ML11215A161: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| document type = Enforcement Notification
| document type = Enforcement Notification
| page count = 2
| page count = 2
| project =
| stage = Approval
}}
}}
=Text=
{{#Wiki_filter:August 3, 2011 EN 11-024 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Dominion Nuclear Connecticut, Inc. EA-11-047  Millstone Power Station, Unit 2 Docket No. 50-336
==Subject:==
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation for two violations associated with a White Significance Determination Process finding will be issued on or about August 8, 2011, to Dominion Nuclear Connecticut, Inc. (licensee), as a result of inspections at Millstone Power Station, Unit 2. This White finding, an issue of low to moderate safety significance, will require additional U.S. Nuclear Regulatory Commission (NRC) inspections. It involves multiple human performance errors, including the failures of Millstone Unit 2 personnel to carry out their assigned roles and responsibilities, as well as to exercise adequate reactivity management, during main turbine control valve testing on February 12, 2011. This resulted in an unintended eight percent reactor power increase during the test.
At the request of the licensee, a Regulatory Conference was held July 19, 2011, to discuss the risk significance of the finding. After reviewing the information developed during the inspection and the supplemental information provided by the licensee during the conference, the staff concluded that the inspection finding is appropriately characterized as White. Dominion has informed the NRC that multiple corrective actions are in place and/or planned. A Notice of Violation is included based on two violations involving the licensee's failure to meet its Technical Specifications requirements. The two violations involve failures by Millstone Unit 2 staff to:  1) correctly implement written procedures regarding their authorities and responsibilities for safe operation and shutdown; and, 2) develop written procedures related to the reactor protection system and for power operation and transients involving multiple reactivity additions. These failures caused and exacerbated the February 12, 2011, unanticipated eight percent reactor power increase during the main turbine control valve testing.
It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:  Mailing of Final Significance Determination  August 8, 2011  Telephone Notification of Licensee  August 8, 2011
The State of Connecticut will be notified.
Contacts:  Gerry Gulla, OE, (301) 415-2872  Nick Hilton, OE, (301) 415-3055 Distribution: EN-11-024, August 3, 2011 OWFN  Chairman Jaczko  Comm. Svinicki Comm. Apostolakis Comm. Magwood Comm. Ostendorff SECY OCA PA IP OWFN EDO DEDR DEDMRS OE OGC NRR NSIR OI  TWFN  OCFO OP CENTER FSME OIG OCIO RES ACRS  EBB NMSS  Regional Offices RI          RII RIII        RIV MAIL ADAMS OE staff Electronic DISTRIBUTION:  R. Zimmerman, OE N. Hilton, OE G. Gulla, OE OE r/f EN binder X  PUBLIC      X NON-SENSITIVE ADAMS ML11215A161 OFFICE OE:ES  OE:BC  NAME N. Coleman N. Hilton DATE 8/3/2011 8/3/2011 OFFICIAL RECORD COPY}}

Revision as of 12:33, 4 August 2018

EN-11-024, Millstone Unit 2, Issuance of Final Significance Determination and Notice of Violation, Dominion Nuclear Connecticut, Inc., (EA-11-047)
ML11215A161
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/03/2011
From: Hilton N D, Gulla G J
NRC/OE
To:
Coleman N G
References
EA-11-047 EN-11-024
Download: ML11215A161 (2)


Text

August 3, 2011 EN 11-024 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Dominion Nuclear Connecticut, Inc. EA-11-047 Millstone Power Station, Unit 2 Docket No. 50-336

Subject:

ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation for two violations associated with a White Significance Determination Process finding will be issued on or about August 8, 2011, to Dominion Nuclear Connecticut, Inc. (licensee), as a result of inspections at Millstone Power Station, Unit 2. This White finding, an issue of low to moderate safety significance, will require additional U.S. Nuclear Regulatory Commission (NRC) inspections. It involves multiple human performance errors, including the failures of Millstone Unit 2 personnel to carry out their assigned roles and responsibilities, as well as to exercise adequate reactivity management, during main turbine control valve testing on February 12, 2011. This resulted in an unintended eight percent reactor power increase during the test.

At the request of the licensee, a Regulatory Conference was held July 19, 2011, to discuss the risk significance of the finding. After reviewing the information developed during the inspection and the supplemental information provided by the licensee during the conference, the staff concluded that the inspection finding is appropriately characterized as White. Dominion has informed the NRC that multiple corrective actions are in place and/or planned. A Notice of Violation is included based on two violations involving the licensee's failure to meet its Technical Specifications requirements. The two violations involve failures by Millstone Unit 2 staff to: 1) correctly implement written procedures regarding their authorities and responsibilities for safe operation and shutdown; and, 2) develop written procedures related to the reactor protection system and for power operation and transients involving multiple reactivity additions. These failures caused and exacerbated the February 12, 2011, unanticipated eight percent reactor power increase during the main turbine control valve testing.

It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is: Mailing of Final Significance Determination August 8, 2011 Telephone Notification of Licensee August 8, 2011

The State of Connecticut will be notified.

Contacts: Gerry Gulla, OE, (301) 415-2872 Nick Hilton, OE, (301) 415-3055 Distribution: EN-11-024, August 3, 2011 OWFN Chairman Jaczko Comm. Svinicki Comm. Apostolakis Comm. Magwood Comm. Ostendorff SECY OCA PA IP OWFN EDO DEDR DEDMRS OE OGC NRR NSIR OI TWFN OCFO OP CENTER FSME OIG OCIO RES ACRS EBB NMSS Regional Offices RI RII RIII RIV MAIL ADAMS OE staff Electronic DISTRIBUTION: R. Zimmerman, OE N. Hilton, OE G. Gulla, OE OE r/f EN binder X PUBLIC X NON-SENSITIVE ADAMS ML11215A161 OFFICE OE:ES OE:BC NAME N. Coleman N. Hilton DATE 8/3/2011 8/3/2011 OFFICIAL RECORD COPY