Pages that link to "ML15356A185"
Jump to navigation
Jump to search
The following pages link to ML15356A185:
Displayed 50 items.
- L-2015-279, RAI Response Clarification for SRXB-RAI-1 and Snpb RAI-2 Thru RAI-20 for the Technical Specification LAR and Exemption Request Regarding the Transitioning to Areva Fuel (← links)
- L-2015-270, Request for Additional Information Reply Fourth Ten-Year Inservice Inspection Interval License Amendment Request Changes to Snubber Surveillance Requirements (← links)
- L-2015-258, Request for Additional Reply for License Renewal Condensate Storage Tank Cross-Connect Buried Piping Inspection Commitment (← links)
- L-2015-179, Response to Request for Additional Information Regarding the Spring 2014 Steam Generator Tube Inspections (← links)
- L-2015-166, Request for Additional Information Reply for Technical Specification Changes and Exemption Request Regarding the Transitioning to Areva Fuel (← links)
- L-2010-259, Extended Power Uprate Licensing Report, Attachment 5; Appendix G, WCAP-17197-NP, Revision 0, RCS Pressure and Temperature Limits and Low-Temperature Overpressure Protection Report for 54 Effective Full Power Years (← links)
- L-77-291, Attachment a to L-77-291 Response to NRC Questions of May 24, 1977 (← links)
- L-2019-056, Inservice Inspection Plan RAI Reply, Fifth Ten-Year Interval Unit 1 Relief Request (← links)
- L-2018-153, Supplemental Information for License Amendment Request to Reduce the Number of Control Element Assemblies (← links)
- L-2018-040, Response to Request for Additional Information Regarding License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply (← links)
- L-2018-006, Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- L-2017-210, Updated Final Response to NRC Generic Letter 2004-02 (← links)
- L-2017-209, Response to Request for Additional Information Regarding Fifth 10-Year Inservice Testing (IST) Program Interval Relief Request PR-01 (← links)
- L-2017-116, Response to Request for Additional Information Regarding License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.5 (← links)
- L-2016-153, Response to Request for Additional Information Regarding License Amendment Request for Biological Opinion License Changes (← links)
- L-2016-135, Second Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B (← links)
- L-2016-143, Response to Request for Additional Information for the Proposed Technical Specification Change to Remove the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank and Relocate to Licensee-Controlled Documents (← links)
- L-2016-114, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 48. (← links)
- L-2016-104, RAI Reply - Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle (← links)
- L-2016-102, RAI Reply - License Amendment Request, Containment Vacuum Gothic Analyses and Conforming Changes (← links)
- L-2016-084, Response to Request for Additional Information Regarding License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-422, Revision 2, Change in Technical Specifications End States. (← links)
- L-2016-018, Response to Request for Additional Information Fourth Ten-Year Inservice Inspection Interval License - Amendment Request Changes to Snubber Surveillance Requirements (← links)
- L-2015-304, RAI Reply for the Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents (← links)
- L-2015-211, Response to Request for Additional Information Regarding License Amendment for Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (← links)
- L-2015-177, Fuel Transition Small Break LOCA Summary Report, ANP-3345NP, Revision 1 (← links)
- L-2008-150, Duane Arnold, and Point, Beach, Units 1 and 2, Quality Assurance Topical Report (QATR-FPL-1) Revisions 1 & 2 (← links)
- L-2007-110, Topical Quality Assurance Report (Fpltqar 1-76A) (← links)
- L-2016-040, License Renewal Commitments, Reactor Vessel Internals Aging Management Plan, Response to Request for Additional Information (← links)
- L-2017-216, License Renewal Commitments: Reactor Vessel Internals Aging Management Plan, Clarification of Responses to RAI 1 and RAI 6 (← links)
- L-2016-129, NextEra Energy Quality Assurance Topical Report (QATR FPL-1) Revision 19 Annual Submittal (← links)
- L-2013-208, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 13 (← links)
- L-2019-107, License Amendment Request - Iodine Removal System Elimination (← links)
- L-2010-138, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 7 (← links)
- L-2019-118, Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation (← links)
- L-2006-246, Response to RAI Follow-Up Questions Regarding Fpl'S Common Quality Assurance Topical Report Request (← links)
- L-2006-164, Topical Quality Assurance Report (Fpltqar 1-76A) (← links)
- L-2006-067, Request for Approval of FPL Quality Assurance Topical Report (← links)
- L-2019-153, Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG (← links)
- L-2019-149, Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG (← links)
- L-2009-134, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 4 (← links)
- L-2019-166, Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response (← links)
- L-2019-164, Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control (← links)
- ML052790692 (← links)
- ML20015A028 (← links)
- L-2004-233, Westinghouse WCAP-15918-NP, Revision 2, Steam Generator Tube Repair for Combustion Engineering and Westinghouse Designed Plants with 3/4 Inch Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves. (← links)
- ML031610789 (← links)
- L-2003-101, WCAP-16038-NP, Revision 0, Structural Integrity Evaluation or Reactor Vessel Upper Head Penetrations to Support Continued Operation: St. Lucie Unit 2, Table of Contents Through Figure 6.24 (← links)
- ML022390183 (← links)
- L-2003-002, to Topical Report WCAP-15975-NP, NDE Inspection Strategy for the Tubesheet Region in St. Lucie Unit 2. (← links)
- ML030020548 (← links)