{{#Wiki_filter:Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIANA MICHIGAN POWER December 5, 2003                                               AEP:NRC:2691-37 Docket Nos.       50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit I and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for November 2003 is submitted.
{{#Wiki_filter:Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIANA MICHIGAN POWER December 5, 2003 AEP:NRC:2691-37 Docket Nos.
50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit I and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for November 2003 is submitted.
There are no new commitments associated with this submittal.
There are no new commitments associated with this submittal.
Should you have any questions, please contact Mr. Brian D. Mann, Acting Manager of Regulatory Affairs, at (269) 697-5806.
Should you have any questions, please contact Mr. Brian D. Mann, Acting Manager of Regulatory Affairs, at (269) 697-5806.
          -, Design Engineering and Regulatory Affairs JEN/jen Attachment A
-, Design Engineering and Regulatory Affairs JEN/jen Attachment A


U. S. Nuclear Regulatory Commission                     AEP:NRC:2691-37 Page 2 c: R. Aben - Department of Consumers and Industry Services ANI Nuclear Engineering Department L. Brandon - MDEQ- WHMD/HWRPS M. J. Finissi G. T. Gaffney - Canton J. B. Giessner INPO Records Center J. N. Jensen B. Lewis - McGraw-Hill Companies D. H. Malin B. D. Mann K. L. Matheny M. K. Nazar NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus T. C. Pham W. H. Schalk J. A. Zwolinski
U. S. Nuclear Regulatory Commission AEP:NRC:2691-37 Page 2 c: R. Aben - Department of Consumers and Industry Services ANI Nuclear Engineering Department L. Brandon - MDEQ-WHMD/HWRPS M. J. Finissi G. T. Gaffney - Canton J. B. Giessner INPO Records Center J. N. Jensen B. Lewis - McGraw-Hill Companies D. H. Malin B. D. Mann K. L. Matheny M. K. Nazar NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus T. C. Pham W. H. Schalk J. A. Zwolinski


N.R.C. OPERATING DATA REPORT DOCKET NO.         50-315 DATE     12/3/2003 COMPLETED BY         T. Pham TELEPHONE 269-465-5901 OPERATING STATUS
N.R.C. OPERATING DATA REPORT DOCKET NO.
: 1. Unit Name       D. C. Cook Unit 1                                         Notes:
50-315 DATE 12/3/2003 COMPLETED BY T. Pham TELEPHONE 269-465-5901 OPERATING STATUS
: 2. Reporting Period                                     Nov-03
: 1. Unit Name D. C. Cook Unit 1 Notes:
: 3. Licensed Thermal Power (MWt)                           3304
: 2. Reporting Period Nov-03
: 4. Name Plate Rating (Gross MWe)                         1152
: 3. Licensed Thermal Power (MWt) 3304
: 5. Design Electrical Rating (Net MWe)                     1020
: 4. Name Plate Rating (Gross MWe) 1152
: 6. Maximum Dependable Capacity(GROSS MWe)                 1056
: 5. Design Electrical Rating (Net MWe) 1020
: 7. Maximum Dependable Capacity (Net MWe)                 1000
: 6. Maximum Dependable Capacity(GROSS MWe) 1056
: 7. Maximum Dependable Capacity (Net MWe) 1000
: 8. If Changes Occur In Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
: 8. If Changes Occur In Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
: 9. Power Level To Which Restricted. If Any (Net MWe)
: 9. Power Level To Which Restricted. If Any (Net MWe)
: 10. Reasons For Restrictions.
: 10. Reasons For Restrictions.
This Mo.                    Yr. to Date              Cumm.
This Mo.
: 11. Hours in Reporting Period                           720.0                          8016.0            253464.0
: 11. Hours in Reporting Period 720.0
: 12. No. of Hrs. Reactor Was Critical                     125.7                         5808.7            173157.3
: 12. No. of Hrs. Reactor Was Critical 125.7
: 13. Reactor Reserve Shutdown Hours                         0.0                            0.0                463.0
: 13. Reactor Reserve Shutdown Hours 0.0
: 14. Hours Generator on Line                               99.1                         5746.7            170435.6
: 14. Hours Generator on Line 99.1
: 15. Unit Reserve Shutdown Hours                           0.0                            0.0                321.0
: 15. Unit Reserve Shutdown Hours 0.0
: 16. Gross Therm. Energy Gen. (MWH)                   135025.2                     18653996.0            508923070.6
: 16. Gross Therm. Energy Gen. (MWH) 135025.2
: 17. Gross Elect. Energy Gen. (MWH)                     37440.0                      6002323.0          165244753.0
: 17. Gross Elect. Energy Gen. (MWH) 37440.0
: 18. Net Elect. Energy Gen. (MWH)                       33916.6                     5799480.4          159074676.9
: 18. Net Elect. Energy Gen. (MWH) 33916.6
: 19. Unit Service Factor                                   13.8                           71.7                67.7
: 19. Unit Service Factor 13.8
: 20. Unit Availability Factor                             13.8                           71.7                67.7
: 20. Unit Availability Factor 13.8
: 21. Unit Capacity Factor (MDC Net)                         4.7                           72.3                64.2
: 21. Unit Capacity Factor (MDC Net) 4.7
: 22. Unit Capacity Factor (DER Net)                         4.6                           70.9                62.9
: 22. Unit Capacity Factor (DER Net) 4.6
: 23. Unit Forced Outage Rate                               0.0                           18.6                19.2
: 23. Unit Forced Outage Rate 0.0
: 24. Shutdowns Scheduled over Next Six Months (Type,Date,and DurationL
: 24. Shutdowns Scheduled over Next Six Months (Type,Date,and DurationL Yr. to Date 8016.0 5808.7 0.0 5746.7 0.0 18653996.0 6002323.0 5799480.4 71.7 71.7 72.3 70.9 18.6 Cumm.
253464.0 173157.3 463.0 170435.6 321.0 508923070.6 165244753.0 159074676.9 67.7 67.7 64.2 62.9 19.2
: 25. If Shut Down At End of Report Period, Est'd Date of Startup:
: 25. If Shut Down At End of Report Period, Est'd Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast                   Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION


AVERAGE DAILY POWER LEVEL (MWe-Net)
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.     50-315 UNIT            ONE DATE            03-Dec-03 COMPLETED BY  T. Pham TELEPHONE      269-465-5901 MONTH     Nov-03 AVERAGE DAILY                           AVERAGE DAILY DAY      POWER LEVEL                   DAY       POWER LEVEL 11/1/2003       0                    11/17/2003         0 11/2/2003       0                    11/18/2003         0 11/3/2003       0                    11/19/2003       0 11/4/2003       0                    11/20/2003       0 11/5/2003       0                    11/21/2003       0 11/6/2003       0                    11/22/2003       0 11/7/2003       0                    11/23/2003       0 11/8/2003       0                    11/24/2003       0 11/9/2003       0                    11/25/2003       0 11/10/2003       0                    11/26/2003       12 11/11/2003       0                    11/27/2003       146 11/12/2003       0                    11/28/2003       239 11/13/2003       0                    11/29/2003       398 11/14/2003       0                    11/30/2003       618 11/15/2003       0 11/16/2003       0
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 03-Dec-03 T. Pham 269-465-5901 MONTH Nov-03 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 11/1/2003 11/2/2003 11/3/2003 11/4/2003 11/5/2003 11/6/2003 11/7/2003 11/8/2003 11/9/2003 11/10/2003 11/11/2003 11/12/2003 11/13/2003 11/14/2003 11/15/2003 11/16/2003 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 11/17/2003 11/18/2003 11/19/2003 11/20/2003 11/21/2003 11/22/2003 11/23/2003 11/24/2003 11/25/2003 11/26/2003 11/27/2003 11/28/2003 11/29/2003 11/30/2003 0
0 0
0 0
0 0
0 0
12 146 239 398 618


DOCKET NO.           50-315 UNIT NAME            D.C. Cook Unit 1 DATE                December 3, 2003 COMPLETED BY        J. Newmiller TELEPHONE            269-465-5901 PAGE                1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - November 2003 METHOD OF SHUTTING     LICENSEE DURATION                   DOWN         EVENT         SYSTEM     COMPONENT             CAUSE AND CORRECTIVE ACTION NO. DATE TYPE 1    HOURS         REASON 2   REACTOR3     REPORT NO. CODE 4    CODE 5                    TO PREVENT RECURRENCE 349   031018   S       620.9             C         2           N/A           N/A         N/A                 Scheduled refueling outage.
DOCKET NO.
1 TYPE:             2 REASON:                              3 METHOD:                4 SYSTEM:                                5 COMPONENT:
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit 1 December 3, 2003 J. Newmiller 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - November 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
F: Forced            A: Equipment Failure (Explain)         1: Manual                Exhibit G - Instructions                  Exhibit I: Same Source S: Scheduled        B: Maintenance or Test                 2: Manual Scram          for preparation of data C: Refueling                           3: Automatic Scram        entry sheets for Ucensee D: Regulatory Restriction               4: Other (Explain)        Event Report (LER) File E: Operator Training and                                         (NUREG 0161)
DATE TYPE1 HOURS REASON 2 REACTOR3 REPORT NO.
Ucense Examination F: Administrative G: Operational Error (Explain)
CODE4 CODE5 TO PREVENT RECURRENCE 349 031018 S
H: Other (Explain)
620.9 C
2 N/A N/A N/A Scheduled refueling outage.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and Ucense Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Ucensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source


