ML18145A249: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Adam C. Heflin, President,  
{{#Wiki_filter:Adam C. Heflin, President, Chief Executive  
Chief Executive  
Officer, and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY  
Officer,  
and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY  
COMMISSION  
COMMISSION  
REGION IV 1600 EAST LAMAR BOULEVARD  
REGION IV 1600 EAST LAMAR BOULEVARD  
ARLINGTON,  
ARLINGTON, TEXAS 76011-4511  
TEXAS 76011-4511  
May 29, 2018 Wolf Creek Nuclear Operating  
May 29, 2018 Wolf Creek Nuclear Operating  
Corporation  
Corporation  
P.O. Box411 Burlington,  
P.O. Box411 Burlington, KS 66839 SUBJECT: ERRATA FOR WOLF CREEK NUCLEAR OPERATING  
KS 66839 SUBJECT:  
ERRATA FOR WOLF CREEK NUCLEAR OPERATING  
CORPORATION  
CORPORATION  
-NOTIFICATION  
-NOTIFICATION  
OF INSPECTION  
OF INSPECTION (NRC INSPECTION  
(NRC INSPECTION  
REPORT 05000482/2018002)  
REPORT 05000482/2018002)  
AND REQUEST FOR INFORMATION  
AND REQUEST FOR INFORMATION  
Line 49: Line 43:
report number is 05000482/2018003.  
report number is 05000482/2018003.  
Please note none of the content of the request for information has changed.  
Please note none of the content of the request for information has changed.  
The NRC has reissued  
The NRC has reissued the notification  
the notification  
in its entirety to correct this error. This fetter, its enclosure, and your response (if any) will be made available  
in its entirety  
to correct this error. This fetter, its enclosure,  
and your response  
(if any) will be made available  
for public inspection  
for public inspection  
and copying at http:/!www.nrc.gov/reading-rm/adams.html  
and copying at http:/!www.nrc.gov/reading-rm/adams.html  
and at the NRC Public Document  
and at the NRC Public Document Room in accordance  
Room in accordance  
with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." Docket No. 50-482 License No. NPF-42 Enclosure:  
with 10 CFR 2.390, "Public Inspections,  
Sincerely, IRA/ Vincent G. Gaddy, Chief Operations  
Exemptions,  
Branch Division of Reactor Safety WOLF CREEK NUCLEAR OPERA TING CORPORATION  
Requests  
for Withholding."  
Docket No. 50-482 License No. NPF-42 Enclosure:  
Sincerely,  
IRA/ Vincent G. Gaddy, Chief Operations  
Branch Division  
of Reactor Safety WOLF CREEK NUCLEAR OPERA TING CORPORATION  
-NOTIFICATION  
-NOTIFICATION  
OF INSPECTION  
OF INSPECTION (NRC INSPECTION  
(NRC INSPECTION  
REPORT 05000482/2018003)  
REPORT 05000482/2018003)  
AND REQUEST FOR INFORMATION  
AND REQUEST FOR INFORMATION  
Line 78: Line 60:
CORPORATION  
CORPORATION  
-NOTIFICATION  
-NOTIFICATION  
OF INSPECTION  
OF INSPECTION (NRC INSPECTION  
(NRC INSPECTION  
REPORT 05000482/2018002)  
REPORT 05000482/2018002)  
AND REQUEST FOR INFORMATION-
AND REQUEST FOR INFORMATION-
DATED MAY 29, 2018 DISTRIBUTION:  
DATED MAY 29, 2018 DISTRIBUTION:  
KKennedy,  
KKennedy, ORA SMorris, ORA TVegel, DRP Rlantz, DRP MShaffer, DRS JClark, DRS DDodson, DRP FThomas, DRP NTaylor, DRP DProulx, DRP JMelfi,DRP  
ORA SMorris,  
ECombs, DRP SGalemore, DRP VDricks, ORA BSingal, NRR GGeorge, DRS EUribe, DRS MHerrera, DRMA R4Enforcement  
ORA TVegel, DRP Rlantz, DRP MShaffer,  
SKirkwood, OGC JWeil, OWFN AMoreno, OWFN JBowen, OEDO BMaier, ORA ADAMS ACCESSION  
DRS JClark, DRS DDodson,  
NUMBER: ML 18145A249 SUNSI Review [&] Non-Sensitive Publicly Available  
DRP FThomas,  
DRP NTaylor,  
DRP DProulx,  
DRP JMelfi,DRP  
ECombs, DRP SGalemore,  
DRP VDricks,  
ORA BSingal,  
NRR GGeorge,  
DRS EUribe, DRS MHerrera,  
DRMA R4Enforcement  
SKirkwood,  
OGC JWeil, OWFN AMoreno,  
OWFN JBowen, OEDO BMaier, ORA ADAMS ACCESSION  
NUMBER: ML 18145A249 SUNSI Review [&] Non-Sensitive Publicly  
Available  
Bv: JCK CJ Sensitive  
Bv: JCK CJ Sensitive  
CJ Non-Publiclv  
CJ Non-Publiclv  
Line 107: Line 73:
C:OB NAME JKiridand  
C:OB NAME JKiridand  
VGaddy SIGNATURE  
VGaddy SIGNATURE  
IRA/ IRA/ DATE 05/29/18  
IRA/ IRA/ DATE 05/29/18 05/29/18 OFFICIAL RECORD COPY Keyword: NRC-002   
05/29/18  
Adam C. Heflin, President, Chief Executive  
OFFICIAL  
Officer, and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY  
RECORD COPY Keyword:  
NRC-002   
Adam C. Heflin, President,  
Chief Executive  
Officer,  
and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY  
COMMISSION  
COMMISSION  
REGJON IV 1600 EAST LAMAR BOULEVARD  
REGJON IV 1600 EAST LAMAR BOULEVARD  
Line 122: Line 82:
May 29, 2018 Wolf Creek Nuclear Operating  
May 29, 2018 Wolf Creek Nuclear Operating  
Corporation  
Corporation  
P.O. Box411 Burlington,  
P.O. Box411 Burlington, KS 66839 SUBJECT: WOLF CREEK NUCLEAR OPERATING  
KS 66839 SUBJECT:  
WOLF CREEK NUCLEAR OPERATING  
CORPORATION  
CORPORATION  
-NOTIFICATION  
-NOTIFICATION  
OF INSPECTION  
OF INSPECTION (NRC INSPECTION  
(NRC INSPECTION  
REPORT 05000482/2018003)  
REPORT 05000482/2018003)  
AND REQUEST FOR INFORMATION  
AND REQUEST FOR INFORMATION  
Dear Mr. Heflin: The purpose of this letter is to notify you that the U.S. Nuclear Regulatory  
Dear Mr. Heflin: The purpose of this letter is to notify you that the U.S. Nuclear Regulatory  
Commission  
Commission (NRC) staff will conduct a biennial requalification  
(NRC) staff will conduct a biennial  
requalification  
inspection  
inspection  
at the Wolf Creek Nuclear Operating  
at the Wolf Creek Nuclear Operating  
Line 145: Line 100:
with the NRC Inspection  
with the NRC Inspection  
Procedure  
Procedure  
{IP) 71111.11  
{IP) 71111.11 B, "Licensed  
B, "Licensed  
Operator Requalification  
Operator  
Program." Experience  
Requalification  
Program."  
Experience  
has shown that this inspection  
has shown that this inspection  
is a resource  
is a resource intensive  
intensive  
inspection  
inspection  
both for the NRC inspectors  
both for the NRC inspectors  
and your staff. In order to minimize  
and your staff. In order to minimize the impact to your on-site resources  
the impact to your on-site resources  
and to ensure a productive  
and to ensure a productive  
inspection,  
inspection, we have enclosed a request for documents  
we have enclosed  
a request for documents  
