ML20078S353

From kanterella
Jump to navigation Jump to search
Forwards Owners Inservice Insp Summary,Reflecting Inservice Insp Activities During Second Outage of First Period of Third 10-yr Interval
ML20078S353
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 02/17/1995
From: Maxfield G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20078S354 List:
References
PBL-95-0043, PBL-95-43, NUDOCS 9502240099
Download: ML20078S353 (1)


Text

r i

Wisconsin l Electnc POWER COMPANY I

Point Beoch Nuclear Plant o610 Nuclear Rd., two Rm WI $4241 (414) 755 2321 PBL 95-0043 February 17, 1995 i

Document Control Desk U.

S.

NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, D.C.

20555 Gentlemen:

Docket 50-301 j

FILING OF OWNER;S INSERVICE INSPECTION

SUMMARY

REPORT POINT DEACH NUCLEAR PLANT, UNIT 2 Attached in the Owner's Inservice Inspection Summary which is submitted in accordance with ASME Section XI, IWA-6230.

Included in this submittal is the Innervice Inspection Summary Report for Form NIS-1 and the Repair / Replacement Summary Report for NIS-2.

This information contained in the report reflects the inservice inspection activities during the second outage of the first period of the third 10-year interval, of Wisconsin Electric Power Company's Point Beach Nuclear Plant, Unit 2.

Sincerely, m

f G.

J, iaxfield Plant Manager 1

S rift Attachment 9502240099 950217 PDR ADOCK 05000301 G

r;q

%k '1t'TCl

\\

g

.4 sakfagaf htvwn Eneas Gpnuw

+

-