Pages that link to "Carlisle C"
Jump to navigation
Jump to search
The following pages link to Carlisle C:
Displayed 21 items.
- GO2-83-652, Revised Final Deficiency Rept for Condition 212 Re 8-H Rayproof Doors & Interim Deficiency Rept for Condition 262 Re Installation of Unapproved Power Piping Brackets.Next Rept Expected by 831021 (← links)
- GO2-83-654, Interim Deficiency Rept Item 221 & Final Deficiency Rept Item 251 Re Namco EA180 & EA740 Limit Switches & Limitorque Motor Operators W/Motors from Baldor Electric Co, Respectively.Initially Reported on 830104 & 0422 (← links)
- GO2-83-622, Forwards Info Re as-built Seismic Category I Quality Class II Hangers,Spec Requirement & Documentation Relative to hold-down Bolts for Reactor Vessel to Assist in Resolution of Issues Raised by Const Assessment Team (← links)
- GO2-83-610, Interim Deficiency Rept Re Reportable Condition 264, Concerning Improperly Sized Overcurrent Devices.Initially Reported on 830609.Pump & Valve Operator Motor Fuses Replaced.Fuse Size Verified.Next Rept by 831003 (← links)
- GO2-83-595, Final Deficiency Rept Condition 246 Re Balance of Plant Board G-2 Design Error.Initially Reported on 830315.AE Issued Project Engineering Directive (PED-218-E-B375) to Switch Power Supplies (← links)
- GO2-83-442, Forwards Final Response to IE Bulletin 79-02,Rev 2 Re Reliability of Pipe Support Base Plates Using Concrete Expansion Anchor Bolts in Seismic Category I Piping Sys. Approx 10,000 Seismic Category I Supports Utilized (← links)
- GO2-83-701, Responds to NRC Re Deviations Noted in IE Insp Rept 50-397/83-22.No Corrective Actions Planned Re Aisc/Nf Boundary.Clarification of FSAR Paragraph 3.2.3 Will Be Submitted by 830901 (← links)
- GO2-83-463, Final Deficiency Repts 229 & 254 Re Hangers Not Installed in Turned Over HPCS Sys 7.1 & Improper Installation of Lubrite Assemblies,Respectively.Interim Rept 251 Re Limitorque Motor Operators W/Motors Supplied by Baldor Encl (← links)
- GO2-83-731, Forwards Interim Deficiency Repts for Condition 216 Re RHR Relief Valve Vents & Condition 270 Re Indeterminate Grade Matl on ECCS Pumps (← links)
- GO2-83-366, Forwards WNP-2 Project Review of Completed Safety-Related Work, Fourteenth Progress Rept for Jan-Mar 1983,per Util 800717 Commitments in Response to Notice of Violation & Addl Info in Accordance w/10CFR50.54(f) (← links)
- GO2-83-389, Interim Deficiency Repts on Condition 221 Re Namco EA-180 & EA-740 Limit Switches & Condition 226 Re 125-volt Dc Motor Operator Connected to 250-volt Dc Power Source.Next Rept by 830726 (← links)
- GO2-83-358, Interim Deficiency Repts Re IE Circular 81-05, Sway Strut/ Snubber End Bushings & Anaconda Flexible Conduit.Initially Reported on 821202 & 830321,respectively.Quarterly Updates Will Continue to Be Provided.Next Rept Expected by 830720 (← links)
- GO2-83-314, Interim Deficiency Rept Re balance-of-plant Board G-2 Design Error.Initially Reported on 830315.Drawing Part Lists Will Be Updated to Provide Correct Part Numbers.Next Rept Will Be Submitted by 830706 (← links)
- GO2-83-313, Final Deficiency Rept Re Incorrect Wiring of Reactor Vessel Water Level Indicating Switches MS-LIS-37A & MS-LIS-37C. Initially Reported on 830315.Switches Rewired to Conform to GE Design Requirements (← links)
- GO2-83-573, Forwards Deficiency Repts Re Condition 240,loss of ESF Loads on Undervoltage Trip & Condition 258,RHR HX Installation (← links)
- GO2-83-436, Interim Deficiency Repts 216 & 223 Re Gaseous Release from RHR Relief Valve Vents & Inadequate Standby Liquid Control Sys,Respectively.Final Deficiency Rept 232 Re Improper Installation of RHR Support Pin Receptacle Also Encl (← links)
- GO2-82-958, Responds to NRC Re Violations & Deviations Noted in IE Insp Rept 50-397/82-21.Corrective Actions:Electrical Separation Project Engineering Directives Reviewed to Identify Cables Affected by 6-inch Separation Requirements (← links)
- GO2-83-353, Final & Interim Deficiency Repts Re Class IE Cables in Seismic Category 1 Raceways & Standby Gas Treatment Sys Damper.Next Rept by 830718 (← links)
- GO2-83-349, Part 21 Rept Re Linear Indications Identified in SA 106 Grade Pipe.Initially Reported on 830413.Caused by Mfg Process Error & Ultrasonic Exam Inadequacies.All Seamless Pipe Put on Hold & Magnetic Particle Examined (← links)
- GO2-83-333, Final Deficiency Rept Re Failure of Temp Control Modules WMA-TS-12A & 12B During Qualification Testing (Condition 238).Initially Reported on 830310.Printed Circuit Board Traces Replaced W/Wire Jumpers.Condition Not Reportable (← links)
- ML20059E996 (← links)