Pages that link to "Schuyler J"
Jump to navigation
Jump to search
The following pages link to Schuyler J:
Displayed 50 items.
- IR 05000133/1984002 (← links)
- ML20211M556 (← links)
- IA-87-608, Advises That NRC Employees Listed in Encl Will Need Unescorted Access Badges for All Areas of Facility for Special Insp During 831128-1210.Employees Should Be Provided Addl Training in Emergency Response & Security.W/O Encl (← links)
- ML20236K056 (← links)
- DCL-84-161, Advises That Util Revised Pipe Support Design to Require Base Plates to Be Welded to Fan Cooler Structure in Lieu of Using A-325 Bolted Connection.Design Issued & Mods Ready for NRC Insp.Related FOIA Documents Encl (← links)
- DCL-84-085, Forwards Response to Issues Identified in Board Notification 84-014 Re Valve Min Wall Thickness Measurements Originally Performed in 1973 & 1974.From Review of allegation,22 Issues Addressed,Including Issue Raised in Ho Hudson (← links)
- DCL-84-029, Forwards Info Re Testing of Carboline Protective Coatings Used in Containment Bldgs,In Response to NRC 831205 Request at Meeting Concerning QC Program for Painting (Sser 21,Allegation 100) (← links)
- DCL-84-084, Forwards Response to 840222 Request for Addl Info Re Bostrom-Bergen Welding Procedures.Response Details Procedure Spec Qualifications (← links)
- DCL-84-081, Forwards Interim Rept of Bostrom-Bergen/Meddco Metal Matls Sampling Program,Per Sser 21-Allegation 99.Rept Provides Status of Util Investigation & Sampling Program Results to Date Re Allegations by Former Employees (← links)
- DCL-84-030, Forwards Bostrom-Bergen/Meddco Metals Allegations Investigations Interim Rept, Per 840116 Commitment.Rept Provides Status of Investigation of Sser 21,Allegation 99 (← links)
- DCL-84-023, Forwards Summary of Former Bostrom-Bergen/Meddco Metals Employees Allegations (Sser 21,Allegation 99) Per 840116 Request.Util Currently Confirming Each Allegation W/Respective Alleger (← links)
- DCL-84-031, Forwards Util Response to Allegations 25,58 & 96 Described in Sser 21 Re Expansion Anchors.Util Responses Re HP Foley Procedure for Installation of Anchor Bolts Will Be Submitted Next Wk (← links)
- DCL-84-065, Forwards Util Response to Sser Item 57 Re NRC Questions About Qualification & Certification of HP Foley Co QC Inspectors.Info Re Qualification of Pullman Power Products QC Inspectors Will Be Provided in Near Future (← links)
- DCL-84-080, Forwards Program Description for HP Foley Co Quality Records Review & Turnover,In Response to Questions Raised by NRC at 840119 Exit Interview (← links)
- DCL-84-074, Forwards Suppl to 840215 Response to SECY-84-61,Items 71,73 & 183 Re Sale & Use of Drugs at Plant (← links)
- DCL-84-068, Forwards Partial Response to Questions on Sser 21,Items 61 & 102 Re Design Control Process for Plant.Encls 2 & 3 Describe Method for Closure of Completed Work & Responds to Questions Raised at 840119 Exit Interview,Respectively (← links)
- DCL-84-045, Submits Design & Const Status of Design Change Notice DCO-EE-446 Re Control Room Ventilation & Pressurization Sys. Design & Const Complete.Repair,Testing Activities & Resolution Scheduled to Be Completed by 840215 (← links)
- DCL-84-022, Requests Errata to Encl Sser 21,Page 2-185,Allegation 82. Review of Sser 21 Indicated Some Factural Errors on Markup of Page 2-185 (← links)
- DCL-84-082, Forwards Util Response to Sser 21,Item 23 Re Qualification of Pullman Power Products QC Welding Inspectors (← links)
- DCL-84-221, Forwards Description of Contractor Record Turnover Program & Results.Partially Withheld Related Documents Encl (← links)
- DCL-84-059, Forwards Results of Review of Electrical Contractor Insp Records Re Use of Concrete Expansion Anchors in Electrical Raceway Supports.Ack of Receipt of Matl Requested.Supporting Documentation Encl (← links)
- DCL-84-297, Forwards Replacement Page to Rev 11 to Security Plan.Page Withheld (Ref 10CFR73.21) (← links)
- DCL-84-291, Revised Emergency Plan Implementing Procedures,Including EP R-2, Release of Airborne Radioactive Matls, EP EF-6, Operating Procedures for Ears 9845C Controlling Stations & EP RB-15, Initial Sampling Exercise... (← links)
- DCL-84-294, Forwards Changes to Rev 11 to Security Plan,Rev 2 to Safeguards Contingency Plan & Rev 2 to Training & Qualification Plan.Revs Withheld (Ref 10CFR73.21) (← links)
- DCL-84-262, Requests Exam & Test Requirements for All Presently Licensed Personnel for Unit 1 Be Waived for Unit 2 & Combined OLs for Units 1 & 2 Be Issued.Supporting Documentation Encl.Related Correspondence (← links)
- DCL-84-277, Responds to NRC Re Violations Noted in IE Insp Rept 50-275/84-10.Corrective Actions:Procedure C-4S1, Mechanical Bypass,Jumper & Lifted Circuit Log, Revised to Include Jumpers in Clearance Package (← links)
