{{#Wiki_filter:m Entergy                                                                         Entergy Nuclear Operations, Inc.
{{#Wiki_filter:m Entergy Entergy Nuclear Operations, Inc.
Pilgrm Station 600 Rocky Hill Road Plyrnouth, MA 02360 April 28, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Pilgrm Station 600 Rocky Hill Road Plyrnouth, MA 02360 April 28, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Personnel and Man-Rem by Work and Job Function LETTER NUMBER:         2.04.038 The enclosed table, "Number of Personnel and Man-Rem by Work and Job Function," for calendar year 2003 is submitted in accordance with Technical Specification 5.6.1, and as recommended by Regulatory Guide 1.16. The tabulation supplements the reporting requirement of 10 CFR 20.2206(b).
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Personnel and Man-Rem by Work and Job Function LETTER NUMBER:
2.04.038 The enclosed table, "Number of Personnel and Man-Rem by Work and Job Function," for calendar year 2003 is submitted in accordance with Technical Specification 5.6.1, and as recommended by Regulatory Guide 1.16. The tabulation supplements the reporting requirement of 10 CFR 20.2206(b).
The total dose measured by Self-indicating Dosimeter (SID) was 259.844 Rem. SID measurements are used for tracking dose assigned by job functions. In part, Technical Specification 5.6.1 specifies that in the aggregate, at least 80% of the total whole body dose received from external sources should be assigned to specific major work functions. The total dose was accounted via radiation work permits assigned to specific major work functions.
The total dose measured by Self-indicating Dosimeter (SID) was 259.844 Rem. SID measurements are used for tracking dose assigned by job functions. In part, Technical Specification 5.6.1 specifies that in the aggregate, at least 80% of the total whole body dose received from external sources should be assigned to specific major work functions. The total dose was accounted via radiation work permits assigned to specific major work functions.
There are no commitments contained in this letter.
There are no commitments contained in this letter.
Line 28: Line 29:


==Enclosure:==
==Enclosure:==
(as stated) cc:     Regional Administrator, Region I                     Senior NRC Resident Inspector U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406
(as stated) cc:
Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior NRC Resident Inspector


ENTERGY NUCLEAR OPERATIONS / PILGRIM NUCLEAR POWER STATION ANNUAL REPORT for Year 2003 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION All Personnel
ENTERGY NUCLEAR OPERATIONS / PILGRIM NUCLEAR POWER STATION ANNUAL REPORT for Year 2003 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION All Personnel
* Total Man-Rem Station l     Utility   Contractors i l Station l   Utility Contractors Work & Job Function     Employees I Employees l and Others l     l Employees I Employees I and Others Reactor Operation & Surveillance
* Total Man-Rem Station l
  -Maintenance Personnel             62             1           52           1.849       0.001       0.172
Utility Contractors i l
  -Operations Personnel             132           6           189           18.489       0.007       2.086
Station l
  -Health Physics Personnel         41           20           67           6.712       1.840       1.687
Utility Contractors Work & Job Function Employees I Employees l and Others l l Employees I Employees I and Others Reactor Operation & Surveillance
  -Supervisory Personnel             75             9           43           0.689       0.004       0.140
-Maintenance Personnel 62 1
  -Engineering Personnel             60             18           48           0.736       0.048       0.152 Routine Maintenance
52 1.849 0.001 0.172
  -Maintenance Personnel             165           58           775           36.104       7.125     66.083
-Operations Personnel 132 6
  -Operations Personnel             51             0           15           2.397       0.000       0.347.
189 18.489 0.007 2.086
  -Health Physics Personnel         32             9           50           3.039       0.458       9.488-
-Health Physics Personnel 41 20 67 6.712 1.840 1.687
  -Supervisory Personnel             36             0           13           2.589       0.000       0.781
-Supervisory Personnel 75 9
  -Engineering Personnel             105           21           120           3.704       1.985     11.697 Inservice Inspection
43 0.689 0.004 0.140
  -Maintenance Personnel             15           19         261           0.390       0.446     35.177
-Engineering Personnel 60 18 48 0.736 0.048 0.152 Routine Maintenance
  -Operations Personnel             21             0             0           0.592       0.000       0.000
-Maintenance Personnel 165 58 775 36.104 7.125 66.083
  -Health Physics Personnel           5             1           7           0.067       0.058       0.083
-Operations Personnel 51 0
  -Supervisory Personnel             8             0             2           0.666       0.000       0.050
15 2.397 0.000 0.347.
  -Engineering Personnel             21             5           23           0.630       0.189       2.567 Special Maintenance"**
-Health Physics Personnel 32 9
  -Maintenance Personnel             4             0           100           0.026       0.000     12.660
50 3.039 0.458 9.488-
  -Operations Personnel               1             0             1           0.002       0.000       0.021
-Supervisory Personnel 36 0
  -Health Physics Personnel           5             1           4           0.096       0.015       0.143
13 2.589 0.000 0.781
  -Supervisory Personnel             1             0             0           0.241       0.000       0.000
-Engineering Personnel 105 21 120 3.704 1.985 11.697 Inservice Inspection
  -Engineering Personnel             6             2           7             0.202       0.119       0.122 Waste Processing
-Maintenance Personnel 15 19 261 0.390 0.446 35.177
  -Maintenance Personnel             62             6           36           2.961       0.117       0.405
-Operations Personnel 21 0
  -Operations Personnel             35             0             7           0.563       0.000       0.958
0 0.592 0.000 0.000
  -Health Physics Personnel         24             3           37           0.762       0.052       0.968
-Health Physics Personnel 5
  -Supervisory Personnel             7             0             4           0.252       0.000       0.391
1 7
  -Engineering Personnel             3             0             5           0.121       0.000       0.090 Refueling
0.067 0.058 0.083
  -Maintenance Personnel             83             8           60           2.339       0.102       5.515
-Supervisory Personnel 8
  -Operations Personnel             44             0             0           0.851       0.000       0.000
0 2
  -Health Physics Personnel         15             2           23           0.582       0.088       2.305
0.666 0.000 0.050
  -Supervisory Personnel             13           0             2           0.136       0.000       0.003
-Engineering Personnel 21 5
  -Engineering Personnel             21             3           42           0.276       0.011       5.030
23 0.630 0.189 2.567 Special Maintenance"**
-Maintenance Personnel 4
0 100 0.026 0.000 12.660
-Operations Personnel 1
0 1
0.002 0.000 0.021
-Health Physics Personnel 5
1 4
0.096 0.015 0.143
-Supervisory Personnel 1
0 0
0.241 0.000 0.000
-Engineering Personnel 6
2 7
0.202 0.119 0.122 Waste Processing
-Maintenance Personnel 62 6
36 2.961 0.117 0.405
-Operations Personnel 35 0
7 0.563 0.000 0.958
-Health Physics Personnel 24 3
37 0.762 0.052 0.968
-Supervisory Personnel 7
0 4
0.252 0.000 0.391
-Engineering Personnel 3
0 5
0.121 0.000 0.090 Refueling
-Maintenance Personnel 83 8
60 2.339 0.102 5.515
-Operations Personnel 44 0
0 0.851 0.000 0.000
-Health Physics Personnel 15 2
23 0.582 0.088 2.305
-Supervisory Personnel 13 0
2 0.136 0.000 0.003
-Engineering Personnel 21 3
42 0.276 0.011 5.030


