Pages that link to "RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors"
Jump to navigation
Jump to search
The following pages link to RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors:
Displayed 50 items.
- RNP-RA/17-0028, Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (← links)
- RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (← links)
- RNP-RA/17-0021, Transmittal of Core Operating Limits Report (← links)
- RNP-RA/16-0090, Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise (← links)
- RNP-RA/16-0089, Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (← links)
- RNP-RA/16-0079, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. (← links)
- RNP-RA/16-0071, Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis (← links)
- RNP-RA/16-0044, Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (← links)
- RNP-RA/16-0073, Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits (← links)
- RNP-RA/16-0065, Supplement to Proposed Amendment to Technical Specification 5.5.16 for the Adoption of Option B of 10 CFR 50, Appendix J for Type B and Type C Testing and the Permanent Change in 10 CFR 50, Appendix J, Integrated Leak Rate Test. (← links)
- RNP-RA/16-0038, Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174 (← links)
- RNP-RA/16-0037, Seismic Probabilistic Risk Assessment Plans in Response to Request for Information Per Near-Term Task Force Recommendation 2.1 (← links)
- RNP-RA/16-0034, Transmittal of 2015 Annual Radiological Environmental Operating Report and Offsite Dose Calculation Manual, Current Revision 34 (← links)
- RNP-RA/16-0031, Supplemental Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits (← links)
- RNP-RA/16-0021, Post-License Examination Documentation - Follow-up (← links)
- RNP-RA/16-0024, Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits (← links)
- RNP-RA/16-0019, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analysis, Revision 27 to AOP-034, Security Events. (← links)
- RNP-RA/16-0017, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. (← links)
- RNP-RA/16-0012, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analysis, Per Revision 17 to EPTSC-06, Emergency Security Team Leader (← links)
- RNP-RA/16-0007, Transmittal of Emergency Procedure Revisions and 10CFR50.54(q) Summary of Analysis, Including Revision 26 to EPOSC-01, Revision 15 to EPOSC-02, Revision 16 to EPEOF-01, and Revision 19 to EPTSC-01 (← links)
- RNP-RA/16-0003, Independent Spent Fuel Storage Installation (Isfsis) - Annual Radioactive Effluent Release Report (← links)
- RNP-RA/16-0001, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analysis, Revision 14 to EPCLA-04, Emergency Action Level Technical Bases Document. (← links)
- RNP-RA/15-0094, Reactor Operator and Senior Reactor Operator Initial Examinations (← links)
- RNP-RA/15-0117, Supplement to Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits (← links)
- RNP-RA/15-0093, Reactor and Senior Reactor Operator Initial Examination Outlines (← links)
- RNP-RA/15-0101, Response to NRC Request for Additional Information Regarding License Amendment Request to Change Emergency Action Levels (Eals) Scheme Based on NEI 99-01, Revision 6 (← links)
- RNP-RA/15-0090, Proposed Amendment to Technical Specification 5.5.16 for the Adoption of Option B of 10 CFR 50, Appendix J for Type B and Type C Testing and the Permanent Change in 10 CFR 50, Appendix J, Integrated Leak Rate Test Interval And.. (← links)
- RA-15-0047, Annual Report of Changes Pursuant to 10 CFR 50.46 (← links)
- RNP-RA/15-0102, Pressurizer Power Operated Relief Valve Position Indication (← links)
- RNP-RA/15-0083, Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits (← links)
- RNP-RA/15-0086, Transmittal of Technical Specifications Bases Revisions (← links)
- RNP-RA/15-0081, Submittal of Ninety-Day Inservice Inspection Summary Report (← links)
- RNP-RA/15-0078, Request for Revised Approval Date Regarding License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System Instrumentation Turbine Trip Function (← links)
- RNP-RA/15-0077, Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication (← links)
- RNP-RA/15-0069, Addendum to Submittal of Revision to Seismic Hazard Evaluation to Include New Ground Motion Response Spectra (GMRS) Using New Geotechnical Data and Shear-Wave Testing (← links)
- RNP-RA/15-0053, Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04) (← links)
- RNP-RA/15-0071, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. (← links)
- RNP-RA/15-0045, Submits Revision to Seismic Hazard Evaluation to Include New Ground Motion Response Spectra (GMRS) Using New Geotechnical Data and Shear-Wave Testing (← links)
- RNP-RA/15-0040, Completion of Required Actions for NRC Order EA-12-051 with Regard to Reliable Spent Fuel Pool Level Instrumentation (← links)
- RNP-RA/15-0059, Submittal of Snubber Examination and Testing Program (← links)
- RNP-RA/15-0041, Submittal of 2014 Annual Radiological Environmental Operating Report (← links)
- RNP-RA/15-0047, Response to Follow-up Request for Additional Information (RAI) Associated with Response to 90-Day RAI Related to License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 (← links)
- RNP-RA/15-0042, Response to Request for Additional Information Regarding the Flood Hazard Reevaluation Report (FHRR) (← links)
- RNP-RA/15-0034, Proposed Changes to Emergency Plan (← links)
- RNP-RA/15-0031, Response to NRC Request for Additional Information Regarding Seismic Re-Evaluations Related to Southeastern Catalog Changes (← links)
- RNP-RA/15-0039, Submittal of 2014 Annual Radioactive Effluent Releae Report (← links)
- RNP-RA/15-0026, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication (← links)
- RNP-RA/15-0021, Supplemental Response to 120-Day Response Submittal to Request for Additional Information Associated with License Amendment Request to Adopt National Fire Protection (NFPA) Standard 805 (← links)
- RNP-RA/15-0015, Fourth Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- RNP-RA/15-0023, Response (60-Day) to Request for Additional Information Associated with License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 (← links)