ML18065A478
From kanterella
Revision as of 19:52, 7 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML18065A478 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 06/27/1995 |
From: | Clark R, Darby J, Rao D SCIENCE & ENGINEERING ASSOCIATES, INC. |
To: | NRC |
Shared Package | |
ML18065A476 | List: |
References | |
CON-NRC-04-91-066, CON-NRC-4-91-66 SEA-95-553-015, SEA-95-553-015-A:4, SEA-95-553-15, SEA-95-553-15-A:4, NUDOCS 9602120371 | |
Download: ML18065A478 (38) | |
Similar Documents at Palisades | |
---|---|
Category:CONTRACTED REPORT - RTA
MONTHYEARL-96-028, TER on Third 10-Yr Interval Inservice Insp Program Plan: Consumers Power Co for Palisades Nuclear Plant1996-08-30030 August 1996
[Table view]TER on Third 10-Yr Interval Inservice Insp Program Plan: Consumers Power Co for Palisades Nuclear Plant ML18065A4781995-06-27027 June 1995 Plant TER on IPE Front End Analysis. ML18065A4791995-05-31031 May 1995 Plant TER on IPE Submittal Human Reliability Analysis Final Rept. ML18065A4801995-04-30030 April 1995 TER of Plant IPE Back-End Submittal - Final Rept. ML18059B1601994-01-31031 January 1994 Safe-End to Pipe Cracking. ML18058A2291992-02-18018 February 1992 Draft Technical Evaluation Rept, Pump & Valves Inservice Testing Program - Palisades Nuclear Plant. ML18054B4461990-02-28028 February 1990 Draft Insights Into Palisades PORV & Block Valve Tests, Technical Evaluation Rept ML18054A7551988-12-31031 December 1988 Technical Evaluation Rept TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing for Palisades. ML18052B1931987-06-30030 June 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Calvert Cliffs-1 & -2, Millstone-2 & Palisades, Final Informal Rept ML18052B1551987-04-30030 April 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Palisades, Informal Rept ML18052B0551987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Palisades, Final Informal Rept ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML18052B0511987-03-30030 March 1987 Technical Evaluation Rept for Palisades Plant,Response to NRR Generic Ltr 83-37, Interim Informal Rept ML18052A8311987-01-12012 January 1987 Evaluation of Spent Fuel Racks Structural Analysis, Cpc,Palisades Plant, Technical Evaluation Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20235L5111986-07-31031 July 1986 Conformance to Reg Guide 1.97,Palisades Plant, Technical Evaluation Rept ML20127D9061985-05-31031 May 1985 Conformance to Reg Guide 1.97,Palisades Plant ML20086D3811983-11-29029 November 1983 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),Palisades Plant, Technical Evaluation Rept ML18051A6381983-10-14014 October 1983 Control of Heavy Loads (C-10),CPC Palisades Plant, Technical Evaluation Rept ML18051A6571983-10-10010 October 1983 Review of Licensee Response to Design Codes,Design Criteria & Loading Combination (SEP,III-7.B),Palisades Plant, Draft Supplementary Technical Evaluation Rept ML18051A4301983-03-0202 March 1983 Selected Operating Reactors Issues Program Ii,Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20072J2761983-02-28028 February 1983 Ser,Pump & Valve Inservice Testing Program,Palisades Nuclear Plant, Interim Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML18047A6111982-10-14014 October 1982 ECCS Repts (F-47) TMI Action Plan Requirements,Palisades Plant, Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20027D2221982-07-31031 July 1982 Redundant DHR Capability,Palisades Nuclear Power Plant. ML18047A5701982-06-29029 June 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69), Request for Addl Info ML20052H5021982-04-30030 April 1982 Redundant Decay Heat Removal Capability,Palisades Nuclear Power Plant, Preliminary Rept ML20050A6811982-03-31031 March 1982 Structural Review of the Palisades Nuclear Power Plant Unit 1 Containment Structure Under Combined Loads for the Systematic Evaluation Program ML18046B2811982-01-20020 January 1982 to Design Codes,Design Criteria & Loading Combinations, Draft Technical Evaluation Rept ML18046B2821981-12-31031 December 1981 Structural Review of the Palisades Nuclear Power Plant Unit 1 Containment Structure Under Combined Loads for the SEP ML18046B1771981-12-18018 December 1981 Suppl to Rept