{{#Wiki_filter:JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A1.A Job Position                                               No.                        Revision Nuclear Supervising Operator                               NRC Exam 2003-301-A1.a           1 JPM Title                                                   Duration            Page Obtain a copy of an Approved Procedure                     15 Minutes         COVER SHEET Examinee:                                                               SRO / RO / NLO / SROC / STA Evaluator:
{{#Wiki_filter:JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A1.A Job Position Nuclear Supervising Operator No.
Evaluation Method:       Perform / Plant or Simulator                   Start Time (Circle method used)                                                     Stop Time Total Time PERFORMANCE EVALUATION Element       S   U     Comments                   Element     S     U     Comments
NRC Exam 2003-301-A1.a Revision 1
  *1.
JPM Title Obtain a copy of an Approved Procedure Duration 15 Minutes Page COVER SHEET Examinee: SRO / RO / NLO / SROC / STA Evaluator:
  *2.
Evaluation Method:
  *3.
Perform / Plant or Simulator Start Time (Circle method used)
  *4.
Stop Time Total Time PERFORMANCE EVALUATION Element S
  *5.
U Comments Element S
  *6.
U Comments
  *7.
* 1.
  *8.
* 2.
  *9.
* 3.
______ SATISFACTORY                                 ______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)
* 4.
Question #   S   U     Comments                   Question # S     U     Comments
*5.
______ SATISFACTORY                                 ______ UNSATISFACTORY Evaluator Signature / Date:                                         /
*6.
*7.
*8.
*9.
______ SATISFACTORY
______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)
Question #
S U
Comments Question #
S U
Comments
______ SATISFACTORY
______ UNSATISFACTORY Evaluator Signature / Date:
/


JOB PERFORMANCE MEASURE JPM Title                                                             No.: NRC Exam 2003-301-A1.a Obtain a copy of an Approved Procedure                                Revision: 1 Page 2
JOB PERFORMANCE MEASURE JPM Title Obtain a copy of an Approved Procedure No.: NRC Exam 2003-301-A1.a Revision: 1 Page 2


==References:==
==References:==
Line 40: Line 53:
Computer Terminal Access (R)
Computer Terminal Access (R)
Preferred Evaluation Method:
Preferred Evaluation Method:
Perform                 X           Walkthrough                           Discuss Plant                   X           Simulator                 X           Classroom Evaluator Notes:
Perform X
Walkthrough Discuss Plant X
Simulator X
Classroom Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
The Plant can be in any mode of operation to conduct this JPM.
The Plant can be in any mode of operation to conduct this JPM.
Line 52: Line 68:
The reactor building Nuclear Operator (NO) on your shift is going to conduct an electrical alignment verification of the Reactor Protection System 120 VAC System. The CRS has requested that you obtain and verify a controlled copy of procedure 23.316, RPS 120 VAC and RPS MG Sets to support this task. The computer in the rear of the simulator may be used for this purpose, but any plant computer terminal may be used.
The reactor building Nuclear Operator (NO) on your shift is going to conduct an electrical alignment verification of the Reactor Protection System 120 VAC System. The CRS has requested that you obtain and verify a controlled copy of procedure 23.316, RPS 120 VAC and RPS MG Sets to support this task. The computer in the rear of the simulator may be used for this purpose, but any plant computer terminal may be used.


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC Exam 2003-301-A1.a Obtain a copy of an Approved Procedure                          Revision: 1 Page 3 PERFORMANCE EVALUATION Time Start Elements                                           Standards
JOB PERFORMANCE MEASURE JPM Title Obtain a copy of an Approved Procedure No.: NRC Exam 2003-301-A1.a Revision: 1 Page 3 PERFORMANCE EVALUATION Time Start Elements Standards
* 1. At any computer terminal, from the Fermi 2
* 1. At any computer terminal, from the Fermi 2 Nucleus Home Page, select ARMS.
* 1. ARMS login screen appears on the screen.
* 1. ARMS login screen appears on the screen.
Nucleus Home Page, select ARMS.
* 2. From the ARMS login screen, Select the Login as Guest button on the page
* 2. From the ARMS login screen, Select the
* 2. The ARMS document portal page appears on the computer screen.
* 2. The ARMS document portal page appears on Login as Guest button on the page                the computer screen.
* 3. Select the WebARMS Search link OR DrillDown WebARMS Search Options link
* 3. Select the WebARMS Search link
* 3. IF the WebARMS Search link is used THEN the Main Record Search Page will appear on the computer screen. Continue on to step 4.
* 3. IF the WebARMS Search link is used OR                                                  THEN the Main Record Search Page will DrillDown WebARMS Search Options link            appear on the computer screen. Continue on to step 4.
IF the Search button is used THEN continue at Step 5.
IF the Search button is used THEN continue at Step 5.
NOTE: The candidate may enter AFC in the Status Code field. This will ensure the latest revision is selected.
NOTE: The candidate may enter AFC in the Status Code field. This will ensure the latest revision is selected.
* 4. Enter the procedure number in the
* 4. Enter the procedure number in the Document Serial Number field.
* 4 Enters 23.316 in the Document Serial Document Serial Number field.                    Number field. GO TO Step 8.
* 4 Enters 23.316 in the Document Serial Number field. GO TO Step 8.
* 5. Select Plant Technical Procedures link
* 5. Select Plant Technical Procedures link
* 5. Plant Technical Drill Down Lookup appears on page
* 5. Plant Technical Drill Down Lookup appears on page
Line 70: Line 85:
* 7 Select page with 23.316
* 7 Select page with 23.316
* 7. Page 6 is the screen with 23.316 NOTE: If the candidate did not enter AFC in the Status Code field using the WebARMS Search method, then the latest revision must be selected.
* 7. Page 6 is the screen with 23.316 NOTE: If the candidate did not enter AFC in the Status Code field using the WebARMS Search method, then the latest revision must be selected.
* 8. Press the printer icon on the left side of the
* 8. Press the printer icon on the left side of the screen by procedure 23.316.
* 8. The Fermi 2 Information Systems page screen by procedure 23.316.                        appears CUE:This will print to a remote location if the candidate selects print. Have the candidate simulate selecting PRINT and hand them a copy of the procedure as if it had come from the printer.
* 8. The Fermi 2 Information Systems page appears CUE:This will print to a remote location if the candidate selects print. Have the candidate simulate selecting PRINT and hand them a copy of the procedure as if it had come from the printer.
* 9. From the Fermi 2 Information Systems page,
* 9. From the Fermi 2 Information Systems page, Control Information drop down box, select Controlled_for_Job
* 9. Procedure will print to the designated printer Control Information drop down box, select Controlled_for_Job
* 9. Procedure will print to the designated printer
* 10.Obtains controlled copy of procedure.
* 10.Obtains controlled copy of procedure.
* 10.Obtains the controlled copy of the procedure and verifies the procedure has controlled copy printed on the cover sheet.
* 10.Obtains the controlled copy of the procedure and verifies the procedure has controlled copy printed on the cover sheet.
Line 79: Line 94:
* Critical Steps
* Critical Steps


JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC Exam 2003-301-A1.a Obtain a copy of an Approved Procedure                        Revision: 1 Page 4 Terminating Cue(s):
JOB PERFORMANCE MEASURE JPM Title Obtain a copy of an Approved Procedure No.: NRC Exam 2003-301-A1.a Revision: 1 Page 4 Terminating Cue(s):
The CRNSO obtains a controlled copy of 23. 316 in accordance with WebArms
The CRNSO obtains a controlled copy of 23. 316 in accordance with WebArms


JOB PERFORMANCE MEASURE JPM Title                                           No.: NRC Exam 2003-301-A1.a Obtain a copy of an Approved Procedure              Revision: 1 Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
JOB PERFORMANCE MEASURE JPM Title Obtain a copy of an Approved Procedure No.: NRC Exam 2003-301-A1.a Revision: 1 Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
Question:
Question:


==Reference:==
==Reference:==
===Response===
===Response===
Question:
Question:
Reference
Reference  


===Response===
===Response===
JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A1.B JPM A1.a Cue Sheet Initial Conditions:
JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A1.B JPM A1.a Cue Sheet Initial Conditions:
Plant conditions are as you see them.
Plant conditions are as you see them.
Line 100: Line 113:
The computer in the rear of the simulator may be used for this purpose.
The computer in the rear of the simulator may be used for this purpose.


JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC Exam 2003-301-A1.b Locate and use mechanical drawings to isolate a leak          Revision: Rev. 0 Page 2 Job Position                                               No.                        Revision Control Room Supervisor                                   NRC Exam 2003-301-A1.b           0 JPM Title                                                 Duration            Page Locate and use mechanical drawings to isolate a leak.     10 Minutes         COVER SHEET Examinee:                                                               SRO / RO / NLO / SROC / STA Evaluator:
JOB PERFORMANCE MEASURE JPM Title Locate and use mechanical drawings to isolate a leak No.: NRC Exam 2003-301-A1.b Revision: Rev. 0 Page 2 Job Position Control Room Supervisor No.
Evaluation Method:       Perform / Plant / Simulator                   Start Time Stop Time Total Time PERFORMANCE EVALUATION Element     S     U     Comments                   Element     S     U     Comments 1.
NRC Exam 2003-301-A1.b Revision 0
JPM Title Locate and use mechanical drawings to isolate a leak.
Duration 10 Minutes Page COVER SHEET Examinee: SRO / RO / NLO / SROC / STA Evaluator:
Evaluation Method:
Perform / Plant / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S
U Comments Element S
U Comments 1.
2.
2.
3.
3.
  *4.
* 4.
______ SATISFACTORY                                 ______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)
______ SATISFACTORY
Question #   S     U     Comments                   Question # S     U     Comments
______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)
______ SATISFACTORY                                 ______ UNSATISFACTORY Evaluator Signature / Date:                                         /
Question #
S U
Comments Question #
S U
Comments
______ SATISFACTORY
______ UNSATISFACTORY Evaluator Signature / Date:
/


JOB PERFORMANCE MEASURE JPM Title                                                           No.: NRC Exam 2003-301-A1.b Locate and use mechanical drawings to isolate a leak                Revision: Rev. 0 Page 3
JOB PERFORMANCE MEASURE JPM Title Locate and use mechanical drawings to isolate a leak No.: NRC Exam 2003-301-A1.b Revision: Rev. 0 Page 3


==References:==
==References:==
Line 116: Line 142:
Tools and Equipment Required:
Tools and Equipment Required:
None Preferred Evaluation Method:
None Preferred Evaluation Method:
Perform                 X           Walkthrough                         Discuss                 X Plant                   X           Simulator                 X         Classroom Evaluator Notes:
Perform X
Walkthrough Discuss X
Plant X
Simulator X
Classroom Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
The Plant can be in any mode of operation to conduct this JPM.
The Plant can be in any mode of operation to conduct this JPM.
K/A Reference : 2.1.24 Ability to locate and interpret electrical and mechanical drawings           2.8 Task Standard:
K/A Reference : 2.1.24 Ability to locate and interpret electrical and mechanical drawings 2.8 Task Standard:
Using the station mechanical drawings, find the valve required to isolate the A CRD Flow Control Valve Initial Conditions:
Using the station mechanical drawings, find the valve required to isolate the A CRD Flow Control Valve Initial Conditions:
You are an extra NSO assigned to the shift.
You are an extra NSO assigned to the shift.
Line 127: Line 157:
The CRS directs you to find C11-F002A and which valve(s) are required to isolate the leak using the station prints. Once you have researched and identified the valve(s), provide this information to the CRS.
The CRS directs you to find C11-F002A and which valve(s) are required to isolate the leak using the station prints. Once you have researched and identified the valve(s), provide this information to the CRS.


JOB PERFORMANCE MEASURE JPM Title                                                           No.: NRC Exam 2003-301-A1.b Locate and use mechanical drawings to isolate a leak                Revision: Rev. 0 Page 4 PERFORMANCE EVALUATION Time Start Elements                                               Standards
JOB PERFORMANCE MEASURE JPM Title Locate and use mechanical drawings to isolate a leak No.: NRC Exam 2003-301-A1.b Revision: Rev. 0 Page 4 PERFORMANCE EVALUATION Time Start Elements Standards
: 1. Locate the control room mechanical drawings.         1. Retrieves the mechanical drawings.
: 1. Locate the control room mechanical drawings.
: 2. Select the CRD system FOS drawing.                   2. Locates drawing 6M721-5703-1, CRD System Drawing.
: 1. Retrieves the mechanical drawings.
: 3. Locates the A Flow Control Valve.                   3. Locates on the drawing the A Flow Control Valve in section D-4.
: 2. Select the CRD system FOS drawing.
  *4. Locates isolation valves                           *4. Determines that P500-F093A will isolate the air leak.
: 2. Locates drawing 6M721-5703-1, CRD System Drawing.
: 3. Locates the A Flow Control Valve.
: 3. Locates on the drawing the A Flow Control Valve in section D-4.
*4. Locates isolation valves
*4. Determines that P500-F093A will isolate the air leak.
Time Stop NOTE: Sequence of drawing selection is not critical.
Time Stop NOTE: Sequence of drawing selection is not critical.
* Critical Steps Terminating Cue(s):
* Critical Steps Terminating Cue(s):
Identifies to the CRS the valves required to isolate the leak on the A CRD Flow Control Valve
Identifies to the CRS the valves required to isolate the leak on the A CRD Flow Control Valve


JOB PERFORMANCE MEASURE JPM Title                                           No.: NRC Exam 2003-301-A1.b Locate and use mechanical drawings to isolate a leak Revision: Rev. 0 Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
JOB PERFORMANCE MEASURE JPM Title Locate and use mechanical drawings to isolate a leak No.: NRC Exam 2003-301-A1.b Revision: Rev. 0 Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
Question:
Question:


==Reference:==
==Reference:==
===Response===
===Response===
Question:
Question:
Reference
Reference  


===Response===
===Response===
JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A2 JPM A1.b Cue Sheet Initial Conditions:
JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A2 JPM A1.b Cue Sheet Initial Conditions:
You are an extra NSO assigned to the shift.
You are an extra NSO assigned to the shift.
Line 154: Line 186:
The CRS directs you to find C11-F002A and which valve(s) are required to isolate the leak using the station prints. Once you have researched and identified the valve(s), provide this information to the CRS.
The CRS directs you to find C11-F002A and which valve(s) are required to isolate the leak using the station prints. Once you have researched and identified the valve(s), provide this information to the CRS.


JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC Exam 2003-301-A2 Review a completed procedure that has an error                Revision: 1 Page 2 Job Position                                               No.                        Revision Nuclear Supervising Operator                               NRC Exam 2003-301-A2             1 JPM Title                                                 Duration            Page Review a completed surveillance that has an errror         15 Minutes         COVER SHEET Examinee:                                                               SRO / RO / NLO / SROC / STA Evaluator:
JOB PERFORMANCE MEASURE JPM Title Review a completed procedure that has an error No.: NRC Exam 2003-301-A2 Revision: 1 Page 2 Job Position Nuclear Supervising Operator No.
Evaluation Method:       Perform / Plant / Simulator                   Start Time Stop Time Total Time PERFORMANCE EVALUATION Element     S     U     Comments                   Element     S     U     Comments
NRC Exam 2003-301-A2 Revision 1
  *1.
JPM Title Review a completed surveillance that has an errror Duration 15 Minutes Page COVER SHEET Examinee: SRO / RO / NLO / SROC / STA Evaluator:
______ SATISFACTORY                                 ______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)
Evaluation Method:
Question #   S     U     Comments                   Question # S     U     Comments
Perform / Plant / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S
______ SATISFACTORY                                 ______ UNSATISFACTORY Evaluator Signature / Date:                                         /
U Comments Element S
U Comments
* 1.
______ SATISFACTORY
______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)
Question #
S U
Comments Question #
S U
Comments
______ SATISFACTORY
______ UNSATISFACTORY Evaluator Signature / Date:
/


JOB PERFORMANCE MEASURE JPM Title                                                         No.: NRC Exam 2003-301-A2 Review a completed procedure that has an error                    Revision: 1 Page 3
JOB PERFORMANCE MEASURE JPM Title Review a completed procedure that has an error No.: NRC Exam 2003-301-A2 Revision: 1 Page 3


==References:==
==References:==
Line 169: Line 213:
Marked up completed copy of 24.630 Remote Shutdown Instrument Channel Checks with faulted data.
Marked up completed copy of 24.630 Remote Shutdown Instrument Channel Checks with faulted data.
Preferred Evaluation Method:
Preferred Evaluation Method:
Perform               X           Walkthrough                         Discuss Plant                             Simulator               X           Classroom Evaluator Notes:
Perform X
Walkthrough Discuss Plant Simulator X
Classroom Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
The Plant can be in any mode of operation to conduct this JPM.
The Plant can be in any mode of operation to conduct this JPM.
Line 183: Line 229:
Review the surveillance and verify all items meet the acceptance criteria.
Review the surveillance and verify all items meet the acceptance criteria.


JOB PERFORMANCE MEASURE JPM Title                                                 No.: NRC Exam 2003-301-A2 Review a completed procedure that has an error            Revision: 1 Page 4 PERFORMANCE EVALUATION Time Start Elements                                     Standards CUE: Present the candidate with the attached completed 24.630 surveillance.
JOB PERFORMANCE MEASURE JPM Title Review a completed procedure that has an error No.: NRC Exam 2003-301-A2 Revision: 1 Page 4 PERFORMANCE EVALUATION Time Start Elements Standards CUE: Present the candidate with the attached completed 24.630 surveillance.
  *1. Reviews the surveillance                   *1. Determines Acceptance Criteria for drywell pressure NOT met Time Stop
*1. Reviews the surveillance
*1. Determines Acceptance Criteria for drywell pressure NOT met Time Stop
* Critical Steps Terminating Cue(s):
* Critical Steps Terminating Cue(s):
Informs the CRS the review is complete.
Informs the CRS the review is complete.


JOB PERFORMANCE MEASURE JPM Title                                           No.: NRC Exam 2003-301-A2 Review a completed procedure that has an error      Revision: 1 Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
JOB PERFORMANCE MEASURE JPM Title Review a completed procedure that has an error No.: NRC Exam 2003-301-A2 Revision: 1 Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
Question:
Question:


==Reference:==
==Reference:==
===Response===
===Response===
Question:
Question:
Reference
Reference  


===Response===
===Response===
JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A3 JPM A2 Cue Sheet Initial Conditions:
JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A3 JPM A2 Cue Sheet Initial Conditions:
You are an extra CRNSO on shift.
You are an extra CRNSO on shift.
Line 205: Line 250:
Review the surveillance and verify all items meet the acceptance criteria.
Review the surveillance and verify all items meet the acceptance criteria.


JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC Exam 2003-301-A3 Calculate Stay time and determine a dose extension is needed  Revision: 1 Page 2 Job Position                                               No.                        Revision Nuclear Supervising Operator                               NRC Exam 2003-301-A3             1 JPM Title                                                 Duration          Page Calculate Stay time and determine a dose extension is     20 Minutes       COVER SHEET needed Examinee:                                                             SRO / RO / NLO / SROC / STA Evaluator:
JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 2 Job Position Nuclear Supervising Operator No.
Evaluation Method:       Perform / Simulator                         Start Time Stop Time Total Time PERFORMANCE EVALUATION Element     S     U     Comments                   Element     S     U     Comments
NRC Exam 2003-301-A3 Revision 1
  *1.
JPM Title Calculate Stay time and determine a dose extension is needed Duration 20 Minutes Page COVER SHEET Examinee: SRO / RO / NLO / SROC / STA Evaluator:
  *2.
Evaluation Method:
  *3.
Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S
______ SATISFACTORY                                 ______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)
U Comments Element S
Question #   S     U     Comments                   Question # S     U     Comments
U Comments
______ SATISFACTORY                                 ______ UNSATISFACTORY
* 1.
* 2.
* 3.
______ SATISFACTORY
______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)
Question #
S U
Comments Question #
S U
Comments
______ SATISFACTORY
______ UNSATISFACTORY


JOB PERFORMANCE MEASURE JPM Title                                                   No.: NRC Exam 2003-301-A3 Calculate Stay time and determine a dose extension is needed Revision: 1 Page 3 Evaluator Signature / Date:                                       /
JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 3 Evaluator Signature / Date:
/


JOB PERFORMANCE MEASURE JPM Title                                                           No.: NRC Exam 2003-301-A3 Calculate Stay time and determine a dose extension is needed        Revision: 1 Page 4
JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 4


==References:==
==References:==
Line 224: Line 281:
Tools and Equipment Required:
Tools and Equipment Required:
None Preferred Evaluation Method:
None Preferred Evaluation Method:
Perform                 X           Walkthrough                         Discuss Plant                                 Simulator               X           Classroom Evaluator Notes:
Perform X
Walkthrough Discuss Plant Simulator X
Classroom Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
The Plant can be in any mode of operation to conduct this JPM.
The Plant can be in any mode of operation to conduct this JPM.
Line 241: Line 300:
Determine if you meet the requirements to perform this inspection.
Determine if you meet the requirements to perform this inspection.


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC Exam 2003-301-A3 Calculate Stay time and determine a dose extension is needed    Revision: 1 Page 5 PERFORMANCE EVALUATION Time Start Elements                                         Standards CUE: Provide candidate copy of RWP with RWCU pump room The radiation levels in the area of the valve to be inspected is 6 Rem/hr
JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 5 PERFORMANCE EVALUATION Time Start Elements Standards CUE:
  *1. Determines that a RWP survey results are       *1. Determines radiation level in the area of the needed for estimation of radiation dose.          valve is 6 Rem/hr
Provide candidate copy of RWP with RWCU pump room The radiation levels in the area of the valve to be inspected is 6 Rem/hr
  *2. Calculates dose.                               *2. Dose = 6/60 hr
*1. Determines that a RWP survey results are needed for estimation of radiation dose.
*1. Determines radiation level in the area of the valve is 6 Rem/hr
*2. Calculates dose.
*2. Dose = 6/60 hr
* 6 Rem/hr = 600 mrem. 600 mrem + 753 mrem = 1353 mrem or 1.353 Rem (Fermi Admin Guideline = 1 REM/yr TEDE)
* 6 Rem/hr = 600 mrem. 600 mrem + 753 mrem = 1353 mrem or 1.353 Rem (Fermi Admin Guideline = 1 REM/yr TEDE)
  *3. Informs SM that dose will exceed Fermi2         *3. Determines dose extension is necessary.
*3. Informs SM that dose will exceed Fermi2 administrative guidleines
administrative guidleines Time Stop
*3. Determines dose extension is necessary.
Time Stop
* Critical Steps Terminating Cue(s):
* Critical Steps Terminating Cue(s):
Candidate informs NSS that dose extension has been obtained
Candidate informs NSS that dose extension has been obtained


JOB PERFORMANCE MEASURE JPM Title                                                   No.: NRC Exam 2003-301-A3 Calculate Stay time and determine a dose extension is needed Revision: 1 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
Question:
Question:


==Reference:==
==Reference:==
===Response===
===Response===
Question:
Question:
Reference
Reference  


===Response===
===Response===
JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A4 JPM A3 Cue Sheet Initial Conditions:
JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A4 JPM A3 Cue Sheet Initial Conditions:
A CRNSO must enter the RWCU pump room to perform an investigation of a G33-F012A.
A CRNSO must enter the RWCU pump room to perform an investigation of a G33-F012A.
Line 269: Line 330:
Determine if you meet the requirements to perform this inspection.
Determine if you meet the requirements to perform this inspection.


JOB PERFORMANCE MEASURE JPM Title                                                 No.: NRC Exam 2003-301-A4 Perform actions as Emergency Communicator during          Revision: 1 declaration of a General Emergency                        Page 2 Job Position                                           No.                        Revision Nuclear Supervising Operator                           NRC Exam 2003-301-A4             1 JPM Title                                             Duration          Page Perform actions as Emergency Communicator during       20 Minutes        COVER SHEET declaration of a General Emergency Examinee:                                                         SRO / RO / NLO / SROC / STA Evaluator:
JOB PERFORMANCE MEASURE JPM Title Perform actions as Emergency Communicator during declaration of a General Emergency No.: NRC Exam 2003-301-A4 Revision: 1 Page 2 Job Position Nuclear Supervising Operator No.
Evaluation Method:       Perform / Simulator                     Start Time Stop Time Total Time PERFORMANCE EVALUATION Element       S   U     Comments               Element     S     U     Comments
NRC Exam 2003-301-A4 Revision 1
    *1.
JPM Title Perform actions as Emergency Communicator during declaration of a General Emergency Duration 20 Minutes Page COVER SHEET Examinee: SRO / RO / NLO / SROC / STA Evaluator:
  *2.
Evaluation Method:
Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S
U Comments Element S
U Comments
* 1.
* 2.
3.
3.
  *4.
* 4.
______ SATISFACTORY                             ______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)
______ SATISFACTORY
Question #     S   U     Comments               Question # S     U     Comments
______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)
______ SATISFACTORY                             ______ UNSATISFACTORY
Question #
S U
Comments Question #
S U
Comments
______ SATISFACTORY
______ UNSATISFACTORY


JOB PERFORMANCE MEASURE JPM Title                                           No.: NRC Exam 2003-301-A4 Perform actions as Emergency Communicator during    Revision: 1 declaration of a General Emergency                  Page 3 Evaluator Signature / Date:                             /
JOB PERFORMANCE MEASURE JPM Title Perform actions as Emergency Communicator during declaration of a General Emergency No.: NRC Exam 2003-301-A4 Revision: 1 Page 3 Evaluator Signature / Date:
/


JOB PERFORMANCE MEASURE JPM Title                                                           No.: NRC Exam 2003-301-A4 Perform actions as Emergency Communicator during                    Revision: 1 declaration of a General Emergency                                  Page 4
JOB PERFORMANCE MEASURE JPM Title Perform actions as Emergency Communicator during declaration of a General Emergency No.: NRC Exam 2003-301-A4 Revision: 1 Page 4


==References:==
==References:==
Line 288: Line 361:
Tools and Equipment Required:
Tools and Equipment Required:
None Preferred Evaluation Method:
None Preferred Evaluation Method:
Perform                   X           Walkthrough                         Discuss Plant                                 Simulator               X           Classroom Evaluator Notes:
Perform X
Walkthrough Discuss Plant Simulator X
Classroom Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
K/A  
K/A  


==Reference:==
==Reference:==
2.4.43 knowledge of emergency communications systems and techniques             2.8 Whenever possible, allow the examinee to use the ERIS terminal to obtain weather information.
2.4.43 knowledge of emergency communications systems and techniques 2.8 Whenever possible, allow the examinee to use the ERIS terminal to obtain weather information.
Otherwise, information is provided in attached cue.
Otherwise, information is provided in attached cue.
Task Standard:
Task Standard:
All steps required are completed within 15 minutes, including:
All steps required are completed within 15 minutes, including:
* Emergency Director approval (signature) of the notification form.
Emergency Director approval (signature) of the notification form.
* Completion of telephone notifications to Offsite Authorities.
Completion of telephone notifications to Offsite Authorities.
* All steps are completed, including 2B (phone calls).
All steps are completed, including 2B (phone calls).
Initial Conditions:
Initial Conditions:
This is a drill The Emergency Director has declared a General Emergency due to an event in progress. (AG1)
This is a drill The Emergency Director has declared a General Emergency due to an event in progress. (AG1)
Line 318: Line 393:
Make the required 15 minute Offsite Authority Telephone Notifications.
Make the required 15 minute Offsite Authority Telephone Notifications.


JOB PERFORMANCE MEASURE JPM Title                                           No.: NRC Exam 2003-301-A4 Perform actions as Emergency Communicator during    Revision: 1 declaration of a General Emergency                  Page 5 This task is time critical.
JOB PERFORMANCE MEASURE JPM Title Perform actions as Emergency Communicator during declaration of a General Emergency No.: NRC Exam 2003-301-A4 Revision: 1 Page 5 This task is time critical.


