{{#Wiki_filter:Adam C. Heflin, President, | {{#Wiki_filter:Adam C. Heflin, President, Chief Executive | ||
Chief Executive | Officer, and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY | ||
Officer, | |||
and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY | |||
COMMISSION | COMMISSION | ||
REGION IV 1600 EAST LAMAR BOULEVARD | REGION IV 1600 EAST LAMAR BOULEVARD | ||
ARLINGTON, | ARLINGTON, TEXAS 76011-4511 | ||
TEXAS 76011-4511 | |||
May 29, 2018 Wolf Creek Nuclear Operating | May 29, 2018 Wolf Creek Nuclear Operating | ||
Corporation | Corporation | ||
P.O. Box411 Burlington, | P.O. Box411 Burlington, KS 66839 SUBJECT: ERRATA FOR WOLF CREEK NUCLEAR OPERATING | ||
KS 66839 SUBJECT: | |||
ERRATA FOR WOLF CREEK NUCLEAR OPERATING | |||
CORPORATION | CORPORATION | ||
-NOTIFICATION | -NOTIFICATION | ||
OF INSPECTION | OF INSPECTION (NRC INSPECTION | ||
(NRC INSPECTION | |||
REPORT 05000482/2018002) | REPORT 05000482/2018002) | ||
AND REQUEST FOR INFORMATION | AND REQUEST FOR INFORMATION | ||
| Line 49: | Line 43: | ||
report number is 05000482/2018003. | report number is 05000482/2018003. | ||
Please note none of the content of the request for information has changed. | Please note none of the content of the request for information has changed. | ||
The NRC has reissued | The NRC has reissued the notification | ||
the notification | in its entirety to correct this error. This fetter, its enclosure, and your response (if any) will be made available | ||
in its entirety | |||
to correct this error. This fetter, its enclosure, | |||
and your response | |||
(if any) will be made available | |||
for public inspection | for public inspection | ||
and copying at http:/!www.nrc.gov/reading-rm/adams.html | and copying at http:/!www.nrc.gov/reading-rm/adams.html | ||
and at the NRC Public Document | and at the NRC Public Document Room in accordance | ||
Room in accordance | with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." Docket No. 50-482 License No. NPF-42 Enclosure: | ||
with 10 CFR 2.390, "Public Inspections, | Sincerely, IRA/ Vincent G. Gaddy, Chief Operations | ||
Exemptions, | Branch Division of Reactor Safety WOLF CREEK NUCLEAR OPERA TING CORPORATION | ||
Requests | |||
for Withholding." | |||
Docket No. 50-482 License No. NPF-42 Enclosure: | |||
Sincerely, | |||
IRA/ Vincent G. Gaddy, Chief Operations | |||
Branch Division | |||
of Reactor Safety WOLF CREEK NUCLEAR OPERA TING CORPORATION | |||
-NOTIFICATION | -NOTIFICATION | ||
OF INSPECTION | OF INSPECTION (NRC INSPECTION | ||
(NRC INSPECTION | |||
REPORT 05000482/2018003) | REPORT 05000482/2018003) | ||
AND REQUEST FOR INFORMATION | AND REQUEST FOR INFORMATION | ||
| Line 78: | Line 60: | ||
CORPORATION | CORPORATION | ||
-NOTIFICATION | -NOTIFICATION | ||
OF INSPECTION | OF INSPECTION (NRC INSPECTION | ||
(NRC INSPECTION | |||
REPORT 05000482/2018002) | REPORT 05000482/2018002) | ||
AND REQUEST FOR INFORMATION- | AND REQUEST FOR INFORMATION- | ||
DATED MAY 29, 2018 DISTRIBUTION: | DATED MAY 29, 2018 DISTRIBUTION: | ||
KKennedy, | KKennedy, ORA SMorris, ORA TVegel, DRP Rlantz, DRP MShaffer, DRS JClark, DRS DDodson, DRP FThomas, DRP NTaylor, DRP DProulx, DRP JMelfi,DRP | ||
ORA SMorris, | ECombs, DRP SGalemore, DRP VDricks, ORA BSingal, NRR GGeorge, DRS EUribe, DRS MHerrera, DRMA R4Enforcement | ||
ORA TVegel, DRP Rlantz, DRP MShaffer, | SKirkwood, OGC JWeil, OWFN AMoreno, OWFN JBowen, OEDO BMaier, ORA ADAMS ACCESSION | ||
DRS JClark, DRS DDodson, | NUMBER: ML 18145A249 SUNSI Review [&] Non-Sensitive Publicly Available | ||
DRP FThomas, | |||
DRP NTaylor, | |||
DRP DProulx, | |||
DRP JMelfi,DRP | |||
ECombs, DRP SGalemore, | |||
DRP VDricks, | |||
ORA BSingal, | |||
NRR GGeorge, | |||
DRS EUribe, DRS MHerrera, | |||
DRMA R4Enforcement | |||
SKirkwood, | |||
OGC JWeil, OWFN AMoreno, | |||
OWFN JBowen, OEDO BMaier, ORA ADAMS ACCESSION | |||
NUMBER: ML 18145A249 SUNSI Review [&] Non-Sensitive Publicly | |||
Available | |||
Bv: JCK CJ Sensitive | Bv: JCK CJ Sensitive | ||
CJ Non-Publiclv | CJ Non-Publiclv | ||
| Line 107: | Line 73: | ||
C:OB NAME JKiridand | C:OB NAME JKiridand | ||
VGaddy SIGNATURE | VGaddy SIGNATURE | ||
IRA/ IRA/ DATE 05/29/18 | IRA/ IRA/ DATE 05/29/18 05/29/18 OFFICIAL RECORD COPY Keyword: NRC-002 | ||
05/29/18 | Adam C. Heflin, President, Chief Executive | ||
OFFICIAL | Officer, and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY | ||
RECORD COPY Keyword: | |||
NRC-002 | |||
Adam C. Heflin, President, | |||
Chief Executive | |||
Officer, | |||
and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY | |||
COMMISSION | COMMISSION | ||
REGJON IV 1600 EAST LAMAR BOULEVARD | REGJON IV 1600 EAST LAMAR BOULEVARD | ||
| Line 122: | Line 82: | ||
May 29, 2018 Wolf Creek Nuclear Operating | May 29, 2018 Wolf Creek Nuclear Operating | ||
Corporation | Corporation | ||
P.O. Box411 Burlington, | P.O. Box411 Burlington, KS 66839 SUBJECT: WOLF CREEK NUCLEAR OPERATING | ||
KS 66839 SUBJECT: | |||
WOLF CREEK NUCLEAR OPERATING | |||
CORPORATION | CORPORATION | ||
-NOTIFICATION | -NOTIFICATION | ||
OF INSPECTION | OF INSPECTION (NRC INSPECTION | ||
(NRC INSPECTION | |||
REPORT 05000482/2018003) | REPORT 05000482/2018003) | ||
AND REQUEST FOR INFORMATION | AND REQUEST FOR INFORMATION | ||
Dear Mr. Heflin: The purpose of this letter is to notify you that the U.S. Nuclear Regulatory | Dear Mr. Heflin: The purpose of this letter is to notify you that the U.S. Nuclear Regulatory | ||
Commission | Commission (NRC) staff will conduct a biennial requalification | ||
(NRC) staff will conduct a biennial | |||
requalification | |||
inspection | inspection | ||
at the Wolf Creek Nuclear Operating | at the Wolf Creek Nuclear Operating | ||
| Line 145: | Line 100: | ||
with the NRC Inspection | with the NRC Inspection | ||
Procedure | Procedure | ||
{IP) 71111.11 | {IP) 71111.11 B, "Licensed | ||
B, "Licensed | Operator Requalification | ||
Operator | Program." Experience | ||