EGG-EA-5317. ML20039A6821981-11-30030 November 1981 SEP Topic V-11.A,Electrical,Instrumentation,& Control Features for Isolation of High & Low Pressure Sys,Palisades Nuclear Station, Informal Rept ML20039A4521981-11-30030 November 1981 Adequacy of Station Electric Distribution Sys Voltages, Palisades Plant, Informal Rept ML18046B1731981-11-30030 November 1981 Degraded Grid Protection for Class IE Power Sys,Palisades Plant,Docket 50-255,TAC 10043, & Adequacy of Station Electric Distribution Sys Voltages,Palisades Plant,Docket 50-255,TAC 12780. ML18046A9761981-10-31031 October 1981 Review of Operating Experience History of Palisades Nuclear Power Plant for NRC Sep. ML18046A6441981-05-14014 May 1981 Nonproprietary Version of Equipment Environ Qualification, Palisades Plant, Final Technical Evaluation Rept ML20008F7891981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages, Palisades Plant, Informal Rept for Apr 1981 ML20003A1601981-01-31031 January 1981 Seismic Review of the Palisades Nuclear Power Plant Unit 1 as Part of the Systematic Evaluation Program ML19341B3841980-12-31031 December 1980 Technical Evaluation Rept,Degraded Grid Protection for Class IE Power Sys,Palisades Plant. ML18067A7831969-07-31031 July 1969 CPC Palisades Plant,Auxiliary Building Job 5935,Seismic Analysis. ML18067A7841969-06-30030 June 1969 CPC Palisades Plant,Reactor Building Job 5935,Seismic Analysis. 1996-08-30 Category:QUICK LOOK MONTHYEARL-96-028, TER on Third 10-Yr Interval Inservice Insp Program Plan: Consumers Power Co for Palisades Nuclear Plant1996-08-30030 August 1996
[Table view]TER on Third 10-Yr Interval Inservice Insp Program Plan: Consumers Power Co for Palisades Nuclear Plant ML18065A4781995-06-27027 June 1995 Plant TER on IPE Front End Analysis. ML18065A4791995-05-31031 May 1995 Plant TER on IPE Submittal Human Reliability Analysis Final Rept. ML18065A4801995-04-30030 April 1995 TER of Plant IPE Back-End Submittal - Final Rept. ML18059B1601994-01-31031 January 1994 Safe-End to Pipe Cracking. ML18058A2291992-02-18018 February 1992 Draft Technical Evaluation Rept, Pump & Valves Inservice Testing Program - Palisades Nuclear Plant. ML18054B4461990-02-28028 February 1990 Draft Insights Into Palisades PORV & Block Valve Tests, Technical Evaluation Rept ML18054A7551988-12-31031 December 1988 Technical Evaluation Rept TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing for Palisades. ML18052B1931987-06-30030 June 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Calvert Cliffs-1 & -2, Millstone-2 & Palisades, Final Informal Rept ML18052B1551987-04-30030 April 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Palisades, Informal Rept ML18052B0551987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Palisades, Final Informal Rept ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML18052B0511987-03-30030 March 1987 Technical Evaluation Rept for Palisades Plant,Response to NRR Generic Ltr 83-37, Interim Informal Rept ML18052A8311987-01-12012 January 1987 Evaluation of Spent Fuel Racks Structural Analysis, Cpc,Palisades Plant, Technical Evaluation Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20235L5111986-07-31031 July 1986 Conformance to Reg Guide 1.97,Palisades Plant, Technical Evaluation Rept ML20127D9061985-05-31031 May 1985 Conformance to Reg Guide 1.97,Palisades Plant ML20086D3811983-11-29029 November 1983 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),Palisades Plant, Technical Evaluation Rept ML18051A6381983-10-14014 October 1983 Control of Heavy Loads (C-10),CPC Palisades Plant, Technical Evaluation Rept ML18051A6571983-10-10010 October 1983 Review of Licensee Response to Design Codes,Design Criteria & Loading Combination (SEP,III-7.B),Palisades Plant, Draft Supplementary Technical Evaluation Rept ML18051A4301983-03-0202 March 1983 Selected Operating Reactors Issues Program Ii,Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20072J2761983-02-28028 February 1983 Ser,Pump & Valve Inservice Testing Program,Palisades Nuclear Plant, Interim Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML18047A6111982-10-14014 October 1982 ECCS Repts (F-47) TMI Action Plan Requirements,Palisades Plant, Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20027D2221982-07-31031 