N.R.C. OPERATING DATA REPORT DOCKET NO.       50-316 DATE 12/3/2003 COMPLETED BY         T. Pham TELEPHONE 269-465-5901 OPERATING STATUS
N.R.C. OPERATING DATA REPORT DOCKET NO.
: 1. Unit Name         D. C.Cook Unit 2                                             Notes:
50-316 DATE 12/3/2003 COMPLETED BY T. Pham TELEPHONE 269-465-5901 OPERATING STATUS
: 2. Reporting Period                                         Nov-03
: 1. Unit Name D. C. Cook Unit 2 Notes:
: 3. Licensed Thermal Power (MWt)                               3468
: 2. Reporting Period Nov-03
: 4. Name Plate Rating (Gross MWe)                               1133
: 3. Licensed Thermal Power (MWt) 3468
: 5. Design Electrical Rating (Net MWe)                         1090
: 4. Name Plate Rating (Gross MWe) 1133
: 6. Maximum Dependable Capacity(GROSS MWe)                     1100
: 5. Design Electrical Rating (Net MWe) 1090
: 7. Maximum Dependable Capacity (Net MWe)                       1060
: 6. Maximum Dependable Capacity(GROSS MWe) 1100
: 7. Maximum Dependable Capacity (Net MWe) 1060
: 8. If Changes Occur In Capacity Ratings (items no. 3 through 7) Since Last Report Give Reasons
: 8. If Changes Occur In Capacity Ratings (items no. 3 through 7) Since Last Report Give Reasons
: 9. Power Level To Which Restricted. If Any (Net MWe)
: 9. Power Level To Which Restricted. If Any (Net MWe)
: 10. Reasons For Restrictions.
: 10. Reasons For Restrictions.
This Mo.                   Yr. to Date             Cumm.
This Mo.
: 11. Hours in Reporting Period                                 720.0                       8016.0             227610.0
Yr. to Date Cumm.
: 12. No. of Hrs. Reactor Was Critical                         720.0                       6005.7             147573.8
1 1. Hours in Reporting Period 720.0 8016.0 227610.0
: 13. Reactor Reserve Shutdown Hours                               0.0                         0.0                 0.0
: 12. No. of Hrs. Reactor Was Critical 720.0 6005.7 147573.8
: 14. Hours Generator on Line                                   720.0                       5930.2             143670.7
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
: 15. Unit Reserve Shutdown Hours                                 0.0                         0.0                 0.0
: 14. Hours Generator on Line 720.0 5930.2 143670.7
: 16. Gross Therm. Energy Gen. (MWH)                       2495461.8                   20115598.6           451339295.9
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
: 17. Gross Elect. Energy Gen. (MWH)                         823150.0                   6570670.0           146344370.0
: 16. Gross Therm. Energy Gen. (MWH) 2495461.8 20115598.6 451339295.9
: 18. Net Elect. Energy Gen. (MWH)                           799063.0                   6365971.8           141118711.1
: 17. Gross Elect. Energy Gen. (MWH) 823150.0 6570670.0 146344370.0
: 19. Unit Service Factor                                       100.0                         74.0                 63.8
: 18. Net Elect. Energy Gen. (MWH) 799063.0 6365971.8 141118711.1
: 20. Unit Availability Factor                                 100.0                         74.0                 63.8
: 19. Unit Service Factor 100.0 74.0 63.8
: 21. Unit Capacity Factor (MDC Net)                           104.7                         74.9                 59.6
: 20. Unit Availability Factor 100.0 74.0 63.8
: 22. Unit Capacity Factor (DER Net)                           101.8                         72.9                 58.0
: 21. Unit Capacity Factor (MDC Net) 104.7 74.9 59.6
: 23. Unit Forced Outage Rate                                     0.0                         13.9                 23.4
: 22. Unit Capacity Factor (DER Net) 101.8 72.9 58.0
: 23. Unit Forced Outage Rate 0.0 13.9 23.4
: 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
: 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
: 25. If Shut Down At End of Report Period, Est'd Date of Startup:
: 25. If Shut Down At End of Report Period, Est'd Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast                   Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION


