ML20234B354: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IR 05000317/1987011]]
{{Adams
| number = ML20234B354
| issue date = 06/23/1987
| title = Matl Control & Accounting Insp Repts 50-317/87-11 & 50-318/87-12 on 870428-0501.Violations Noted:Failure to Keep Records Supporting Physical Inventories of SNM
| author name = Della Ratta A, Keimig R
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee name =
| addressee affiliation =
| docket = 05000317, 05000318
| license number =
| contact person =
| document report number = 50-317-87-11, 50-318-87-12, NUDOCS 8707020388
| package number = ML20234B351
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 7
}}
See also: [[see also::IR 05000317/1987011]]
 
=Text=
{{#Wiki_filter:.
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION I
Report Nos.
50-317/87-11
1
50-318/87-12
Docket Nos.
50-317
50-318
License Nos.
DPR-53
DPR-69
Safeguards Group
IV
Licensee:
Baltimore Gas and Electric Company
P.O. Box 1475
Baltimore, Maryland 21203
'
Facility Name: Calvert Cliffs Nuclear Power Plant, Units 1 and 2
Inspection At:
Lusby, Maryland
'
Inspection Conducted: April 28 - May 1, 1987
Type of Inspection:
Routine, Unannounced Material Control and Accounting
Inspector:
M4 /[
M
c, -aa -py
A, Della Ratta'y Saf u
Auditor
date
/
/
4 ,21. U
Approved by:
-
f
Keimig , ChTsT , S
guards Section,
date
Inspection Summary:
I_nspection on April 28 - May 1, 1987 (Report
Nos. 50-317/87-11 and 50-318/87-12).
' Areas Inspected:
Routine, unannounced inspection of nuclear material control
and accounting, including:
organization and operation; shipping and receiving;
-
storage and internal control; inventory; records and reports; and management of
materials control system.
Results:
The licensee's procedures for the control of special nuclear material
f
(SNM), in some cases, lacked specificity.
Records and reports, in itost instances,
were complete, maintained, and available, except for the following:
the licensee
failed to keep records to support that physical inventories of SNM required at
twelve month intervals were conducted between April 3,1981 and March 30, 1985
(except for an inventory conducted on February 20,1983), as required by 10 CFR
70.51(b)(1) and (3).
-
8,'070203GG 070626
ADOCK0500g7
PDR
G
 
,
.
)
'
I
.
Details
1.
Key Persons Contacted
*J. Lemons, Manager, Nuclear Operations Department
*J. Mihalcik, Principal Engineer, Fuel Cycle Management
!
*M. Bowman, General Supervisor, Technical Services Engineering
*S. Cowne, Senior Engineer, Licensing
*J. Steelman, Senior Engineer, Analyticel Support Unit
*J. Wood, Engineer, Quality' Assurance Audits
.
l
R. Beall, Fuel Cycle Management
;
L. Larragoite, Engineer, Licensing
The inspector interviewed other licensee personnel during the
inspection.
*present at the exit interview
2.
Nuclear Material Control and Accounting
a.
Organization and Operation
The procedures for the control and accounting of special nuclear
material (SNM) and written statements of responsibility for SNM were
included in the licensee's Special Nuclear Material Accounting
Procedure CC1-507D, dated February 14, 1986.
As described in the
following paragraphs the inspector found that the procedures lacked
the specificity required to ensure proper control and accounting of
SNM, at all times,
b.
Shipping and Receiving
The inspector determined through review that the procedures for
shipping and receiving were properly established, maintained, and
implemented to assure that all SNM shipped and received was
accurately accounted for.
A review was performed of all DOE /NRC Form-741's generated during
the period October 1, 1981 - March 31, 1987 to determine proper
signature, timely dispatch, and accuracy of data.
No discrepancies
were noted.
c.
Storage and Internal Control
The licensee was maintaining Item Control Areas that included the
reactor vessel, spent fuel storage pool, new fuel storage, and other
areas that were appropriate for SNM contained in other than fuel.
l
l
 