July 1982 Redundant DHR Capability,Palisades Nuclear Power Plant. ML18047A5701982-06-29029 June 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69), Request for Addl Info ML20052H5021982-04-30030 April 1982 Redundant Decay Heat Removal Capability,Palisades Nuclear Power Plant, Preliminary Rept ML20050A6811982-03-31031 March 1982 Structural Review of the Palisades Nuclear Power Plant Unit 1 Containment Structure Under Combined Loads for the Systematic Evaluation Program ML18046B2811982-01-20020 January 1982 to Design Codes,Design Criteria & Loading Combinations, Draft Technical Evaluation Rept ML18046B2821981-12-31031 December 1981 Structural Review of the Palisades Nuclear Power Plant Unit 1 Containment Structure Under Combined Loads for the SEP ML18046B1771981-12-18018 December 1981 Suppl to Rept EGG-EA-5317. ML20039A6821981-11-30030 November 1981 SEP Topic V-11.A,Electrical,Instrumentation,& Control Features for Isolation of High & Low Pressure Sys,Palisades Nuclear Station, Informal Rept ML20039A4521981-11-30030 November 1981 Adequacy of Station Electric Distribution Sys Voltages, Palisades Plant, Informal Rept ML18046B1731981-11-30030 November 1981 Degraded Grid Protection for Class IE Power Sys,Palisades Plant,Docket 50-255,TAC 10043, & Adequacy of Station Electric Distribution Sys Voltages,Palisades Plant,Docket 50-255,TAC 12780. ML18046A9761981-10-31031 October 1981 Review of Operating Experience History of Palisades Nuclear Power Plant for NRC Sep. ML18046A6441981-05-14014 May 1981 Nonproprietary Version of Equipment Environ Qualification, Palisades Plant, Final Technical Evaluation Rept ML20008F7891981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages, Palisades Plant, Informal Rept for Apr 1981 ML20003A1601981-01-31031 January 1981 Seismic Review of the Palisades Nuclear Power Plant Unit 1 as Part of the Systematic Evaluation Program ML19341B3841980-12-31031 December 1980 Technical Evaluation Rept,Degraded Grid Protection for Class IE Power Sys,Palisades Plant. ML18067A7831969-07-31031 July 1969 CPC Palisades Plant,Auxiliary Building Job 5935,Seismic Analysis. ML18067A7841969-06-30030 June 1969 CPC Palisades Plant,Reactor Building Job 5935,Seismic Analysis. 1996-08-30 Category:ETC. (PERIODIC MONTHYEARL-96-028, TER on Third 10-Yr Interval Inservice Insp Program Plan: Consumers Power Co for Palisades Nuclear Plant1996-08-30030 August 1996
[Table view]TER on Third 10-Yr Interval Inservice Insp Program Plan: Consumers Power Co for Palisades Nuclear Plant ML18065A4781995-06-27027 June 1995 Plant TER on IPE Front End Analysis. ML18065A4791995-05-31031 May 1995 Plant TER on IPE Submittal Human Reliability Analysis Final Rept. ML18065A4801995-04-30030 April 1995 TER of Plant IPE Back-End Submittal - Final Rept. ML18059B1601994-01-31031 January 1994 Safe-End to Pipe Cracking. ML18058A2291992-02-18018 February 1992 Draft Technical Evaluation Rept, Pump & Valves Inservice Testing Program - Palisades Nuclear Plant. ML18054B4461990-02-28028 February 1990 Draft Insights Into Palisades PORV & Block Valve Tests, Technical Evaluation Rept ML18054A7551988-12-31031 December 1988 Technical Evaluation Rept TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing for Palisades. ML18052B1931987-06-30030 June 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Calvert Cliffs-1 & -2, Millstone-2 & Palisades, Final Informal Rept ML18052B1551987-04-30030 April 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Palisades, Informal Rept ML18052B0551987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Palisades, Final Informal Rept ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML18052B0511987-03-30030 March 1987 Technical Evaluation Rept for Palisades Plant,Response to NRR Generic Ltr 83-37, Interim Informal Rept ML18052A8311987-01-12012 January 1987 Evaluation of Spent Fuel Racks Structural Analysis, Cpc,Palisades Plant, Technical Evaluation Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20235L5111986-07-31031 July 1986 Conformance to Reg Guide 1.97,Palisades Plant, Technical Evaluation Rept ML20127D9061985-05-31031 May 1985 Conformance to Reg Guide 1.97,Palisades Plant ML20086D3811983-11-29029 November 1983 