Requalification | |||
Program." | |||
Experience | |||
has shown that this inspection | has shown that this inspection | ||
is a resource | is a resource intensive | ||
intensive | |||
inspection | inspection | ||
both for the NRC inspectors | both for the NRC inspectors | ||
and your staff. In order to minimize | and your staff. In order to minimize the impact to your on-site resources | ||
the impact to your on-site resources | |||
and to ensure a productive | and to ensure a productive | ||
inspection, | inspection, we have enclosed a request for documents | ||
we have enclosed | |||
a request for documents | |||
needed for this inspection. | needed for this inspection. | ||
These documents | These documents | ||
have been divided into three groups. The first group (Section | have been divided into three groups. The first group (Section A of the enclosure) | ||
A of the enclosure) | |||
identifies | identifies | ||
information | information | ||
to be provided | to be provided prior to the inspection | ||
prior to the inspection | |||
to ensure that the inspectors | to ensure that the inspectors | ||
are adequately | are adequately | ||
prepared. | prepared. | ||
The second group (Section | The second group (Section B of the enclosure) | ||
B of the enclosure) | |||
identifies | identifies | ||
the information | the information | ||
the inspectors | the inspectors | ||
will need upon arrival at the site. The third group {Section | will need upon arrival at the site. The third group {Section C of this enclosure) | ||
C of this enclosure) | |||
identifies | identifies | ||
the items which are necessary | the items which are necessary | ||
| Line 186: | Line 130: | ||
that all of these documents | that all of these documents | ||
are up-to-date | are up-to-date | ||
and complete | and complete in order to minimize the number of additional | ||
in order to minimize | |||
the number of additional | |||
documents | documents | ||
requested | requested | ||
during the preparation | during the preparation | ||
and/or the on-site portions | and/or the on-site portions of the inspection. | ||
of the inspection. | |||
We have discussed | We have discussed | ||
the schedule | the schedule for these inspection | ||
for these inspection | |||
activities | activities | ||
with your staff and understand | with your staff and understand | ||
| Line 202: | Line 142: | ||
contact for this inspection | contact for this inspection | ||
will be Ms. Lucille Stone. Our inspection | will be Ms. Lucille Stone. Our inspection | ||
dates are subject to change based on your updated schedule | dates are subject to change based on your updated schedule of examination | ||
of examination | |||
activities. | activities. | ||
If there are any questions | If there are any questions | ||
about this inspection | about this inspection | ||
or the material | or the material requested, please contact the lead inspector , John Kirkland, at (817) 200-1771 (John.Kirkland@nrc.gov | ||
requested, | |||
please contact the lead inspector | |||
, John Kirkland, | |||
at (817) 200-1771 | |||
(John.Kirkland@nrc.gov | |||
). This letter does not contain new or amended information | ). This letter does not contain new or amended information | ||
collection | collection | ||
| Line 218: | Line 152: | ||
subject To the Paperwork | subject To the Paperwork | ||
Reduction | Reduction | ||
Act of 1995 (44 U.S.C. 3501 et seq.). Existing | Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | ||
information | |||
collection | collection | ||
requirements | requirements | ||
were approved | were approved by the Office of Management | ||
by the Office of Management | |||
and Budget, control number 3150-0018. | and Budget, control number 3150-0018. | ||
A. Heflin 2 The NRC may not conduct or sponsor, | A. Heflin 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information | ||
and a person is not required | |||
to respond to, a request for information | |||
or an information | or an information | ||
collection | collection | ||
requirement | requirement | ||
unless the requesting | unless the requesting | ||
document | document displays a currently | ||
displays | |||
a currently | |||
valid Office of Management | valid Office of Management | ||
and Budget control number. In accordance | and Budget control number. In accordance | ||
with 10 CFR 2.390 of the NRC's "Agency Rules of Practice," | with 10 CFR 2.390 of the NRC's "Agency Rules of Practice," a copy of this letter and its enclosure | ||
a copy of this letter and its enclosure | |||
will be available | will be available | ||
electronically | electronically | ||
for public inspection | for public inspection | ||
in the NRC Public Document | in the NRC Public Document Room or from the Publicly Available | ||
Room or from the Publicly | |||
Available | |||
Records (PARS) component | Records (PARS) component | ||
of NRC's document | of NRC's document system (ADAMS). ADAMS is accessible | ||
system (ADAMS). | |||
ADAMS is accessible | |||
from the NRC web site at | from the NRC web site at | ||
rm/adams.html | rm/adams.html (the Public Electronic | ||
(the Public Electronic | |||
Reading Room). Docket No. 50-482 License No. NPF-42 Enclosure: | Reading Room). Docket No. 50-482 License No. NPF-42 Enclosure: | ||
Request for Information | Request for Information | ||
cc: Electronic | cc: Electronic | ||
Distribution | Distribution | ||
Sincerely, | Sincerely, IRA! Vincent G. Gaddy, Chief Operations | ||
IRA! Vincent G. Gaddy, Chief Operations | Branch Division of Reactor Safety | ||
Branch Division | |||
of Reactor Safety | |||
Inspection | Inspection | ||
Report: Inspection | Report: Inspection | ||
Dates: Initial Request for Information | Dates: Initial Request for Information | ||
Biennial | Biennial Requalification | ||
Requalification | |||
Inspection | Inspection | ||
Wolf Creek Generating | Wolf Creek Generating | ||
