Pages that link to "L-19-053, Emergency Response Data System Data Point Library Update"
Jump to navigation
Jump to search
The following pages link to L-19-053, Emergency Response Data System Data Point Library Update:
Displayed 50 items.
- L-11-119, Submission of the Core Operating Limits Report, Cycle 16 (← links)
- L-11-024, Chapters 5 and 7 of Holtec Licensing Report, in Support of License Amendment Request for Unit 2 Spent Fuel Pool Rerack (← links)
- L-18-017, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado. (← links)
- L-17-259, Mitigating Strategies Assessment (MSA) for Flooding (← links)
- MNS-17-035, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- LR-N16-0136, NEI 12-06, Appendix H, Revision 2, H.4.3 Path 3: GMRS ≫ SSE But ≪ IHS, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- RS-16-169, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (Partial Submittal - High Frequency Work Scope) (← links)
- L-15-187, Submittal of 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models (← links)
- L-11-312, Submittal of 10 CFR 50.46 Report of Changes or Errors in ECCS Evaluation Models (← links)
- L-11-026, Response to Request for Additional Information Regarding Application for License Amendment for Revised Steam Generator Inspection Scope Using F* Methodology (← links)
- L-08-327, Pressure and Temperature Limits Report, Revision 3 (← links)
- L-08-204, Reactor Head Inspection 60-Day Report for 2R13 (← links)
- L-08-072, Transmittal of Technical Specification 5.6.6.1 - Steam Generator Inspection Report (← links)
- L-08-100, Responses to Request for Additional Information in Support of License Amendment Request No. 204, Revision 1 (← links)
- L-08-081, Reply to Request for Additional Information Regarding Severe Accident Mitigation Alternatives License Renewal (← links)
- L-07-130, Submittal of Pressure and Temperature Limits Report, Revision 4 (← links)
- L-07-100, Fitness-For-Duty Program Six Month Report for the Period January 1, 2007 Through June 30, 2007 (← links)
- L-07-012, Fitness-for-Duty Program Six Month Report for the Period of July 1, 2006, Through December 31, 2006 (← links)
- L-07-024, Emergency Response Data System (← links)
- L-06-157, Supplemental Information - Steam Generator Tube Rupture (SGTR) Analysis Update (← links)
- L-06-163, Pressurizer Weld Overlay Examination Report (← links)
- L-06-119, Supplement to License Amendment Request Nos. 324 and 196, Steam Generator Tube Integrity (← links)
- L-06-126, Fitness-For-Duty Program Six Month Report (← links)
- L-05-204, Additional Information Regarding Dose Consequence Analysis in Support of License Amendment Request Nos. 302 and 173 (← links)
- L-05-201, 10 CFR 50.46 Report of Changes or Errors in ECCS Evaluation Models (← links)
- ML19056A189 (redirect page) (← links)
- ML19051A109 (← links)
- L-19-053 (redirect page) (← links)
- L-18-037, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models (← links)
- JAFP-17-0104, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Revision 4, Appendix H, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- L-13-095, Discharge Monitoring Report (NPDES) Permit No. PA0025615 (← links)
- L-12-347, FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident (← links)
- L-12-249, CFR 50.46 Report of Changes or Errors in ECCS Evaluation Models (← links)
- L-13-036, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedules (← links)
- L-07-003, Reactor Head Inspection 60-Day Report for 2R12 (← links)
- L-06-071, Revised Financial Information Associated with an Order Approving Transfer of Licenses to Firstenergy Nuclear Generation Corp (← links)
- L-06-038, Proposed Alternative to American Society of Mechanical Engineers Code Section XI Repair Requirements (← links)
- ML19280A038 (← links)
- L-14-401, First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In (← links)
- L-16-006, Submittal of Annual Report Pursuant to 10 CFR 75.11, Location Information (← links)
- L-05-056, Firstenergy Nuclear Operating Company Requests Authorization to Use Delta Protection Supplied-Air Containment Suits as Respiratory Protection Equipment and Assignment of a Protection Factor, Pursuant to 10CFR20.1703 and 10CFR20.1705 (← links)
- L-05-161, Year 2004/2005 Steam Generator Examination Reports (← links)
- L-05-129, Fitness-For-Duty Program Six Month Report for the Period of January 1, 2005, Through June 30, 2005 (← links)
- ML052100101 (← links)
- L-05-104, Probabilistic Safety Review for License Amendment Request Nos. 302 and 173 (← links)
- L-05-092, BV-2 NRC Bulletin 2003-02 Lower Head Inspection 60-Day Report for 2R11 (← links)
- L-05-093, NRC Bulletin 2004-01 Inspection 60-Day Report for 2R11 (← links)
- L-05-091, Reactor Vessel Head Penetration Inspection 60-Day Report for 2R11 (← links)
- L-05-083, R11 Steam Generator Tube Plug Special Report (← links)
- L-05-063, Pressure and Temperature Limits Reports, Revision 1 (← links)