Responds to NRC 811119 Ltr Re Violations Noted in IE Insp Rept 50-528/81-12 on 810817-21.Corrective Actions:Procedure for Piping Sys Final Insp,Wpp/Qci No 2023,deleted & Included in Other Procedures
ML17297B706
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/16/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-21203-WEI, NUDOCS 8210080155
Download: ML17297B706 (6)


See also: IR 05000528/1981012

Text

a p STA.PGIIM IIV aHIIEWICIOtl

CKSRZMHW P.o.BOX 21666-PHOENIX, ARIZONA 85036/June 16, 1982 ANPP-21203-WEI/JAR

U.S.Nuclear Regulatory

Commission

Region V Creekside Oaks Office Park 1450 Maria Lane-Suite 210 Walnut Creek, California

94596 Attention:

Mr.T.W.Bishop, Chief Reactor Construction

Projects Branch=0 I'Il C>>cfog"'g fTI fTl Subject: NRC I&E Inspection

of August 17-21, 1982 File: 82-019-026

D.4.33.3 Dear Sir: This letter refers to the Inspection

conducted by Messrs.J.H.Eckhardt, W.J.Wagner and T.W.Bishop on August 17-21, 1981, as documented

in your letter of November 19, 1981, of activities

authorized

by the Nuclear Regulatory

Commission (NRC)Construction

Permit Nos.CPPR-141, 142 and 143.During this Inspection, a commitment

was made to revise the procedure for Piping System Final Inspection, WPP/QCI No.202.3, to include inspection

of spring hangers for proper thread engagement.

This was left as Open Item 50-528/81-12/02.

A decision has been made to delete WPP/QCI No.202.3,"Piping System Final Inspection".

The inspections

included within this procedure have been incorporated

into other procedures.

Specifically, the requirement

to verify proper thread engagement

of spring hangers has been incorporated

into WPP/QCI No.201.1,"Nuclear Pipe Hangers and Supports Installation".

This inspection

will take place at the time of cold setting of the springs.Verification

of proper thread engagement

at the time of cold setting of the springs should fulfill the same purpose as performing

the verification

at final walkdown.f" 210080155 820b 6 R'DQCK 05000MB PDR EEVBJr/WEI:skc

Attachments

1 cc: See Attached Page 2 Very truly yours, k.e.U~E.E.Van Brunt, Jr.APS Vice President Nuclear Projects ANPP Project

0.<p.-

U.S.Nuclear Regu ory Commission

Attention:

Mr.T.W.Bishop, Chief ANPP-21202-WEI/JAR

June 16, 1982 Page 2 CC~Richard DeYoung, Director Office of Inspection

and Enforcement

U.S.Nuclear Regulatory

Commission

Washington, D.C.20555 J.A.Roedel D.B.Fasnach't G.C.Andognini A.C.Rogers B.S.Kaplan W.E.Ide J.Vorees J.A.Brand A.C.Gehr W.J.Stubblefield

W.G.Bingham R.L.Patterson R.W.Welcher R.M.Grant D.R.Hawkinson L.E.Vorderbrueggen

G.A.Fiorelli Lynne Bernabei, Esq.Harmon&Weiss 1725"I" Street, NW Suite 506 Washington, D., C, 200'06 R.L.Greenfield, Assistant Attorney General Bataan Memorial Building Santa Fe, New'Mexico 87503

PALO VERDE NUCLEAR GENERATING

STATlON UNlTS le R&3 PROCEDURE CHANGE NOTICE (PCN)JOB NO.I 0407 4.CHANGE REQUESTED BY: QQA QQC QFE I.20 PAGE~OF PCN NO.3.QXWP/P QiL QCI NO.@col.I REV~~FLIC i~IE PiP'8'IiA~RKCS

TITLE'LIPPY~

GtJ@AL-C 4 Sio<5.INITIATED BY: 'EASON FOR CHANGE: 7~iZedigC EXIS-,IWC Cg zeal'Z PLar.g>au$.$4<o AOa Cai ieeieTc PiZOCSOL3a, Q Ee~ar i uC 4balami-&ramie Y~aL liow A~o io JER[PY Ao&JD:Tc TLLRGho circ wc Msgr oF 0 g.Rog Qw Lc+D CCL LIMIJ Si'Tc WMw h w&L1+o~Qs'TI&c oc~I iP'<wc.Lid%(80 F~i~m FP~aC~rZam&

6~9.h-7.DESCRIPTION

OF CHANGE: IZ&vI'5&I AR461RAI 4 6$.4 Vc'fz&.b o~gP~+C~Sggl L 4 ISQAI LY tQP II (PhtOV PguPSR~~~~c~~~~~~

QA.m~~Ac&iMMKco h'4o'hj Aao Pc czAC=Iz>v u 8 i8.I~APL&'losJ

OF 7ikC RERPi3IRBD

FILL I Q Cq OF/L3+i3$-~5T&'MI P5~P'~NWA L.L.CIGP&~Q'~~~

A, MC+~~Moc LI~~+'V Tike G~OVAi C)P TQ~Tg)SdgL WO~.+R4VGl MoP'g SHAl V P~4I 74~<'RI AEL'P+PR I 44'n5, 7iLHr lAclJ QgggI3:A<so

544L L gL oo TH4'7 TQ~~A%&/~CW Llh.m QMtZ.I&I~D

Wild:T"T&~.Wc H&lz wug+Aro MuQmcqamaav

Q~~~g g ckcelco A<<~1+~QI'sl EL E Pi4lzodc~LI%wc 9 i Ps Pe I g L~LoAo&t OH'8.APPROVED P CE DATE DATE CCQCE DATE

0 k S