JOB PERFORMANCE MEASURE JPM Title                                                   No.: NRC Exam 2003-301-A4 Perform actions as Emergency Communicator during            Revision: 1 declaration of a General Emergency                          Page 6 PERFORMANCE EVALUATION Time Start Elements                                     Standards CUE: Provide copy of Event Notification Form (ENF).
JOB PERFORMANCE MEASURE JPM Title Perform actions as Emergency Communicator during declaration of a General Emergency No.: NRC Exam 2003-301-A4 Revision: 1 Page 6 PERFORMANCE EVALUATION Time Start Elements Standards CUE:
: 1. Obtains copy of ENF                         1. No action CUE: Plant message number is the sequential number of the message, i.e. 1, 2, 3, etc.
Provide copy of Event Notification Form (ENF).
1.
Obtains copy of ENF
: 1. No action CUE:
Plant message number is the sequential number of the message, i.e. 1, 2, 3, etc.
Initiating condition/ description comes from EP-101 Enclosure A Meteorological data can be obtained from the 10 meter MET TOWER screen of ERIS. It may also be obtained by calling the National Weather Service. It may also be obtained by going to the meteorological computer above the control room. (Each sector is equivalent to 22.5 degrees.) Give the candidate the met data from the STA Protective action recommendations are only provided for a general emergency and IAW EP-545.
Initiating condition/ description comes from EP-101 Enclosure A Meteorological data can be obtained from the 10 meter MET TOWER screen of ERIS. It may also be obtained by calling the National Weather Service. It may also be obtained by going to the meteorological computer above the control room. (Each sector is equivalent to 22.5 degrees.) Give the candidate the met data from the STA Protective action recommendations are only provided for a general emergency and IAW EP-545.
Telephone numbers are listed on the copy of the ENF, and will ring in the simulator Control Booth
Telephone numbers are listed on the copy of the ENF, and will ring in the simulator Control Booth
  *2. Complete ENF
*2.
Complete ENF
* 2. Completes ENF CUE: Give the candidate the completed Technical Data Form (TDF).
* 2. Completes ENF CUE: Give the candidate the completed Technical Data Form (TDF).
: 3. Obtains completed TDF                         3. Obtains completed TDF NOTE: When the candidate makes notifications from the simulator using speed dial, the phone numbers will ring in the Simulator Control Booth.
3.
  *4. Makes notifications to offsite agencies     *4. Makes notifications Time Stop
Obtains completed TDF
: 3. Obtains completed TDF NOTE:
When the candidate makes notifications from the simulator using speed dial, the phone numbers will ring in the Simulator Control Booth.
*4. Makes notifications to offsite agencies
*4. Makes notifications Time Stop
* Critical Steps
* Critical Steps


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC Exam 2003-301-A4 Perform actions as Emergency Communicator during                Revision: 1 declaration of a General Emergency                              Page 7 Terminating Cue(s):
JOB PERFORMANCE MEASURE JPM Title Perform actions as Emergency Communicator during declaration of a General Emergency No.: NRC Exam 2003-301-A4 Revision: 1 Page 7 Terminating Cue(s):
Informs the Emergency Director initial notifications have been made.
Informs the Emergency Director initial notifications have been made.


JOB PERFORMANCE MEASURE JPM Title                                           No.: NRC Exam 2003-301-A4 Perform actions as Emergency Communicator during    Revision: 1 declaration of a General Emergency                  Page 8 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
JOB PERFORMANCE MEASURE JPM Title Perform actions as Emergency Communicator during declaration of a General Emergency No.: NRC Exam 2003-301-A4 Revision: 1 Page 8 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
Question:
Question:


==Reference:==
==Reference:==
===Response===
===Response===
Question:
Question:
Reference
Reference  


===Response===
===Response===
JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A3 JPM A4 Cue Sheet Initial Conditions:
JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A3 JPM A4 Cue Sheet Initial Conditions:
This is a drill The Emergency Director has declared a General Emergency due to an event in progress. (AG1)
This is a drill The Emergency Director has declared a General Emergency due to an event in progress. (AG1)
Line 356: Line 438:
This task is time critical.
This task is time critical.


JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC Exam 2003-301-A3 Calculate Stay time and determine a dose extension is needed  Revision: 1 Page 2 Job Position                                               No.                        Revision Control Room Supervisor                                   NRC Exam 2003-301-A3             1 JPM Title                                                 Duration          Page Determine dose limit will be exceeded and complete a       20 Minutes       COVER SHEET dose extension Examinee:                                                             SRO / RO / NLO / SROC / STA Evaluator:
JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 2 Job Position Control Room Supervisor No.
Evaluation Method:         Perform / Simulator                       Start Time Stop Time Total Time PERFORMANCE EVALUATION Element     S     U     Comments                 Element     S     U     Comments
NRC Exam 2003-301-A3 Revision 1
    *1.
JPM Title Determine dose limit will be exceeded and complete a dose extension Duration 20 Minutes Page COVER SHEET Examinee: SRO / RO / NLO / SROC / STA Evaluator:
    *2.
Evaluation Method:
    *3.
Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S
    *4.
U Comments Element S
    *5.
U Comments
    *6.
* 1.
    *7.
* 2.
  *8.
* 3.
  *9.
* 4.
______ SATISFACTORY                                 ______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)
* 5.
Question #   S     U     Comments                 Question # S     U     Comments
* 6.
______ SATISFACTORY                                 ______ UNSATISFACTORY
* 7.
* 8.
* 9.
______ SATISFACTORY
______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)
Question #
S U
Comments Question #
S U
Comments
______ SATISFACTORY
______ UNSATISFACTORY


JOB PERFORMANCE MEASURE JPM Title                                                   No.: NRC Exam 2003-301-A3 Calculate Stay time and determine a dose extension is needed Revision: 1 Page 3 Evaluator Signature / Date:                                       /
JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 3 Evaluator Signature / Date:
/


JOB PERFORMANCE MEASURE JPM Title                                                           No.: NRC Exam 2003-301-A3 Calculate Stay time and determine a dose extension is needed        Revision: 1 Page 4
JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 4


==References:==
==References:==
Line 381: Line 475:
Tools and Equipment Required:
Tools and Equipment Required:
None Preferred Evaluation Method:
None Preferred Evaluation Method:
Perform                 X           Walkthrough                       Discuss Plant                                 Simulator               X         Classroom Evaluator Notes:
Perform X
Walkthrough Discuss Plant Simulator X
Classroom Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
The Plant can be in any mode of operation to conduct this JPM.
The Plant can be in any mode of operation to conduct this JPM.
Line 388: Line 484:


==Reference:==
==Reference:==
2.3.4 Knowldege of Radiation exposure limits and contamination control / including permissible levels in excess of those authorized.                       2.5 / 3.1 Task Standard:
2.3.4 Knowldege of Radiation exposure limits and contamination control / including permissible levels in excess of those authorized.
2.5 / 3.1 Task Standard:
Authorization to exceed Fermi 2 Administrative Guidelines is obtained in accordance with MRP 12 Initial Conditions:
Authorization to exceed Fermi 2 Administrative Guidelines is obtained in accordance with MRP 12 Initial Conditions:
A CRNSO must enter the RWCU pump room to perform an investigation of a G33-F012A.
A CRNSO must enter the RWCU pump room to perform an investigation of a G33-F012A.
Line 398: Line 495:
Perform the necessary requirements to allow this entry to occur.
Perform the necessary requirements to allow this entry to occur.


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC Exam 2003-301-A3 Calculate Stay time and determine a dose extension is needed    Revision: 1 Page 5 PERFORMANCE EVALUATION Time Start Elements                                             Standards CUE: Provide candidate copy of RWP with RWCU pump room The radiation levels in the area of the valve to be inspected is 6 Rem/hr
JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 5 PERFORMANCE EVALUATION Time Start Elements Standards CUE:
  *1. Determines that a RWP survey results are       *1. Determines radiation level in the area of the needed for estimation of radiation dose.            valve is 6 Rem/hr
Provide candidate copy of RWP with RWCU pump room The radiation levels in the area of the valve to be inspected is 6 Rem/hr
  *2. Calculates dose and concludes that dose         *2. Dose = 6/60 hr
*1. Determines that a RWP survey results are needed for estimation of radiation dose.
* 6 Rem/hr = 600 mrem. 600 extension is necessary.                            mrem + 753 mrem = 1353 mrem or 1.353 Rem (Fermi Admin Guideline = 1 REM/yr TEDE)
*1. Determines radiation level in the area of the valve is 6 Rem/hr
  *3. Obtains Procedure MRP 12 and form MRP           *3. Obtains procedure and form 12001 CUE:     Enters Hans Blix 111-11-1111
*2. Calculates dose and concludes that dose extension is necessary.
  *4. Completes part 1A of form MRP 12001             *4.     Enters correct information
*2. Dose = 6/60 hr
    *5. Completes part 1B of MRP 12001                 *5. Enters:
* 6 Rem/hr = 600 mrem. 600 mrem + 753 mrem = 1353 mrem or 1.353 Rem (Fermi Admin Guideline = 1 REM/yr TEDE)
*3. Obtains Procedure MRP 12 and form MRP 12001
*3. Obtains procedure and form CUE:
Enters Hans Blix 111-11-1111
*4.
Completes part 1A of form MRP 12001
*4.
Enters correct information
* 5. Completes part 1B of MRP 12001
*5. Enters:
* Checks TEDE
* Checks TEDE
* Accumulated: 753 mrem
* Accumulated: 753 mrem
* Fermi guideline: 1 Rem/yr
* Fermi guideline: 1 Rem/yr
* 50% Federal Limit (1353-2500mr)
* 50% Federal Limit (1353-2500mr)
CUE: If the candidate requests information as to why another worker cannot be substituted or job dose reduced, act as the NSS and inform the candidate there are no qualified workers available with a lower dose.
CUE:
If the candidate requests information as to why another worker cannot be substituted or job dose reduced, act as the NSS and inform the candidate there are no qualified workers available with a lower dose.
Also, the exposure time is so short that attempts to reduce the dose by installing temporary shielding would result in more total Man-rem than with just the short exposure.
Also, the exposure time is so short that attempts to reduce the dose by installing temporary shielding would result in more total Man-rem than with just the short exposure.
  *6. Completes part 1C                               *6. Enters: No other individual available with lower dose, exposure time to short for other practical dose reduction methods (or similar).
*6. Completes part 1C
*6. Enters: No other individual available with lower dose, exposure time to short for other practical dose reduction methods (or similar).


