ML20078S353: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 1: Line 1:
#REDIRECT [[L-95-004, Forwards Owners Inservice Insp Summary,Reflecting Inservice Insp Activities During Second Outage of First Period of Third 10-yr Interval]]
{{Adams
| number = ML20078S353
| issue date = 02/17/1995
| title = Forwards Owners Inservice Insp Summary,Reflecting Inservice Insp Activities During Second Outage of First Period of Third 10-yr Interval
| author name = Maxfield G
| author affiliation = WISCONSIN ELECTRIC POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000301
| license number =
| contact person =
| document report number = PBL-95-0043, PBL-95-43, NUDOCS 9502240099
| package number = ML20078S354
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 1
}}
 
=Text=
{{#Wiki_filter:r i
Wisconsin l Electnc POWER COMPANY I
Point Beoch Nuclear Plant o610 Nuclear Rd., two Rm WI $4241 (414) 755 2321 PBL 95-0043 February 17, 1995 i
Document Control Desk U.
S.
NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, D.C.
20555 Gentlemen:
Docket 50-301 j
FILING OF OWNER;S INSERVICE INSPECTION
 
==SUMMARY==
REPORT POINT DEACH NUCLEAR PLANT, UNIT 2 Attached in the Owner's Inservice Inspection Summary which is submitted in accordance with ASME Section XI, IWA-6230.
Included in this submittal is the Innervice Inspection Summary Report for Form NIS-1 and the Repair / Replacement Summary Report for NIS-2.
This information contained in the report reflects the inservice inspection activities during the second outage of the first period of the third 10-year interval, of Wisconsin Electric Power Company's Point Beach Nuclear Plant, Unit 2.
Sincerely, m
f G.
J, iaxfield Plant Manager 1
S rift Attachment 9502240099 950217 PDR ADOCK 05000301 G
r;q
%k '1t'TCl
\\
g
.4 sakfagaf htvwn Eneas Gpnuw
+
-}}

Latest revision as of 06:28, 26 May 2025

Forwards Owners Inservice Insp Summary,Reflecting Inservice Insp Activities During Second Outage of First Period of Third 10-yr Interval
ML20078S353
Person / Time
Site: Point Beach 
Issue date: 02/17/1995
From: Maxfield G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20078S354 List:
References
PBL-95-0043, PBL-95-43, NUDOCS 9502240099
Download: ML20078S353 (1)


Text

r i

Wisconsin l Electnc POWER COMPANY I

Point Beoch Nuclear Plant o610 Nuclear Rd., two Rm WI $4241 (414) 755 2321 PBL 95-0043 February 17, 1995 i

Document Control Desk U.

S.

NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, D.C.

20555 Gentlemen:

Docket 50-301 j

FILING OF OWNER;S INSERVICE INSPECTION

SUMMARY

REPORT POINT DEACH NUCLEAR PLANT, UNIT 2 Attached in the Owner's Inservice Inspection Summary which is submitted in accordance with ASME Section XI, IWA-6230.

Included in this submittal is the Innervice Inspection Summary Report for Form NIS-1 and the Repair / Replacement Summary Report for NIS-2.

This information contained in the report reflects the inservice inspection activities during the second outage of the first period of the third 10-year interval, of Wisconsin Electric Power Company's Point Beach Nuclear Plant, Unit 2.

Sincerely, m

f G.

J, iaxfield Plant Manager 1

S rift Attachment 9502240099 950217 PDR ADOCK 05000301 G

r;q

%k '1t'TCl

\\

g

.4 sakfagaf htvwn Eneas Gpnuw

+

-