{{#Wiki_filter:Entergy Nuclear Northeast Entergy Nuclear Operations, Inc tergy                                                              Vermont Yankee 322 Governor Hunt Rd PO Box 157 Vernon, Vr 05354 Tel 802-257-7711 March 10, 2003 BVY-03-21 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
{{#Wiki_filter:tergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc Vermont Yankee 322 Governor Hunt Rd PO Box 157 Vernon, Vr 05354 Tel 802-257-7711 March 10, 2003 BVY-03-21 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555  


==Reference:==
==Reference:==
Line 25: Line 25:
VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 03-02 FOR THE MONTH OF FEBRUARY 2003
VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 03-02 FOR THE MONTH OF FEBRUARY 2003


OPERATING DATA REPORT DOCKET   NO.50-271 DATE 030310 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO.50-271 DATE 030310 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 OPERATING STATUS
: 1. Unit Name:     Vermont Yankee
: 1. Unit Name:
: 2. Reporting Period:   February
Vermont Yankee
: 3. Licensed Thermal Power(MWt):1593
: 2. Reporting Period:
February
: 3.
Licensed Thermal Power(MWt):1593
: 4. Nameplate Rating(Gross MWe): 540
: 4. Nameplate Rating(Gross MWe): 540
: 5. Design Electrical Rating(Net MWe):   522
: 5. Design Electrical Rating(Net MWe):
: 6. Maximum Dependable Capacity(Gross MWe):     535
522
: 7. Maximum Dependable Capacity(Net MWe):       510
: 6.
: 8. If changes, occur in capacity ratings(Items Number     3 through 7)  since last report, give reasons:
Maximum Dependable Capacity(Gross MWe):
: 9. Power level to which restricted, if   any(Net MWe):     N/A
: 7. Maximum Dependable Capacity(Net MWe):
: 10. Reasons for restrictions, if any:               N/A This Month     Yr-to-Date Cumulative
535 510
: 11. Hours in Reporting Period                       672.00      1416.00    264384.00
: 8.
: 12. Number Of Hours Reactor was Critical           672.00       1416.00    224564.83
If changes, occur in capacity ratings(Items Number last report, give reasons:
: 13. Reactor Reserve Shutdown Hours                   0.00          0.00          0.00
3 through 7) since
: 14. Hours Generator On-Line                         672.00       1416.00    220929.78
: 9.
: 15. Unit Reserve Shutdown Hours                       0.00          0.00          0.00
Power level to which restricted, if any(Net MWe):
: 16. Gross Thermal Energy Generated(MWH)       1034855.90   2219242.35  334599659.17
N/A
: 17. Gross Electrical Energy Generated(MWH)     357388.00    767578.00 112348508.00
: 10. Reasons for restrictions, if any:
: 18. Net Electrical Energy Generated(MWH)       343479.00    737649.00 106920008.00
N/A This Month
: 19. Unit Service Factor                             100.00       100.00        82.60
: 11. Hours in Reporting Period 672.00
: 20. Unit Availability Factor                       100.00        100.00         82.60
: 12. Number Of Hours Reactor was Critical 672.00
: 21. Unit Capacity Factor(Using MDC Net)             100.20       102.10        79.00
: 13. Reactor Reserve Shutdown Hours 0.00
: 22. Unit Capacity Factor(Using DER Net)             97.90         99.80        77.40
: 14. Hours Generator On-Line 672.00
: 23. Unit Forced Outage Rate                           0.00        0.00         3.91
: 15. Unit Reserve Shutdown Hours 0.00
: 24. Shutdowns scheduled over next 6 months(Type, Date, and Duration of Each:   N/A
: 16. Gross Thermal Energy Generated(MWH) 1034855.90
: 25. If shut down at end of report period, estimated date of startup: N/A
: 17. Gross Electrical Energy Generated(MWH) 357388.00
: 18. Net Electrical Energy Generated(MWH) 343479.00
: 19. Unit Service Factor 100.00
: 20. Unit Availability Factor 100.00
: 21. Unit Capacity Factor(Using MDC Net) 100.20
: 22. Unit Capacity Factor(Using DER Net) 97.90
: 23. Unit Forced Outage Rate 0.00
: 24. Shutdowns scheduled over next 6 months(Type, Date, Each:
N/A Yr-to-Date Cumulative 1416.00 264384.00 1416.00 224564.83 0.00 0.00 1416.00 220929.78 0.00 0.00 2219242.35 334599659.17 767578.00 112348508.00 737649.00 106920008.00 100.00 82.60 100.00 82.60 102.10 79.00 99.80 77.40 0.00 3.91 and Duration of
: 25.
If shut down at end of report period, estimated date of startup: N/A
: 26. Units In Test Status(prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 (Sample)
: 26. Units In Test Status(prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 (Sample)
DP 0411 Rev. 8 Page 1 of 1 RT No. 13.FO1.19F
DP 0411 Rev. 8 Page 1 of 1 RT No. 13.FO1.19F