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC Exam 2003-301-A3 Calculate Stay time and determine a dose extension is needed    Revision: 1 Page 6 Elements                                         Standards Cue:     When requested by the candidate, acknowledge the extension request by completing part 1D
JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 6 Elements Standards Cue:
  *7. Requests NO to sign part 1D                     *7. Examiner signs for Hans Blix
When requested by the candidate, acknowledge the extension request by completing part 1D
  *8. Complete Part E                                 *8. Signs Part E Cue:     Act as Radiological health personnel and accept form.
*7. Requests NO to sign part 1D
  *9. Routes form to Radiological Health.             *9. Routes form to Radiological Health.
*7. Examiner signs for Hans Blix
CUE: Acting as Radiation health, tell candidate that part 2 of MRP 12001 is complete and return the form to candidate instructing to obtain required approvals. Ask who has to sign for approval of extension.
*8. Complete Part E
NOTE: If the candidate obtains the Site VP signature , make an exam comment.
*8. Signs Part E Cue:
  *10. Obtains appropriate approvals as required by   *10. Obtains approvals from:
Act as Radiological health personnel and accept form.
MRP12 enclosure B.
*9. Routes form to Radiological Health.
*9. Routes form to Radiological Health.
CUE:
Acting as Radiation health, tell candidate that part 2 of MRP 12001 is complete and return the form to candidate instructing to obtain required approvals. Ask who has to sign for approval of extension.
NOTE: If the candidate obtains the Site VP signature, make an exam comment.
*10. Obtains appropriate approvals as required by MRP12 enclosure B.
*10. Obtains approvals from:
* Operations Superintendent
* Operations Superintendent
* Radiation Protection Manager
* Radiation Protection Manager
Line 427: Line 541:
Candidate completes dose extension.
Candidate completes dose extension.


JOB PERFORMANCE MEASURE JPM Title                                                   No.: NRC Exam 2003-301-A3 Calculate Stay time and determine a dose extension is needed Revision: 1 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
Question:
Question:


==Reference:==
==Reference:==
===Response===
===Response===
Question:
Question:
Reference
Reference  


===Response===
===Response===
JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A4 JPM A3 Cue Sheet Initial Conditions:
JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A4 JPM A3 Cue Sheet Initial Conditions:
A CRNSO must enter the RWCU pump room to perform an investigation of a G33-F012A.
A CRNSO must enter the RWCU pump room to perform an investigation of a G33-F012A.
Line 447: Line 559:
Perform the necessary requirements to allow this entry to occur.
Perform the necessary requirements to allow this entry to occur.


JOB PERFORMANCE MEASURE JPM Title                                                         No.: NRC Exam 2003-301-A4 Event Classification in accordance with EP-101, Classification    Revision: Rev. 1 of Emergencies.                                                  Page 2 Job Position                                                 No.                        Revision Control Room Supervisor                                       NRC Exam 2003-301-A4             1 JPM Title                                                     Duration          Page Event Classification in accordance with EP-101,               10 Minutes        COVER SHEET Classification of Emergencies.
JOB PERFORMANCE MEASURE JPM Title Event Classification in accordance with EP-101, Classification of Emergencies.
Examinee:                                                                 SRO / RO / NLO / SROC / STA Evaluator:
No.: NRC Exam 2003-301-A4 Revision: Rev. 1 Page 2 Job Position Control Room Supervisor No.
Evaluation Method:         Perform / Plant / Simulator                   Start Time Stop Time Total Time PERFORMANCE EVALUATION Element       S   U     Comments                   Element       S     U     Comments 1.
NRC Exam 2003-301-A4 Revision 1
JPM Title Event Classification in accordance with EP-101, Classification of Emergencies.
Duration 10 Minutes Page COVER SHEET Examinee: SRO / RO / NLO / SROC / STA Evaluator:
Evaluation Method:
Perform / Plant / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S
U Comments Element S
U Comments 1.
2.
2.
3.
3.
* 4.
* 4.
______ SATISFACTORY                                 ______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)
______ SATISFACTORY
Question #     S   U     Comments                   Question #   S     U     Comments
______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)
______ SATISFACTORY                                 ______ UNSATISFACTORY
Question #
S U
Comments Question #
S U
Comments
______ SATISFACTORY
______ UNSATISFACTORY


JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC Exam 2003-301-A4 Event Classification in accordance with EP-101, Classification Revision: Rev. 1 of Emergencies.                                                Page 3 Evaluator Signature / Date:                                         /
JOB PERFORMANCE MEASURE JPM Title Event Classification in accordance with EP-101, Classification of Emergencies.
No.: NRC Exam 2003-301-A4 Revision: Rev. 1 Page 3 Evaluator Signature / Date:
/


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC Exam 2003-301-A4 Event Classification in accordance with EP-101, Classification  Revision: Rev. 1 of Emergencies.                                                  Page 4
JOB PERFORMANCE MEASURE JPM Title Event Classification in accordance with EP-101, Classification of Emergencies.
No.: NRC Exam 2003-301-A4 Revision: Rev. 1 Page 4


==References:==
==References:==
Line 466: Line 593:
Tools and Equipment Required:
Tools and Equipment Required:
None Preferred Evaluation Method:
None Preferred Evaluation Method:
Perform                   X         Walkthrough                         Discuss Plant                     X         Simulator               X           Classroom Evaluator Notes:
Perform X
Walkthrough Discuss Plant X
Simulator X
Classroom Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
K/A  
K/A  
Line 487: Line 617:
Report your classification to the Emergency Director and the basis for that classification.
Report your classification to the Emergency Director and the basis for that classification.


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC Exam 2003-301-A4 Event Classification in accordance with EP-101, Classification  Revision: Rev. 1 of Emergencies.                                                  Page 5 PERFORMANCE EVALUATION Time Start Elements                                         Standards
JOB PERFORMANCE MEASURE JPM Title Event Classification in accordance with EP-101, Classification of Emergencies.
: 1. Candidate locates and obtains a copy of           1. Candidate locates and obtains a copy of EP-101 procedure.                                  EP-101 procedure from SRO Desk in control room.
No.: NRC Exam 2003-301-A4 Revision: Rev. 1 Page 5 PERFORMANCE EVALUATION Time Start Elements Standards
: 2. Reviews conditions from Cue Sheet                 2. Reviews events from Cue Sheet.
: 1. Candidate locates and obtains a copy of EP-101 procedure.
: 3. Compares events from the scenario to the         3. Refers to Enclosure A or B, Tab S of EP-101.
: 1. Candidate locates and obtains a copy of EP-101 procedure from SRO Desk in control room.
requirements of EP-101.
: 2. Reviews conditions from Cue Sheet
* 4. Declares Site Area Emergency to the
: 2. Reviews events from Cue Sheet.
* 4. Declares an ALERT based on a failure to Emergency Director, based on A valid               scram and manual scram was successful initiating scram signal received, but no           System Malfunction SS2, page S-7, and automatic scram occurred and Manual                 communicates this to the Emergency actions taken at COP H11-P603 were not             Director.
: 3. Compares events from the scenario to the requirements of EP-101.
successful in scram of control rods to achieve reactor power < 3%
: 3. Refers to Enclosure A or B, Tab S of EP-101.
* 4. Declares Site Area Emergency to the Emergency Director, based on A valid initiating scram signal received, but no automatic scram occurred and Manual actions taken at COP H11-P603 were not successful in scram of control rods to achieve reactor power < 3%
* 4. Declares an ALERT based on a failure to scram and manual scram was successful System Malfunction SS2, page S-7, and communicates this to the Emergency Director.
Time Stop
Time Stop
* Critical Steps Terminating Cue(s):
* Critical Steps Terminating Cue(s):
Declares an SITE AREA EMERGENCY based on failure of reactor protection system instrumentation to complete or initiate an automatic reactor scram once a reactor protection system setpoint has been exceeded and manual scram was not successful, System Malfunction SS2, page S-7, and communicates this to the Emergency Director.
Declares an SITE AREA EMERGENCY based on failure of reactor protection system instrumentation to complete or initiate an automatic reactor scram once a reactor protection system setpoint has been exceeded and manual scram was not successful, System Malfunction SS2, page S-7, and communicates this to the Emergency Director.


JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC Exam 2003-301-A4 Event Classification in accordance with EP-101, Classification Revision: Rev. 1 of Emergencies.                                                Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
JOB PERFORMANCE MEASURE JPM Title Event Classification in accordance with EP-101, Classification of Emergencies.
No.: NRC Exam 2003-301-A4 Revision: Rev. 1 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
Question:
Question:


==Reference:==
==Reference:==
===Response===
===Response===
Question:
Question:
Reference
Reference  


===Response===
===Response===
JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A4 JPM A4 Cue Sheet Initial Conditions:
JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A4 JPM A4 Cue Sheet Initial Conditions:
You are the SM assigned to the shift.
You are the SM assigned to the shift.

Latest revision as of 11:34, 16 January 2025

Final As-Administered Administrative Jpms for the Fermi Initial Examiantion - March 2003
ML030870913
Person / Time
Site: Fermi 
Issue date: 03/10/2003
From: Bollinger S
Detroit Edison
To:
Office of Nuclear Reactor Regulation
References
-RFPFR, 50-341/03-301 50-341/03-301
Download: ML030870913 (48)


Text

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A1.A Job Position Nuclear Supervising Operator No.