needed for this inspection.  
needed for this inspection.  
These documents  
These documents  
have been divided into three groups. The first group (Section  
have been divided into three groups. The first group (Section A of the enclosure)  
A of the enclosure)  
identifies  
identifies  
information  
information  
to be provided  
to be provided prior to the inspection  
prior to the inspection  
to ensure that the inspectors  
to ensure that the inspectors  
are adequately  
are adequately  
prepared.  
prepared.  
The second group (Section  
The second group (Section B of the enclosure)  
B of the enclosure)  
identifies  
identifies  
the information  
the information  
the inspectors  
the inspectors  
will need upon arrival at the site. The third group {Section  
will need upon arrival at the site. The third group {Section C of this enclosure)  
C of this enclosure)  
identifies  
identifies  
the items which are necessary  
the items which are necessary  
Line 186: Line 130:
that all of these documents  
that all of these documents  
are up-to-date  
are up-to-date  
and complete  
and complete in order to minimize the number of additional  
in order to minimize  
the number of additional  
documents  
documents  
requested  
requested  
during the preparation  
during the preparation  
and/or the on-site portions  
and/or the on-site portions of the inspection.  
of the inspection.  
We have discussed  
We have discussed  
the schedule  
the schedule for these inspection  
for these inspection  
activities  
activities  
with your staff and understand  
with your staff and understand  
Line 202: Line 142:
contact for this inspection  
contact for this inspection  
will be Ms. Lucille Stone. Our inspection  
will be Ms. Lucille Stone. Our inspection  
dates are subject to change based on your updated schedule  
dates are subject to change based on your updated schedule of examination  
of examination  
activities.  
activities.  
If there are any questions  
If there are any questions  
about this inspection  
about this inspection  
or the material  
or the material requested, please contact the lead inspector , John Kirkland, at (817) 200-1771 (John.Kirkland@nrc.gov
requested,  
please contact the lead inspector
, John Kirkland,  
at (817) 200-1771  
(John.Kirkland@nrc.gov
). This letter does not contain new or amended information  
). This letter does not contain new or amended information  
collection  
collection  
Line 218: Line 152:
subject To the Paperwork  
subject To the Paperwork  
Reduction  
Reduction  
Act of 1995 (44 U.S.C. 3501 et seq.). Existing  
Act of 1995 (44 U.S.C. 3501 et seq.). Existing information  
information  
collection  
collection  
requirements  
requirements  
were approved  
were approved by the Office of Management  
by the Office of Management  
and Budget, control number 3150-0018.   
and Budget, control number 3150-0018.   
A. Heflin 2 The NRC may not conduct or sponsor,  
A. Heflin 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information  
and a person is not required  
to respond to, a request for information  
or an information  
or an information  
collection  
collection  
requirement  
requirement  
unless the requesting  
unless the requesting  
document  
document displays a currently  
displays  
a currently  
valid Office of Management  
valid Office of Management  
and Budget control number. In accordance  
and Budget control number. In accordance  
with 10 CFR 2.390 of the NRC's "Agency Rules of Practice,"  
with 10 CFR 2.390 of the NRC's "Agency Rules of Practice," a copy of this letter and its enclosure  
a copy of this letter and its enclosure  
will be available  
will be available  
electronically  
electronically  
for public inspection  
for public inspection  
in the NRC Public Document  
in the NRC Public Document Room or from the Publicly Available  
Room or from the Publicly  
Available  
Records (PARS) component  
Records (PARS) component  
of NRC's document  
of NRC's document system (ADAMS). ADAMS is accessible  
system (ADAMS).  
ADAMS is accessible  
from the NRC web site at  
from the NRC web site at  
rm/adams.html  
rm/adams.html (the Public Electronic  
(the Public Electronic  
Reading Room). Docket No. 50-482 License No. NPF-42 Enclosure:  
Reading Room). Docket No. 50-482 License No. NPF-42 Enclosure:  
Request for Information  
Request for Information  
cc: Electronic  
cc: Electronic  
Distribution  
Distribution  
Sincerely,  
Sincerely, IRA! Vincent G. Gaddy, Chief Operations  
IRA! Vincent G. Gaddy, Chief Operations  
Branch Division of Reactor Safety   
Branch Division  
of Reactor Safety   
Inspection  
Inspection  
Report: Inspection  
Report: Inspection  
Dates: Initial Request for Information  
Dates: Initial Request for Information  
Biennial  
Biennial Requalification  
Requalification  
Inspection  
Inspection  
Wolf Creek Generating  
Wolf Creek Generating  
Line 270: Line 189:
June 4-7, 2018 Inspection  
June 4-7, 2018 Inspection  
Procedure:  
Procedure:  
IP 71111.11  
IP 71111.11 B, "Licensed  
B, "Licensed  
Operator Requalification  
Operator  
Program" Lead Inspector:  
Requalification  
John Kirkland, Senior Operations  
Program"  
Engineer A. The following  
Lead Inspector:  
John Kirkland,  
Senior Operations  
Engineer  
A. The following  
information  
information  
is requested  
is requested  
Line 286: Line 200:
activities.  
activities.  
These items are fisted by section as they appear in the inspection  
These items are fisted by section as they appear in the inspection  
module (ie 2.02, 2.04,  
module (ie 2.02, 2.04, etc). Requested  
etc). Requested  
materf als should be sent either electronically  
materf als should be sent either electronically  
or CD/DVD ( do not send USB drives) in order to arrive at the Region IV office no later than May 14, 2018. * Electronically:  
or CD/DVD ( do not send USB drives) in order to arrive at the Region IV office no later than May 14, 2018. * Electronically:  
Line 295: Line 208:
Commission  
Commission  
Region IV General Bequests:  
Region IV General Bequests:  