1
3
.
' The inspector found that the licensee was documenting all SNM
-
j
movement on an internal SNM transfer form.
However, the licensee was
transferring fuel bundles, fission chambers, neutron sources, and
bcronometer sources between the Calvert Cliffs Unit I reporting
{
identification symbol (RIS: XCL) and the Calvert Cliffs Unit 2
l
reporting identification symbol (RIS: XBL), without completing and
submitting a Nuclear Material Transaction Report (D0E/NRC Form-741).
The need to complete and submit a DOE /NRC Form-741 to document all
SNM transfers between locations or operations that have been assigned
,
discrete reporting identification symbols (RIS's) apparently was not
fully understood by the licensee.
The licensee committed to modify its SNM accounting procedure,
CCI-5070, by July 1, 1987 to clarify this matter.
d.
Inventory
The inspector reviewed supporting records which reconciled t!.e
quantity of SNM possessed as of March 31, 1987.
The licensee SNM
inventory consisted of:
1.
217 Fuel Assemblies - Reactor Core Unit 1
2.
217 Fuel Assemblies - Reactor Core Unit 2
3.
620 Fuel Assemblies - North Spent Fuel Pool
4.
519 Fuel Assemblies - South Spent Fuel Pool
5,
20 Wide Range Fission Chambers
6.
4 Neutron Startup Sources
7.
2 Boronometer Sources
The inspector performed an inventory verification on April 30, 1987,
which consisted of a comparison of the fuel location history card
file to the core loading and spent fuel pool storage map.
The
results of this verification indicated that the North Spent Fuel Pool
storage map did not agree with the fuel location history card file
for several bundles. When the licensee was advised of this fact, the
inspector was informed, and confirmed, that the discrepancies had
been identified a few months ago and that the licensee was in the
process of correcting them.
The licensee committed to accomplish
this action by July 1, 1987.
On April 29, 1987, the inspector found that the licensee could not
provide evidence, i.e., records showing the inventory of SNM, including
location, to support the fact that physical inventories were conducted
every twelve months between April 3, 1981 and March 30, 1985, as
required by 10 CFR 70.51(d), except for a physical invetry completed
on February 20, 1983. That inventory was supported by inventory
records that included the physical location of the SNU. Such records
I
l
\\
L
U
 
,
.
4
'
.
!
are required by 10 CFR 70.51(b)(1) and (3).
Failure to comply with
10 CFR 70.51(b)(1) and (3) is an apparent violation of NRC require-
ments (50-317/87-11-03 and 50-318/87-12-03).
e.
Records and Reports
The inspector reviewed the licensee's records and source data and all
Material . Balance Reports (DOE /NRC Form -742) submitted during the
period October 1,1981 - March 31,1987-. Total uranium and
U-235 fission, transmutation and plutonium production and decay
records were also reviewed.
No discrepancies were noted.
; Exhibits I, II and III of this report summarize the licensee's
nuclear material activities for the period October 1,1981 -
March 31, 1987.
,
f.
Management of Materials Control System
The inspector found that the licensee's management system for the
revision, implementation, and enforcement of nuclear material control
and accounting procedures was generally weak. This was indicated by:
not maintaining records to support the conduct and results ' f annual
o
physical inventories; not fully understanding the requirement for
completion and submittal of a Nuclear Material Transaction Report
(DOE /NRC Form-741) whenever SNM was transferred between discrete
reporting identification symbols (RISs); and the inconsistencies in
the location area of fuel bundles in the North Spent Fuel Pool when
compared to the lccation area shown on the fuel location history card
file.
The licensee stated that its procedures would be revised to
correct these deficiencies by July 1, 1987.
.
3.
Exit Interview
The inspector met with the licensee representatives indicated in
paragraph I at the completion of the inspection on May 1, 1987, and
summarized the scope and findings of the inspection.
No written material was provided to the licensee by the inspector during
the inspection.
 
B
a
n,
,
*
,
'f
Exhibit I
Baltimore Gas and Electric Company
Calvert Cliffs Unit 1
DOCKET NO. 50-317 LICENSE N0, DPR-53
Material Balance for Period: October 1, 1981 - March 31, 1987
Reporting Identification Symbol:
XCL
Reporting Unit:
grams
v
Enriched Uranium
Plutonium
Element
Isotope
Element
Isotope
Beginning Inventory:
(October 1, 1981)
194,867,515
2,407.024
1,903,492
.1,236,083
Additions:
L
Production:
-----o-----
----o----
2,284,575
1,220,742
Receipts:
100,523,338
3,860,904
664
439
Material to Account For: 295,390,853
6,267,928
4,188,731
2,457,264
Removals:
Degradation To
Other Materials:
685,319
4,319
----o----
----o----
Shipments:
13,006
142
13,320
7,462
Fission and
Transmutation:
4,490,529
2,379,689
----o----
----o----
Decay:
----o-----
-----o---
151,994
150,689
Inventory Difference:
(1)
(1)
5
(3)
Total Removals:
5,188,853
2,384,149
165,319
158,148
Ending Inventory:
(March 31, 1987)
1/
290,202,000
3,883,779 2/ 4,023,412
2,299,116
Material Accounted for:
295,390,853
6,267,928
4,188,731
2,457,264
_
1/
Includes 20 High Enriched Uranium Fission Chambers (58 grams Element and
55 grams Isotope)
2/
Includes 2 Plutonium Boronmeter Sources (33 grams Element and 29 grams
Isotope)
 