ENTERGY NUCLEAR OPERATIONS I PILGRIM NUCLEAR POWER STATION ANNUAL REPORT for Year 2003 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION All Personnel
ENTERGY NUCLEAR OPERATIONS I PILGRIM NUCLEAR POWER STATION ANNUAL REPORT for Year 2003 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION All Personnel
* Total Man-Rem Station         Utility   Contractors         Station       Utility Contractors Totals by Work & Job Function     Employees I Employees I and Others I         I Employees I Employees I and Others
* Total Man-Rem Station Utility Contractors Station Utility Contractors Totals by Work & Job Function Employees I Employees I and Others I I Employees I Employees I and Others
  -Maintenance Personnel                 391             92         1284             43.669       7.791     120.012
-Maintenance Personnel 391 92 1284 43.669 7.791 120.012
  -Operations Personnel                 284             6           212             22.893       0.007       3.412
-Operations Personnel 284 6
  -Health Physics Personnel             122             36           188             11.257       2.509     14.674
212 22.893 0.007 3.412
  -Supervisory Personnel                 140             9           64               4.573       0.004       1.364
-Health Physics Personnel 122 36 188 11.257 2.509 14.674
  -Engineering Personnel                 216             49           245               5.669       2.352     19.658 Grand Totals**                           1153           192         1993             88.061       12.663   159.120
-Supervisory Personnel 140 9
64 4.573 0.004 1.364
-Engineering Personnel 216 49 245 5.669 2.352 19.658 Grand Totals**
1153 192 1993 88.061 12.663 159.120
* Workers may be counted In more than one category.
* Workers may be counted In more than one category.
** Total dose by self-indicating dosimeter is 259.844 Rem. Total TEDE dose is 250.192 Rem.
** Total dose by self-indicating dosimeter is 259.844 Rem. Total TEDE dose is 250.192 Rem.

Latest revision as of 03:10, 16 January 2025

Personnel and Man-Rem by Work and Job Function
ML041270035
Person / Time
Site: Pilgrim
Issue date: 04/28/2004
From: Ford B
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.04.038, RG-1.016
Download: ML041270035 (3)


Text

m Entergy Entergy Nuclear Operations, Inc.

