to Preliminary Design Approval for SWESSAR/RESAR-41 Application.Requests Design Assessment for Each Matter Identified in Lists,If Extension of Assessment Is Sought ML20062E6781978-11-29029 November 1978 Forwards NRC Staff Position on Seismic Category 1 Fuel Bldg. Finds non-seismic Category 1 Classificattion of Portion of Fuel Bldg Unacceptable NUREG-0433, Requests Proposal of Appropriate Preliminary Design Features & Procedures Suitable to Meet Lic Requirements as Listed in Staff Position on Cold shutdown(NUREG-0433)as Clarified in Encl1978-11-17017 November 1978 Requests Proposal of Appropriate Preliminary Design Features & Procedures Suitable to Meet Lic Requirements as Listed in Staff Position on Cold shutdown(NUREG-0433)as Clarified in Encl ML20062B2391978-10-0303 October 1978 Submits Discovery Rept for Sept 1978.South Texas Electric Cooperative & Medina Electric Cooperative,Inc Neither Initiated Nor Received Any Discovery Requests.Certificate of Svc Encl 1982-04-28
[Table view] Category:ENGINEERING/CONSTRUCTION/CONSULTING FIRM TO NRC
MONTHYEARML20052B5181982-04-28028 April 1982 Responds to 820112 Generic Ltr 82-01 Re Plans for Submittal of Application & Requests for Review Prior to 841231.Early 1983 Application Planned to Extend 810209 Preliminary Design Authorization Request ML19345F5731981-02-10010 February 1981 Informs That PA Wild Has Responsibility for S&W Std Ref Design Described in S&W Std SAR ML19339D0501981-02-0909 February 1981 Requests 2-yr Extension for Existing Preliminary Design approvals,PDA-4,PDA-6 & PDA-8.Extension Is Preferable to Submittal of New Application.Also Requests Status Rept & Schedule for BSAR-205 ML19312D4111980-03-25025 March 1980 Forwards Affidavit Attesting to Distribution of Amend 42 to SWESSAR-P1 ML19290E5511980-03-17017 March 1980 Forwards Amend 42 to SWESSAR-P1 for NRC Review ML19207C0081979-08-30030 August 1979 Forwards Affidavit of Distribution for Amend 41 to S&W Std SAR,SWESSAR-P1 ML19249A5571979-08-17017 August 1979 Forwards Amend 41 to SWESSAR-P1,revising App 3C in Response to NRC Comments on Amend 40 ML19242A3251979-07-18018 July 1979 Forwards Affidavit of Distribution of Amend 40 to SWESSAR-P1 ML19241B7261979-07-16016 July 1979 Forwards Amend 40 to SSAR,SWESSAR-P1 ML19269C8451979-01-26026 January 1979 Responds to NRC 781117 Ltr Re NRC Position on Cold Shutdown Requirements for SWESSAR-P1/BSAR-205.NRC Position Has No Effect on Design.Believes Preliminary Design Approval Can Be Issued W/O Further Delay ML19270F2111979-01-24024 January 1979 Forwards List of Category I-IV Matters Applicable to Preliminary Design Approval for SWESSAR/RESAR-41 Application.Requests Design Assessment for Each Matter Identified in Lists,If Extension of Assessment Is Sought 1982-04-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20052B5181982-04-28028 April 1982 Responds to 820112 Generic Ltr 82-01 Re Plans for Submittal of Application & Requests for Review Prior to 841231.Early 1983 Application Planned to Extend 810209 Preliminary Design Authorization Request ML19345F5731981-02-10010 February 1981 Informs That PA Wild Has Responsibility for S&W Std Ref Design Described in S&W Std SAR ML19339D0501981-02-0909 February 1981 Requests 2-yr Extension for Existing Preliminary Design approvals,PDA-4,PDA-6 & PDA-8.Extension Is Preferable to Submittal of New Application.Also Requests Status Rept & Schedule for BSAR-205 ML19312D4111980-03-25025 March 1980 Forwards Affidavit Attesting to Distribution of Amend 42 to