ATTN: John Kirkland  
ATTN: John Kirkland 1600 E. Lamar Blvd Arlington, TX 76011 * List of licensed operators (SRO and RO) by crew (operating  
1600 E. Lamar Blvd Arlington,  
and staff) * Training and Operations  
TX 76011 * List of licensed  
operators  
(SRO and RO) by crew (operating  
and staff) * Training  
and Operations  
Department  
Department  
organization  
organization  
Line 308: Line 216:
identified)  
identified)  
* Procedures  
* Procedures  
that identify  
that identify process for revising and maintaining  
process for revising  
and maintaining  
LO continuing  
LO continuing  
training  
training program up-to-date  
program up-to-date  
* List of outstanding  
* List of outstanding  
LOR program changes * List of plant events and industry  
LOR program changes * List of plant events and industry operating  
operating  
experience  
experience  
incorporated  
incorporated  
into LOR program since last BRQ * Audits and/or self-assessment  
into LOR program since last BRQ * Audits and/or self-assessment  
reports addressing  
reports addressing  
the licensed  
the licensed operator requalification  
operator  
training program * Last 2-years of simulator  
requalification  
review committee (or equivalent)  
training  
program * Last 2-years of simulator  
review committee  
(or equivalent)  
meeting minutes Enclosure   
meeting minutes Enclosure   
* Last 2-years of CRC (or equivalent)  
* Last 2-years of CRC (or equivalent)  
meeting minutes 2.3 Biennial  
meeting minutes 2.3 Biennial Regualification  
Regualification  
Written Examination  
Written Examination  
Qual!h'.  
Qual!h'. * The current and approved biennial written examination  
* The current and approved  
schedule * The current requalification  
biennial  
written examination  
schedule  
* The current requalification  
cycle written examination  
cycle written examination  
results for both SRO and RO that have already been administered  
results for both SRO and RO that have already been administered  
Line 344: Line 239:
team arrival on-site * All.written  
team arrival on-site * All.written  
examinations  
examinations  
that have been approved  
that have been approved for administration  
for administration  
up to and including  
up to and including  
the week before the inspection  
the week before the inspection  
team is on-site.  
team is on-site. This will need to have adequate password protection  
This will need to have adequate  
if e-mailed or double envelope protection  
password  
protection  
if e-mailed  
or double envelope  
protection  
if mailed via regular mail per NUREG-1021.  
if mailed via regular mail per NUREG-1021.  
* The current requalification  
* The current requalification  
cycle examination  
cycle examination  
methodology  
methodology (sample plan} 2.4 Annual Regualification  
(sample plan} 2.4 Annual Regualification  
Operating  
Operating  
Test Quality 2.5 2.6 * The schedule  
Test Quality 2.5 2.6 * The schedule for the operating  
for the operating  
tests (JPMs and scenarios)  
tests (JPMs and scenarios)  
to be given the week of June 4, 2018 * The operating  
to be given the week of June 4, 2018 * The operating  
tests (JPMs and scenarios)  
tests (JPMs and scenarios) (password  
(password  
protected  
protected  
and provide separately  
and provide separately  
Line 374: Line 260:
tests (SRO and RO) and results up to the week prior to the inspection  
tests (SRO and RO) and results up to the week prior to the inspection  
team arrival on-site (NIA if the inspection  
team arrival on-site (NIA if the inspection  
week is the first week of testing)  
week is the first week of testing) * All.of the previous year's NRC required annual operating  
* All.of the previous  
year's NRC required  
annual operating  
tests * Current requalification  
tests * Current requalification  
cycle operating  
cycle operating  
test methodology  
test methodology (sample plan) * All portions of the updated Final Safety Analysis Report (FSAR) that identify operator response times for time critical operator actions Licensee Admin of Requalification  
(sample plan) * All portions  
of the updated Final Safety Analysis  
Report (FSAR) that identify  
operator  
response  
times for time critical  
operator  
actions Licensee  
Admin of Requalification  
Exams * All procedures  
Exams * All procedures  
used to administer  
used to administer  
the annual operating  
the annual operating  
test * All procedures  
test * All procedures  
used to assess operator  
used to assess operator perfomiance  
perfomiance  
* All procedures  
* All procedures  
that describe  
that describe conduct of simulator  
conduct of simulator  
training * All procedures  
training  
used to test, operate, and maintain the simulator  
* All procedures  
used to test, operate,  
and maintain  
the simulator  
Regualification  
Regualification  
Examination  
Examination  
Secur~ * Submit any tracking  
Secur~ * Submit any tracking tools that you use as a means to prevent excessive  
tools that you use as a means to prevent excessive  
overlap on the written examinations  
overlap on the written examinations  
and also meet the intent of sampling  
and also meet the intent of sampling all required topics on a periodic basis * Submit any tracking tools that you use as a means to prevent excessive  
all required  
topics on a periodic  
basis * Submit any tracking  
tools that you use as a means to prevent excessive  
overlap on 2   
overlap on 2   
the operating  
the operating  
tests and also meet the intent of sampling  
tests and also meet the intent of sampling all required malfunctions (including  
all required  
malfunctions  
(including  
major events, instrument/component  
major events, instrument/component  
malfunctions,  
malfunctions, TS calls, etc.) on a periodic basis * All procedures  
TS calls, etc.) on a periodic  
that describe examination  
basis * All procedures  
security, including  
that describe  
examination  
security,  
including  
procedures  
procedures  
used to develop the examinations  
used to develop the examinations  