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-271 UNIT  Vermont Yankee DATE  030310 COMPLETED BY  G.A. WALLIN TELEPHONE  (802)258-5414 MONTH   February DAY    AVERAGE DAILY POWER LEVEL        DAY   AVERAGE DAILY POWER LEVEL (MWe-Net)                                (MWe-Net)
AVERAGE DAILY UNIT POWER LEVEL MONTH DAY
: 1.             530                    17.            530
: 1.
: 2.             530                    18.            530
: 2.
: 3.             530                    19.            530
: 3.
: 4.             530                    20.            531
: 4.
: 5.             530                    21.            530
: 5.
: 6.             530                    22.            530
: 6.
: 7.             530                    23.            530
: 7.
: 8.             530                    24.            530
: 8.
: 9.             530                    25.            530
: 9.
: 10.             530                    26.            530
: 10.
: 11.             232                    27.            529
: 11.
: 12.             358                    28.            530
: 12.
: 13.             489                    29.              --
: 13.
: 14.             514                    30 .            --
: 14.
: 15.             529                    31.              ---
: 15.
: 16.               529 INSTRUCTIONS:
16.
On this format,   list   the average daily unit power level in MWE-Net for each day in   the reporting month.     Compute to the nearest whole megawatt.
February AVERAGE DAILY POWER LEVEL (MWe-Net) 530 530 530 530 530 530 530 530 530 530 232 358 489 514 529 529 INSTRUCTIONS:
On this format, list the average daily unit power level in MWE-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
VYDPF 0411.02 (Sample)
VYDPF 0411.02 (Sample)
DP 0411 Rev. 8 Page 1 of 1 RT No. 13.FO1.18V
DP 0411 Rev.
8 Page 1 of 1 RT No.
13.FO1.18V DOCKET NO.
50-271 UNIT Vermont Yankee DATE 030310 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
: 17.
530
: 18.
530
: 19.
530
: 20.
531
: 21.
530
: 22.
530
: 23.
530
: 24.
530
: 25.
530
: 26.
530
: 27.
529
: 28.
530
: 29.
30.
: 31.


UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH FEBRUARY                                 DOCKET NO 50-271 UNIT NAME Vermont Yankee DATE 030310 COMPLETED BY G.A. Wallin TELEPHONE (802)258-5414 1                   2         3                   4       5 No. Date     Type   Duration   Reason Method of License   System   Component   Cause and Corrective (hours)           Shutting   Event     Code     Code         Action to Prevent Down       Report #                       Recurrence Reactor 03-01   030211   S         0.00     B,H*       4       N/A       RB     CONROD     Turbine bypass and MSIV Power                                   testing, 06-23 HCU accumulator Reduction                                 replacement, single rod scram testing, 79-40 breaker SF-6 leak repair, recirc "B" MG scoop tube lock up and "A" condensate pump maintenance, "C" feedpump seal replacement, and a rod pattern exchange.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH FEBRUARY 1
03-02   030213   5         0.00       H*       4       N/A       RB     CONROD     Power reduction for a rod Power                                   pattern adjustment.
F: Forced S: Scheduled VYDPF 0411.03 DP 0411 Rev.
Reduction 1  F: Forced      2 Reason:                          3 Method:              4 Exhibit G- Instructions S: Scheduled      A-Equipment Failure (Explain)      1 - Manual            for Preparation of Data B-Maintenance or Test              2 - Manual Scram      Entry Sheets for License C-Refueling                        3 - Automatic Scram    Event Report (LER) File D-Regulatory Restriction          4 - Other (Explain)    (NUREG 0161)
8 Page 1 of 1 DOCKET NO UNIT NAME DATE COMPLETED BY TELEPHONE 2 Reason:
E-Operator Training and License Examination                                  5 Exhibit I - Same Source VYDPF 0411.03          F-Administrative DP 0411 Rev. 8        G-Operational Error (Explain)
3 Method:
Page 1 of 1          *H-(Explain)- rod pattern exchange/adjustment
A-Equipment Failure (Explain) 1 - Manual B-Maintenance or Test 2 - Manual Scram C-Refueling 3 - Automatic Scram D-Regulatory Restriction 4 - Other (Explain)
E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
*H-(Explain)- rod pattern exchange/adjustment 50-271 Vermont Yankee 030310 G.A. Wallin (802)258-5414 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for License Event Report (LER) File (NUREG 0161) 5 Exhibit I -
Same Source 1
2 3
4 5
No.
Date Type Duration Reason Method of License System Component Cause and Corrective (hours)
Shutting Event Code Code Action to Prevent Down Report #
Recurrence Reactor 03-01 030211 S
0.00 B,H*
4 N/A RB CONROD Turbine bypass and MSIV Power testing, 06-23 HCU accumulator Reduction replacement, single rod scram testing, 79-40 breaker SF-6 leak repair, recirc "B" MG scoop tube lock up and "A" condensate pump maintenance, "C" feedpump seal replacement, and a rod pattern exchange.
03-02 030213 5
0.00 H*
4 N/A RB CONROD Power reduction for a rod Power pattern adjustment.
Reduction


DOCKET NO. 50-271 DATE 030310 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 REPORT MONTH February
DOCKET NO.
50-271 DATE 030310 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 REPORT MONTH February  


