==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mr. Lyman:== | ==Dear Mr. Lyman:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 32: | Line 31: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 38: | Line 37: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mayor Gosek:== | ==Dear Mayor Gosek:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 51: | Line 49: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 57: | Line 55: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mr. Burdick:== | ==Dear Mr. Burdick:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 70: | Line 67: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 76: | Line 73: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mayor Grimshaw:== | ==Dear Mayor Grimshaw:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 89: | Line 85: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 95: | Line 91: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mr. Anderson:== | ==Dear Mr. Anderson:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 108: | Line 103: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 114: | Line 109: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Chairman Johnson:== | ==Dear Chairman Johnson:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 127: | Line 121: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 133: | Line 127: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mr. Proud:== | ==Dear Mr. Proud:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 146: | Line 139: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 152: | Line 145: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mr. Kunzwiler:== | ==Dear Mr. Kunzwiler:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 165: | Line 157: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 171: | Line 163: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mr. Gardner:== | ==Dear Mr. Gardner:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 184: | Line 175: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 190: | Line 181: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mr. Vasho:== | ==Dear Mr. Vasho:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 203: | Line 193: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
March 12, 2004 The Honorable Thomas Bullard Oswego County Legislator- 14th District Majority Whip, 165 Duke Road Oswego, NY 13126 | March 12, 2004 The Honorable Thomas Bullard Oswego County Legislator-14th District Majority Whip, 165 Duke Road Oswego, NY 13126 | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mr. Bullard:== | ==Dear Mr. Bullard:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 222: | Line 211: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 228: | Line 217: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mr. Barclay:== | ==Dear Mr. Barclay:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 241: | Line 229: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 247: | Line 235: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mr. Wright:== | ==Dear Mr. Wright:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 260: | Line 247: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 266: | Line 253: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mr. Oaks:== | ==Dear Mr. Oaks:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 279: | Line 265: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 286: | Line 272: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mr. Anson:== | ==Dear Mr. Anson:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 299: | Line 284: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 305: | Line 290: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mr. Jerrett:== | ==Dear Mr. Jerrett:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 318: | Line 302: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 324: | Line 308: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Ms. Somers:== | ==Dear Ms. Somers:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 337: | Line 320: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 343: | Line 326: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mr. Beardsley:== | ==Dear Mr. Beardsley:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 356: | Line 338: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 362: | Line 344: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mr. McHugh:== | ==Dear Mr. McHugh:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 375: | Line 356: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 381: | Line 362: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mr. Judson:== | ==Dear Mr. Judson:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 394: | Line 374: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 400: | Line 380: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mr. Gurdziel:== | ==Dear Mr. Gurdziel:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 413: | Line 392: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects | ||
| Line 419: | Line 398: | ||
==SUBJECT:== | ==SUBJECT:== | ||
FITZPATRICK NUCLEAR POWER PLANT- ANNUAL ASSESSMENT MEETING | FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING | ||
==Dear Mr. Leemann:== | ==Dear Mr. Leemann:== | ||
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant. | ||
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation. | ||
| Line 432: | Line 410: | ||
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects}} | Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects}} | ||
Latest revision as of 04:12, 16 January 2025
| ML040890141 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 03/12/2004 |
| From: | Meyer G Reactor Projects Branch 3 |
| To: | Donna Anderson, Anson C, Barclay W, Beardsley F, Bullard T, Burdick K, Gardner K, Gosek J, Grimshaw T, Tom Gurdziel, Jarrett T, Rachel Johnson, Judson T, Kunzwiler M, Leemann B, James Mchugh, Oaks R, Proud J, Somers T, Stephen S, Vasho P, Jason Wright Central New York Citizens Awareness Network, Oswego County, NY, Oswego County, NY, Legislature, Oswego County, NY, Office of the County Administrator, State of NY, State of NY, Senate, State of NY, State Assembly, Town of Mexico, NY, Town of Scriba, NY, Village of Mexico, NY |
| Shared Package | |
| ML040640889 | List: |
| References | |
| Download: ML040890141 (22) | |
Text