Line 434: Line 291:
in current exam cycle tests and prior year examinations  
in current exam cycle tests and prior year examinations  
* List of all condition  
* List of all condition  
reports since the last biennial  
reports since the last biennial requalification  
requalification  
inspection  
inspection  
related to examination  
related to examination  
security  
security and overlap 2.7 Licensee Remedial Training Program 2.8 2.9 * List of remedial training conducted  
and overlap 2.7 Licensee  
Remedial  
Training  
Program 2.8 2.9 * List of remedial  
training  
conducted  
or planned since last requalification  
or planned since last requalification  
exams (includes  
exams (includes  
training  
training provided to operators  
provided  
to operators  
to enable passing requalification  
to enable passing requalification  
exams and training  
exams and training provided to correct generic or individual  
provided  
to correct generic or individual  
weaknesses  
weaknesses  
observed  
observed during previous requalification  
during previous  
requalification  
exam cycle) * Remediation  
exam cycle) * Remediation  
plans (lesson plans, reference  
plans (lesson plans, reference  
materials,  
materials, and attendance  
and attendance  
documentation)  
documentation)  
Conformance  
Conformance  
with Operator  
with Operator License Conditions  
License Conditions  
* All procedures  
* All procedures  
and program documentation  
and program documentation  
for maintaining  
for maintaining  
active operator  
active operator licenses, tracking training attendance, and ensuring medical fitness of licensed operators  
licenses,  
tracking  
training  
attendance,  
and ensuring  
medical fitness of licensed  
operators  
* All procedures  
* All procedures  
and associated  
and associated  
documentation  
documentation  
that supports  
that supports reactivation  
reactivation  
of any SRO/RO license (operating  
of any SRO/RO license (operating  
or staff crew) since the last biennial  
or staff crew) since the last biennial inspection  
inspection  
Simulator  
Simulator  
Performance  
Performance  
* For the following  
* For the following  
cases, send the most recent transient  
cases, send the most recent transient  
test packages,  
test packages, which may be electronic  
which may be electronic  
or in paper single test packages, and shall be complete with test procedures  
or in paper single test packages,  
and shall be complete  
with test procedures  
for each test, the acceptance  
for each test, the acceptance  
criteria,  
criteria, and results. For each transient  
and results.  
For each transient  
test, the reference chart  
test, the reference chart  
should be included  
should be included or an equivalent  
or an equivalent  
subject matter expert review versus the simulator  
subject matter expert review versus the simulator  
results with a write-up  
results with a write-up for any differences  
for any differences  
beyond the ANSI 3.5 standard requirements.  
beyond the ANSI 3.5 standard  
requirements.  
o Transient  
o Transient  
test 1, manual reactor trip o Transient  
test 1 , manual reactor trip o Transient  
test 5, trip of any single reactor coolant pump o Transient  
test 5, trip of any single reactor coolant pump o Transient  
test 8, maximum size RCS rupture combined  
test 8, maximum size RCS rupture combined with loss of all offsite power o Steady state tests for low power * SBT Packages for any three scenarios  
with loss of all offsite power o Steady state tests for low power * SBT Packages  
for any three scenarios  
used for the 2017 Annual Requalification  
used for the 2017 Annual Requalification  
Operating  
Operating  
Line 519: Line 342:
and Configuration  
and Configuration  
Procedures  
Procedures  
if not already provided  
if not already provided for Section 02.05 above * Simulator  
for Section 02.05 above * Simulator  
Discrepancy  
Discrepancy  
Report (DR) summacx list for all open DRs. For closed DRs, summary list for those items closed between June 2016 to May 2018 * Malfunction  
Report (DR) summacx list for all open DRs. For closed DRs, summary list for those items closed between June 2016 to May 2018 * Malfunction  
tests for loss of condenser  
tests for loss of condenser  
vacuum and reactor pressure  
vacuum and reactor pressure control system failure. If these are included in an SBT package then the review of that package would be acceptable  
control system failure.  
* Two examples of primary parameters  
If these are included  
in an SBT package then the review of that package would be acceptable  
* Two examples  
of primary parameters  
tested in order to verify core physics parameters.  
tested in order to verify core physics parameters.  
The applicable  
The applicable  
Line 535: Line 353:
grf}phs from the plant physics data book (electronic  
grf}phs from the plant physics data book (electronic  
or other means as available)  
or other means as available)  
should also be included  
should also be included as well as the test procedures  
as well as the test procedures  
used and the acceptance  
used and the acceptance  
criteria  
criteria with results. * All simulator  
with results.  
* All simulator  
modification  
modification  
packages  
packages that are on hold, delayed, or just not completed  
that are on hold, delayed,  
or just not completed  
in the last 2-years * A list of simulator  
in the last 2-years * A list of simulator  
modification  
modification  
packages  
packages completed  
completed  
in the last 2-year window 2.10 Problem Identification  
in the last 2-year window 2.10 Problem Identification  
and Resolution * A summary report of all condition  
and Resolution * A summary report of all condition  
reports related to operator  
reports related to operator actions/errors  
actions/errors  
in the control room * Any revised requalification  
in the control room * Any revised requalification  
training  
training that was based on licensed operator performance  
that was based on licensed  