I
i
\\
.
i
;.
Exhibit II
Baltimore Gas and Electric Company
Calvert Cliffs Unit 2
DOCKET NO. 50-318 LICENSE NO. DPR-69
.
<
Material Balance for Period: October 1, 1981 - March 31, 1987
Reporting Identification Symbol: XBL
Reporting Unit:
grams
Enriched Uranium
Plutonium
Element
Isotope
Element
Isotope
Beginning Inventory:
(October 1, 1981)
183,657,014
2,638.287
1,533,028
1,028,269
Additions:
Production:
-----o-----
----o----
2,612,119
1,394,641
Receipts:
113,601,261
4,127,543
----o----
----o----
Material to Account For: 297,258,275
7,065,830
4,145,147
2,422,910
Removals:
Shipments:
387,930
15,469
----o----
----o----
Fission and
Transmutation:
5,205,110
2,701,252
----o----
----o----
Decay:
-----o------
----o----
129,307
128,642
Inventory Difference:
-----o------
(1)
----o----
----o----
Total Removals:
5,593,040
2,716,720
129,307
128,642
Ending Inventory:
(March 31, 1987)
291,665,235
4,349,110
4,015,840
2,294,268
Material Accounted for:
297,258,275
7,065,830
4,145,147
2,422,910
._.- -._ . - -
_ _ _ - _ . _ . - -
._ .
 
_ _ - -
_
,
*
,
Exhibit III
Baltimore Gas and Electric Company
Calvert Cliffs Unit i
DOCKET NO. 30-317 LICENSE NO. OPR-53
Material Balance for Period:
October 1, 1981 - March 31, 1987
,
Reporting Identification Symbol:
XCL
Reporting Unit:
grams
'
Plutonium - 238
Elem,nt
Isotope
Beginning Inventory:
(October 1, 1981)
4.60
3.80
Additions:
-o--
-o--
Material To Account For:
4.60
3.80
. . -
Removals:
-o--
-o--
Ending Inventory:
(March 31, 1987)
4.60
3.80
Material Accounted for:
4.60
3.80
__
-
-
is
}}

Latest revision as of 03:14, 23 May 2025

Matl Control & Accounting Insp Repts 50-317/87-11 & 50-318/87-12 on 870428-0501.Violations Noted:Failure to Keep Records Supporting Physical Inventories of SNM
ML20234B354
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/23/1987
From: Della Ratta A, Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20234B351 List:
References
50-317-87-11, 50-318-87-12, NUDOCS 8707020388
Download: ML20234B354 (7)


See also: IR 05000317/1987011

Text

.

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

Report Nos.

50-317/87-11

1

50-318/87-12

Docket Nos.

50-317

50-318

License Nos.

DPR-53

DPR-69

Safeguards Group

IV

Licensee:

Baltimore Gas and Electric Company

P.O. Box 1475

Baltimore, Maryland 21203

'

Facility Name: Calvert Cliffs Nuclear Power Plant, Units 1 and 2

Inspection At:

Lusby, Maryland

'

Inspection Conducted: April 28 - May 1, 1987

Type of Inspection:

Routine, Unannounced Material Control and Accounting

Inspector:

M4 /[

M

c, -aa -py

A, Della Ratta'y Saf u

Auditor

date

/

/

4 ,21. U

Approved by:

-

f

Keimig , ChTsT , S

guards Section,

date

Inspection Summary:

I_nspection on April 28 - May 1, 1987 (Report

Nos. 50-317/87-11 and 50-318/87-12).

' Areas Inspected:

Routine, unannounced inspection of nuclear material control

and accounting, including:

organization and operation; shipping and receiving;

-

storage and internal control; inventory; records and reports; and management of

materials control system.

Results:

The licensee's procedures for the control of special nuclear material

f

(SNM), in some cases, lacked specificity.

Records and reports, in itost instances,

were complete, maintained, and available, except for the following:

the licensee

failed to keep records to support that physical inventories of SNM required at

twelve month intervals were conducted between April 3,1981 and March 30, 1985

(except for an inventory conducted on February 20,1983), as required by 10 CFR 70.51(b)(1) and (3).

-

8,'070203GG 070626

ADOCK0500g7

PDR

G

,

.