| Line 270: | Line 189: | ||
June 4-7, 2018 Inspection | June 4-7, 2018 Inspection | ||
Procedure: | Procedure: | ||
IP 71111.11 | IP 71111.11 B, "Licensed | ||
B, "Licensed | Operator Requalification | ||
Operator | Program" Lead Inspector: | ||
Requalification | John Kirkland, Senior Operations | ||
Program" | Engineer A. The following | ||
Lead Inspector: | |||
John Kirkland, | |||
Senior Operations | |||
Engineer | |||
A. The following | |||
information | information | ||
is requested | is requested | ||
| Line 286: | Line 200: | ||
activities. | activities. | ||
These items are fisted by section as they appear in the inspection | These items are fisted by section as they appear in the inspection | ||
module (ie 2.02, 2.04, | module (ie 2.02, 2.04, etc). Requested | ||
etc). Requested | |||
materf als should be sent either electronically | materf als should be sent either electronically | ||
or CD/DVD ( do not send USB drives) in order to arrive at the Region IV office no later than May 14, 2018. * Electronically: | or CD/DVD ( do not send USB drives) in order to arrive at the Region IV office no later than May 14, 2018. * Electronically: | ||
| Line 295: | Line 208: | ||
Commission | Commission | ||
Region IV General Bequests: | Region IV General Bequests: | ||
ATTN: John Kirkland | ATTN: John Kirkland 1600 E. Lamar Blvd Arlington, TX 76011 * List of licensed operators (SRO and RO) by crew (operating | ||
1600 E. Lamar Blvd Arlington, | and staff) * Training and Operations | ||
TX 76011 * List of licensed | |||
operators | |||
(SRO and RO) by crew (operating | |||
and staff) * Training | |||
and Operations | |||
Department | Department | ||
organization | organization | ||
| Line 308: | Line 216: | ||
identified) | identified) | ||
* Procedures | * Procedures | ||
that identify | that identify process for revising and maintaining | ||
process for revising | |||
and maintaining | |||
LO continuing | LO continuing | ||
training | training program up-to-date | ||
program up-to-date | |||
* List of outstanding | * List of outstanding | ||
LOR program changes * List of plant events and industry | LOR program changes * List of plant events and industry operating | ||
operating | |||
experience | experience | ||
incorporated | incorporated | ||
into LOR program since last BRQ * Audits and/or self-assessment | into LOR program since last BRQ * Audits and/or self-assessment | ||
reports addressing | reports addressing | ||
the licensed | the licensed operator requalification | ||
operator | training program * Last 2-years of simulator | ||
requalification | review committee (or equivalent) | ||
training | |||
program * Last 2-years of simulator | |||
review committee | |||
(or equivalent) | |||
meeting minutes Enclosure | meeting minutes Enclosure | ||
* Last 2-years of CRC (or equivalent) | * Last 2-years of CRC (or equivalent) | ||
meeting minutes 2.3 Biennial | meeting minutes 2.3 Biennial Regualification | ||
Regualification | |||
Written Examination | Written Examination | ||
Qual!h'. | Qual!h'. * The current and approved biennial written examination | ||
* The current and approved | schedule * The current requalification | ||
biennial | |||
written examination | |||
schedule | |||
* The current requalification | |||
cycle written examination | cycle written examination | ||
results for both SRO and RO that have already been administered | results for both SRO and RO that have already been administered | ||
| Line 344: | Line 239: | ||
team arrival on-site * All.written | team arrival on-site * All.written | ||
examinations | examinations | ||
that have been approved | that have been approved for administration | ||
for administration | |||
up to and including | up to and including | ||
the week before the inspection | the week before the inspection | ||
team is on-site. | team is on-site. This will need to have adequate password protection | ||
This will need to have adequate | if e-mailed or double envelope protection | ||
password | |||
protection | |||
if e-mailed | |||
or double envelope | |||
protection | |||
if mailed via regular mail per NUREG-1021. | if mailed via regular mail per NUREG-1021. | ||
* The current requalification | * The current requalification | ||
cycle examination | cycle examination | ||
methodology | methodology (sample plan} 2.4 Annual Regualification | ||
(sample plan} 2.4 Annual Regualification | |||
Operating | Operating | ||
Test Quality 2.5 2.6 * The schedule | Test Quality 2.5 2.6 * The schedule for the operating | ||
for the operating | |||
tests (JPMs and scenarios) | tests (JPMs and scenarios) | ||
to be given the week of June 4, 2018 * The operating | to be given the week of June 4, 2018 * The operating | ||
tests (JPMs and scenarios) | tests (JPMs and scenarios) (password | ||
(password | |||
protected | protected | ||
and provide separately | and provide separately | ||
| Line 374: | Line 260: | ||
tests (SRO and RO) and results up to the week prior to the inspection | tests (SRO and RO) and results up to the week prior to the inspection | ||
team arrival on-site (NIA if the inspection | team arrival on-site (NIA if the inspection | ||
week is the first week of testing) | week is the first week of testing) * All.of the previous year's NRC required annual operating | ||
* All.of the previous | |||
year's NRC required | |||
annual operating | |||
tests * Current requalification | tests * Current requalification | ||
cycle operating | cycle operating | ||
test methodology | test methodology (sample plan) * All portions of the updated Final Safety Analysis Report (FSAR) that identify operator response times for time critical operator actions Licensee Admin of Requalification | ||
(sample plan) * All portions | |||
of the updated Final Safety Analysis | |||
Report (FSAR) that identify | |||
operator | |||
response | |||
times for time critical | |||
operator | |||
actions Licensee | |||