NRC Exam 2003-301-A1.a Revision 1

JPM Title Obtain a copy of an Approved Procedure Duration 15 Minutes Page COVER SHEET Examinee: SRO / RO / NLO / SROC / STA Evaluator:

Evaluation Method:

Perform / Plant or Simulator Start Time (Circle method used)

Stop Time Total Time PERFORMANCE EVALUATION Element S

U Comments Element S

U Comments

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.

______ SATISFACTORY

______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)

Question #

S U

Comments Question #

S U

Comments

______ SATISFACTORY

______ UNSATISFACTORY Evaluator Signature / Date:

/

JOB PERFORMANCE MEASURE JPM Title Obtain a copy of an Approved Procedure No.: NRC Exam 2003-301-A1.a Revision: 1 Page 2

References:

Required (R) / Available (A)

Web ARMS (R)

Tools and Equipment Required:

Computer Terminal Access (R)

Preferred Evaluation Method:

Perform X

Walkthrough Discuss Plant X

Simulator X

Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

The Plant can be in any mode of operation to conduct this JPM.

K/A Reference 2.1.21 Ability to obtain and verify controlled procedure copy (3.1)

Task Standard:

Obtain and verify an approved copy of SOP 23.316, RPS 120 VAC and RPS MG Sets in accordance with WebARMS.

Initial Conditions:

Plant conditions are as you see them.

Your shift is responsible for conducting a electrical lineup verification of the Reactor Protection System 120 VAC System this shift.

Initiating Cue(s):

The reactor building Nuclear Operator (NO) on your shift is going to conduct an electrical alignment verification of the Reactor Protection System 120 VAC System. The CRS has requested that you obtain and verify a controlled copy of procedure 23.316, RPS 120 VAC and RPS MG Sets to support this task. The computer in the rear of the simulator may be used for this purpose, but any plant computer terminal may be used.

JOB PERFORMANCE MEASURE JPM Title Obtain a copy of an Approved Procedure No.: NRC Exam 2003-301-A1.a Revision: 1 Page 3 PERFORMANCE EVALUATION Time Start Elements Standards

  • 1. At any computer terminal, from the Fermi 2 Nucleus Home Page, select ARMS.
  • 1. ARMS login screen appears on the screen.
  • 2. From the ARMS login screen, Select the Login as Guest button on the page
  • 2. The ARMS document portal page appears on the computer screen.
  • 3. Select the WebARMS Search link OR DrillDown WebARMS Search Options link
  • 3. IF the WebARMS Search link is used THEN the Main Record Search Page will appear on the computer screen. Continue on to step 4.

IF the Search button is used THEN continue at Step 5.

NOTE: The candidate may enter AFC in the Status Code field. This will ensure the latest revision is selected.

  • 4. Enter the procedure number in the Document Serial Number field.
  • 4 Enters 23.316 in the Document Serial Number field. GO TO Step 8.
  • 5. Select Plant Technical Procedures link
  • 5. Plant Technical Drill Down Lookup appears on page
  • 6. Search Results page appears
  • 7 Select page with 23.316
  • 7. Page 6 is the screen with 23.316 NOTE: If the candidate did not enter AFC in the Status Code field using the WebARMS Search method, then the latest revision must be selected.
  • 8. Press the printer icon on the left side of the screen by procedure 23.316.
  • 8. The Fermi 2 Information Systems page appears CUE:This will print to a remote location if the candidate selects print. Have the candidate simulate selecting PRINT and hand them a copy of the procedure as if it had come from the printer.
  • 9. From the Fermi 2 Information Systems page, Control Information drop down box, select Controlled_for_Job
  • 9. Procedure will print to the designated printer
  • 10.Obtains controlled copy of procedure.
  • 10.Obtains the controlled copy of the procedure and verifies the procedure has controlled copy printed on the cover sheet.

Time Stop

  • Critical Steps

JOB PERFORMANCE MEASURE JPM Title Obtain a copy of an Approved Procedure No.: NRC Exam 2003-301-A1.a Revision: 1 Page 4 Terminating Cue(s):

The CRNSO obtains a controlled copy of 23. 316 in accordance with WebArms

JOB PERFORMANCE MEASURE JPM Title Obtain a copy of an Approved Procedure No.: NRC Exam 2003-301-A1.a Revision: 1 Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A1.B JPM A1.a Cue Sheet Initial Conditions:

Plant conditions are as you see them.

Your shift is responsible for conducting a electrical lineup verification of the Reactor Protection System 120 VAC System this shift Initiating Cue(s):

The reactor building Nuclear Operator (NO) on your shift is going to conduct an electrical alignment verification of the Reactor Protection System 120 VAC System.

The CRS has requested that you obtain and verify a controlled copy of procedure 23.316, RPS 120 VAC and RPS MG Sets to support this task.

The computer in the rear of the simulator may be used for this purpose.

JOB PERFORMANCE MEASURE JPM Title Locate and use mechanical drawings to isolate a leak No.: NRC Exam 2003-301-A1.b Revision: Rev. 0 Page 2 Job Position Control Room Supervisor No.

NRC Exam 2003-301-A1.b Revision 0

JPM Title Locate and use mechanical drawings to isolate a leak.

Duration 10 Minutes Page COVER SHEET Examinee: SRO / RO / NLO / SROC / STA Evaluator:

Evaluation Method:

Perform / Plant / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S

U Comments Element S

U Comments 1.

2.

3.

  • 4.

______ SATISFACTORY

______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)

Question #

S U

Comments Question #

S U

Comments

______ SATISFACTORY

______ UNSATISFACTORY Evaluator Signature / Date:

/

JOB PERFORMANCE MEASURE JPM Title Locate and use mechanical drawings to isolate a leak No.: NRC Exam 2003-301-A1.b Revision: Rev. 0 Page 3

References:

Required (R) / Available (A)

Mechanical Drawings 6M721-5703-1, Control Rod Drive System (A)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X

Walkthrough Discuss X

Plant X

Simulator X

Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

The Plant can be in any mode of operation to conduct this JPM.

K/A Reference : 2.1.24 Ability to locate and interpret electrical and mechanical drawings 2.8 Task Standard:

Using the station mechanical drawings, find the valve required to isolate the A CRD Flow Control Valve Initial Conditions:

You are an extra NSO assigned to the shift.

Plant conditions are stable and 97 % power.

During shift rounds the reactor building Nuclear Operator (NO) calls the control room and reports that he has discovered the air line supplying C11-F002A is broken and there is a lot of noise due to the air leaking. He has found what he thinks is the isolation valve, but needs confirmation before he closes the valve.

Initiating Cue(s):

The CRS directs you to find C11-F002A and which valve(s) are required to isolate the leak using the station prints. Once you have researched and identified the valve(s), provide this information to the CRS.

JOB PERFORMANCE MEASURE JPM Title Locate and use mechanical drawings to isolate a leak No.: NRC Exam 2003-301-A1.b Revision: Rev. 0 Page 4 PERFORMANCE EVALUATION Time Start Elements Standards

1. Locate the control room mechanical drawings.
1. Retrieves the mechanical drawings.
2. Select the CRD system FOS drawing.
2. Locates drawing 6M721-5703-1, CRD System Drawing.
3. Locates the A Flow Control Valve.
3. Locates on the drawing the A Flow Control Valve in section D-4.
  • 4. Locates isolation valves
  • 4. Determines that P500-F093A will isolate the air leak.

Time Stop NOTE: Sequence of drawing selection is not critical.

  • Critical Steps Terminating Cue(s):

Identifies to the CRS the valves required to isolate the leak on the A CRD Flow Control Valve

JOB PERFORMANCE MEASURE JPM Title Locate and use mechanical drawings to isolate a leak No.: NRC Exam 2003-301-A1.b Revision: Rev. 0 Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A2 JPM A1.b Cue Sheet Initial Conditions:

You are an extra NSO assigned to the shift.

Plant conditions are stable and 97 % power.

During shift rounds the reactor building Nuclear Operator calls the control room and reports that he has discovered the air line supplying C11-F002A is broken and there is a lot of noise due to the air leaking. He has found what he thinks is the isolation valve, but needs confirmation before he closes the valve.

Initiating Cue(s):

The CRS directs you to find C11-F002A and which valve(s) are required to isolate the leak using the station prints. Once you have researched and identified the valve(s), provide this information to the CRS.

JOB PERFORMANCE MEASURE JPM Title Review a completed procedure that has an error No.: NRC Exam 2003-301-A2 Revision: 1 Page 2 Job Position Nuclear Supervising Operator No.

NRC Exam 2003-301-A2 Revision 1

JPM Title Review a completed surveillance that has an errror Duration 15 Minutes Page COVER SHEET Examinee: SRO / RO / NLO / SROC / STA Evaluator:

Evaluation Method:

Perform / Plant / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S

U Comments Element S

U Comments

  • 1.

______ SATISFACTORY

______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)

Question #

S U

Comments Question #

S U

Comments

______ SATISFACTORY

______ UNSATISFACTORY Evaluator Signature / Date:

/

JOB PERFORMANCE MEASURE JPM Title Review a completed procedure that has an error No.: NRC Exam 2003-301-A2 Revision: 1 Page 3

References:

Required (R) / Available (A)

MWC03 (A) Surveillance/Performance package control. (A)

Tools and Equipment Required:

Marked up completed copy of 24.630 Remote Shutdown Instrument Channel Checks with faulted data.