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),Palisades Plant, Technical Evaluation Rept ML18051A6381983-10-14014 October 1983 Control of Heavy Loads (C-10),CPC Palisades Plant, Technical Evaluation Rept ML18051A6571983-10-10010 October 1983 Review of Licensee Response to Design Codes,Design Criteria & Loading Combination (SEP,III-7.B),Palisades Plant, Draft Supplementary Technical Evaluation Rept ML18051A4301983-03-0202 March 1983 Selected Operating Reactors Issues Program Ii,Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20072J2761983-02-28028 February 1983 Ser,Pump & Valve Inservice Testing Program,Palisades Nuclear Plant, Interim Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML18047A6111982-10-14014 October 1982 ECCS Repts (F-47) TMI Action Plan Requirements,Palisades Plant, Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20027D2221982-07-31031 July 1982 Redundant DHR Capability,Palisades Nuclear Power Plant. ML18047A5701982-06-29029 June 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69), Request for Addl Info ML20052H5021982-04-30030 April 1982 Redundant Decay Heat Removal Capability,Palisades Nuclear Power Plant, Preliminary Rept ML20050A6811982-03-31031 March 1982 Structural Review of the Palisades Nuclear Power Plant Unit 1 Containment Structure Under Combined Loads for the Systematic Evaluation Program ML18046B2811982-01-20020 January 1982 to Design Codes,Design Criteria & Loading Combinations, Draft Technical Evaluation Rept ML18046B2821981-12-31031 December 1981 Structural Review of the Palisades Nuclear Power Plant Unit 1 Containment Structure Under Combined Loads for the SEP ML18046B1771981-12-18018 December 1981 Suppl to Rept EGG-EA-5317. ML20039A6821981-11-30030 November 1981 SEP Topic V-11.A,Electrical,Instrumentation,& Control Features for Isolation of High & Low Pressure Sys,Palisades Nuclear Station, Informal Rept ML20039A4521981-11-30030 November 1981 Adequacy of Station Electric Distribution Sys Voltages, Palisades Plant, Informal Rept ML18046B1731981-11-30030 November 1981 Degraded Grid Protection for Class IE Power Sys,Palisades Plant,Docket 50-255,TAC 10043, & Adequacy of Station Electric Distribution Sys Voltages,Palisades Plant,Docket 50-255,TAC 12780. ML18046A9761981-10-31031 October 1981 Review of Operating Experience History of Palisades Nuclear Power Plant for NRC Sep. ML18046A6441981-05-14014 May 1981 Nonproprietary Version of Equipment Environ Qualification, Palisades Plant, Final Technical Evaluation Rept ML20008F7891981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages, Palisades Plant, Informal Rept for Apr 1981 ML20003A1601981-01-31031 January 1981 Seismic Review of the Palisades Nuclear Power Plant Unit 1 as Part of the Systematic Evaluation Program ML19341B3841980-12-31031 December 1980 Technical Evaluation Rept,Degraded Grid Protection for Class IE Power Sys,Palisades Plant. ML18067A7831969-07-31031 July 1969 CPC Palisades Plant,Auxiliary Building Job 5935,Seismic Analysis. ML18067A7841969-06-30030 June 1969 CPC Palisades Plant,Reactor Building Job 5935,Seismic Analysis. 1996-08-30 Category:TEXT-PROCUREMENT & CONTRACTS MONTHYEARL-96-028, TER on Third 10-Yr Interval Inservice Insp Program Plan: Consumers Power Co for Palisades Nuclear Plant1996-08-30030 August 1996
[Table view]TER on Third 10-Yr Interval Inservice Insp Program Plan: Consumers Power Co for Palisades Nuclear Plant ML18065A4781995-06-27027 June 1995 Plant TER on IPE Front End Analysis. ML18065A4791995-05-31031 May 1995 Plant TER on IPE Submittal Human Reliability Analysis Final Rept. ML18065A4801995-04-30030 April 1995 TER of Plant IPE Back-End Submittal - Final Rept. ML18059B1601994-01-31031 January 1994 Safe-End to Pipe Cracking. ML18058A2291992-02-18018 February 1992 Draft Technical Evaluation Rept, Pump & Valves Inservice Testing Program - Palisades Nuclear Plant. ML20059P0461990-09-27027 September 1990 Notification of Contract Execution,Task Order 2,to NDE Support at Palisades Nuclear Power Plant. Contractor:Tet,Inc ML18054B4461990-02-28028 February 1990 Draft Insights Into Palisades PORV & Block Valve Tests, Technical Evaluation Rept ML18054A7551988-12-31031 December 1988 Technical Evaluation Rept TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing for Palisades. ML18052B1931987-06-30030 June 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Calvert Cliffs-1 & -2, Millstone-2 & Palisades, Final Informal Rept ML18052B1551987-04-30030 April 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Palisades, Informal Rept ML18052B0551987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Palisades, Final Informal Rept ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML18052B0511987-03-30030 March 1987 Technical Evaluation Rept for Palisades Plant,Response to NRR Generic Ltr 83-37, Interim Informal Rept ML18052A8311987-01-12012 January 1987 Evaluation of Spent Fuel Racks Structural Analysis, Cpc,Palisades Plant, Technical Evaluation Rept ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20235L5111986-07-31031 July 1986 Conformance to Reg Guide 1.97,Palisades Plant, Technical Evaluation Rept ML20127D9061985-05-31031 May 1985 Conformance to Reg Guide 1.97,Palisades Plant ML20086D3811983-11-29029 November 1983 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),Palisades Plant, Technical Evaluation Rept ML18051A6381983-10-14014 October 1983 Control of Heavy Loads (C-10),CPC Palisades Plant, Technical Evaluation Rept ML18051A6571983-10-10010 October 1983 Review of Licensee Response to Design Codes,Design Criteria & Loading Combination (SEP,III-7.B),Palisades Plant, Draft Supplementary Technical Evaluation Rept ML18051A4301983-03-0202 March 1983 Selected Operating Reactors Issues Program Ii,Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20072J2761983-02-28028 February 1983 Ser,Pump & Valve Inservice Testing Program,Palisades Nuclear Plant, Interim Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML18047A6111982-10-14014 October 1982 ECCS Repts (F-47) TMI Action Plan Requirements,Palisades Plant, Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20027D2221982-07-31031 July 1982 Redundant DHR Capability,Palisades Nuclear Power Plant. ML18047A5701982-06-29029 June 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69), Request for Addl Info ML20052H5021982-04-30030 April 1982 Redundant Decay Heat Removal Capability,Palisades Nuclear Power Plant, Preliminary Rept ML20050A6811982-03-31031 March 1982 Structural Review of the Palisades Nuclear Power Plant Unit 1 Containment Structure Under Combined Loads for the Systematic Evaluation Program ML18046B2811982-01-20020 January 1982 to Design Codes,Design Criteria & Loading Combinations, Draft Technical Evaluation Rept ML18046B2821981-12-31031 December 1981 Structural Review of the Palisades Nuclear Power Plant Unit 1 Containment Structure Under Combined Loads for the SEP ML18046B1771981-12-18018 December 1981 Suppl to Rept EGG-EA-5317. ML20039A4521981-11-30030 November 1981 Adequacy of Station Electric Distribution Sys Voltages, Palisades Plant, Informal Rept ML20039A6821981-11-30030 November 1981 SEP Topic V-11.A,Electrical,Instrumentation,& Control Features for Isolation of High & Low Pressure Sys,Palisades Nuclear Station, Informal Rept ML18046B1731981-11-30030 November 1981 Degraded Grid Protection for Class IE Power Sys,Palisades Plant,Docket 50-255,TAC 10043, & Adequacy of Station Electric Distribution Sys Voltages,Palisades Plant,Docket 50-255,TAC 12780. ML18046A9761981-10-31031 October 1981 Review of Operating Experience History of Palisades Nuclear Power Plant for NRC Sep. ML18046A6441981-05-14014 May 1981 Nonproprietary Version of Equipment Environ Qualification, Palisades Plant, Final Technical Evaluation Rept ML20008F7891981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages, Palisades Plant, Informal Rept for Apr 1981 ML20003A1601981-01-31031 January 1981 Seismic Review of the Palisades Nuclear Power Plant Unit 1 as Part of the Systematic Evaluation Program ML19341B3841980-12-31031 December 1980 Technical Evaluation Rept,Degraded Grid Protection for Class IE Power Sys,Palisades Plant. ML18067A7831969-07-31031 July 1969 CPC Palisades Plant,Auxiliary Building Job 5935,Seismic Analysis. ML18067A7841969-06-30030 June 1969 CPC Palisades Plant,Reactor Building Job 5935,Seismic Analysis. 1996-08-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML18065A478&oldid=2074349"