Pages that link to "Duffy J"
← Duffy J
Jump to navigation
Jump to search
The following pages link to Duffy J:
Displayed 48 items.
- ML20129C449 (← links)
- ML20128P391 (← links)
- ML20128P186 (← links)
- IA-92-261, Final Response to FOIA Request for Documents Re Morgantown Ordanance Works.No Records Subj to Request Located (← links)
- ML20149M741 (← links)
- ML20149M702 (← links)
- ML20149M672 (← links)
- ML20148H912 (← links)
- ML20195D141 (← links)
- ML20236Q831 (← links)
- ML20210H103 (← links)
- BVY-97-100, Submits Response to Request for Addl Info Re NRC Architect Engineer Team Insp.Yankee Operating Procedure OP-3126 Provides Reasonable Assurance That RHR Pump Minimum Flow Will Be Above That Recommended by Pump Mfg (← links)
- BVY-97-102, Forwards Response to RAI Re Cr/Cable Vault Fire Barrier at Vynps.Util Commits to Maintain Barrier Between CR & Cable Vault in Current Configuration & Maintain Barriers Separating CR (← links)
- BVY-97-119, Responds to 970828 RAI Re Rept YAEC-1339, Yaec Application of FIBWR2 Core Hydraulics Code to BWR Reload Analyses (← links)
- BVY-97-115, Requests That Relief Requests RR-V13,RR-V14 & RR-V15 Be Replaced W/Attached Relief Requests (← links)
- BVY-97-110, Forwards Rept YAEC-1941, Addl Benchmarking of BWRs Using CASMO-3/SIMULATE-3, Which Demonstrates Suitability of Using Codes for BWR Operational Support & Reload Licensing.Various Graph Pgs of Submittal Had Data Cut from Left Margin Area (← links)
- BVY-97-104, Submits Addl Relief Request RR-V15,prepared After Submittal of 961219.Attachment a Provides Summary of Changes Made to Ltr Dtd 961219.W/one Oversize Drawing (← links)
- BVY-97-105, Provides NRC W/Degradation Mechanism Evaluation & Results of Element & Segment Risk Rankings.Util Intends to Submit Revised ISI Program Following NRC Review of Evaluations & Risk Ranking,As Stated in Ltr (← links)
- BVY-96-152, Responds to RAI Re Request for Exemption for 10CFR50,App R, Section Iii.G (← links)
- BVY-96-151, Informs That Installation of Improved Fire Protection Sys Will Be Completed by 961231 Instead of 961130 (← links)
- BVY-96-144, Forwards 10CFR50.59 Evaluation Re Core Spray & RHR Containment Isolation Valves at Plant (← links)
- BVY-96-140, Advises to Remove J Thayer from List of Recipients of NRC Correspondence & to Add Re Mccullough.Addresses,Listed (← links)
- BVY-96-139, Forwards Response to RAI Re 10CFR50,Appendix R Exemptions (← links)
- BVY-96-159, Forwards Objectives for 1997 full-participation Biennial Exercise Scheduled for 970319 (← links)
- BVY-96-158, Provides Response to Request for Addl Info Re 10CFR50,App R Exemptions (← links)
- BVY-96-157, Submits Changes in Peak Cladding Temp for Plant ECCS LOCA Analysis (← links)
- BVY-96-110, Informs of Intention to Inspect Core Spray Sys Internal to Rv,Per NRC Bulletin 80-13 (← links)
- BVY-96-111, Documents Info Provided During Re License Change Requested That We Revise P. 278 Reference to Include Word Legible in Section 6.13.A.3 (← links)
- BVY-96-129, Forwards COLR for Vermont Yankee Cycle 19 Which Presents cycle-specific Operating Limits for Operation of Cycle IAW Section 6.7.A.4 (← links)
- BVY-96-126, Forwards Revised TS Pages 89,89a & 90 to Incorporate Changes from Amends 148 & 149 to License DPR-28,as Discussed W/Nrc (← links)
- BVY-96-123, Forwards Summary of Evaluation of Intention to Redesignate Several Core Spray & Residual Heat Removal Sys Containment Isolation Valves at Vermont Yankee (← links)
- BVY-96-128, Reports Status of Efforts & Provides Update of Commitment to Achieve Compliance W/Inservice Test Requirements by 961001 (← links)
- BVY-96-119, Forwards Rev 2 to Calculation YAEC-25Q-301, Flaw Evaluation for UT Indication Using Appenda Program (← links)
- BVY-96-118, Forwards Rept Re Core Spray Sys Insp Conducted at Util During 1996 Refueling Outage (← links)
- BVY-96-117, Informs That Noted Guidance Has Been Incorporated Into Util Plans for App R Corrective Actions in Response to Violations Noted in Insp Rept 50-271/95-26 (← links)
- BVY-96-109, Provides Revised TS Pages to Change 186,indicating That New Safety Limit MCPR Valid Only for Util Cycle 19 (← links)
- BVY-96-105, Provides Util Plans for Insp of RPV Shell Welds at Plant During Refueling Outage on 960906 (← links)
- BVY-96-102, Forwards Revised Pp 232 of Proposed Change 187 Re Core Shutdown Margin (← links)
- BVY-95-139, Forwards Rev 3 of Cycle 18,COLR, for VT Yankee Power Station (← links)
- BVY-95-126, Documents Actions Taken by Util to Evaluate Small Leak in Svc Water Piping & Request Relief from Requirement to Perform Immediate Code Repair,Per GL 95-05 (← links)
- BVY-95-119, Submits Correction to Ltr Submitting YAEC-1926, Yankee Atomic Electric Co Application of BWROG Stability Exclusion Region Methodology for Implementation of Long Term Solution Option 1-D at Vermont Yankee Nuclear Power Plant (← links)
- BVY-95-110, Forwards Missed Safety Evaluation Summaries Re Cycle 16 Operating Rept as Required by 10CFR50.59(b)(2) (← links)
- BVY-95-114, Provides Addl Info Re GL 88-20, IPE for Severe Accident Vulnerabilities 10CFR50.54(f) (← links)
- BVY-95-115, Forwards Validation Rept YAEC-1926, Method for Power/Flow Exclusion Region Calculation Using LAPUR5 Computer Code, Per NRC 950330 SER Re Thermal Hydraulic Stability (← links)
- BVY-95-111, Forwards Vermont Yankee Cycle 17 Operating Rept (← links)
- BVY-95-102, Documents Actions Taken by Util to Evaluate,W/O Immediate Code Repair,Small Leak in Svc Water Piping at Plant & Requests Relief from Requirement to Perform Immediate Code Repair,In Accordance W/Gl 90-05 & 10CFR50.55a(g)(6)(i) (← links)
- BVY-95-101, Forwards Vermont Yankee Nuclear Power Station Cycle 18 COLR, Rev 2 (← links)
- BVY-95-100, Forwards Vermont Yankee Nuclear Power Corp 1994 Annual Rept (← links)