Preferred Evaluation Method:

Perform X

Walkthrough Discuss Plant Simulator X

Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

The Plant can be in any mode of operation to conduct this JPM.

Start this JPM at the CRS Desk in the simulator or the control room.

K/A

Reference:

2.2.12 Knowledge Task Standard:

Review a completed surveillance that has an error Initial Conditions:

You are an extra CRNSO on shift.

24.630 Remote Shutdown Instrument Channel Checks has just been completed.

Initiating Cue(s):

Review the surveillance and verify all items meet the acceptance criteria.

JOB PERFORMANCE MEASURE JPM Title Review a completed procedure that has an error No.: NRC Exam 2003-301-A2 Revision: 1 Page 4 PERFORMANCE EVALUATION Time Start Elements Standards CUE: Present the candidate with the attached completed 24.630 surveillance.

  • 1. Reviews the surveillance
  • 1. Determines Acceptance Criteria for drywell pressure NOT met Time Stop
  • Critical Steps Terminating Cue(s):

Informs the CRS the review is complete.

JOB PERFORMANCE MEASURE JPM Title Review a completed procedure that has an error No.: NRC Exam 2003-301-A2 Revision: 1 Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A3 JPM A2 Cue Sheet Initial Conditions:

You are an extra CRNSO on shift.

24.630 Remote Shutdown Instrument Channel Checks has just been completed.

Initiating Cue(s):

Review the surveillance and verify all items meet the acceptance criteria.

JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 2 Job Position Nuclear Supervising Operator No.

NRC Exam 2003-301-A3 Revision 1

JPM Title Calculate Stay time and determine a dose extension is needed Duration 20 Minutes Page COVER SHEET Examinee: SRO / RO / NLO / SROC / STA Evaluator:

Evaluation Method:

Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S

U Comments Element S

U Comments

  • 1.
  • 2.
  • 3.

______ SATISFACTORY

______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)

Question #

S U

Comments Question #

S U

Comments

______ SATISFACTORY

______ UNSATISFACTORY

JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 3 Evaluator Signature / Date:

/

JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 4

References:

Required (R) / Available (A)

MRP 12, Authorization To Exceed Dose Control Thresholds (R)

Training RWP for RWCU room (A)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X

Walkthrough Discuss Plant Simulator X

Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

The Plant can be in any mode of operation to conduct this JPM.

Start this JPM at the CRS Desk in the Simulator.

K/A

Reference:

2.3.4 Knowldege of Radiation exposure limits and contamination control / including permissible levels in excess of those authorized. (2.5/3.1)

Task Standard:

Authorization to exceed Fermi 2 Administrative Guidelines is obtained in accordance with MRP 12 Initial Conditions:

A CRNSO must enter the RWCU pump room to perform an investigation of a G33-F012A.

The estimated time necessary to perform the inspection is 6 minutes.

Initiating Cue(s):

You are the CRNSO desigated to perform the entry.

Your total exposure for the year is 753 mrem TEDE The situation is NOT an emergency but there is no alternative to performing the inspection.

Determine if you meet the requirements to perform this inspection.

JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 5 PERFORMANCE EVALUATION Time Start Elements Standards CUE:

Provide candidate copy of RWP with RWCU pump room The radiation levels in the area of the valve to be inspected is 6 Rem/hr

  • 1. Determines that a RWP survey results are needed for estimation of radiation dose.
  • 1. Determines radiation level in the area of the valve is 6 Rem/hr
  • 2. Calculates dose.
  • 2. Dose = 6/60 hr
  • 6 Rem/hr = 600 mrem. 600 mrem + 753 mrem = 1353 mrem or 1.353 Rem (Fermi Admin Guideline = 1 REM/yr TEDE)
  • 3. Informs SM that dose will exceed Fermi2 administrative guidleines
  • 3. Determines dose extension is necessary.

Time Stop

  • Critical Steps Terminating Cue(s):

Candidate informs NSS that dose extension has been obtained

JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A4 JPM A3 Cue Sheet Initial Conditions:

A CRNSO must enter the RWCU pump room to perform an investigation of a G33-F012A.

The estimated time necessary to perform the inspection is 6 minutes.

Initiating Cue(s):

You are the CRNSO desigated to perform the entry.

Your total exposure for the year is 753 mrem TEDE The situation is NOT an emergency but there is no alternative to performing the inspection.

Determine if you meet the requirements to perform this inspection.

JOB PERFORMANCE MEASURE JPM Title Perform actions as Emergency Communicator during declaration of a General Emergency No.: NRC Exam 2003-301-A4 Revision: 1 Page 2 Job Position Nuclear Supervising Operator No.

NRC Exam 2003-301-A4 Revision 1

JPM Title Perform actions as Emergency Communicator during declaration of a General Emergency Duration 20 Minutes Page COVER SHEET Examinee: SRO / RO / NLO / SROC / STA Evaluator:

Evaluation Method:

Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S

U Comments Element S

U Comments

  • 1.
  • 2.

3.

  • 4.

______ SATISFACTORY

______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)

Question #

S U

Comments Question #

S U

Comments

______ SATISFACTORY

______ UNSATISFACTORY

JOB PERFORMANCE MEASURE JPM Title Perform actions as Emergency Communicator during declaration of a General Emergency No.: NRC Exam 2003-301-A4 Revision: 1 Page 3 Evaluator Signature / Date:

/

JOB PERFORMANCE MEASURE JPM Title Perform actions as Emergency Communicator during declaration of a General Emergency No.: NRC Exam 2003-301-A4 Revision: 1 Page 4

References:

Required (R) / Available (A)

EP 290 (R)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X

Walkthrough Discuss Plant Simulator X

Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

K/A

Reference:

2.4.43 knowledge of emergency communications systems and techniques 2.8 Whenever possible, allow the examinee to use the ERIS terminal to obtain weather information.

Otherwise, information is provided in attached cue.

Task Standard:

All steps required are completed within 15 minutes, including:

Emergency Director approval (signature) of the notification form.

Completion of telephone notifications to Offsite Authorities.

All steps are completed, including 2B (phone calls).

Initial Conditions:

This is a drill The Emergency Director has declared a General Emergency due to an event in progress. (AG1)

The event caused the Site boundary dose rates, resulting from a gaseous release, to exceed 1000 mrem TEDE for the projected duration of the release.

Currently the plant is degrading and a confirmatory sample is in progress.

There is currently no precipitation.

The protective action recommendations are to evacuate Area 1 at this time based on dose calculations.

There are no in place shelter requirements.

NOTE: The examinee may request the information from the evaluator in accordance with the enclosure in EP-290. Be prepared to provide this information as requested, including meteorological data.

IF ERIS NOT AVAILABLE:

Wind direction is from 0 to 180 degrees.

Wind speed is 2 MPH Stability class of C Down wind sectors can be calculated (HJK).

No precipitation.

Initiating Cue(s):

You are the Control Room Emergency Communicator. Your duties are to perform the following:

Fill out the required information for a Nuclear Plant Event Notification Form.

Present the form to the Emergency Director for approval.

Make the required 15 minute Offsite Authority Telephone Notifications.

JOB PERFORMANCE MEASURE JPM Title Perform actions as Emergency Communicator during declaration of a General Emergency No.: NRC Exam 2003-301-A4 Revision: 1 Page 5 This task is time critical.

JOB PERFORMANCE MEASURE JPM Title Perform actions as Emergency Communicator during declaration of a General Emergency No.: NRC Exam 2003-301-A4 Revision: 1 Page 6 PERFORMANCE EVALUATION Time Start Elements Standards CUE:

Provide copy of Event Notification Form (ENF).

1.

Obtains copy of ENF

1. No action CUE:

Plant message number is the sequential number of the message, i.e. 1, 2, 3, etc.

Initiating condition/ description comes from EP-101 Enclosure A Meteorological data can be obtained from the 10 meter MET TOWER screen of ERIS. It may also be obtained by calling the National Weather Service. It may also be obtained by going to the meteorological computer above the control room. (Each sector is equivalent to 22.5 degrees.) Give the candidate the met data from the STA Protective action recommendations are only provided for a general emergency and IAW EP-545.

Telephone numbers are listed on the copy of the ENF, and will ring in the simulator Control Booth

  • 2.

Complete ENF

  • 2. Completes ENF CUE: Give the candidate the completed Technical Data Form (TDF).

3.

Obtains completed TDF

3. Obtains completed TDF NOTE:

When the candidate makes notifications from the simulator using speed dial, the phone numbers will ring in the Simulator Control Booth.

  • 4. Makes notifications to offsite agencies
  • 4. Makes notifications Time Stop
  • Critical Steps

JOB PERFORMANCE MEASURE JPM Title Perform actions as Emergency Communicator during declaration of a General Emergency No.: NRC Exam 2003-301-A4 Revision: 1 Page 7 Terminating Cue(s):

Informs the Emergency Director initial notifications have been made.

JOB PERFORMANCE MEASURE JPM Title Perform actions as Emergency Communicator during declaration of a General Emergency No.: NRC Exam 2003-301-A4 Revision: 1 Page 8 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A3 JPM A4 Cue Sheet Initial Conditions:

This is a drill The Emergency Director has declared a General Emergency due to an event in progress. (AG1)

The event caused the Site boundary dose rates, resulting from a gaseous release, to exceed 1000 mrem TEDE for the projected duration of the release.

Currently the plant is degrading and a confirmatory sample is in progress.

There is currently no precipitation.

Initiating Cue(s):

You are the Control Room Emergency Communicator. Your duties are to perform the following:

  • Fill out the required information for a Nuclear Plant Event Notification Form.
  • Present the form to the Emergency Director for approval.
  • Make the required 15 minute Offsite Authority Telephone Notifications.

