ML16162A013: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:1NRR-PMDAPEm | {{#Wiki_filter:1NRR-PMDAPEm Resource From:Klos, John Sent:Thursday, June 09, 2016 3:35 PM To:Williams, Lisa L. | ||
Cc:Klos, John; Garcia, Richard M. | |||
==Subject:== | ==Subject:== | ||
Columbia Generating Station, Acceptance of Requested Licensing Action: CAC No. MF7699 License Amendment Request Modify | Columbia Generating Station, Acceptance of Requested Licensing Action: CAC No. | ||
MF7699 License Amendment Request Modify Te chnical Specification (TS) Surveillance Requirements (SR) | |||
Ms. Williams, By letter dated May 10, 2016. Energy Northwest for Columbia Generating Station submitted a license amendment request concerning a change in the safety function lift setpoint tolerances for the Safety/Relief Valves (SRVs) that are listed in Surveillance Requirements (SRs) 3.4.3.1 and 3.4.4.1 of the TS. | |||
The purpose of this email is to provide the results of the U.S. Nuclear Regulatory (NRC) staff's acceptance review of this license amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | The purpose of this email is to provide the results of the U.S. Nuclear Regulatory (NRC) staff's acceptance review of this license amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | ||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. | ||
If you have any questions, please contact me. | If you have any questions, please contact me. | ||
Thank you, | |||
Thank you, John Klos DORL Callaway, Columbia Project Manager U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating Re actor Licensing, O8E7 NRC/NRR/DORL/LPL4-1, MS O8H4A Washington, DC 20555-0001 | |||
301.415.5136, 301.415.2102 (fax) | |||
John.Klos@NRC.gov | |||
Hearing Identifier: NRR_PMDA Email Number: 2893 Mail Envelope Properties (886bc589d3fd4a26aff0eae1e27b054e) | |||
==Subject:== | ==Subject:== | ||
Columbia Generating Station, Acceptance of Requested Licensing Action: CAC No. MF7699 License Amendment Request Modify Technical Specification (TS) Surveillance Requirements (SR) | Columbia Generating Station, Acceptance of Requested Licensing Action: CAC No. MF7699 License Amendment Request Modify Technical Specification (TS) Surveillance Requirements (SR) | ||
Sent Date: 6/9/2016 3:34:54 PM Received Date: 6/9/2016 3:34:55 PM | Sent Date: 6/9/2016 3:34:54 PM Received Date: 6/9/2016 3:34:55 PM From: Klos, John Created By: John.Klos@nrc.gov | ||
Recipients: "Klos, John" <John.Klos@nrc.gov> Tracking Status: None "Garcia, Richard M." <rmgarcia@energy-northwest.com> Tracking Status: None "Williams, Lisa L." <llwilliams@energy-northwest.com> Tracking Status: None | |||
Post Office: HQPWMSMRS02.nrc.gov Files Size Date & Time MESSAGE 1972 6/9/2016 3:34:55 PM | |||
Options Priority: Standard Return Notification: Yes Reply Requested: Yes Sensitivity: Normal Expiration Date: Recipients Received:}} | |||
Revision as of 06:38, 30 June 2018
| ML16162A013 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 06/09/2016 |
| From: | Klos J J Plant Licensing Branch IV |
| To: | Williams L L Energy Northwest |
| References | |
| MF7699 | |
| Download: ML16162A013 (2) | |
Text
1NRR-PMDAPEm Resource From:Klos, John Sent:Thursday, June 09, 2016 3:35 PM To:Williams, Lisa L.
Cc:Klos, John; Garcia, Richard M.
Subject:
Columbia Generating Station, Acceptance of Requested Licensing Action: CAC No.
MF7699 License Amendment Request Modify Te chnical Specification (TS) Surveillance Requirements (SR)
Ms. Williams, By letter dated May 10, 2016. Energy Northwest for Columbia Generating Station submitted a license amendment request concerning a change in the safety function lift setpoint tolerances for the Safety/Relief Valves (SRVs) that are listed in Surveillance Requirements (SRs) 3.4.3.1 and 3.4.4.1 of the TS.
The purpose of this email is to provide the results of the U.S. Nuclear Regulatory (NRC) staff's acceptance review of this license amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Thank you, John Klos DORL Callaway, Columbia Project Manager U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating Re actor Licensing, O8E7 NRC/NRR/DORL/LPL4-1, MS O8H4A Washington, DC 20555-0001
301.415.5136, 301.415.2102 (fax)
John.Klos@NRC.gov
Hearing Identifier: NRR_PMDA Email Number: 2893 Mail Envelope Properties (886bc589d3fd4a26aff0eae1e27b054e)
Subject:
Columbia Generating Station, Acceptance of Requested Licensing Action: CAC No. MF7699 License Amendment Request Modify Technical Specification (TS) Surveillance Requirements (SR)
Sent Date: 6/9/2016 3:34:54 PM Received Date: 6/9/2016 3:34:55 PM From: Klos, John Created By: John.Klos@nrc.gov
Recipients: "Klos, John" <John.Klos@nrc.gov> Tracking Status: None "Garcia, Richard M." <rmgarcia@energy-northwest.com> Tracking Status: None "Williams, Lisa L." <llwilliams@energy-northwest.com> Tracking Status: None
Post Office: HQPWMSMRS02.nrc.gov Files Size Date & Time MESSAGE 1972 6/9/2016 3:34:55 PM
Options Priority: Standard Return Notification: Yes Reply Requested: Yes Sensitivity: Normal Expiration Date: Recipients Received: