Pages that link to "RA-22-0331, Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 1"
Jump to navigation
Jump to search
The following pages link to RA-22-0331, Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 1:
Displayed 50 items.
- RA-19-0092, Refuel 24 (C1R24) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report (← links)
- RA-19-0004, Response to NRC for Additional Information (RAI) Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 for Catawba Nuclear Station, Units 1 and 2 (← links)
- RA-18-0198, (Cns), Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System (← links)
- RA-18-0199, (Cns), Units 1 and 2 - Submittal of Evacuation Time Estimates (ETE) Analysis (← links)
- RA-18-0097, (Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System (← links)
- RA-17-0035, Supplement to License Amendment Request Proposing Changes to Technical Specification 3.5.1, AC Sources - Operating. (← links)
- RA-15-0020, License Amendment Request and 10 CFR 50.12 Exemption Request for Use of Optimized Zirlo Fuel Rod Cladding (← links)
- RA-19-0121, Commitment Change Evaluation Report for 2018 (← links)
- RA-18-008, Summary of Changes to Quality Assurance Topical Report, NO-AA-10 (← links)
- RA-15-0029, 10 CFR 50.46 - Annual Report for 2014 (← links)
- RA-18-0269, Transmittal of Core Operating Limits Report (COLR) for Unit 1 Cycle 25 Reload Core (← links)
- CNS-18-027, Submittal of Core Operating Limits Report (COLR) for Cycle 23 Reload Core - Implementation Instructions for Revision 0 (← links)
- CNS-17-030, Core Operating Limits Report (COLR) for Cycle 24 Reload Core, Appendix a - Power Distribution Monitoring Factors (← links)
- CNS-15-105, Core Operating Limits Report (COLR) for Cycle 23 Reload Core - Revision 1 (← links)
- RA-17-007, Summary of Changes to Quality Assurance Topical Report NO-AA-10 (← links)
- CNS-16-070, Cycle 22, Core Operating Limits Report, Rev 0, QA Condition 1, Part 2 of 2 (← links)
- RA-16-007, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, Revision 88, 89 and 90 (← links)
- RA-19-0189, Supplement to Response for Request for Additional Information Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 (← links)
- RA-19-0209, 2018 Annual Radioactive Effluent Release Report (← links)
- RA-19-0275, Independent Spent Fuel Storage Installation (ISFSI) - Registration of Spent Fuel Storage Cask (← links)
- RA-19-0280, Response to NRC RAI Clarifications Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 (← links)
- RA-18-0036, License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits (← links)
- RA-18-0219, Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes (← links)
- RA-19-0312, Supplement to License Amendment Request Proposing Changes to the Technical Specification 3.8.1 (← links)
- RA-19-0364, Core Operating Limits Report (COLR) for Unit 1 Cycle 25 Reload Core, Rev. 1 (← links)
- RA-19-0365, Core Operating Limits Report (COLR) for Unit 2 Cycle 23 Reload Core, Rev. 1 (← links)
- RA-19-0355, Reply to a Notice of Violation, NRC Inspection Report 05000413/414/2019002-01 (← links)
- RA-19-0357, Reply to a Notice of Violation - NRC Inspection Report 05000413/2019002-04 (← links)
- RA-18-0156, Administrative License Amendment Request Proposing to Revise Technical Specification 3.0, Surveillance Requirement (SR) Applicability (← links)
- RA-17-0034, Withdrawal of the License Amendment Request to Revise Technical Specifications to Adopt TSTF-285-A, Rev. 1, Charging Pump Sway LTOP Allowance. (← links)
- RA-19-0385, Core Operating Limits Report (COLR) for Unit 2 Cycle 24 Reload Core (← links)
- RA-19-0389, Emergency Plan, Revision 19-04 (← links)
- ML053410182 (← links)
- ML051670098 (← links)
- ML051670093 (← links)
- ML051670089 (← links)
- ML051050433 (← links)
- RA-19-0391, Refuel 23 (C2R23) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report (← links)
- RA-19-0434, Emergency Plan, Revision 19-05 (← links)
- RA-19-0471, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System (← links)
- RA-20-0042, SR-2020-001 for Catawba Nuclear Station, Units 1 and 2, Meteorological Instrumentation Non-Functional for Greater than 7 Days (← links)
- RA-20-0065, Emergency Plan, Revision 20-02 (← links)
- RA-20-0002, Response to Request for Additional Information (RAI) Regarding License Amendment Request to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits (← links)
- RA-20-0009, Emergency Plan, Revision 20-01 (← links)
- ML043090064 (← links)
- ML043090060 (← links)
- ML043090054 (← links)
- ML042020394 (← links)
- ML041180583 (← links)
- ML033490666 (← links)