March 12, 2004 The Honorable Stephen P. Lyman County Administrator 46 East Bridge Street Oswego, NY 13126
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mr. Lyman:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable John Gosek Mayor of Oswego City Hall, 13 West Oneida Street Oswego, NY 13126
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mayor Gosek:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable Kenneth Burdick Supervisor, Town of Scriba 42 Creamery Road Oswego, NY 13126
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mr. Burdick:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable Terry Grimshaw Mayor of Mexico, Village of Mexico 3236 Main Street, P. O. Box 39 Mexico, NY 13114
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mayor Grimshaw:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable David Anderson Supervisor, Town of Mexico P.O. Box 98 Mexico, NY 13114
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mr. Anderson:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable Russ Johnson Chairman, Oswego County Legislature County Office Building, 46 East Bridge Street Oswego, NY 13126
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Chairman Johnson:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable Jack Proud 7th District, County Office Building 46 East Bridge Street Oswego, NY 13126
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mr. Proud:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable Michael Kunzwiler Minority Leader, Oswego County Legislature 18th District, 161 East Third Street Oswego, NY 13126
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mr. Kunzwiler:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable Kevin Gardner 13th District 19 Mason Road Mexico, NY 13114
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mr. Gardner:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable Phillip E. Vasho Oswego County Legislature 22nd District, 656 West 1st Street Fulton, NY 13069
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mr. Vasho:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable Thomas Bullard Oswego County Legislator-14th District Majority Whip, 165 Duke Road Oswego, NY 13126
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mr. Bullard:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable William A. Barclay New York State Assembly, 124th District 543 Legislative Office Building Albany, NY 12248
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mr. Barclay:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable James W. Wright New York State Senate, 48th District 707 Legislative Office Building Albany, NY 12247
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mr. Wright:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable Robert C. Oaks New York State Assembly, 128th District 718 Legislative Office Building Albany, NY 12248
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mr. Oaks:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable Carl Anson, Sr.,
Vice-Chairman, 2nd District 1479 County Route 22 Altmar, NY 13302
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mr. Anson:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable Theodore Jerrett Clerk of the Legislature 46 East Bridge Street Oswego, NY 13126
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mr. Jerrett:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable Teresa A. Somers Deputy Clerk of the Legislature 46 East Bridge Street Oswego, NY 13126
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Ms. Somers:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable Fred Beardsley Oswego County Legislature 9th District 178 Hungry Lane Central Square, NY 13036
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mr. Beardsley:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable John M. McHugh Congressman, 23rd District 2333 Rayburn House Office Building Washington, DC 20515
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mr. McHugh:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 Mr. Tim Judson Central NY Citzens Awareness Network 140 Bassett Street Syracuse, NY 13210-2142
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mr. Judson:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 Mr. Thomas Gurdziel 9 Twin Orchard Drive Oswego, NY 13126-3107
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mr. Gurdziel:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects
March 12, 2004 The Honorable Barry Leemann Majority Leader 4th District 521 County Route 17A Williamstown, NY 13493
SUBJECT:
FITZPATRICK NUCLEAR POWER PLANT-ANNUAL ASSESSMENT MEETING
Dear Mr. Leemann:
I would like to personally invite you and other members of your organization to attend the March 25 meeting between the Nuclear Regulatory Commission (NRC) and Entergy Northeast Nuclear (Entergy) in which the NRC staff will discuss our annual assessment of the safety performance of the FitzPatrick Nuclear Power Plant.
The meeting will be held at 1:00 p.m. on Thursday, March 25, 2004, at the Joint News Center (Oswego County Airport), County Route 176, Fulton, NY. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Entergy our assessment of their safety performance at FitzPatrick and their response to our assessment. The meeting is open to the public for observation.
Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of FitzPatrick and the role of the NRC in ensuring safe plant operations.
The NRC recently completed its annual assessment of the safety performance of FitzPatrick in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. Plant performance was within the Licensee Response Column of the NRCs Action Matrix, which involves baseline inspection and the lowest level of regulatory involvement. We described our assessment results in a letter to Entergy on March 2, 2004. The assessment letter can be found at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/fitz_2003q4.pdf.
You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the FitzPatrick Nuclear Power Plant through the NRC Web site. This information may be accessed at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Your schedule permitting, I look forward to meeting you on March 25, 2004. In the interim, please do not hesitate to contact me at 610-337-5211, if I can be of further assistance to you.
Sincerely,
/RA/
Glenn W. Meyer, Chief Projects Branch 3 Division of Reactor Projects