ML19274E683

From kanterella
Revision as of 07:50, 23 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 79-026/03L-0
Date released: 10/15/2019 Download: ML19274E683


LER 79-026/03L-0 on 790318:during Reactor Startup,Discovered Absolute Position Indication for Rod 8 Was Inoperable.Caused by Sticking Reed Switch.Variable Ac Frequency,Applied to Reed Switch Circuit,Eliminated Sticking
ML19274E685
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/05/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274E685 (2)
Forwards LER 79-026/03L-0
ML19274E682
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/09/1979
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274E682 (1)