Pages that link to "TS-3.3.4.1"
Jump to navigation
Jump to search
The following pages link to TS-3.3.4.1:
Displayed 50 items.
- ML051780433 (← links)
- ML030360299 (← links)
- ML013060412 (← links)
- TSTF-15-11, TSTF Comments on Draft Model Safety Evaluation of Traveler TSTF-545, TS Inservice Testing Program & Clarify SR Usage Rule Application to Section 5.5 Testing and Transmittal of TSTF-545, Revision 3 (← links)
- TSTF-15-03, Response to NRC Comments Regarding TSTF-545, Revision 1, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing and Submittal of TSTF-545, Revision 2 (← links)
- TSTF-14-05, Transmittal of TSTF-545, Revision 1, TS Inservice Testing Program Removal. (← links)
- TSTF-13-09, Transmittal of TSTF-545, Revision 0, TS Inservice Testing (IST) Program Removal. (← links)
- TSTF-10-07, Transmittal of TSTF-493, Revision 4, Errata, Clarify Application of Setpoint Methodology for LSSS Functions. (← links)
- PLA-6209, Susquenhanna - Proposed License Amendment No. 285 for Unit 1 Operating License NPF-14 and Proposed License Amendment No. 253 for Unit 2 Operating License NPF-22 Extended Power Uprate Application Reactor Systems Technical Review Request For. (← links)
- ML18284A370 (← links)
- GNRO-2018/00042, Core Operating Limits Report Cycle 22, Revision 1 (← links)
- CNL-16-165, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specification Change (← links)
- CNL-16-109, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates (← links)
- GNRO-2012/00061, Core Operating Limits Report Cycle 19 (← links)
- NL-11-1812, Technical Requirements Manual (← links)
- GNRO-2011/00071, Submittal of Core Operating Limits Report Cycle 18, Mid-cycle Revision Updating a Current Cycle Reference (← links)
- GNRO-2011/00005, Core Operating Limits Report Cycle 18 Mid-Cycle Revision (← links)
- GNRO-2010/00041, Core Operating Limits Report Cycle 18 (← links)
- L-MT-06-034, Copy of Applicable Portions of the Us NRC and Monticello Improved Technical Specifications Conversion Website (← links)
- GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation (← links)
- ML18347B366 (← links)
- ML19056A535 (← links)
- ML19053A762 (← links)
- NG-18-0101, Withdrawal of License Amendment Request TSCR-179 to Add Technical Specification 3.2.3, Linear Heat Generation Rate (← links)
- NG-17-0236, License Amendment Request (TSCR-179) Application to Add Technical Specification 3.2.3. Linear Heat Generation Rate. (← links)
- JAFP-17-0093, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (← links)
- RS-16-228, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition (← links)
- GO2-16-096, License Amendment Request to Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate (← links)
- ML17096A738 (← links)
- GO2-13-138, License Amendment Request for Adoption of TSTF-493, Revision 4, Option a (← links)
- GO2-12-104, Response to Request for Additional Information for License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License (← links)
- GO2-12-003, License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License (← links)
- NLS2011071, License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a (← links)
- RBG-47169, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases (← links)
- PLA-6328, Proposed License Amendment No. 299 for Unit 1 and Proposed License Amendment No. 269 for Unit 2 for Changes to Technical Specifications 3.6.4.1 Secondary Contaminant and 3.6.4.3 Standby Gas Treatment System (← links)
- L-2019-105, License Amendment Request (TSCR-183): Application to Revise Operating License and Technical Specifications for Permanently Defueled Condition (← links)
- GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. (← links)
- GNRO-2008/00070, Cycle 17 Update to the Core Operating Limits Report (COLR) (← links)
- JAFP-01-0133, ITS: 3.3.4.1 Anticipated Transient Without Scram Recirulation Pump Trip (ATWS-RPT) Instrumentation (← links)
- ML19192A031 (← links)
- ML19224B705 (← links)
- NRC-19-0054, DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle (← links)
- NMP2L2706, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. (← links)
- ML052940480 (← links)
- GNRO-2005/00057, Transmittal of Revised Ldc 05060, Core Operating Limits Report Cycle 15. (← links)
- ML052630396 (← links)
- ML052630295 (← links)
- ML050830162 (← links)
- ML20008D645 (← links)
- ML20005G281 (← links)