This task is time critical.

JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 2 Job Position Control Room Supervisor No.

NRC Exam 2003-301-A3 Revision 1

JPM Title Determine dose limit will be exceeded and complete a dose extension Duration 20 Minutes Page COVER SHEET Examinee: SRO / RO / NLO / SROC / STA Evaluator:

Evaluation Method:

Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S

U Comments Element S

U Comments

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.

______ SATISFACTORY

______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)

Question #

S U

Comments Question #

S U

Comments

______ SATISFACTORY

______ UNSATISFACTORY

JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 3 Evaluator Signature / Date:

/

JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 4

References:

Required (R) / Available (A)

MRP 12, Authorization To Exceed Dose Control Thresholds (R)

Training RWP for RWCU room (A)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X

Walkthrough Discuss Plant Simulator X

Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

The Plant can be in any mode of operation to conduct this JPM.

Start this JPM at the CRS Desk in the Simulator.

K/A

Reference:

2.3.4 Knowldege of Radiation exposure limits and contamination control / including permissible levels in excess of those authorized.

2.5 / 3.1 Task Standard:

Authorization to exceed Fermi 2 Administrative Guidelines is obtained in accordance with MRP 12 Initial Conditions:

A CRNSO must enter the RWCU pump room to perform an investigation of a G33-F012A.

The estimated time necessary to perform the inspection is 6 minutes.

Initiating Cue(s):

You are the CRS.

The CRNSOs total exposure for the year is 753 mrem TEDE.

The situation is NOT an emergency but there is no alternative to performing the inspection.

Perform the necessary requirements to allow this entry to occur.

JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 5 PERFORMANCE EVALUATION Time Start Elements Standards CUE:

Provide candidate copy of RWP with RWCU pump room The radiation levels in the area of the valve to be inspected is 6 Rem/hr

  • 1. Determines that a RWP survey results are needed for estimation of radiation dose.
  • 1. Determines radiation level in the area of the valve is 6 Rem/hr
  • 2. Calculates dose and concludes that dose extension is necessary.
  • 2. Dose = 6/60 hr
  • 6 Rem/hr = 600 mrem. 600 mrem + 753 mrem = 1353 mrem or 1.353 Rem (Fermi Admin Guideline = 1 REM/yr TEDE)
  • 3. Obtains Procedure MRP 12 and form MRP 12001
  • 3. Obtains procedure and form CUE:

Enters Hans Blix 111-11-1111

  • 4.

Completes part 1A of form MRP 12001

  • 4.

Enters correct information

  • 5. Completes part 1B of MRP 12001
  • 5. Enters:
  • Accumulated: 753 mrem
  • Fermi guideline: 1 Rem/yr
  • 50% Federal Limit (1353-2500mr)

CUE:

If the candidate requests information as to why another worker cannot be substituted or job dose reduced, act as the NSS and inform the candidate there are no qualified workers available with a lower dose.

Also, the exposure time is so short that attempts to reduce the dose by installing temporary shielding would result in more total Man-rem than with just the short exposure.

  • 6. Completes part 1C
  • 6. Enters: No other individual available with lower dose, exposure time to short for other practical dose reduction methods (or similar).

JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 6 Elements Standards Cue:

When requested by the candidate, acknowledge the extension request by completing part 1D

  • 7. Requests NO to sign part 1D
  • 7. Examiner signs for Hans Blix
  • 8. Complete Part E
  • 8. Signs Part E Cue:

Act as Radiological health personnel and accept form.

  • 9. Routes form to Radiological Health.
  • 9. Routes form to Radiological Health.

CUE:

Acting as Radiation health, tell candidate that part 2 of MRP 12001 is complete and return the form to candidate instructing to obtain required approvals. Ask who has to sign for approval of extension.

NOTE: If the candidate obtains the Site VP signature, make an exam comment.

  • 10. Obtains appropriate approvals as required by MRP12 enclosure B.
  • 10. Obtains approvals from:
  • Operations Superintendent
  • Radiation Protection Manager
  • Plant Manager Time Stop
  • Critical Steps Terminating Cue(s):

Candidate completes dose extension.

JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine a dose extension is needed No.: NRC Exam 2003-301-A3 Revision: 1 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A4 JPM A3 Cue Sheet Initial Conditions:

A CRNSO must enter the RWCU pump room to perform an investigation of a G33-F012A.

The estimated time necessary to perform the inspection is 6 minutes.

Initiating Cue(s):

You are the CRS.

The CRNSOs total exposure for the year is 753 mrem TEDE.

The situation is NOT an emergency but there is no alternative to performing the inspection.

Perform the necessary requirements to allow this entry to occur.

JOB PERFORMANCE MEASURE JPM Title Event Classification in accordance with EP-101, Classification of Emergencies.

No.: NRC Exam 2003-301-A4 Revision: Rev. 1 Page 2 Job Position Control Room Supervisor No.

NRC Exam 2003-301-A4 Revision 1

JPM Title Event Classification in accordance with EP-101, Classification of Emergencies.

Duration 10 Minutes Page COVER SHEET Examinee: SRO / RO / NLO / SROC / STA Evaluator:

Evaluation Method:

Perform / Plant / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S

U Comments Element S

U Comments 1.

2.

3.

  • 4.

______ SATISFACTORY

______ UNSATISFACTORY ORAL EVALUATION (Not Required for LOR Annual Exams)

Question #

S U

Comments Question #

S U

Comments

______ SATISFACTORY

______ UNSATISFACTORY

JOB PERFORMANCE MEASURE JPM Title Event Classification in accordance with EP-101, Classification of Emergencies.

No.: NRC Exam 2003-301-A4 Revision: Rev. 1 Page 3 Evaluator Signature / Date:

/

JOB PERFORMANCE MEASURE JPM Title Event Classification in accordance with EP-101, Classification of Emergencies.

No.: NRC Exam 2003-301-A4 Revision: Rev. 1 Page 4

References:

Required (R) / Available (A)

EP-101 Classification of Emergencies (R)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X

Walkthrough Discuss Plant X

Simulator X

Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

K/A

Reference:

2.4.40, Knowledge of the SRO Responsiblities in emergency plan implementation4.0 Task Standard:

Classify the emergency as a Site Area Emergency based on a failure to scram and communicates this to the Emergency Director.

Initial Conditions:

You are the SM assigned to the shift.

Initiating Cue(s):

The plant is operating at rated power.

While removing RHR from Torus Cooling, the crew discovers that RHR Pump C will not shutdown.

During an attempt to trip the RHR Pump breaker locally, the breaker fails and causes a loss of bus 64C.

The crew enters 20.300.04 and 20.413.01 in response to the loss of power.

A high temperature alarm occurs on the B Recirc MG Set, followed by a trip of the MG Set and Pump.

Prior to a high temperature alarm on the A MG Set, the crew places the Mode Switch in Shutdown. All control rods fail to insert.

The crew enters the EOPs and takes action to shutdown the reactor and stabilize the plant.

After completion of FSQ1 through 8, reactor power is 22% and steady.

Classify the event in accordance with EP-101, Classification of Emergencies.

Report your classification to the Emergency Director and the basis for that classification.

JOB PERFORMANCE MEASURE JPM Title Event Classification in accordance with EP-101, Classification of Emergencies.

No.: NRC Exam 2003-301-A4 Revision: Rev. 1 Page 5 PERFORMANCE EVALUATION Time Start Elements Standards

1. Candidate locates and obtains a copy of EP-101 procedure.
1. Candidate locates and obtains a copy of EP-101 procedure from SRO Desk in control room.
2. Reviews conditions from Cue Sheet
2. Reviews events from Cue Sheet.
3. Compares events from the scenario to the requirements of EP-101.
3. Refers to Enclosure A or B, Tab S of EP-101.
  • 4. Declares Site Area Emergency to the Emergency Director, based on A valid initiating scram signal received, but no automatic scram occurred and Manual actions taken at COP H11-P603 were not successful in scram of control rods to achieve reactor power < 3%
  • 4. Declares an ALERT based on a failure to scram and manual scram was successful System Malfunction SS2, page S-7, and communicates this to the Emergency Director.

Time Stop

  • Critical Steps Terminating Cue(s):

Declares an SITE AREA EMERGENCY based on failure of reactor protection system instrumentation to complete or initiate an automatic reactor scram once a reactor protection system setpoint has been exceeded and manual scram was not successful, System Malfunction SS2, page S-7, and communicates this to the Emergency Director.

JOB PERFORMANCE MEASURE JPM Title Event Classification in accordance with EP-101, Classification of Emergencies.

No.: NRC Exam 2003-301-A4 Revision: Rev. 1 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-A4 JPM A4 Cue Sheet Initial Conditions:

You are the SM assigned to the shift.

Initiating Cue(s):

The plant is operating at rated power.

While removing RHR from Torus Cooling, the crew discovers that RHR Pump C will not shutdown. During an attempt to trip the RHR Pump breaker locally, the breaker fails and causes a loss of bus 64C.

The crew enters 20.300.04 and 20.413.01 in response to the loss of power.

A high temperature alarm occurs on the B Recirc MG Set, followed by a trip of the MG Set and Pump. Prior to a high temperature alarm on the A MG Set, the crew places the Mode Switch in Shutdown. All control rods fail to insert.

The crew enters the EOPs and takes action to shutdown the reactor and stabilize the plant.

After completion of FSQ1 through 8, reactor power is 22% and steady.

Classify the event in accordance with EP-101, Classification of Emergencies.

Report your classification to the Emergency Director and the basis for that classification.