ENS 57975: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 25: | Line 25: | ||
The event is being reported under 10 CFR 50.72(b)(2)(iv)(B) and 10 CFR 50.72(b)(3)(iv)(A) as an event or condition that results in actuation of the RPS when the reactor is critical and as a specified system actuation due to the expected reactor water level 3 isolation signal immediately following the reactor scram, and a subsequent level 8 signal. | The event is being reported under 10 CFR 50.72(b)(2)(iv)(B) and 10 CFR 50.72(b)(3)(iv)(A) as an event or condition that results in actuation of the RPS when the reactor is critical and as a specified system actuation due to the expected reactor water level 3 isolation signal immediately following the reactor scram, and a subsequent level 8 signal. | ||
The NRC Resident Inspector has been notified. | The NRC Resident Inspector has been notified. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251014en.html#en57975 | ||
}}{{unit info | }}{{unit info | ||
| Unit = 1 | | Unit = 1 | ||
Latest revision as of 06:20, 14 October 2025
| Where | |
|---|---|
| River Bend Louisiana (NRC Region 4) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
| Time - Person (Reporting Time:+-0.47 h-0.0196 days <br />-0.0028 weeks <br />-6.43806e-4 months <br />) | |
| Opened: | Jason Shidaker 16:39 Oct 9, 2025 |
| NRC Officer: | Sam Colvard |
| Last Updated: | Oct 9, 2025 |
| 57975 - NRC Website
| |