Admin of Requalification | |||
Exams * All procedures | Exams * All procedures | ||
used to administer | used to administer | ||
the annual operating | the annual operating | ||
test * All procedures | test * All procedures | ||
used to assess operator | used to assess operator perfomiance | ||
perfomiance | |||
* All procedures | * All procedures | ||
that describe | that describe conduct of simulator | ||
conduct of simulator | training * All procedures | ||
training | used to test, operate, and maintain the simulator | ||
* All procedures | |||
used to test, operate, | |||
and maintain | |||
the simulator | |||
Regualification | Regualification | ||
Examination | Examination | ||
Secur~ * Submit any tracking | Secur~ * Submit any tracking tools that you use as a means to prevent excessive | ||
tools that you use as a means to prevent excessive | |||
overlap on the written examinations | overlap on the written examinations | ||
and also meet the intent of sampling | and also meet the intent of sampling all required topics on a periodic basis * Submit any tracking tools that you use as a means to prevent excessive | ||
all required | |||
topics on a periodic | |||
basis * Submit any tracking | |||
tools that you use as a means to prevent excessive | |||
overlap on 2 | overlap on 2 | ||
the operating | the operating | ||
tests and also meet the intent of sampling | tests and also meet the intent of sampling all required malfunctions (including | ||
all required | |||
malfunctions | |||
(including | |||
major events, instrument/component | major events, instrument/component | ||
malfunctions, | malfunctions, TS calls, etc.) on a periodic basis * All procedures | ||
TS calls, etc.) on a periodic | that describe examination | ||
basis * All procedures | security, including | ||
that describe | |||
examination | |||
security, | |||
including | |||
procedures | procedures | ||
used to develop the examinations | used to develop the examinations | ||
| Line 434: | Line 291: | ||
in current exam cycle tests and prior year examinations | in current exam cycle tests and prior year examinations | ||
* List of all condition | * List of all condition | ||
reports since the last biennial | reports since the last biennial requalification | ||
requalification | |||
inspection | inspection | ||
related to examination | related to examination | ||
security | security and overlap 2.7 Licensee Remedial Training Program 2.8 2.9 * List of remedial training conducted | ||
and overlap 2.7 Licensee | |||
Remedial | |||
Training | |||
Program 2.8 2.9 * List of remedial | |||
training | |||
conducted | |||
or planned since last requalification | or planned since last requalification | ||
exams (includes | exams (includes | ||
training | training provided to operators | ||
provided | |||
to operators | |||
to enable passing requalification | to enable passing requalification | ||
exams and training | exams and training provided to correct generic or individual | ||
provided | |||
to correct generic or individual | |||
weaknesses | weaknesses | ||
observed | observed during previous requalification | ||
during previous | |||
requalification | |||
exam cycle) * Remediation | exam cycle) * Remediation | ||
plans (lesson plans, reference | plans (lesson plans, reference | ||
materials, | materials, and attendance | ||
and attendance | |||
documentation) | documentation) | ||
Conformance | Conformance | ||
with Operator | with Operator License Conditions | ||
License Conditions | |||
* All procedures | * All procedures | ||
and program documentation | and program documentation | ||
for maintaining | for maintaining | ||
active operator | active operator licenses, tracking training attendance, and ensuring medical fitness of licensed operators | ||
licenses, | |||
tracking | |||
training | |||
attendance, | |||
and ensuring | |||
medical fitness of licensed | |||
operators | |||
* All procedures | * All procedures | ||
and associated | and associated | ||
documentation | documentation | ||
that supports | that supports reactivation | ||
reactivation | |||
of any SRO/RO license (operating | of any SRO/RO license (operating | ||
or staff crew) since the last biennial | or staff crew) since the last biennial inspection | ||
inspection | |||
Simulator | Simulator | ||
Performance | Performance | ||
* For the following | * For the following | ||
cases, send the most recent transient | cases, send the most recent transient | ||
test packages, | test packages, which may be electronic | ||
which may be electronic | or in paper single test packages, and shall be complete with test procedures | ||
or in paper single test packages, | |||
and shall be complete | |||
with test procedures | |||
for each test, the acceptance | for each test, the acceptance | ||
criteria, | criteria, and results. For each transient | ||
and results. | |||
For each transient | |||
test, the reference chart | test, the reference chart | ||
should be included | should be included or an equivalent | ||
or an equivalent | |||
subject matter expert review versus the simulator | subject matter expert review versus the simulator | ||
results with a write-up | results with a write-up for any differences | ||
for any differences | beyond the ANSI 3.5 standard requirements. | ||
beyond the ANSI 3.5 standard | |||
requirements. | |||
o Transient | o Transient | ||
test 1, manual reactor trip o Transient | test 1 , manual reactor trip o Transient | ||
test 5, trip of any single reactor coolant pump o Transient | test 5, trip of any single reactor coolant pump o Transient | ||
test 8, maximum size RCS rupture combined | test 8, maximum size RCS rupture combined with loss of all offsite power o Steady state tests for low power * SBT Packages for any three scenarios | ||
with loss of all offsite power o Steady state tests for low power * SBT Packages | |||
for any three scenarios | |||
