Pages that link to "05000413/LER-2014-001"
Jump to navigation
Jump to search
The following pages link to 05000413/LER-2014-001:
Displayed 34 items.
- 05000413/LER-1990-025, Notifies of Missed Commitment & Change in Commitment Re LER 90-025 & Insp Repts 50-413/90-09 & 50-414/90-09.Prior Commitment Is Being Changed to Allow Continued Use of Vendor Methodology (← links)
- 05000413/LER-1999-005, Forwards LER 99-005-00 Entitled, Surveillance Requirements for Turbine Trip-Reactor Trip Functions Incorrectly Performed Causing TS Non-Compliance. Expected Submittal Date for Suppl Rept Is 990429 (← links)
- 05000413/LER-1999-003, Forwards LER 99-003-00 Re Inoperability of Eight Ice Condenser Inlet Doors Caused by Ice/Frost Buildup That Could Restrict Door Movement.Rept Contains No New Regulatory Commitments (← links)
- 05000413/LER-1999-002, Forwards LER 99-002-00,re Three RHR Sys Valves Which Did Not Meet Edf Response Time Requirements.Commitments Made by Util Are Listed in Planned Corrective Actions Section (← links)
- 05000413/LER-1999-001, Forwards LER 99-001-00,re Inoperable Refueling Water Storage Tank Level Channels Resulting in Operation Outside Design Basis.Commitments Are Provided in Planned Corrective Action Section of LER (← links)
- 05000413/LER-1997-008, Forwards LER 97-008-00 Re Inadequate Solid State Protection Sys Surveillance Testing.Event Considered to Be No Significance W/Respect to Health & Safety of Public (← links)
- 05000413/LER-1998-019, Forwards LER 98-019-00 Re Inoperable Standby Shutdown Facility in Excess of TS AOT Due to Mispositioned Breakers. One Regulatory Commitment Is Contained in Planned Corrective Actions Section of Rept (← links)
- 05000413/LER-1999-007, Forwards LER 99-007-00,re Operation Prohibited by TS 3.4.7. Commitments Identified in LER Are Listed in Planned Corrective Actions Section (← links)
- 05000413/LER-1997-009, Forwards LER 97-009-02, Unanalyzed Postulated Single Failure Affecting SG Tube Rupture Analysis, Suppl Revises Planned C/A Described in Suppl 1 to Ler.Current Status of C/As & Addl C/As Planned,Provided in Rept (← links)
- 05000413/LER-1999-006, Forwards LER 99-006-00,re CR Ventilation Sys Inoperability. Root Cause & Corrective Actions for Occurence Are Being Finalized & Will Be Reported in Supplement Rept on 990607 (← links)
- 05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach (← links)
- 05000413/LER-1998-014, Forwards LER 98-014-00 Concerning Misinterpretation of TSs Resulting in Failure to Perform DG Surveillance Requirement within Required Surveillance Interval (← links)
- 05000413/LER-1998-015, Forwards LER 98-015-00 Re TS Required Shutdown & Operation Prohibited by TS Associated W/Ice Condenser.Rept Will Be Revised by 981015 (← links)
- 05000413/LER-1998-013, Forwards LER 98-013-01 Re Operation Outside of Tech Specs Due to Analyzing Grab Samples at Incorrect Lower of Detection.Two Regulatory Commitments Contained in Planned Corrective Actions Section of Rept (← links)
- 05000413/LER-1998-009, Forwards LER 98-009-00,concerning Unit Entering TS 3.0.3 Due to Inadequate Testing of Auxiliary Bldg Filtered Exhaust Sys (← links)
- 05000413/LER-1998-011, Forwards LER 98-011-00 Re Two Inoperable Refueling Water Storage Tank Level Channels on Each Unit Due to Lightning Activity.Commitments Made by Util Are Contained in Planned Corrective Action Section of LER (← links)
- 05000413/LER-1998-006, Forwards LER 98-006-00,re Missed TS Surveillance on Pressurizer Heater Emergency Power Supply Testing. Commitments Made within Ltr,Encl (← links)
- 05000413/LER-1998-005, Forwards LER 98-005-00,re Missed TS Surveillance on Abv. Commitments Made within Ltr,Encl (← links)
- 05000413/LER-1998-002, Forwards LER 98-002-00,incorrectly Set Valve Leads to Elevated Condensate Storage Sys Temperature,Causing Condition Outside Design Basis of Plant.Planned Corrective Actions Section of Rept Contain Commitments (← links)
- 05000413/LER-1998-012, Forwards LER 98-012-00 Re Entry Into TS 3.0.3 Due to Inoperability of Both Trains of CR Ventilation Caused by Improper Sys Isolation (← links)
- 05000413/LER-1998-010, Forwards LER 98-010-00,re Pinhole Leak in AFW Nozzle Tempering Line.Commitments Are Contained in Planned Corrective Action Section of Rept (← links)
- 05000413/LER-1987-037, Advises That Submittal of LER 87-037-00,re Itt Grinnell mini-stiff Pipe Clamps Found Broken Due to Improper Heat Treatment,Will Be Delayed Until 871215 to Allow for Analysis & Review of Pertinent Info (← links)
- 05000413/LER-1998-007, Forwards LER 98-007-00,concerning Missed TS Surveillance on Containment Penetration Testing Due to Literal Compliance Issue (← links)
- 05000413/LER-1987-036, Advises That LER 87-36 Re Operation of Nuclear Svc Water Sys Will Be Delayed to Allow for Proper Review & Consideration of Info Recently Gathered by Util.Ler Originally Due on 870930.Rept Will Be Submitted on 871023 (← links)
- 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept (← links)
- 05000413/LER-1998-001, Forwards LER 98-001-00 Re Both Trains of Control Room Area Ventilation Inadvertently Disabled During Restoration.Ltr Contains Commitments to Perform Corrective Actions (← links)
- 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept (← links)
- 05000413/LER-1987-011, Forwards LER 87-011-03 Re Shutdown Due to Diesel Generator Inoperability Because of Mfg Deficiency.Ler 87-011-01,dtd 870506 Should Have Been Rev 2 & Did Not Include Changes from 870413 Submittal (← links)
- 05000413/LER-1986-037, Forwards LER 86-037-00 Re Inoperable Ice Condenser Lower Inlet Doors Due to Personnel Error.Event of No Significance to Health & Safety of Public.Previous LER Numbered 86-037 Changed to 86-033 by (← links)
- 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment (← links)
- 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER (← links)
- 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment (← links)
- 05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units (← links)
- 05000413/LER-2021-005, Automatic Actuation of the 1B Emergency Diesel Generator Load Sequencer on Bus Under-voltage Condition (← links)