operator  
performance  
issues B. The following  
issues B. The following  
information  
information  
Line 568: Line 376:
to the inspection  
to the inspection  
team, either electronically  
team, either electronically  
or hardcopy,  
or hardcopy, upon site arrival on June 4, 2018. 2.2 2.8 2.9 Exam Results / 02.03 and 02.04: Written Exam and Op Test Qualit'l * All Operating  
upon site arrival on June 4, 2018. 2.2 2.8 2.9 Exam Results / 02.03 and 02.04: Written Exam and Op Test Qualit'l  
* All Operating  
tests (JPMs and scenarios)  
tests (JPMs and scenarios)  
to be given in all subsequent  
to be given in all subsequent  
weeks after on-site week * All results up to the day the team leaves the site Conformance  
weeks after on-site week * All results up to the day the team leaves the site Conformance  
with Operator  
with Operator License Conditions  
License Conditions  
* Access to licensed operators'  
* Access to licensed  
operators'  
records ( operating  
records ( operating  
and staff crews) * Access to licensed  
and staff crews) * Access to licensed operators'  
operators'  
training attendance  
training  
records * Access to licensed operators'  
attendance  
records * Access to licensed  
operators'  
medical records Simulator  
medical records Simulator  
Performance  
Performance  
Line 591: Line 392:
reports (DRs) from June 2016 to May 2018. This should include all open DR's and DR's that have been closed, including  
reports (DRs) from June 2016 to May 2018. This should include all open DR's and DR's that have been closed, including  
the documentation/justification  
the documentation/justification  
for closure.  
for closure. 4   
4   
* Acceptance  
* Acceptance  
test documentation,  
test documentation, including  
including  
hardware and software model revisions  
hardware  
at the time of acceptance (as available)  
and software  
model revisions  
at the time of acceptance  
(as available)  
* Documentation  
* Documentation  
that validates  
that validates  
Line 606: Line 402:
the thermal*hydraulics  
the thermal*hydraulics  
and neutronics  
and neutronics  
models, to the actual plant * All current model deficiencies,  
models, to the actual plant * All current model deficiencies, including  
including  
FSAR vs. Design differences  
FSAR vs. Design differences  
in the simulator  
in the simulator (any documentation  
(any documentation  
on this) * Summary list of modifications  
on this) * Summary list of modifications  
from June 2016 to May 2018 * Plant modifications  
from June 2016 to May 2018 * Plant modifications (both hardware and software)  
(both hardware  
and software)  
completed  
completed  
on the simulator  
on the simulator  
by due date from June 2016 to May 2018 * Simulator  
by due date from June 2016 to May 2018 * Simulator  
Differences  
Differences  
Lesson plan used in training  
Lesson plan used in training (current to June 4, 2018) * The complete book of all simulator  
(current  
to June 4, 2018) * The complete  
book of all simulator  
annual performance  
annual performance  
test packages  
test packages (usually in a single book, but may be electronic  
(usually  
or in single test packages), complete with all transient  
in a single book, but may be electronic  
or in single test packages),  
complete  
with all transient  
tests, steady state tests, and malfunction  
tests, steady state tests, and malfunction  
tests. This should also include the test procedures  
tests. This should also include the test procedures  
for each test, the acceptance  
for each test, the acceptance  
criteria,  
criteria, and results. For each transient  
and results.  
For each transient  
test, the reference  
test, the reference  
chart should be included  
chart should be included or an equivalent  
or an equivalent  
subject matter expert review versus the simulator  
subject matter expert review versus the simulator  
results with a write-up  
results with a write-up for any differences  
for any differences  
beyond the ANSI standard requirements.  
beyond the ANSI standard  
* All test packages used to verify core physics parameters.  
requirements.  
* All test packages  
used to verify core physics parameters.  
The applicable  
The applicable  
reference  
reference  
graphs from the plant physics data book ( electronic  
graphs from the plant physics data book ( electronic  
or other means as available)  
or other means as available)  
should also be included  
should also be included as well as the test procedures  
as well as the test procedures  
used and the acceptance  
used and the acceptance  
criteria  
criteria with results. * All simulator  
with results.  
* All simulator  
test, configuration  
test, configuration  
management,  
management, and related documents  
and related documents  
available  
available  
in the room for inspectors  
in the room for inspectors  
to review. This includes  
to review. This includes training needs analysis packages, simulator  
training  
needs analysis  
packages,  
simulator  
review committee  
review committee  
meeting minutes,  
meeting minutes, etc. * Current copy of ANSI 3.5 standard you are committed  
etc. * Current copy of ANSI 3.5 standard  
you are committed  
to for simulator  
to for simulator  
testing 2.10 Problem Identification  
testing 2.10 Problem Identification  
and Resolution  
and Resolution  
* All condition  
* All condition  
reports related to operator  
reports related to operator actions/errors  
actions/errors  
in the control room C. Wolf Creek Nuclear Operating  
in the control room C. Wolf Creek Nuclear Operating  
Corporation  
Corporation  
is required  
is required to send the final results summary, and any remaining  
to send the final results summary,  
and any remaining  
exams and operating  
exams and operating  
tests that have not been reviewed  
tests that have not been reviewed to the Regional office lead inspector  
to the Regional  
office lead inspector  
for this inspection  
for this inspection  
for final review and comparison  
for final review and comparison  