used for the 2017 Annual Requalification | used for the 2017 Annual Requalification | ||
Operating | Operating | ||
| Line 519: | Line 342: | ||
and Configuration | and Configuration | ||
Procedures | Procedures | ||
if not already provided | if not already provided for Section 02.05 above * Simulator | ||
for Section 02.05 above * Simulator | |||
Discrepancy | Discrepancy | ||
Report (DR) summacx list for all open DRs. For closed DRs, summary list for those items closed between June 2016 to May 2018 * Malfunction | Report (DR) summacx list for all open DRs. For closed DRs, summary list for those items closed between June 2016 to May 2018 * Malfunction | ||
tests for loss of condenser | tests for loss of condenser | ||
vacuum and reactor pressure | vacuum and reactor pressure control system failure. If these are included in an SBT package then the review of that package would be acceptable | ||
control system failure. | * Two examples of primary parameters | ||
If these are included | |||
in an SBT package then the review of that package would be acceptable | |||
* Two examples | |||
of primary parameters | |||
tested in order to verify core physics parameters. | tested in order to verify core physics parameters. | ||
The applicable | The applicable | ||
| Line 535: | Line 353: | ||
grf}phs from the plant physics data book (electronic | grf}phs from the plant physics data book (electronic | ||
or other means as available) | or other means as available) | ||
should also be included | should also be included as well as the test procedures | ||
as well as the test procedures | |||
used and the acceptance | used and the acceptance | ||
criteria | criteria with results. * All simulator | ||
with results. | |||
* All simulator | |||
modification | modification | ||
packages | packages that are on hold, delayed, or just not completed | ||
that are on hold, delayed, | |||
or just not completed | |||
in the last 2-years * A list of simulator | in the last 2-years * A list of simulator | ||
modification | modification | ||
packages | packages completed | ||
completed | |||
in the last 2-year window 2.10 Problem Identification | in the last 2-year window 2.10 Problem Identification | ||
and Resolution * A summary report of all condition | and Resolution * A summary report of all condition | ||
reports related to operator | reports related to operator actions/errors | ||
actions/errors | |||
in the control room * Any revised requalification | in the control room * Any revised requalification | ||
training | training that was based on licensed operator performance | ||
that was based on licensed | |||
operator | |||
performance | |||
issues B. The following | issues B. The following | ||
information | information | ||
| Line 568: | Line 376: | ||
to the inspection | to the inspection | ||
team, either electronically | team, either electronically | ||
or hardcopy, | or hardcopy, upon site arrival on June 4, 2018. 2.2 2.8 2.9 Exam Results / 02.03 and 02.04: Written Exam and Op Test Qualit'l * All Operating | ||
upon site arrival on June 4, 2018. 2.2 2.8 2.9 Exam Results / 02.03 and 02.04: Written Exam and Op Test Qualit'l | |||
* All Operating | |||
tests (JPMs and scenarios) | tests (JPMs and scenarios) | ||
to be given in all subsequent | to be given in all subsequent | ||
weeks after on-site week * All results up to the day the team leaves the site Conformance | weeks after on-site week * All results up to the day the team leaves the site Conformance | ||
with Operator | with Operator License Conditions | ||
License Conditions | * Access to licensed operators' | ||
* Access to licensed | |||
operators' | |||
records ( operating | records ( operating | ||
and staff crews) * Access to licensed | and staff crews) * Access to licensed operators' | ||
operators' | training attendance | ||
training | records * Access to licensed operators' | ||
attendance | |||
records * Access to licensed | |||
operators' | |||
medical records Simulator | medical records Simulator | ||
Performance | Performance | ||
| Line 591: | Line 392: | ||
reports (DRs) from June 2016 to May 2018. This should include all open DR's and DR's that have been closed, including | reports (DRs) from June 2016 to May 2018. This should include all open DR's and DR's that have been closed, including | ||
the documentation/justification | the documentation/justification | ||
for closure. | for closure. 4 | ||
4 | |||
* Acceptance | * Acceptance | ||
test documentation, | test documentation, including | ||
including | hardware and software model revisions | ||
hardware | at the time of acceptance (as available) | ||
and software | |||
model revisions | |||
at the time of acceptance | |||
(as available) | |||
* Documentation | * Documentation | ||
that validates | that validates | ||
| Line 606: | Line 402: | ||
the thermal*hydraulics | the thermal*hydraulics | ||
and neutronics | and neutronics | ||
models, to the actual plant * All current model deficiencies, | models, to the actual plant * All current model deficiencies, including | ||
including | |||
FSAR vs. Design differences | FSAR vs. Design differences | ||
in the simulator | in the simulator (any documentation | ||
(any documentation | |||
on this) * Summary list of modifications | on this) * Summary list of modifications | ||
from June 2016 to May 2018 * Plant modifications | from June 2016 to May 2018 * Plant modifications (both hardware and software) | ||
(both hardware | |||
and software) | |||
completed | completed | ||
on the simulator | on the simulator | ||
by due date from June 2016 to May 2018 * Simulator | by due date from June 2016 to May 2018 * Simulator | ||
Differences | Differences | ||
Lesson plan used in training | Lesson plan used in training (current to June 4, 2018) * The complete book of all simulator | ||
(current | |||
to June 4, 2018) * The complete | |||
book of all simulator | |||
annual performance | annual performance | ||
