ML072040283

From kanterella
Revision as of 10:30, 10 February 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Revised Pages of Facility Operating License DPR-40 to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026
ML072040283
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/26/2007
From: Dyer J E
Office of Nuclear Reactor Regulation
To:
Wang, A B, NRR/DORL/LPLIV, 415-1445
Shared Package
ML072040093 List:
References
EA-02-026, TAC MD4534
Download: ML072040283 (2)


Text

ENCLOSURE 1REVISED PAGES OF RENEWED FACILITY OPERATING LICENSE NO. DPR-40FORT CALHOUN STATION, UNIT NO. 1DOCKET NO. 50-285Replace the following page of the Renewed Facility Operating License with the attached revisedpage. The revised page is identified by the date of the letter issuing this page and contain marginal lines indicating the areas of change. REMOVE INSERTPage 5 Page 5 G.Mitigation Strategy License Condition llDevelop and maintain strategies for addressing large fires and explosions and that linclude the following key areas:

l l(a) Fire fighting response strategy with the following elements:

l1. Pre-defined coordinated fire response strategy and guidance l2. Assessment of mutual aid fire fighting assets l3. Designated staging areas for equipment and materials l4. Command and control l5. Training of response personnel l

l(b) Operations to mitigate fuel damage considering the following:

l1. Protection and use of personnel assets l2. Communications l3. Minimizing fire spread l4. Procedures for implementing integrated fire response strategy l5. Identification of readily-available pre-staged equipment l6. Training on integrated fire response strategy l7. Spent fuel pool mitigation measures l

l(c) Actions to minimize release to include consideration of:

l1. Water spray scrubbing l2. Dose to onsite responders l4. This renewed license is effective as of the date of issuance and shall expire at midnighton August 9, 2033.FOR THE NUCLEAR REGULATORY COMMISSIONOriginal Signed by:J. E. DyerJ. E. Dyer, DirectorOffice of Nuclear Reactor RegulationAttachments: 1. Appendix A - Technical Specifications 2. Appendix B - Additional ConditionsDate of Issuance: November 4, 2003Renewed Operating License No. DPR-40Revised by letter dated July 26, 2007