==SUMMARY==
==SUMMARY==
Line 89: Line 150:
At the beginning of the reporting period the plant was operating at 99.9%
At the beginning of the reporting period the plant was operating at 99.9%
of rated thermal power.
of rated thermal power.
030211   At 0200 hours, reducing power to 27% to perform turbine bypass valve testing, MSIV full closure testing, 06-23 HCU accumulator replacement, single rod scram post-maintenance testing, 79-40 breaker SF-6 leak repair, recirc "B" MG scoop tube lock up and "A" condensate pump maintenance, "C" feedpump seal replacement, and a rod pattern exchange.   (See Unit Shutdowns and Power Reductions) 030211 At 0309 hours, secured the "A" condensate pump for maintenance.
030211 At 0200 hours, reducing power to 27% to perform turbine bypass valve testing, MSIV full closure testing, 06-23 HCU accumulator replacement, single rod scram post-maintenance testing, 79-40 breaker SF-6 leak repair, recirc "B" MG scoop tube lock up and "A" condensate pump maintenance, "C" feedpump seal replacement, and a rod pattern exchange.
030211 At 0330 hours, completed MSIV full closure testing.
(See Unit Shutdowns and Power Reductions) 030211 At 0309 hours, secured the "A" condensate pump for maintenance.
030211 At 0400 hours, #3 turbine stop valve declared inoperative as found during testing. Under investigation and repair.
030211 At 0330 hours, completed MSIV full closure testing.
030211 At 0710 hours, opened 79-40 breaker for leak repair.
030211 At 0400 hours, #3 turbine stop valve declared inoperative as found during testing.
030211 At 0719 hours, commenced a rod pattern exchange.
Under investigation and repair.
030211 At 0808 hours, secured the "C" feed pump for seal replacement.
030211 At 0710 hours, opened 79-40 breaker for leak repair.
030211 At 0951 hours, completed the rod pattern exchange.
030211 At 0719 hours, commenced a rod pattern exchange.
030211 At 1311 hours, closed 79-40 breaker following leak repair.
030211 At 0808 hours, secured the "C" feed pump for seal replacement.
030211 At 1445 hours, declared control rod 06-23 inoperable for accumulator replacement.
030211 At 0951 hours, completed the rod pattern exchange.
030211 At 1931 hours, declared #3 turbine stop valve operable.
030211 At 1311 hours, closed 79-40 breaker following leak repair.
030211 At 2140 hours, secured the "B" recirculation pump for MG scoop tube lock up maintenance.
030211 At 1445 hours, declared control rod 06-23 inoperable for accumulator replacement.
030212   At 0247 hours, started the "B" recirculation pump following MG scoop tube lock up maintenance.
030211 At 1931 hours, declared #3 turbine stop valve operable.
030212   At 0341 hours, started the "A" condensate pump following repairs.
030211 At 2140 hours, secured the "B" recirculation pump for MG scoop tube lock up maintenance.
030212   At 0355 hours, performing single rod scram testing on 06-23 rod following accumulator replacement.
030212 At 0247 hours, started the "B" recirculation pump following MG scoop tube lock up maintenance.
030212   At 0414 hours, scram testing satisfactorily completed, HCU 06-23 declared operable.
030212 At 0341 hours, started the "A" condensate pump following repairs.
030212   At 0945 hours, completed turbine bypass valve testing.
030212 At 0355 hours, performing single rod scram testing on 06-23 rod following accumulator replacement.
030212   At 1135 hours, commenced a return to full power.
030212 At 0414 hours, scram testing satisfactorily completed, HCU 06-23 declared operable.
030213   At 2000 hours, reduced power to 69% for a rod pattern adjustment.
030212 At 0945 hours, completed turbine bypass valve testing.
(See Unit Shutdowns and Power Reductions) 030213   At 2200 hours, completed the rod pattern adjustment and began a return to full power.
030212 At 1135 hours, commenced a return to full power.
030213 At 2000 hours, reduced power to 69% for a rod pattern adjustment.
(See Unit Shutdowns and Power Reductions) 030213 At 2200 hours, completed the rod pattern adjustment and began a return to full power.


At the end of the reporting period the plant was operating at 99.9% of rated thermal power.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.
VYDPF 0411.04 (Sample)
VYDPF 0411.04 (Sample)
DP 0411 Rev. 8 Page 1 of 1 RT No. 13.FO1.18X}}
DP 0411 Rev.
8 Page 1 of 1 RT No.
13.FO1.18X}}

Latest revision as of 11:48, 16 January 2025

February 2003 Monthly Operating Report for Vermont Yankee
ML030770619
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/10/2003
From: Bronson K
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY-03-21
Download: ML030770619 (7)


Text

tergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc Vermont Yankee 322 Governor Hunt Rd PO Box 157 Vernon, Vr 05354 Tel 802-257-7711 March 10, 2003 BVY-03-21 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Reference:

(a) License No. DPR-28 (Docket No. 50-271)

In accordance with section 6.6.B of the Vermont Yankee Technical Specifications, submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of February, 2003.

Sincerely, Kevin H. Bronson General Manager, Plant Operations cc: USNRC Region I Administrator USNRC Resident Inspector USNRC Project Manager

VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 03-02 FOR THE MONTH OF FEBRUARY 2003

OPERATING DATA REPORT DOCKET NO.50-271 DATE 030310 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 OPERATING STATUS

1. Unit Name:

Vermont Yankee

2. Reporting Period:

February

3.

Licensed Thermal Power(MWt):1593

4. Nameplate Rating(Gross MWe): 540
5. Design Electrical Rating(Net MWe):

522

6.