test packages | test packages (usually in a single book, but may be electronic | ||
(usually | or in single test packages), complete with all transient | ||
in a single book, but may be electronic | |||
or in single test packages), | |||
complete | |||
with all transient | |||
tests, steady state tests, and malfunction | tests, steady state tests, and malfunction | ||
tests. This should also include the test procedures | tests. This should also include the test procedures | ||
for each test, the acceptance | for each test, the acceptance | ||
criteria, | criteria, and results. For each transient | ||
and results. | |||
For each transient | |||
test, the reference | test, the reference | ||
chart should be included | chart should be included or an equivalent | ||
or an equivalent | |||
subject matter expert review versus the simulator | subject matter expert review versus the simulator | ||
results with a write-up | results with a write-up for any differences | ||
for any differences | beyond the ANSI standard requirements. | ||
beyond the ANSI standard | * All test packages used to verify core physics parameters. | ||
requirements. | |||
* All test packages | |||
used to verify core physics parameters. | |||
The applicable | The applicable | ||
reference | reference | ||
graphs from the plant physics data book ( electronic | graphs from the plant physics data book ( electronic | ||
or other means as available) | or other means as available) | ||
should also be included | should also be included as well as the test procedures | ||
as well as the test procedures | |||
used and the acceptance | used and the acceptance | ||
criteria | criteria with results. * All simulator | ||
with results. | |||
* All simulator | |||
test, configuration | test, configuration | ||
management, | management, and related documents | ||
and related documents | |||
available | available | ||
in the room for inspectors | in the room for inspectors | ||
to review. This includes | to review. This includes training needs analysis packages, simulator | ||
training | |||
needs analysis | |||
packages, | |||
simulator | |||
review committee | review committee | ||
meeting minutes, | meeting minutes, etc. * Current copy of ANSI 3.5 standard you are committed | ||
etc. * Current copy of ANSI 3.5 standard | |||
you are committed | |||
to for simulator | to for simulator | ||
testing 2.10 Problem Identification | testing 2.10 Problem Identification | ||
and Resolution | and Resolution | ||
* All condition | * All condition | ||
reports related to operator | reports related to operator actions/errors | ||
actions/errors | |||
in the control room C. Wolf Creek Nuclear Operating | in the control room C. Wolf Creek Nuclear Operating | ||
Corporation | Corporation | ||
is required | is required to send the final results summary, and any remaining | ||
to send the final results summary, | |||
and any remaining | |||
exams and operating | exams and operating | ||
tests that have not been reviewed | tests that have not been reviewed to the Regional office lead inspector | ||
to the Regional | |||
office lead inspector | |||
for this inspection | for this inspection | ||
for final review and comparison | for final review and comparison | ||
Revision as of 22:47, 5 July 2018
| ML18145A249 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 05/29/2018 |
| From: | Vincent Gaddy Operations Branch IV |
| To: | Heflin A C Wolf Creek |
| References | |
| IR 2018002 | |
| Download: ML18145A249 (9) | |
See also: IR 05000482/2018002
Text
Adam C. Heflin, President, Chief Executive
Officer, and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY
COMMISSION
REGION IV 1600 EAST LAMAR BOULEVARD
ARLINGTON, TEXAS 76011-4511
May 29, 2018 Wolf Creek Nuclear Operating
Corporation
P.O. Box411 Burlington, KS 66839 SUBJECT: ERRATA FOR WOLF CREEK NUCLEAR OPERATING
CORPORATION
-NOTIFICATION
OF INSPECTION (NRC INSPECTION
REPORT 05000482/2018002)
AND REQUEST FOR INFORMATION
Dear Mr. Heflin: It was identified
that the notification
sent to you dated April 25, 2018 (NRC's Agencywide
Documents
Access and Management
System (ADAMS) Accession
No. ML18116A613)
improperly
listed the inspection
report number as 05000482/2018002.
The correct inspection
report number is 05000482/2018003.
Please note none of the content of the request for information has changed.
The NRC has reissued the notification
in its entirety to correct this error. This fetter, its enclosure, and your response (if any) will be made available
for public inspection
and copying at http:/!www.nrc.gov/reading-rm/adams.html
and at the NRC Public Document Room in accordance
with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." Docket No. 50-482 License No. NPF-42 Enclosure:
Sincerely, IRA/ Vincent G. Gaddy, Chief Operations
Branch Division of Reactor Safety WOLF CREEK NUCLEAR OPERA TING CORPORATION
-NOTIFICATION
OF INSPECTION (NRC INSPECTION
REPORT 05000482/2018003)
AND REQUEST FOR INFORMATION
cc: Electronic
Distribution
A. Heflin 2 ERRATA FOR WOLF CREEK NUCLEAR OPERATING
CORPORATION
-NOTIFICATION
OF INSPECTION (NRC INSPECTION
REPORT 05000482/2018002)
AND REQUEST FOR INFORMATION-
DATED MAY 29, 2018 DISTRIBUTION:
KKennedy, ORA SMorris, ORA TVegel, DRP Rlantz, DRP MShaffer, DRS JClark, DRS DDodson, DRP FThomas, DRP NTaylor, DRP DProulx, DRP JMelfi,DRP
ECombs, DRP SGalemore, DRP VDricks, ORA BSingal, NRR GGeorge, DRS EUribe, DRS MHerrera, DRMA R4Enforcement
SKirkwood, OGC JWeil, OWFN AMoreno, OWFN JBowen, OEDO BMaier, ORA ADAMS ACCESSION
NUMBER: ML 18145A249 SUNSI Review [&] Non-Sensitive Publicly Available
Bv: JCK CJ Sensitive
CJ Non-Publiclv
Available OFFICE SOE:OB
C:OB NAME JKiridand
VGaddy SIGNATURE
IRA/ IRA/ DATE 05/29/18 05/29/18 OFFICIAL RECORD COPY Keyword: NRC-002
Adam C. Heflin, President, Chief Executive
Officer, and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY
COMMISSION
REGJON IV 1600 EAST LAMAR BOULEVARD
ARLINGTON.