)

'

I

.

Details

1.

Key Persons Contacted

  • J. Lemons, Manager, Nuclear Operations Department
  • J. Mihalcik, Principal Engineer, Fuel Cycle Management

!

  • M. Bowman, General Supervisor, Technical Services Engineering
  • S. Cowne, Senior Engineer, Licensing
  • J. Steelman, Senior Engineer, Analyticel Support Unit
  • J. Wood, Engineer, Quality' Assurance Audits

.

l

R. Beall, Fuel Cycle Management

L. Larragoite, Engineer, Licensing

The inspector interviewed other licensee personnel during the

inspection.

  • present at the exit interview

2.

Nuclear Material Control and Accounting

a.

Organization and Operation

The procedures for the control and accounting of special nuclear

material (SNM) and written statements of responsibility for SNM were

included in the licensee's Special Nuclear Material Accounting

Procedure CC1-507D, dated February 14, 1986.

As described in the

following paragraphs the inspector found that the procedures lacked

the specificity required to ensure proper control and accounting of

SNM, at all times,

b.

Shipping and Receiving

The inspector determined through review that the procedures for

shipping and receiving were properly established, maintained, and

implemented to assure that all SNM shipped and received was

accurately accounted for.

A review was performed of all DOE /NRC Form-741's generated during

the period October 1, 1981 - March 31, 1987 to determine proper

signature, timely dispatch, and accuracy of data.

No discrepancies

were noted.

c.

Storage and Internal Control

The licensee was maintaining Item Control Areas that included the

reactor vessel, spent fuel storage pool, new fuel storage, and other

areas that were appropriate for SNM contained in other than fuel.

l

l

1

3

.

' The inspector found that the licensee was documenting all SNM

-

j

movement on an internal SNM transfer form.

However, the licensee was

transferring fuel bundles, fission chambers, neutron sources, and

bcronometer sources between the Calvert Cliffs Unit I reporting

{

identification symbol (RIS: XCL) and the Calvert Cliffs Unit 2

l

reporting identification symbol (RIS: XBL), without completing and

submitting a Nuclear Material Transaction Report (D0E/NRC Form-741).

The need to complete and submit a DOE /NRC Form-741 to document all

SNM transfers between locations or operations that have been assigned

,

discrete reporting identification symbols (RIS's) apparently was not

fully understood by the licensee.

The licensee committed to modify its SNM accounting procedure,

CCI-5070, by July 1, 1987 to clarify this matter.

d.

Inventory

The inspector reviewed supporting records which reconciled t!.e

quantity of SNM possessed as of March 31, 1987.

The licensee SNM

inventory consisted of:

1.

217 Fuel Assemblies - Reactor Core Unit 1

2.

217 Fuel Assemblies - Reactor Core Unit 2

3.

620 Fuel Assemblies - North Spent Fuel Pool

4.

519 Fuel Assemblies - South Spent Fuel Pool

5,

20 Wide Range Fission Chambers

6.

4 Neutron Startup Sources

7.

2 Boronometer Sources

The inspector performed an inventory verification on April 30, 1987,

which consisted of a comparison of the fuel location history card

file to the core loading and spent fuel pool storage map.

The

results of this verification indicated that the North Spent Fuel Pool

storage map did not agree with the fuel location history card file

for several bundles. When the licensee was advised of this fact, the

inspector was informed, and confirmed, that the discrepancies had

been identified a few months ago and that the licensee was in the

process of correcting them.

The licensee committed to accomplish

this action by July 1, 1987.

On April 29, 1987, the inspector found that the licensee could not

provide evidence, i.e., records showing the inventory of SNM, including

location, to support the fact that physical inventories were conducted

every twelve months between April 3, 1981 and March 30, 1985, as

required by 10 CFR 70.51(d), except for a physical invetry completed

on February 20, 1983. That inventory was supported by inventory

records that included the physical location of the SNU. Such records

I

l

\\

L

U

,

.

4

'

.

!

are required by 10 CFR 70.51(b)(1) and (3).

Failure to comply with

10 CFR 70.51(b)(1) and (3) is an apparent violation of NRC require-

ments (50-317/87-11-03 and 50-318/87-12-03).

e.

Records and Reports

The inspector reviewed the licensee's records and source data and all

Material . Balance Reports (DOE /NRC Form -742) submitted during the

period October 1,1981 - March 31,1987-. Total uranium and

U-235 fission, transmutation and plutonium production and decay

records were also reviewed.

No discrepancies were noted.

Exhibits I, II and III of this report summarize the licensee's

nuclear material activities for the period October 1,1981 -

March 31, 1987.

,

f.

Management of Materials Control System

The inspector found that the licensee's management system for the

revision, implementation, and enforcement of nuclear material control

and accounting procedures was generally weak. This was indicated by:

not maintaining records to support the conduct and results ' f annual

o

physical inventories; not fully understanding the requirement for

completion and submittal of a Nuclear Material Transaction Report

(DOE /NRC Form-741) whenever SNM was transferred between discrete

reporting identification symbols (RISs); and the inconsistencies in

the location area of fuel bundles in the North Spent Fuel Pool when

compared to the lccation area shown on the fuel location history card

file.

The licensee stated that its procedures would be revised to

correct these deficiencies by July 1, 1987.

.

3.

Exit Interview

The inspector met with the licensee representatives indicated in

paragraph I at the completion of the inspection on May 1, 1987, and

summarized the scope and findings of the inspection.

No written material was provided to the licensee by the inspector during

the inspection.

B

a

n,

,

,

'f

Exhibit I

Baltimore Gas and Electric Company

Calvert Cliffs Unit 1

DOCKET NO. 50-317 LICENSE N0, DPR-53

Material Balance for Period: October 1, 1981 - March 31, 1987

Reporting Identification Symbol:

XCL

Reporting Unit:

grams

v

Enriched Uranium

Plutonium

Element

Isotope

Element

Isotope

Beginning Inventory:

(October 1, 1981)

194,867,515

2,407.024

1,903,492

.1,236,083

Additions:

L

Production:


o-----


o----

2,284,575

1,220,742

Receipts:

100,523,338

3,860,904

664

439

Material to Account For: 295,390,853

6,267,928

4,188,731

2,457,264

Removals:

Degradation To

Other Materials:

685,319

4,319


o----


o----

Shipments:

13,006

142

13,320

7,462

Fission and

Transmutation:

4,490,529

2,379,689


o----


o----

Decay:


o-----


o---

151,994

150,689

Inventory Difference:

(1)

(1)

5

(3)

Total Removals:

5,188,853

2,384,149

165,319

158,148

Ending Inventory:

(March 31, 1987)

1/

290,202,000

3,883,779 2/ 4,023,412

2,299,116

Material Accounted for:

295,390,853

6,267,928

4,188,731

2,457,264

_

1/

Includes 20 High Enriched Uranium Fission Chambers (58 grams Element and

55 grams Isotope)

2/

Includes 2 Plutonium Boronmeter Sources (33 grams Element and 29 grams

Isotope)

I

i

\\

.

i

.

Exhibit II

Baltimore Gas and Electric Company

Calvert Cliffs Unit 2

DOCKET NO. 50-318 LICENSE NO. DPR-69

.

<

Material Balance for Period: October 1, 1981 - March 31, 1987

Reporting Identification Symbol: XBL

Reporting Unit:

grams

Enriched Uranium

Plutonium

Element

Isotope

Element

Isotope

Beginning Inventory:

(October 1, 1981)

183,657,014

2,638.287

1,533,028

1,028,269

Additions:

Production:


o-----


o----

2,612,119

1,394,641

Receipts:

113,601,261

4,127,543


o----


o----

Material to Account For: 297,258,275

7,065,830

4,145,147

2,422,910

Removals:

Shipments:

387,930

15,469


o----


o----

Fission and

Transmutation:

5,205,110

2,701,252


o----


o----

Decay:


o------


o----

129,307

128,642

Inventory Difference:


o------

(1)


o----


o----

Total Removals:

5,593,040

2,716,720

129,307

128,642

Ending Inventory:

(March 31, 1987)

291,665,235

4,349,110

4,015,840

2,294,268

Material Accounted for:

297,258,275

7,065,830

4,145,147

2,422,910

._.- -._ . - -

_ _ _ - _ . _ . - -

._ .

_ _ - -

_

,

,

Exhibit III

Baltimore Gas and Electric Company

Calvert Cliffs Unit i

DOCKET NO.30-317 LICENSE NO. OPR-53

Material Balance for Period:

October 1, 1981 - March 31, 1987

,

Reporting Identification Symbol:

XCL

Reporting Unit:

grams

'

Plutonium - 238

Elem,nt

Isotope

Beginning Inventory:

(October 1, 1981)

4.60

3.80

Additions:

-o--

-o--

Material To Account For:

4.60

3.80

. . -

Removals:

-o--

-o--

Ending Inventory:

(March 31, 1987)

4.60

3.80

Material Accounted for:

4.60

3.80

__

-

-

is