Maximum Dependable Capacity(Gross MWe):

7. Maximum Dependable Capacity(Net MWe):

535 510

8.

If changes, occur in capacity ratings(Items Number last report, give reasons:

3 through 7) since

9.

Power level to which restricted, if any(Net MWe):

N/A

10. Reasons for restrictions, if any:

N/A This Month

11. Hours in Reporting Period 672.00
12. Number Of Hours Reactor was Critical 672.00
13. Reactor Reserve Shutdown Hours 0.00
14. Hours Generator On-Line 672.00
15. Unit Reserve Shutdown Hours 0.00
16. Gross Thermal Energy Generated(MWH) 1034855.90
17. Gross Electrical Energy Generated(MWH) 357388.00
18. Net Electrical Energy Generated(MWH) 343479.00
19. Unit Service Factor 100.00
20. Unit Availability Factor 100.00
21. Unit Capacity Factor(Using MDC Net) 100.20
22. Unit Capacity Factor(Using DER Net) 97.90
23. Unit Forced Outage Rate 0.00
24. Shutdowns scheduled over next 6 months(Type, Date, Each:

N/A Yr-to-Date Cumulative 1416.00 264384.00 1416.00 224564.83 0.00 0.00 1416.00 220929.78 0.00 0.00 2219242.35 334599659.17 767578.00 112348508.00 737649.00 106920008.00 100.00 82.60 100.00 82.60 102.10 79.00 99.80 77.40 0.00 3.91 and Duration of

25.

If shut down at end of report period, estimated date of startup: N/A

26. Units In Test Status(prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 (Sample)

DP 0411 Rev. 8 Page 1 of 1 RT No. 13.FO1.19F

AVERAGE DAILY UNIT POWER LEVEL MONTH DAY

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.

16.

February AVERAGE DAILY POWER LEVEL (MWe-Net) 530 530 530 530 530 530 530 530 530 530 232 358 489 514 529 529 INSTRUCTIONS:

On this format, list the average daily unit power level in MWE-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

VYDPF 0411.02 (Sample)

DP 0411 Rev.

8 Page 1 of 1 RT No.

13.FO1.18V DOCKET NO.

50-271 UNIT Vermont Yankee DATE 030310 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

17.

530

18.

530

19.

530

20.

531

21.

530

22.

530

23.

530

24.

530

25.

530

26.

530

27.

529

28.

530

29.

30.

31.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH FEBRUARY 1

F: Forced S: Scheduled VYDPF 0411.03 DP 0411 Rev.

8 Page 1 of 1 DOCKET NO UNIT NAME DATE COMPLETED BY TELEPHONE 2 Reason:

3 Method:

A-Equipment Failure (Explain) 1 - Manual B-Maintenance or Test 2 - Manual Scram C-Refueling 3 - Automatic Scram D-Regulatory Restriction 4 - Other (Explain)

E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)

  • H-(Explain)- rod pattern exchange/adjustment 50-271 Vermont Yankee 030310 G.A. Wallin (802)258-5414 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for License Event Report (LER) File (NUREG 0161) 5 Exhibit I -

Same Source 1

2 3

4 5

No.

Date Type Duration Reason Method of License System Component Cause and Corrective (hours)

Shutting Event Code Code Action to Prevent Down Report #

Recurrence Reactor 03-01 030211 S

0.00 B,H*

4 N/A RB CONROD Turbine bypass and MSIV Power testing, 06-23 HCU accumulator Reduction replacement, single rod scram testing, 79-40 breaker SF-6 leak repair, recirc "B" MG scoop tube lock up and "A" condensate pump maintenance, "C" feedpump seal replacement, and a rod pattern exchange.

03-02 030213 5

0.00 H*

4 N/A RB CONROD Power reduction for a rod Power pattern adjustment.

Reduction

DOCKET NO.

50-271 DATE 030310 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 REPORT MONTH February

SUMMARY

OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 96.6 of rated thermal power for the month.