TEXAS 76011-4511
May 29, 2018 Wolf Creek Nuclear Operating
Corporation
P.O. Box411 Burlington, KS 66839 SUBJECT: WOLF CREEK NUCLEAR OPERATING
CORPORATION
-NOTIFICATION
OF INSPECTION (NRC INSPECTION
REPORT 05000482/2018003)
AND REQUEST FOR INFORMATION
Dear Mr. Heflin: The purpose of this letter is to notify you that the U.S. Nuclear Regulatory
Commission (NRC) staff will conduct a biennial requalification
inspection
at the Wolf Creek Nuclear Operating
Corporation
from June 4 -7, 2018. The inspection
will consist of two reactor inspectors
from the NRC's Region IV office for one week. The inspection
will be conducted
in accordance
with the NRC Inspection
Procedure
{IP) 71111.11 B, "Licensed
Operator Requalification
Program." Experience
has shown that this inspection
is a resource intensive
inspection
both for the NRC inspectors
and your staff. In order to minimize the impact to your on-site resources
and to ensure a productive
inspection, we have enclosed a request for documents
needed for this inspection.
These documents
have been divided into three groups. The first group (Section A of the enclosure)
identifies
information
to be provided prior to the inspection
to ensure that the inspectors
are adequately
prepared.
The second group (Section B of the enclosure)
identifies
the information
the inspectors
will need upon arrival at the site. The third group {Section C of this enclosure)
identifies
the items which are necessary
to close out the inspection
and are usually sent a few weeks after the team has left the site. It is important
that all of these documents
are up-to-date
and complete in order to minimize the number of additional
documents
requested
during the preparation
and/or the on-site portions of the inspection.
We have discussed
the schedule for these inspection
activities
with your staff and understand
that our regulatory
contact for this inspection
will be Ms. Lucille Stone. Our inspection
dates are subject to change based on your updated schedule of examination
activities.
If there are any questions
about this inspection
or the material requested, please contact the lead inspector , John Kirkland, at (817) 200-1771 (John.Kirkland@nrc.gov
). This letter does not contain new or amended information
collection
requirements
subject To the Paperwork
Reduction
Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection
requirements
were approved by the Office of Management
and Budget, control number 3150-0018.
A. Heflin 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information
or an information
collection
requirement
unless the requesting
document displays a currently
valid Office of Management
and Budget control number. In accordance
with 10 CFR 2.390 of the NRC's "Agency Rules of Practice," a copy of this letter and its enclosure
will be available
electronically
for public inspection
in the NRC Public Document Room or from the Publicly Available
Records (PARS) component
of NRC's document system (ADAMS). ADAMS is accessible
from the NRC web site at
rm/adams.html (the Public Electronic
Reading Room). Docket No. 50-482 License No. NPF-42 Enclosure:
Request for Information
cc: Electronic
Distribution
Sincerely, IRA! Vincent G. Gaddy, Chief Operations
Branch Division of Reactor Safety
Inspection
Report: Inspection
Dates: Initial Request for Information
Biennial Requalification
Inspection
Wolf Creek Generating
Station 05000482/2018003
June 4-7, 2018 Inspection
Procedure:
IP 71111.11 B, "Licensed
Operator Requalification
Program" Lead Inspector:
John Kirkland, Senior Operations
Engineer A. The following
information
is requested
In order to support inspection
preparation
activities.
These items are fisted by section as they appear in the inspection
module (ie 2.02, 2.04, etc). Requested
materf als should be sent either electronically
or CD/DVD ( do not send USB drives) in order to arrive at the Region IV office no later than May 14, 2018. * Electronically:
To: John.Kirkland@nrc.gov
cc: Clyde.Osterholtz@nrc.gov
- CD/DVD to: U.S. Nuclear Regulatory
Commission
Region IV General Bequests:
ATTN: John Kirkland 1600 E. Lamar Blvd Arlington, TX 76011 * List of licensed operators (SRO and RO) by crew (operating
and staff) * Training and Operations
Department
organization
charts (with qualified
LOR evaluators
identified)
- Procedures
that identify process for revising and maintaining
LO continuing
training program up-to-date
- List of outstanding
LOR program changes * List of plant events and industry operating
experience
incorporated
into LOR program since last BRQ * Audits and/or self-assessment
reports addressing
the licensed operator requalification
training program * Last 2-years of simulator
review committee (or equivalent)
meeting minutes Enclosure
- Last 2-years of CRC (or equivalent)
meeting minutes 2.3 Biennial Regualification
Written Examination
Qual!h'. * The current and approved biennial written examination
schedule * The current requalification
cycle written examination
results for both SRO and RO that have already been administered
up to the week prior to the inspection
team arrival on-site * All.written
examinations
that have been approved for administration
up to and including
the week before the inspection
team is on-site. This will need to have adequate password protection
if e-mailed or double envelope protection
if mailed via regular mail per NUREG-1021.