Revision as of 22:47, 5 July 2018

Errata for Wolf Creek Nuclear Operating Corporation - Notification of Inspection (NRC Inspection Report 05000482/2018002) and Request for Information
ML18145A249
Person / Time
Site: Wolf Creek 
Issue date: 05/29/2018
From: Vincent Gaddy
Operations Branch IV
To: Heflin A C
Wolf Creek
References
IR 2018002
Download: ML18145A249 (9)


See also: IR 05000482/2018002

Text

Adam C. Heflin, President, Chief Executive

Officer, and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY

COMMISSION

REGION IV 1600 EAST LAMAR BOULEVARD

ARLINGTON, TEXAS 76011-4511

May 29, 2018 Wolf Creek Nuclear Operating

Corporation

P.O. Box411 Burlington, KS 66839 SUBJECT: ERRATA FOR WOLF CREEK NUCLEAR OPERATING

CORPORATION

-NOTIFICATION

OF INSPECTION (NRC INSPECTION

REPORT 05000482/2018002)

AND REQUEST FOR INFORMATION

Dear Mr. Heflin: It was identified

that the notification

sent to you dated April 25, 2018 (NRC's Agencywide

Documents

Access and Management

System (ADAMS) Accession

No. ML18116A613)

improperly

listed the inspection

report number as 05000482/2018002.

The correct inspection

report number is 05000482/2018003.

Please note none of the content of the request for information has changed.

The NRC has reissued the notification

in its entirety to correct this error. This fetter, its enclosure, and your response (if any) will be made available

for public inspection

and copying at http:/!www.nrc.gov/reading-rm/adams.html

and at the NRC Public Document Room in accordance

with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." Docket No. 50-482 License No. NPF-42 Enclosure:

Sincerely, IRA/ Vincent G. Gaddy, Chief Operations

Branch Division of Reactor Safety WOLF CREEK NUCLEAR OPERA TING CORPORATION

-NOTIFICATION

OF INSPECTION (NRC INSPECTION

REPORT 05000482/2018003)

AND REQUEST FOR INFORMATION

cc: Electronic

Distribution

A. Heflin 2 ERRATA FOR WOLF CREEK NUCLEAR OPERATING

CORPORATION

-NOTIFICATION

OF INSPECTION (NRC INSPECTION

REPORT 05000482/2018002)

AND REQUEST FOR INFORMATION-

DATED MAY 29, 2018 DISTRIBUTION:

KKennedy, ORA SMorris, ORA TVegel, DRP Rlantz, DRP MShaffer, DRS JClark, DRS DDodson, DRP FThomas, DRP NTaylor, DRP DProulx, DRP JMelfi,DRP

ECombs, DRP SGalemore, DRP VDricks, ORA BSingal, NRR GGeorge, DRS EUribe, DRS MHerrera, DRMA R4Enforcement

SKirkwood, OGC JWeil, OWFN AMoreno, OWFN JBowen, OEDO BMaier, ORA ADAMS ACCESSION

NUMBER: ML 18145A249 SUNSI Review [&] Non-Sensitive Publicly Available

Bv: JCK CJ Sensitive

CJ Non-Publiclv

Available OFFICE SOE:OB

C:OB NAME JKiridand

VGaddy SIGNATURE

IRA/ IRA/ DATE 05/29/18 05/29/18 OFFICIAL RECORD COPY Keyword: NRC-002

Adam C. Heflin, President, Chief Executive

Officer, and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY

COMMISSION

REGJON IV 1600 EAST LAMAR BOULEVARD

ARLINGTON.