AVERAGE DAILY POWER LEVEL (MWe-Net)
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.     50-316 UNIT            TWO DATE            3-Dec-03 COMPLETED BY    T. Pham TELEPHONE      269-465-5901 MONTH     Nov-03 AVERAGE DAILY                           AVERAGE DAILY DAY      POWER LEVEL                 DAY         POWER LEVEL 11/1/2003     1102                  11/17/2003         1125 11/2/2003     1106                  11/18/2003         1099 11/3/2003     1101                  11/19/2003         1111 11/4/2003     1102                  11/20/2003         1110 11/5/2003     1106                  11/21/2003         1112 11/6/2003     1105                  11/22/2003         1104 11/7/2003     1107                  11/23/2003         1110 11/8/2003     1110                  11/24/2003         1112 11/9/2003     1112                  11/25/2003         1113 11/10/2003     1111                  11/26/2003         1113 11/11/2003     1109                  11/27/2003       1110 11/12/2003     1109                  11/28/2003         1112 11/13/2003     1112                  11/29/2003         1116 11/14/2003     1113                  11/30/2003       1116 11/15/2003     1115 11/16/2003     1115
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 3-Dec-03 T. Pham 269-465-5901 MONTH Nov-03 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 11/1/2003 11/2/2003 11/3/2003 11/4/2003 11/5/2003 11/6/2003 11/7/2003 11/8/2003 11/9/2003 11/10/2003 11/11/2003 11/12/2003 11/13/2003 11/14/2003 11/15/2003 11/16/2003 1102 1106 1101 1102 1106 1105 1107 1110 1112 1111 1109 1109 1112 1113 1115 1115 11/17/2003 11/18/2003 11/19/2003 11/20/2003 11/21/2003 11/22/2003 11/23/2003 11/24/2003 11/25/2003 11/26/2003 11/27/2003 11/28/2003 11/29/2003 11/30/2003 1125 1099 1111 1110 1112 1104 1110 1112 1113 1113 1110 1112 1116 1116


I DOCKET NO.       50-316 UNIT NAME        D.C. Cook Unit 2 DATE              December 3, 2003 COMPLETED BY      J. Newmiller TELEPHONE        269-465-5901 PAGE              1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - November 2003 METHOD OF SHUTTING       LICENSEE DURATION                   DOWN           EVENT         SYSTEM     COMPONENT             CAUSE AND CORRECTIVE ACTION NO. DATE TYPE1     HOURS         REASON 2    REACTOR 3     REPORT NO. CODE 4    CODE 5                    TO PREVENT RECURRENCE None
DOCKET NO.
                              .          k .
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C. Cook Unit 2 December 3, 2003 J. Newmiller 269-465-5901 1 of 1 I
1 TYPE:           2 REASON:                              3  METHOD:                4 SYSTEM:                              5 COMPONENT:
UNIT SHUTDOWNS AND POWER REDUCTIONS - November 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
F: Forced          A: Equipment Failure (Explain)           1: Manual                Exhibit G - Instructions                Exhibit I: Same Source S: Scheduled      B: Maintenance or Test                 2:  Manual Scram          for preparation of data C: Refueling                           3:  Automatic Scram        entry sheets for Ucensee D: Regulatory Restriction               4:  Other (Explain)        Event Report (LER) File E: Operator Training and                                           (NUREG 0161)
DATE TYPE1 HOURS REASON2 REACTOR 3 REPORT NO.
License Examination F: Administrative G: Operational Error (Explain)
CODE4 CODE5 TO PREVENT RECURRENCE None k
H: Other (Explain)}}
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Ucensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source}}

Latest revision as of 07:04, 16 January 2025

November 2003 Monthly Operating Report for D.C. Cook, Units 1 and 2
ML033530108
Person / Time
Site: Cook  
Issue date: 12/05/2003
From: Zwolinski J
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-37
Download: ML033530108 (8)


Text

Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIANA MICHIGAN POWER December 5, 2003 AEP:NRC:2691-37 Docket Nos.

50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit I and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for November 2003 is submitted.

There are no new commitments associated with this submittal.

Should you have any questions, please contact Mr. Brian D. Mann, Acting Manager of Regulatory Affairs, at (269) 697-5806.

