Pages that link to "NL-21-1104, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis"
Jump to navigation
Jump to search
The following pages link to NL-21-1104, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis:
Displayed 50 items.
- NL-15-1392, Enclosure 4 - Farley Staffing - Detailed Description and Technical Evaluation & Enclosure 5 - Farley Standard Emergency Plan Annex (← links)
- NL-15-1392, Enclosure 3 - Corporate Joint Information Center Description and Technical Evaluation (← links)
- NL-15-1392, Enclosure 2 - SNC Standard Emergency Plan (← links)
- NL-15-1392, Enclosure 1 - Evaluation of the Proposed Changes - LAR for the Adoption of a Standard Emergency Plan for the SNC Fleet (← links)
- NL-15-1392, Joseph M. Farley Nuclear Plant Units 1 and 2; Edwin I. Hatch Nuclear Plant Units 1 and 2; Vogtle Electric Generating Plant Units 1 and 2; Vogtle Electric Generating Plant Units 3 and 4 Standard Emergency Plan (← links)
- NL-15-1447, E.I. Hatch ISFSI - Registration of Spent Fuel Cask Use (← links)
- NL-15-1241, E.I. Hatch - Registration of Spent Fuel Cask Use (← links)
- NL-15-1032, E. I. Hatch, Unit 2 - Inservice Inspection Program Owner'S Activity Report for Outage 2R23 (← links)
- NL-15-0979, E.I. Hatch - Registration of Spent Fuel Cask Use (← links)
- NL-15-0820, Hatch, Units 1 and 2 - Emergency Plan, Revision 37 (← links)
- NL-15-0309, Enclosure 1: Edwin I. Hatch Units 1 & 2, Version 36 to Emergency Plan (← links)
- NL-14-1416, E. I. Hatch, Unit 2 - Supplemental Information Regarding Proposed Safety Limit Minimum Critical Power Ratio (SLMCPR) License Amendment (← links)
- NL-13-2180, Edwin Hatch - Letter of Intent to Adopt the 2001 Edition of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (← links)
- NL-13-1161, E. I. Hatch, Unit 2 - Inservice Inspection Program, Owner'S Activity Report for Outage 2R22 (← links)
- NL-12-1078, Letter from M. Ajluni, Sc to NRC on Edwin Hatch License Amendment Request to Revise the Minimum Water Level in the Plant Service Water Pump Well (← links)
- NL-12-2269, Edwin I. Hatch, Unit 2, Seismic Recommendation 2.3 Walkdown Report in Response to Request for Information Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident (← links)
- NL-12-1078, Edwin I. Hatch, Units 1 and 2, License Amendment Request to Revise the Minimum Water Level in the Plant Service Water Pump Well (← links)
- NL-12-1321, Special Report 12-001-00 for Edwin I. Hatch, Unit 2, Regarding Post Accident Temperature Instrument Out of Service Greater than 30 Days (← links)
- NL-12-0673, E. I. Hatch Nuclear Plant- Unit 1, Cycle 26 Core Operating Limits Report, Version 1 (← links)
- NL-11-2032, D. R. Madison Ltr. Edwin I. Hatch, Appeal to the Executive Director of Operations: Backfit and Applicability of Compliance Backfit Exception (← links)
- NL-11-1812, Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Fire Hazards Analysis Changes, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Report, and Revised NRC Commitments Report (← links)
- NL-11-0985, E. I. Hatch, SNC Response to NRC Bulletin 2011-01 Mitigating Strategies (← links)
- NL-11-1134, E. I. Hatch, Units 1 & 2, Comments Opposing NRC Acceptance of Petition for Emergency Enforcement Action for GE Boiling Water Reactors Utilizing Mark 1 Primary Containment Systems & Without Dedicated Class E1 Power for Cooling Elevated Irr (← links)
- NL-11-0451, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (← links)
- NL-10-0824, Edwin I. Hatch, Unit 2, Proposed Exemption from Fuel Cladding Material Requirements in 10 CFR 50.46 and 10 CFR 50 Appendix K (← links)
- NL-08-1906, LER 08-S01-00, for Edwin I. Hatch, Failure to Report Arrest Results in Inappropriate Access to Protected and Vital Areas (← links)
- NL-08-1250, Edwin I. Hatch, Unit 2 - Submittal of Additional Information to Support Proposed Exemption to 10 CFR 50.46 and 10 CFR 50 Appendix K to Allow Ziron Fuel Cladding (← links)
- NL-17-1089, Edwin I. Hatch Nuclear Plant Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis (← links)
- ML18226A095 (← links)
- NL-07-0185, Submittal of Edwin I. Hatch - Fourth 10-Year Interval ISI Plan (← links)
- NL-06-2726, LER 06-S01-00 for Edwin I. Hatch Nuclear Plant, Re Contract Employee Failure to Self-Disclose Material Information for Unescorted Access (← links)
- NL-06-0756, E. I. Hatch Operating License Revision to Support Use of Potassium Iodide for an Interim Period, Supplemental Information (← links)
- NL-06-0685, E. I. Hatch Unit 1 Notification of Deviations from BWRVIP-76 and BWRVIP-84 (← links)
- NL-18-0713, Request for Alternative HNP-ISI-ALT-05-08 to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping for Hatch Unit 1 Plant Service Water (← links)
- NL-16-0827, E. I. Hatch, Units 1 and 2 - Withdrawal of TSTF-500 Request to Increase the Completion Time for the Station Service Batteries from 2 to 12 Hours (← links)
- NL-14-1839, E. I. Hatch, Units 1 and 2, First Six-Month Status Report of the Implementation of the Commission Order with Regard to Requirements for Reliable Hardened Containment Vents (EA-13-109) (← links)
- NL-07-0129, D.R. Madison, Southern Nuclear Operation Company, Inc. Ltr. Edwin I. Hatch Nuclear Plant, Notice of Violation and Proposed Imposition of Civil Penalty Method of Payment (← links)
- NL-18-1333, Completion of Required Action for NRC Order EA-13-109 Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (← links)
- NL-18-1336, Relief Request Reactor Pressure Vessel Stud HNP-ISI-RR-05-02 (← links)
- NL-18-0774, Lnservice Inspection Program Owner'S Activity Report for Outage 1R28 (← links)
- NL-18-0639, Response to Request for Information Regarding Safety Relief Valve Main Valve Body Testing Extension (← links)
- NL-18-0541, Response to Request for Additional Information for Alternative RR-V-11 Regarding Main Steam Safety Valve Testing Requirements (← links)
- NL-17-1916, Pressure and Temperature Limits Report (← links)
- NL-17-1490, Deviation for Shroud Support Vertical Welds. BWRVIP-76 (Rev. 1-A) (← links)
- NL-17-1366, Proposed Alternative RR-V-11 Regarding Main Steam Safety Relief Valve Testing Requirements (← links)
- NL-17-0951, Inservice Inspection Program, Owner'S Activity Report for Outage 2R24 (← links)
- NL-17-0841, Correction of Technical Specification Typographical Error (← links)
- NL-17-0248, Relief Request Reactor Pressure Vessel Stud Inspection (← links)
- NL-16-2383, Information Report for Lead Use Assemblies (← links)
- NL-16-2457, Supplemental Information Regarding Proposed Safety Limit Minimum Critical Power Ratio (SLMCPR) License Amendment (← links)