TEXAS 76011-4511

May 29, 2018 Wolf Creek Nuclear Operating

Corporation

P.O. Box411 Burlington, KS 66839 SUBJECT: WOLF CREEK NUCLEAR OPERATING

CORPORATION

-NOTIFICATION

OF INSPECTION (NRC INSPECTION

REPORT 05000482/2018003)

AND REQUEST FOR INFORMATION

Dear Mr. Heflin: The purpose of this letter is to notify you that the U.S. Nuclear Regulatory

Commission (NRC) staff will conduct a biennial requalification

inspection

at the Wolf Creek Nuclear Operating

Corporation

from June 4 -7, 2018. The inspection

will consist of two reactor inspectors

from the NRC's Region IV office for one week. The inspection

will be conducted

in accordance

with the NRC Inspection

Procedure

{IP) 71111.11 B, "Licensed

Operator Requalification

Program." Experience

has shown that this inspection

is a resource intensive

inspection

both for the NRC inspectors

and your staff. In order to minimize the impact to your on-site resources

and to ensure a productive

inspection, we have enclosed a request for documents

needed for this inspection.

These documents

have been divided into three groups. The first group (Section A of the enclosure)

identifies

information

to be provided prior to the inspection

to ensure that the inspectors

are adequately

prepared.

The second group (Section B of the enclosure)

identifies

the information

the inspectors

will need upon arrival at the site. The third group {Section C of this enclosure)

identifies

the items which are necessary

to close out the inspection

and are usually sent a few weeks after the team has left the site. It is important

that all of these documents

are up-to-date

and complete in order to minimize the number of additional

documents

requested

during the preparation

and/or the on-site portions of the inspection.

We have discussed

the schedule for these inspection

activities

with your staff and understand

that our regulatory

contact for this inspection

will be Ms. Lucille Stone. Our inspection

dates are subject to change based on your updated schedule of examination

activities.

If there are any questions

about this inspection

or the material requested, please contact the lead inspector , John Kirkland, at (817) 200-1771 (John.Kirkland@nrc.gov

). This letter does not contain new or amended information

collection

requirements

subject To the Paperwork

Reduction

Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection

requirements

were approved by the Office of Management

and Budget, control number 3150-0018.

A. Heflin 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information

or an information

collection

requirement

unless the requesting

document displays a currently

valid Office of Management

and Budget control number. In accordance

with 10 CFR 2.390 of the NRC's "Agency Rules of Practice," a copy of this letter and its enclosure

will be available

electronically

for public inspection

in the NRC Public Document Room or from the Publicly Available

Records (PARS) component

of NRC's document system (ADAMS). ADAMS is accessible

from the NRC web site at

rm/adams.html (the Public Electronic

Reading Room). Docket No. 50-482 License No. NPF-42 Enclosure:

Request for Information

cc: Electronic

Distribution

Sincerely, IRA! Vincent G. Gaddy, Chief Operations

Branch Division of Reactor Safety

Inspection

Report: Inspection

Dates: Initial Request for Information

Biennial Requalification

Inspection

Wolf Creek Generating

Station 05000482/2018003

June 4-7, 2018 Inspection

Procedure:

IP 71111.11 B, "Licensed

Operator Requalification

Program" Lead Inspector:

John Kirkland, Senior Operations

Engineer A. The following

information

is requested

In order to support inspection

preparation

activities.

These items are fisted by section as they appear in the inspection

module (ie 2.02, 2.04, etc). Requested

materf als should be sent either electronically

or CD/DVD ( do not send USB drives) in order to arrive at the Region IV office no later than May 14, 2018. * Electronically:

To: John.Kirkland@nrc.gov

cc: Clyde.Osterholtz@nrc.gov

  • CD/DVD to: U.S. Nuclear Regulatory

Commission

Region IV General Bequests:

ATTN: John Kirkland 1600 E. Lamar Blvd Arlington, TX 76011 * List of licensed operators (SRO and RO) by crew (operating

and staff) * Training and Operations

Department

organization

charts (with qualified

LOR evaluators

identified)

  • Procedures

that identify process for revising and maintaining

LO continuing

training program up-to-date

  • List of outstanding

LOR program changes * List of plant events and industry operating

experience

incorporated

into LOR program since last BRQ * Audits and/or self-assessment

reports addressing

the licensed operator requalification

training program * Last 2-years of simulator

review committee (or equivalent)

meeting minutes Enclosure

  • Last 2-years of CRC (or equivalent)

meeting minutes 2.3 Biennial Regualification

Written Examination

Qual!h'. * The current and approved biennial written examination

schedule * The current requalification

cycle written examination

results for both SRO and RO that have already been administered

up to the week prior to the inspection

team arrival on-site * All.written

examinations

that have been approved for administration

up to and including

the week before the inspection

team is on-site. This will need to have adequate password protection

if e-mailed or double envelope protection

if mailed via regular mail per NUREG-1021.