Gross electrical generation was 357,388 MWHe or 97.4% design electrical capacity.

Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:

At the beginning of the reporting period the plant was operating at 99.9%

of rated thermal power.

030211 At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />, reducing power to 27% to perform turbine bypass valve testing, MSIV full closure testing, 06-23 HCU accumulator replacement, single rod scram post-maintenance testing, 79-40 breaker SF-6 leak repair, recirc "B" MG scoop tube lock up and "A" condensate pump maintenance, "C" feedpump seal replacement, and a rod pattern exchange.

(See Unit Shutdowns and Power Reductions) 030211 At 0309 hours0.00358 days <br />0.0858 hours <br />5.109127e-4 weeks <br />1.175745e-4 months <br />, secured the "A" condensate pump for maintenance.

030211 At 0330 hours0.00382 days <br />0.0917 hours <br />5.456349e-4 weeks <br />1.25565e-4 months <br />, completed MSIV full closure testing.

030211 At 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />, #3 turbine stop valve declared inoperative as found during testing.

Under investigation and repair.

030211 At 0710 hours0.00822 days <br />0.197 hours <br />0.00117 weeks <br />2.70155e-4 months <br />, opened 79-40 breaker for leak repair.

030211 At 0719 hours0.00832 days <br />0.2 hours <br />0.00119 weeks <br />2.735795e-4 months <br />, commenced a rod pattern exchange.

030211 At 0808 hours0.00935 days <br />0.224 hours <br />0.00134 weeks <br />3.07444e-4 months <br />, secured the "C" feed pump for seal replacement.

030211 At 0951 hours0.011 days <br />0.264 hours <br />0.00157 weeks <br />3.618555e-4 months <br />, completed the rod pattern exchange.

030211 At 1311 hours0.0152 days <br />0.364 hours <br />0.00217 weeks <br />4.988355e-4 months <br />, closed 79-40 breaker following leak repair.

030211 At 1445 hours0.0167 days <br />0.401 hours <br />0.00239 weeks <br />5.498225e-4 months <br />, declared control rod 06-23 inoperable for accumulator replacement.

030211 At 1931 hours0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.347455e-4 months <br />, declared #3 turbine stop valve operable.

030211 At 2140 hours0.0248 days <br />0.594 hours <br />0.00354 weeks <br />8.1427e-4 months <br />, secured the "B" recirculation pump for MG scoop tube lock up maintenance.

030212 At 0247 hours0.00286 days <br />0.0686 hours <br />4.083995e-4 weeks <br />9.39835e-5 months <br />, started the "B" recirculation pump following MG scoop tube lock up maintenance.

030212 At 0341 hours0.00395 days <br />0.0947 hours <br />5.638227e-4 weeks <br />1.297505e-4 months <br />, started the "A" condensate pump following repairs.

030212 At 0355 hours0.00411 days <br />0.0986 hours <br />5.869709e-4 weeks <br />1.350775e-4 months <br />, performing single rod scram testing on 06-23 rod following accumulator replacement.

030212 At 0414 hours0.00479 days <br />0.115 hours <br />6.845238e-4 weeks <br />1.57527e-4 months <br />, scram testing satisfactorily completed, HCU 06-23 declared operable.

030212 At 0945 hours0.0109 days <br />0.263 hours <br />0.00156 weeks <br />3.595725e-4 months <br />, completed turbine bypass valve testing.

030212 At 1135 hours0.0131 days <br />0.315 hours <br />0.00188 weeks <br />4.318675e-4 months <br />, commenced a return to full power.

030213 At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br />, reduced power to 69% for a rod pattern adjustment.

(See Unit Shutdowns and Power Reductions) 030213 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, completed the rod pattern adjustment and began a return to full power.

At the end of the reporting period the plant was operating at 99.9% of rated thermal power.

VYDPF 0411.04 (Sample)

DP 0411 Rev.

8 Page 1 of 1 RT No.

13.FO1.18X