- The current requalification
cycle examination
methodology (sample plan} 2.4 Annual Regualification
Operating
Test Quality 2.5 2.6 * The schedule for the operating
tests (JPMs and scenarios)
to be given the week of June 4, 2018 * The operating
tests (JPMs and scenarios) (password
protected
and provide separately
via telephone
at later date) to be given the week of June 4, 2018 * Current requalification
cycle operating
tests (SRO and RO) and results up to the week prior to the inspection
team arrival on-site (NIA if the inspection
week is the first week of testing) * All.of the previous year's NRC required annual operating
tests * Current requalification
cycle operating
test methodology (sample plan) * All portions of the updated Final Safety Analysis Report (FSAR) that identify operator response times for time critical operator actions Licensee Admin of Requalification
Exams * All procedures
used to administer
the annual operating
test * All procedures
used to assess operator perfomiance
- All procedures
that describe conduct of simulator
training * All procedures
used to test, operate, and maintain the simulator
Regualification
Examination
Secur~ * Submit any tracking tools that you use as a means to prevent excessive
overlap on the written examinations
and also meet the intent of sampling all required topics on a periodic basis * Submit any tracking tools that you use as a means to prevent excessive
overlap on 2
the operating
tests and also meet the intent of sampling all required malfunctions (including
major events, instrument/component
malfunctions, TS calls, etc.) on a periodic basis * All procedures
that describe examination
security, including
procedures
used to develop the examinations
that include guidelines
on overlap between examinations
in current exam cycle tests and prior year examinations
- List of all condition
reports since the last biennial requalification
inspection
related to examination
security and overlap 2.7 Licensee Remedial Training Program 2.8 2.9 * List of remedial training conducted
or planned since last requalification
exams (includes
training provided to operators
to enable passing requalification
exams and training provided to correct generic or individual
weaknesses
observed during previous requalification
exam cycle) * Remediation
plans (lesson plans, reference
materials, and attendance
documentation)
Conformance
with Operator License Conditions
- All procedures
and program documentation
for maintaining
active operator licenses, tracking training attendance, and ensuring medical fitness of licensed operators
- All procedures
and associated
documentation
that supports reactivation
of any SRO/RO license (operating
or staff crew) since the last biennial inspection
Simulator
Performance
- For the following
cases, send the most recent transient
test packages, which may be electronic
or in paper single test packages, and shall be complete with test procedures
for each test, the acceptance
criteria, and results. For each transient
test, the reference chart
should be included or an equivalent
subject matter expert review versus the simulator
results with a write-up for any differences
beyond the ANSI 3.5 standard requirements.
test 1 , manual reactor trip o Transient
test 5, trip of any single reactor coolant pump o Transient
test 8, maximum size RCS rupture combined with loss of all offsite power o Steady state tests for low power * SBT Packages for any three scenarios
used for the 2017 Annual Requalification
Operating
Test 3
- All Simulator
Management
and Configuration
Procedures
if not already provided for Section 02.05 above * Simulator
Discrepancy
Report (DR) summacx list for all open DRs. For closed DRs, summary list for those items closed between June 2016 to May 2018 * Malfunction
tests for loss of condenser
vacuum and reactor pressure control system failure. If these are included in an SBT package then the review of that package would be acceptable
- Two examples of primary parameters
tested in order to verify core physics parameters.
The applicable
reference
grf}phs from the plant physics data book (electronic
or other means as available)
should also be included as well as the test procedures
used and the acceptance
criteria with results. * All simulator
modification
packages that are on hold, delayed, or just not completed
in the last 2-years * A list of simulator
modification
packages completed
in the last 2-year window 2.10 Problem Identification
and Resolution * A summary report of all condition
reports related to operator actions/errors
in the control room * Any revised requalification
training that was based on licensed operator performance
issues B. The following
information
is requested
in order to support the on-site inspection
activities.
Requested
materials
should be available
to the inspection
team, either electronically
or hardcopy, upon site arrival on June 4, 2018. 2.2 2.8 2.9 Exam Results / 02.03 and 02.04: Written Exam and Op Test Qualit'l * All Operating
tests (JPMs and scenarios)
to be given in all subsequent
weeks after on-site week * All results up to the day the team leaves the site Conformance
with Operator License Conditions
- Access to licensed operators'
records ( operating
and staff crews) * Access to licensed operators'
training attendance
records * Access to licensed operators'
medical records Simulator
Performance
- Simulator
discrepancy
reports (DRs) from June 2016 to May 2018. This should include all open DR's and DR's that have been closed, including
the documentation/justification
for closure. 4
- Acceptance
test documentation, including
hardware and software model revisions
at the time of acceptance (as available)
- Documentation
that validates
current models, including
the thermal*hydraulics
and neutronics
models, to the actual plant * All current model deficiencies, including
FSAR vs. Design differences
in the simulator (any documentation
on this) * Summary list of modifications
from June 2016 to May 2018 * Plant modifications (both hardware and software)
completed
on the simulator
by due date from June 2016 to May 2018 * Simulator
Differences
Lesson plan used in training (current to June 4, 2018) * The complete book of all simulator
annual performance
test packages (usually in a single book, but may be electronic
or in single test packages), complete with all transient
tests, steady state tests, and malfunction
tests. This should also include the test procedures
for each test, the acceptance
criteria, and results. For each transient
test, the reference
chart should be included or an equivalent
subject matter expert review versus the simulator
results with a write-up for any differences
beyond the ANSI standard requirements.
- All test packages used to verify core physics parameters.
The applicable
reference
graphs from the plant physics data book ( electronic
or other means as available)
should also be included as well as the test procedures
used and the acceptance
criteria with results. * All simulator
test, configuration
management, and related documents
available
in the room for inspectors
to review. This includes training needs analysis packages, simulator
review committee
meeting minutes, etc. * Current copy of ANSI 3.5 standard you are committed
to for simulator
testing 2.10 Problem Identification
and Resolution
- All condition
reports related to operator actions/errors
in the control room C. Wolf Creek Nuclear Operating
Corporation
is required to send the final results summary, and any remaining
exams and operating
tests that have not been reviewed to the Regional office lead inspector
for this inspection
for final review and comparison
against the significance
determination
tools in order to communicate
the exit results for the inspection.
5