SWESSAR-P1 ML19290E5511980-03-17017 March 1980 Forwards Amend 42 to SWESSAR-P1 for NRC Review ML19207C0081979-08-30030 August 1979 Forwards Affidavit of Distribution for Amend 41 to S&W Std SAR,SWESSAR-P1 ML19249A5571979-08-17017 August 1979 Forwards Amend 41 to SWESSAR-P1,revising App 3C in Response to NRC Comments on Amend 40 ML19242A3251979-07-18018 July 1979 Forwards Affidavit of Distribution of Amend 40 to SWESSAR-P1 ML19241B7261979-07-16016 July 1979 Forwards Amend 40 to SSAR,SWESSAR-P1 ML19269C8451979-01-26026 January 1979 Responds to NRC 781117 Ltr Re NRC Position on Cold Shutdown Requirements for SWESSAR-P1/BSAR-205.NRC Position Has No Effect on Design.Believes Preliminary Design Approval Can Be Issued W/O Further Delay ML19270F2111979-01-24024 January 1979 Forwards List of Category I-IV Matters Applicable to Preliminary Design Approval for SWESSAR/RESAR-41 Application.Requests Design Assessment for Each Matter Identified in Lists,If Extension of Assessment Is Sought ML20062B2391978-10-0303 October 1978 Submits Discovery Rept for Sept 1978.South Texas Electric Cooperative & Medina Electric Cooperative,Inc Neither Initiated Nor Received Any Discovery Requests.Certificate of Svc Encl 1982-04-28
[Table view] |
Text
Y.
STONE TJ WEBSTER ENGINEERING CORPORATION 245 SUMMER STREET. BOSTON. M ASSACHUSETTS ADDRESS ALL COR RESPC'NDE NC E TO P.O. BOX 232S. BOSTON. MASS- 02107 W U TF LE X 94 0001 ORM L N.T M U< ilON O m u tons
' "4'.","O N ~t PAL
!"O,'at "' "
W A SHINGTON. O C.
Mr. Harold R. Denton, Director March 17, 1980 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission W.O.No. 510.h1 Washington, DC 20555 RPS- 379
Dear Sir:
DOCKET '10. S""i 50 h95 S&W REFERENCE ?iUCLEAR POWER PLANT lbrvarded for Nuclear Regulatory Commission review are 70 copies of Auendment 42 to the Stone & Uebster Standard Safety Analysis Report, SWESSAR-Pl.
Amendment h2 addresses the extent to which the design complies with Regulatory Requirements Review Committee Category I and III items approved since September 1, 1978.
Anendment h2 is printed on white pagec end is applicable to SWESSAR/
tU:3AR bl, SWESSAR/CESSAR, SWESSAR/RESAR-3S, and SWESSAR/BSAR-205 Very truly yours W. J. L. Kennedy Vice President Enclosure RMH:mrs soosw IW
UUITED STATES OF AMERICA NUCLEAR REGULATORY C0!sIISSION In the liatter of: !! arch 17,1980 Stone & Webster Engineering Corporation Docket No. STN-50 h95 Pressurized Water Reactor Reference Nuclear Power Plant APPLICATION FOR REVIEW OF
" SIT)NE & WEBSTER STANDARD SAFETY ANALYSIS REPOR*"
AMENDME'IT h2 Stone & Webster Engineering Ccrporation hereby applies for Nuclear Regulatory Commission Staff and Advisory Committee on Reactor Safeguards review of Amendment h2 to " Stone & Webster Engineering Corporation Standard Safety Analysis Report" (SWESSAR-P1), pursuant to Appendix 0 to 10CFR50,
" Standardization of Design; Staff Review of Standard Designs."
Stone & Webster Engineering Corporation applied for extension of PDAs h, 6, and 8 by letter to fir. Edson G. Case from Mr. W. J. L. Kennedy dated liarch 13, 1978. The material provided in Amendment h2 responds to all known requirements since NRC extension of PDAs k and 6 on August 18, 1979, and meets the requirements for extension of PDA-8 as provided in the Federal Register on August 31, 1978 (h3 FR 3895h).
ST0!IE & WEBSTER ENGINEERING CORPORATION Bh'- f b
Philip g. Wild Vice President Subscribed and Sworn to before me this 7E# day of March 1980.
M' Notary it Lv., .4 uJ1 Lx,irm 59terbe- 21, f Mi