  • The current requalification

cycle examination

methodology (sample plan} 2.4 Annual Regualification

Operating

Test Quality 2.5 2.6 * The schedule for the operating

tests (JPMs and scenarios)

to be given the week of June 4, 2018 * The operating

tests (JPMs and scenarios) (password

protected

and provide separately

via telephone

at later date) to be given the week of June 4, 2018 * Current requalification

cycle operating

tests (SRO and RO) and results up to the week prior to the inspection

team arrival on-site (NIA if the inspection

week is the first week of testing) * All.of the previous year's NRC required annual operating

tests * Current requalification

cycle operating

test methodology (sample plan) * All portions of the updated Final Safety Analysis Report (FSAR) that identify operator response times for time critical operator actions Licensee Admin of Requalification

Exams * All procedures

used to administer

the annual operating

test * All procedures

used to assess operator perfomiance

  • All procedures

that describe conduct of simulator

training * All procedures

used to test, operate, and maintain the simulator

Regualification

Examination

Secur~ * Submit any tracking tools that you use as a means to prevent excessive

overlap on the written examinations

and also meet the intent of sampling all required topics on a periodic basis * Submit any tracking tools that you use as a means to prevent excessive

overlap on 2

the operating

tests and also meet the intent of sampling all required malfunctions (including

major events, instrument/component

malfunctions, TS calls, etc.) on a periodic basis * All procedures

that describe examination

security, including

procedures

used to develop the examinations

that include guidelines

on overlap between examinations

in current exam cycle tests and prior year examinations

  • List of all condition

reports since the last biennial requalification

inspection

related to examination

security and overlap 2.7 Licensee Remedial Training Program 2.8 2.9 * List of remedial training conducted

or planned since last requalification

exams (includes

training provided to operators

to enable passing requalification

exams and training provided to correct generic or individual

weaknesses

observed during previous requalification

exam cycle) * Remediation

plans (lesson plans, reference

materials, and attendance

documentation)

Conformance

with Operator License Conditions

  • All procedures

and program documentation

for maintaining

active operator licenses, tracking training attendance, and ensuring medical fitness of licensed operators

  • All procedures

and associated

documentation

that supports reactivation

of any SRO/RO license (operating

or staff crew) since the last biennial inspection

Simulator

Performance

  • For the following

cases, send the most recent transient

test packages, which may be electronic

or in paper single test packages, and shall be complete with test procedures

for each test, the acceptance

criteria, and results. For each transient

test, the reference chart

should be included or an equivalent

subject matter expert review versus the simulator

results with a write-up for any differences

beyond the ANSI 3.5 standard requirements.

o Transient

test 1 , manual reactor trip o Transient

test 5, trip of any single reactor coolant pump o Transient

test 8, maximum size RCS rupture combined with loss of all offsite power o Steady state tests for low power * SBT Packages for any three scenarios

used for the 2017 Annual Requalification

Operating

Test 3

  • All Simulator

Management

and Configuration

Procedures

if not already provided for Section 02.05 above * Simulator

Discrepancy

Report (DR) summacx list for all open DRs. For closed DRs, summary list for those items closed between June 2016 to May 2018 * Malfunction

tests for loss of condenser

vacuum and reactor pressure control system failure. If these are included in an SBT package then the review of that package would be acceptable

  • Two examples of primary parameters

tested in order to verify core physics parameters.

The applicable

reference

grf}phs from the plant physics data book (electronic

or other means as available)

should also be included as well as the test procedures

used and the acceptance

criteria with results. * All simulator

modification

packages that are on hold, delayed, or just not completed

in the last 2-years * A list of simulator

modification

packages completed

in the last 2-year window 2.10 Problem Identification

and Resolution * A summary report of all condition

reports related to operator actions/errors

in the control room * Any revised requalification

training that was based on licensed operator performance

issues B. The following

information

is requested

in order to support the on-site inspection

activities.

Requested

materials

should be available

to the inspection

team, either electronically

or hardcopy, upon site arrival on June 4, 2018. 2.2 2.8 2.9 Exam Results / 02.03 and 02.04: Written Exam and Op Test Qualit'l * All Operating

tests (JPMs and scenarios)

to be given in all subsequent

weeks after on-site week * All results up to the day the team leaves the site Conformance

with Operator License Conditions

  • Access to licensed operators'

records ( operating

and staff crews) * Access to licensed operators'

training attendance

records * Access to licensed operators'

medical records Simulator

Performance

  • Simulator

discrepancy

reports (DRs) from June 2016 to May 2018. This should include all open DR's and DR's that have been closed, including

the documentation/justification

for closure. 4

  • Acceptance

test documentation, including

hardware and software model revisions

at the time of acceptance (as available)

  • Documentation

that validates

current models, including

the thermal*hydraulics

and neutronics

models, to the actual plant * All current model deficiencies, including

FSAR vs. Design differences

in the simulator (any documentation

on this) * Summary list of modifications

from June 2016 to May 2018 * Plant modifications (both hardware and software)

completed

on the simulator

by due date from June 2016 to May 2018 * Simulator

Differences

Lesson plan used in training (current to June 4, 2018) * The complete book of all simulator

annual performance

test packages (usually in a single book, but may be electronic

or in single test packages), complete with all transient

tests, steady state tests, and malfunction

tests. This should also include the test procedures

for each test, the acceptance

criteria, and results. For each transient

test, the reference

chart should be included or an equivalent

subject matter expert review versus the simulator

results with a write-up for any differences

beyond the ANSI standard requirements.

  • All test packages used to verify core physics parameters.

The applicable

reference

graphs from the plant physics data book ( electronic

or other means as available)

should also be included as well as the test procedures

used and the acceptance

criteria with results. * All simulator

test, configuration

management, and related documents

available

in the room for inspectors

to review. This includes training needs analysis packages, simulator

review committee

meeting minutes, etc. * Current copy of ANSI 3.5 standard you are committed

to for simulator

testing 2.10 Problem Identification

and Resolution

  • All condition

reports related to operator actions/errors

in the control room C. Wolf Creek Nuclear Operating

Corporation

is required to send the final results summary, and any remaining

exams and operating

tests that have not been reviewed to the Regional office lead inspector

for this inspection

for final review and comparison

against the significance

determination

tools in order to communicate

the exit results for the inspection.