{{#Wiki_filter:Entergy Operations, Inc.
{{#Wiki_filter:~Entergy Entergy Operations, Inc.
1340 Echelon Parkway
1340 Echelon Parkway Jackson, MS 39213-8298 Tel 601 368 5758 Michael A. Krupa Director Nuclear Safety & Licensing CNRO-2003-00040 September 12, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
~Entergy                                                                          Jackson, MS 39213-8298 Tel 601 368 5758 Michael A. Krupa Director Nuclear Safety &Licensing CNRO-2003-00040 September 12, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555


==SUBJECT:==
==SUBJECT:==
                -Entergy Operations.nc     _-
-Entergy Operations.nc Relaxation Request to NRC Order EA-03-009 for In-Core Instrumentation Nozzles Arkansas Nuclear One, Unit 2 Docket No. 50-368 License No. NPF-6
Relaxation Request to NRC Order EA-03-009 for In-Core Instrumentation Nozzles       -
Arkansas Nuclear One, Unit 2 Docket No. 50-368 License No. NPF-6


==REFERENCE:==
==REFERENCE:==
Line 31: Line 28:


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In the referenced letter, Entergy Operations, Inc. (Entergy) requested relaxation from Section IV.C(1)(b) of NRC Order EA-03-009 for Arkansas Nuclear One, Unit 2 (ANO-2) via Relaxation Request #3 pertaining to the In-Core Instrumentation (ICI) nozzles located in the reactor pressure vessel (RPV) head. The request proposed a three-step alternative based on ultrasonic testing, stress analysis, and augmented inspections utilizing a sampling plan.
In the referenced letter, Entergy Operations, Inc. (Entergy) requested relaxation from Section IV.C(1)(b) of NRC Order EA-03-009 for Arkansas Nuclear One, Unit 2 (ANO-2) via Relaxation Request #3 pertaining to the In-Core Instrumentation (ICI) nozzles located in the reactor pressure vessel (RPV) head. The request proposed a three-step alternative based on ultrasonic testing, stress analysis, and augmented inspections utilizing a sampling plan.
  -In a telephone-conference hekldon-September9, 2003,-representatives of the NRC staff and Entergy discussed the use of a sampling plan to determine the number of nozzles to be inspected. As a result of that discussion and by this letter, Entergy amends Relaxation Request #3. Specifically, Entergy will not utilize a sampling plan and proposes to perform augmented inspections of the eight (8) ICI nozzles as described in the request.
-In a telephone-conference hekldon-September9, 2003,-representatives of the NRC staff and Entergy discussed the use of a sampling plan to determine the number of nozzles to be inspected. As a result of that discussion and by this letter, Entergy amends Relaxation Request #3. Specifically, Entergy will not utilize a sampling plan and proposes to perform augmented inspections of the eight (8) ICI nozzles as described in the request.
This letter contains no new commitments.
This letter contains no new commitments.
                                                                                                      %7 0ID
%7 0ID


CNRO-2003-00040 Page 2 of 2 If you have any questions or require additional information, please contact Guy Davant at (601) 368-5756.
CNRO-2003-00040 Page 2 of 2 If you have any questions or require additional information, please contact Guy Davant at (601) 368-5756.
Sincerely, MAKIGHD/bal cc:     Mr. C. G. Anderson (ANO)
Sincerely, MAKIGHD/bal cc:
Mr. C. G. Anderson (ANO)
Mr. W. A. Eaton (ECH)
Mr. W. A. Eaton (ECH)
Mr. G. A. Williams (ECH)
Mr. G. A. Williams (ECH)
Mr. T. -A. Alexionm-NRR Project Manager (AN-)             -    v Mr. R. L. Bywater, NRC Senior Resident Inspector (ANO)
Mr. T. -A. Alexionm-NRR Project Manager (AN-)
v Mr. R. L. Bywater, NRC Senior Resident Inspector (ANO)
Mr. T. P. Gwynn, NRC Region IV Regional Administrator}}
Mr. T. P. Gwynn, NRC Region IV Regional Administrator}}

Latest revision as of 07:44, 16 January 2025

Entergy Operations, Inc. - Relaxation Request to NRC Order EA-03-009 for In-Core Instrumentation Nozzles
ML032660016
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/12/2003
From: Krupa M
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNRO-2003-00040, EA-03-009
Download: ML032660016 (2)


Text

~Entergy Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213-8298 Tel 601 368 5758 Michael A. Krupa Director Nuclear Safety & Licensing CNRO-2003-00040 September 12, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

-Entergy Operations.nc Relaxation Request to NRC Order EA-03-009 for In-Core Instrumentation Nozzles Arkansas Nuclear One, Unit 2 Docket No. 50-368 License No. NPF-6

REFERENCE:

Entergy Operations, Inc. letter CNRO-2003-00035 to the NRC, "Response to Request for Additional Information Pertaining to Relaxation Request to NRC Order EA-03-009 for In-Core Instrumentation Nozzles," dated September 3, 2003

Dear Sir or Madam:

In the referenced letter, Entergy Operations, Inc. (Entergy) requested relaxation from Section IV.C(1)(b) of NRC Order EA-03-009 for Arkansas Nuclear One, Unit 2 (ANO-2) via Relaxation Request #3 pertaining to the In-Core Instrumentation (ICI) nozzles located in the reactor pressure vessel (RPV) head. The request proposed a three-step alternative based on ultrasonic testing, stress analysis, and augmented inspections utilizing a sampling plan.

-In a telephone-conference hekldon-September9, 2003,-representatives of the NRC staff and Entergy discussed the use of a sampling plan to determine the number of nozzles to be inspected. As a result of that discussion and by this letter, Entergy amends Relaxation Request #3. Specifically, Entergy will not utilize a sampling plan and proposes to perform augmented inspections of the eight (8) ICI nozzles as described in the request.

This letter contains no new commitments.

%7 0ID

CNRO-2003-00040 Page 2 of 2 If you have any questions or require additional information, please contact Guy Davant at (601) 368-5756.

Sincerely, MAKIGHD/bal cc:

Mr. C. G. Anderson (ANO)

Mr. W. A. Eaton (ECH)

Mr. G. A. Williams (ECH)

Mr. T. -A. Alexionm-NRR Project Manager (AN-)

v Mr. R. L. Bywater, NRC Senior Resident Inspector (ANO)

Mr. T. P. Gwynn, NRC Region IV Regional Administrator