-, Design Engineering and Regulatory Affairs JEN/jen Attachment A

U. S. Nuclear Regulatory Commission AEP:NRC:2691-37 Page 2 c: R. Aben - Department of Consumers and Industry Services ANI Nuclear Engineering Department L. Brandon - MDEQ-WHMD/HWRPS M. J. Finissi G. T. Gaffney - Canton J. B. Giessner INPO Records Center J. N. Jensen B. Lewis - McGraw-Hill Companies D. H. Malin B. D. Mann K. L. Matheny M. K. Nazar NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus T. C. Pham W. H. Schalk J. A. Zwolinski

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-315 DATE 12/3/2003 COMPLETED BY T. Pham TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 1 Notes:
2. Reporting Period Nov-03
3. Licensed Thermal Power (MWt) 3304
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity(GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur In Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

11. Hours in Reporting Period 720.0
12. No. of Hrs. Reactor Was Critical 125.7
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator on Line 99.1
15. Unit Reserve Shutdown Hours 0.0
16. Gross Therm. Energy Gen. (MWH) 135025.2
17. Gross Elect. Energy Gen. (MWH) 37440.0
18. Net Elect. Energy Gen. (MWH) 33916.6
19. Unit Service Factor 13.8
20. Unit Availability Factor 13.8
21. Unit Capacity Factor (MDC Net) 4.7
22. Unit Capacity Factor (DER Net) 4.6
23. Unit Forced Outage Rate 0.0
24. Shutdowns Scheduled over Next Six Months (Type,Date,and DurationL Yr. to Date 8016.0 5808.7 0.0 5746.7 0.0 18653996.0 6002323.0 5799480.4 71.7 71.7 72.3 70.9 18.6 Cumm.

253464.0 173157.3 463.0 170435.6 321.0 508923070.6 165244753.0 159074676.9 67.7 67.7 64.2 62.9 19.2

25. If Shut Down At End of Report Period, Est'd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 03-Dec-03 T. Pham 269-465-5901 MONTH Nov-03 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 11/1/2003 11/2/2003 11/3/2003 11/4/2003 11/5/2003 11/6/2003 11/7/2003 11/8/2003 11/9/2003 11/10/2003 11/11/2003 11/12/2003 11/13/2003 11/14/2003 11/15/2003 11/16/2003 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 11/17/2003 11/18/2003 11/19/2003 11/20/2003 11/21/2003 11/22/2003 11/23/2003 11/24/2003 11/25/2003 11/26/2003 11/27/2003 11/28/2003 11/29/2003 11/30/2003 0

0 0

0 0

0 0

0 0

12 146 239 398 618

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit 1 December 3, 2003 J. Newmiller 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - November 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE1 HOURS REASON 2 REACTOR3 REPORT NO.

CODE4 CODE5 TO PREVENT RECURRENCE 349 031018 S

620.9 C

2 N/A N/A N/A Scheduled refueling outage.

1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and Ucense Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Ucensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-316 DATE 12/3/2003 COMPLETED BY T. Pham TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 2 Notes:
2. Reporting Period Nov-03
3. Licensed Thermal Power (MWt) 3468
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity(GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur In Capacity Ratings (items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

Yr. to Date Cumm.

1 1. Hours in Reporting Period 720.0 8016.0 227610.0

12. No. of Hrs. Reactor Was Critical 720.0 6005.7 147573.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 720.0 5930.2 143670.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 2495461.8 20115598.6 451339295.9
17. Gross Elect. Energy Gen. (MWH) 823150.0 6570670.0 146344370.0
18. Net Elect. Energy Gen. (MWH) 799063.0 6365971.8 141118711.1
19. Unit Service Factor 100.0 74.0 63.8
20. Unit Availability Factor 100.0 74.0 63.8
21. Unit Capacity Factor (MDC Net) 104.7 74.9 59.6
22. Unit Capacity Factor (DER Net) 101.8 72.9 58.0
23. Unit Forced Outage Rate 0.0 13.9 23.4
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Est'd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 3-Dec-03 T. Pham 269-465-5901 MONTH Nov-03 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 11/1/2003 11/2/2003 11/3/2003 11/4/2003 11/5/2003 11/6/2003 11/7/2003 11/8/2003 11/9/2003 11/10/2003 11/11/2003 11/12/2003 11/13/2003 11/14/2003 11/15/2003 11/16/2003 1102 1106 1101 1102 1106 1105 1107 1110 1112 1111 1109 1109 1112 1113 1115 1115 11/17/2003 11/18/2003 11/19/2003 11/20/2003 11/21/2003 11/22/2003 11/23/2003 11/24/2003 11/25/2003 11/26/2003 11/27/2003 11/28/2003 11/29/2003 11/30/2003 1125 1099 1111 1110 1112 1104 1110 1112 1113 1113 1110 1112 1116 1116

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C. Cook Unit 2 December 3, 2003 J. Newmiller 269-465-5901 1 of 1 I

UNIT SHUTDOWNS AND POWER REDUCTIONS - November 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE1 HOURS REASON2 REACTOR 3 REPORT NO.

CODE4 CODE5 TO PREVENT RECURRENCE None k

1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Ucensee Event Report (LER) File (NUREG 0161) 5 COMPONENT: