Pages that link to "RA-22-0117, Relief Request for Inservice Testing Program Plan - Fourth Ten-Year Interval"
Jump to navigation
Jump to search
The following pages link to RA-22-0117, Relief Request for Inservice Testing Program Plan - Fourth Ten-Year Interval:
Displayed 48 items.
- RA-20-0321, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Comple (← links)
- RA-20-0312, Relief Request, Service Water Pinhole Leak in a Socket Weld, Inservice Inspection Program, Fourth Ten-Year Interval (← links)
- RA-20-0335, Response to Request for Additional Information Regarding License Amendment Request to Reduce the Minimum Required Reactor Coolant System Flow Rate and Update the List of Analytical Methods Used in . (← links)
- RA-20-0381, CFR 50.54( Q) Screening Evaluation Form for Revisions (← links)
- RA-21-0023, 10 CFR 50 .54(q) Screening Evaluation Form and 10 CFR 50 .54(q) Effectiveness Evaluation Form for PLP-201, Revision 73 (← links)
- RA-20-0311, License Amendment Request to Revise the 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process. (← links)
- RA-21-0067, Response to Request for Additional Information - Relief Request, Service Water Pinhole Leak in a Socket Weld, Inservice Inspection Program, Fourth Ten-Year Interval (← links)
- RA-20-0252, License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications (← links)
- RA-21-0073, Notification of Permit Application for Industrial Stormwater Activities (← links)
- RA-21-0061, Notification of NPDES Permit Renewal Application (← links)
- RA-21-0097, Notification of Permit Revision Request Regarding Copper and Zinc Limits (← links)
- RA-21-0052, License Amendment Request Regarding Change to Containment Spray Nozzle Test Frequency (← links)
- RA-21-0131, Annual Environmental (Non-radiological) Operating Report (← links)
- RA-21-0130, 10 CFR 50.54(q) Evaluations (← links)
- RA-21-0139, Cycle 24 Core Operating Limits Report, Revisions 0 and 1 (← links)
- RA-21-0162, Supplement to License Amendment Request to Revise the 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to Reflect an Alternative (← links)
- RA-21-0112, License Amendment Request Regarding Administrative Change to Reflect Development of a Technical Requirements Manual (← links)
- RA-21-0164, Day Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Acceptable Loss of Coolant Evaluation Model (← links)
- RA-21-0195, 14-Day Special Report for an Inoperable Post-Accident Radiation Monitor (← links)
- RA-21-0203, Response to Request for Additional Information Regarding License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications (← links)
- RA-21-0200, End of Cycle 23 (H1R23) Inservice Inspection Program Owner'S Activity Report (← links)
- RA-21-0191, License Amendment Request to Revise Technical Specifications Related to Reactor Protection System Instrumentation (← links)
- RA-21-0213, License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown (← links)
- RA-21-0279, Notification of New NPDES Permit Receipt (← links)
- RA-20-0223, Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes (← links)
- RA-22-0055, Evacuation Time Estimate Report (← links)
- RA-22-0079, Snubber Program Plan (← links)
- RA-22-0136, Annual Environmental (Nonradiological) Operating Report (← links)
- ML22108A018 (← links)
- RA-22-0117 (redirect page) (← links)
- ML22097A150 (redirect page) (← links)
- RA-22-0172, Duke Energy Progress, LLC - Supplement to Relief Request HNP-IST-004-RR1 for Inservice Testing Program Plan - Fourth Ten-Year Interval (← links)
- RA-22-0043, CFR 50.54(q) Evaluation (← links)
- RA-22-0197, Reactor and Senior Reactor Operator Initial Examinations 05000400/2022301 (← links)
- RA-22-0213, Notification of Modification to Permit Application for Industrial Stormwater Activities (← links)
- ML22227A068 (← links)
- RA-22-0214, 10 CFR 50.54(Q) Review Form for Revisions to the Shearon Harris Nuclear Power Plant, Unit 1, Emergency Action Level (EAL) Technical Basis Document and the EAL Wallchart Document (← links)
- RA-22-0314, Notification of Source Water Resiliency and Response Plan Submission (← links)
- RA-23-0011, End of Cycle 24 (H1R24) Inservice Inspection Program Owner'S Activity Report (← links)
- RA-22-0081, License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications (← links)
- RA-23-0098, Annual Environmental (Nonradiological) Operating Report (← links)
- RA-22-0297, Cycle 25 Core Operating Limits Report, Revisions 0 and 1 (← links)
- RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications (← links)
- RA-23-0195, Notice of Intentions Regarding Apparent Violation Response; (EA-23-060) (← links)
- RA-23-0218, Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals (← links)
- RA-23-0276, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific (← links)
- RA-24-0006, 10 CFR 50.54(q) Evaluation (← links)