- DCL-84-261, Public Version of Revs to Vol III of San Luis Obispo County Emergency Response Std Operating Procedures (Sop),Including Section III.01, SOP Emergency Svcs Director. W/Felton 840802 Release Memo (← links)
- DCL-84-231, Responds to NRC Re Violations Noted in IE Insp Repts 50-275/83-37 & 50-323/83-25.Corrective Actions:Reinsp Program Implemented for Welds Originally Accepted by Unqualified Inspectors (← links)
- DCL-84-248, Notifies of Completion of Fixes for safety-related Masonry Walls,Per IE Bulletin 80-11.Existing as-built Condition Would Not Preclude Addl Mod.No Addl Fixes Necessary Based on Analysis for Line Break & Jet Impingement (← links)
- DCL-84-224, Forwards Addl Info Re Pipe Support Design Guides Per NRC Request as Result of Recent Audits Connected W/License Condition 2.C.(11) (← links)
- DCL-84-140, Responds to NRC Re Violations Noted in IE Insp Repts 50-275/83-37 & 50-323/83-25.Corrective actions:20% or More of Accessible Welds Reinspected Prior to Compliance w/ESD-237 Procedure (← links)
- DCL-84-124, Forwards Response to 840229 Notice of Severity Level IV Violation Noted in IE Insp Repts 50-275/83-37 & 50-323/83-25.Weldments Examined for Acceptability by Qualified Inspectors & Necessary Repairs Will Be Made (← links)
- DCL-84-129, Responds to IE Bulletin 83-08, Electrical Circuit Breakers W/Undervoltage Trip Feature in Use in Safety-Related Applications Other than Reactor Trip Sys. Subj Circuit Breakers Not Used at Facilities (← links)
- DCL-84-090, Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure EP-OP-O Re Reactor Trip W/ Safety injection,EPM-9 Re Hazardous Waste Mgt Contingency Plan & EP-OP-1 Re LOCA & 840323 Release Memo (← links)
- DCL-84-088, Responds to NRC Re Violations Noted in IE Insp Rept 50-275/83-40.Corrective actions:831227 Interofc Memo Issued to All Engineering Disciplines Covering Procedures to Revise Existing Files & Prepare New Files (← links)
- DCL-84-103, Forwards Safeguards Info Re Changes to Rev 11 to Security Plan.Info Withheld (Ref 10CFR73.21) (← links)
- DCL-84-110, Forwards Nekton,Inc Paper, Post-Miocene Compressional Tectonics Along Central State of CA Margin. Conclusion of Paper Will Reviewed (← links)
- DCL-84-043, Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) (← links)
- DCL-84-176, Responds to IE Bulletin 84-02, Failures of GE Type Hfa Relays in Class IE Safety Sys. Nylon or Lexan-type GE Hfa Relays Not Used in safety-related Sys (← links)
- DCL-84-136, Forwards Corrections to Responding to Issues Discussed in 840328 & 0402 Meetings W/Nrc Re Board Notification 84-071.Related Correspondence (← links)
- DCL-84-130, Responds to NRC Re Violations Noted in IE Insp Rept 50-275/83-41.Corrective Actions:Plant Staff Review Committee Approved Bypass Consisting of Jumper on Pressurizer Pressure Instrument on 831219 (← links)
- DCL-84-151, Submits Updated Response to IE Bulletin 83-08, Electrical Circuit Breakers W/Undervoltage Trip Feature in Use in Safety-Related Application.... No Subj Breakers in Use. Revised Emergency Implementing Procedures Encl (← links)
- DCL-84-149, Forwards Rev 11 to Security Plan.Rev Withheld (Ref 10CFR73.21) (← links)
- DCL-84-144, Requests That NRC Ack Receipt of Submitting Status Rept on Actions Required for Operational Readiness. All Actions Re Containment Integrity Prior to Plant Heatup Complete.W/O Encl.Related Correspondence (← links)
- DCL-84-007, Final Deficiency Rept Re Containment Spray Initiation Timing.Timer Setting for Starting of Containment Spray Pump Changed from Original FSAR Table 8.3-4 Value to Value of 26 & 22 for Pumps 1 & 2,respectively (← links)
- DCL-84-091, Responds to NRC Re Violations Noted in IE Insp Rept 50-275/83-39.Corrective Actions:Area Permits for Welding Posted to Identify Generic Requirements on Area Basis & Util Inspector Assigned to Assist Fire Marshall (← links)
- DCL-84-086, Final Deficiency Rept Re Malfunction of Valve Operator Mfg by Limitorque.Initially Reported on 830627.Existing Screws Will Be Replaced on Affected Valves Prior to Fuel Load.Maint Procedures Modified (← links)
- DCL-84-092, Forwards Response to Request for Addl Info Re Class IE Electrical Raceway Supports.Design Supports Have Sufficient Margin to Assure That Loss of Single Support Will Not Cause Loss of Safety Function (← links)
- DCL-84-093, Forwards Description of Program Implemented to Verify Clearance Between Piping & Penetrations,In Response to IE Bulletin 79-14 (← links)
- DCL-84-049, Public Version of Emergency Plan Implementing Procedures, Including Procedure EP G-4 Personnel Accountability & Assembly & EP RB-12 Re Mid & high-range Plant Vent Radiation Monitors & Jm Felton 840302 Release Memo (← links)