Pages that link to "CNL-15-250, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 7"
Jump to navigation
Jump to search
The following pages link to CNL-15-250, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 7:
Displayed 50 items.
- ML13253A075 (← links)
- ML11249A046 (← links)
- ML112150096 (← links)
- CAC:MF6741 (← links)
- NL-17-012, Browns Ferry, Units 1, 2, and 3, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2 - Organization Topical Report, TVA-NPOD89-A (← links)
- NL-15-169, Browns Ferry, Units 1, 2, and 3, Areva Affidavits (← links)
- NL-15-169, Browns Ferry, Units 1, 2, and 3, General Electric Hitachi Affidavits (← links)
- NL-15-169, Browns Ferry, Units 1, 2 and 3, ANP-3327NP, Revision 1, Evaluation of Areva Fuel Thermal-Hydraulic Performance for Browns Ferry at EPU (← links)
- ML101160299 (← links)
- ML092600185 (← links)
- ML090220394 (← links)
- ML082470029 (← links)
- ML081550279 (← links)
- ML080710498 (← links)
- ML072490146 (← links)
- ML072130371 (← links)
- ML062170004 (← links)
- ML061950670 (← links)
- ML061300436 (← links)
- ML060720281 (← links)
- CNL-18-081, Request for Review and Approval of Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041, Revision 1 (← links)
- CNL-18-069, Tennessee Valley Authority - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revisions 35 and 36 (← links)
- CNL-16-163, Tennessee Valley Authority Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (← links)
- CNL-16-119, Brown Ferry Nuclear Plant, Unit 1, 2 and 3 - Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information Related to Replacement Steam Dryers (← links)
- CNL-16-091, Brown Ferry, Units 1, 2 & 3, Responses to Requests for Additional Information and Updates Associated with Interconnection System Impact Study Modifications on Proposed Technical Specifications Change TS-505 - Request for License Amendment (← links)
- CNL-15-247, Brown Ferry Unit 1, Submittal of Response to NRC Request for Additional Information Re Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506). Enclosure 2 ANP-3458NP Enclose (← links)
- CNL-15-250, Browns Ferry, Units 1, 2, and 3 - Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 7 (redirect page) (← links)
- CNL-15-250 (redirect page) (← links)
- CNL-14-226, Organization Topical Report, TVA-NPOD89-A (← links)
- CNL-18-131, Extended Power - Uprate Replacement Steam Dryer Core Flow Sweep Report - Supplemental Information (← links)
- CNL-18-125, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report (← links)
- CNL-18-124, Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports (← links)
- CNL-18-112, Extended Power Uprate - Flow Induced Vibration Summary Report (← links)
- CNL-18-106, Extended Power Uprate Replacement Steam Dryer Core Flow Sweep Test Report (← links)
- CNL-18-062, Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to Unit 1 License Condition 2.C(18)(a)3, Supplement 1 (← links)
- CNL-18-041, Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)3 (← links)
- CNL-18-042, Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 1 (← links)
- CNL-17-035, Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate(Epu) - Supplement 38, Spent Fuel Pool Criticality Safety Analysis - Updated Information (← links)
- CNL-17-017, Proposed Technical Specifications (TS) Change TS-505 Request for License Amendments - Extended Power Uprate (EPU) - Supplement 37, Transmission System Update - Environmental Aspects (← links)
- CNL-17-015, Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Safety Aspects (← links)
- CNL-16-161, Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 33, Revised Response to Request for Additional.. (← links)
- CNL-16-150, Revised Response to Requests for Additional Information Proposed Technical Specifications Change TS-505 - Request for License Amendment - Extended Power Uprate - Supplement 31 (← links)
- CNL-16-152, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 32, Revised Responses to Requests for Additional Information (← links)
- CNL-16-129, Response to Request for Additional Information Regarding Proposed Technical Specifications (TS) Change TS-505 License Amendments - Extended Power Uprate (EPU) - Supplement 29 (← links)
- CNL-16-127, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Upgrade (EPU) - Supplement 28, Responses to Requests for Additional Information (← links)
- CNL-16-114, Responses to Requests for Additional Information and Containment Accident Pressure Credit Elimination Updates on Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate . (← links)
- CNL-16-116, Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 25 (← links)
- CNL-16-109, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates (← links)
- CNL-16-105, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 22, Responses to Requests for Additional Information (← links)
- CNL-16-093, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 19, Responses to Requests for Additional Information (← links)