NL-07-0185, Submittal of Edwin I. Hatch - Fourth 10-Year Interval ISI Plan

From kanterella
Jump to navigation Jump to search
Submittal of Edwin I. Hatch - Fourth 10-Year Interval ISI Plan
ML070430069
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/07/2007
From: George B
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-07-0185
Download: ML070430069 (3)


Text

Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 205.992.5000 SOUTHERN M COMPANY February 7, 2007 Energy to Serve Your World'"

Docket Nos.:

50-321 NL-07-0185 50-366 U. S. Nuclear Regulatory Cormmission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Fourth 10-Year Interval ISI Plan Ladies and Gentlemen:

Per the requirements of IWA-1400(c) of the 2001 Edition of Section XI ASME Code with Addenda through 2003, Southern Nuclear Operating Company (SNC) hereby submits the Edwin I. Hatch Nuclear Plant (HNP) Unit 1 and 2 Fourth 10-Year Interval Inservice Inspection (ISI) Plan.

The 4th Interval ISI Plan is a compilation of ISI related activities. Each activity is located in a specific volume of the collective plan and is considered to be a stand-alone document with approval documentation for each volume. The enclosed plan consists of the following (excluding Volumes 4 and 5):

Volume 1: General Introduction Volume 2: Class 1, 2, and 3 Inservice Inspection (ISI) Examinations Volume 3: Class 1, 2, and 3 Sketches Volume 4: BWRVIP Vessel Internals (not included with this submittal - not Section XI ASME Code related)

Volume 5: IWE Containment Examinations (not included with this submittal per 10 CFR 50.55a(g)(6)(ii)(B))

Volume 6: Class 1, 2, and 3 Pressure Testing This letter contains no NRC commitments. If you have any questions, please advise.

Sincerely, B. J.

e e

Manager, Nuclear Licensing BJG/MNW/daj Ile CL',(O

U. S. Nuclear Regulatory Commission NL-07-0185 Page 2

Enclosure:

HNP Fourth 10-Year Interval ISI Plan (Volumes 1-3, 6) cc:

Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. D. R. Madison, Vice President - Hatch Mr. D. H. Jones, Vice President - Engineering RTYPE: CHA02.004 U. S. Nuclear Regulatory Commission Dr. W. D. Travers, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Hatch Mr. D. S. Simpkins, Senior Resident Inspector - Hatch

Enclosure Edwin I. Hatch Nuclear Plant Fourth 10-Year Interval ISI Plan HNP Fourth 10-Year Interval ISI Plan (Volumes 1-3, 6)