Pilgrm Station 600 Rocky Hill Road Plyrnouth, MA 02360 April 28, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Personnel and Man-Rem by Work and Job Function LETTER NUMBER:

2.04.038 The enclosed table, "Number of Personnel and Man-Rem by Work and Job Function," for calendar year 2003 is submitted in accordance with Technical Specification 5.6.1, and as recommended by Regulatory Guide 1.16. The tabulation supplements the reporting requirement of 10 CFR 20.2206(b).

The total dose measured by Self-indicating Dosimeter (SID) was 259.844 Rem. SID measurements are used for tracking dose assigned by job functions. In part, Technical Specification 5.6.1 specifies that in the aggregate, at least 80% of the total whole body dose received from external sources should be assigned to specific major work functions. The total dose was accounted via radiation work permits assigned to specific major work functions.

There are no commitments contained in this letter.

Please feel free to contact Douglas Ellis, (508) 830-8160, if there are any questions regarding this subject.

Sincerely, Bryan Ford Licensing Manager DWE/dm

Enclosure:

(as stated) cc:

Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior NRC Resident Inspector

ENTERGY NUCLEAR OPERATIONS / PILGRIM NUCLEAR POWER STATION ANNUAL REPORT for Year 2003 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION All Personnel

  • Total Man-Rem Station l

Utility Contractors i l

Station l

Utility Contractors Work & Job Function Employees I Employees l and Others l l Employees I Employees I and Others Reactor Operation & Surveillance

-Maintenance Personnel 62 1

52 1.849 0.001 0.172

-Operations Personnel 132 6

189 18.489 0.007 2.086

-Health Physics Personnel 41 20 67 6.712 1.840 1.687

-Supervisory Personnel 75 9

43 0.689 0.004 0.140

-Engineering Personnel 60 18 48 0.736 0.048 0.152 Routine Maintenance

-Maintenance Personnel 165 58 775 36.104 7.125 66.083

-Operations Personnel 51 0

15 2.397 0.000 0.347.

-Health Physics Personnel 32 9

50 3.039 0.458 9.488-

-Supervisory Personnel 36 0

13 2.589 0.000 0.781

-Engineering Personnel 105 21 120 3.704 1.985 11.697 Inservice Inspection

-Maintenance Personnel 15 19 261 0.390 0.446 35.177

-Operations Personnel 21 0

0 0.592 0.000 0.000

-Health Physics Personnel 5

1 7

0.067 0.058 0.083

-Supervisory Personnel 8

0 2

0.666 0.000 0.050

-Engineering Personnel 21 5

23 0.630 0.189 2.567 Special Maintenance"**

-Maintenance Personnel 4

0 100 0.026 0.000 12.660

-Operations Personnel 1

0 1

0.002 0.000 0.021

-Health Physics Personnel 5

1 4

0.096 0.015 0.143

-Supervisory Personnel 1

0 0

0.241 0.000 0.000

-Engineering Personnel 6

2 7

0.202 0.119 0.122 Waste Processing

-Maintenance Personnel 62 6

36 2.961 0.117 0.405

-Operations Personnel 35 0

7 0.563 0.000 0.958

-Health Physics Personnel 24 3

37 0.762 0.052 0.968

-Supervisory Personnel 7

0 4

0.252 0.000 0.391

-Engineering Personnel 3

0 5

0.121 0.000 0.090 Refueling

-Maintenance Personnel 83 8

60 2.339 0.102 5.515

-Operations Personnel 44 0

0 0.851 0.000 0.000

-Health Physics Personnel 15 2

23 0.582 0.088 2.305

-Supervisory Personnel 13 0

2 0.136 0.000 0.003

-Engineering Personnel 21 3

42 0.276 0.011 5.030

ENTERGY NUCLEAR OPERATIONS I PILGRIM NUCLEAR POWER STATION ANNUAL REPORT for Year 2003 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION All Personnel

  • Total Man-Rem Station Utility Contractors Station Utility Contractors Totals by Work & Job Function Employees I Employees I and Others I I Employees I Employees I and Others

-Maintenance Personnel 391 92 1284 43.669 7.791 120.012

-Operations Personnel 284 6

212 22.893 0.007 3.412

-Health Physics Personnel 122 36 188 11.257 2.509 14.674

-Supervisory Personnel 140 9

64 4.573 0.004 1.364

-Engineering Personnel 216 49 245 5.669 2.352 19.658 Grand Totals**

1153 192 1993 88.061 12.663 159.120

  • Workers may be counted In more than one category.
    • Total dose by self-indicating dosimeter is 259.844 Rem. Total TEDE dose is 250.192 Rem.
      • Special Maintenance Work
1. RWP 03-0093 Torus Diving, Desludging and Inspection (ECCS Suction Strainer Loading)
2. RWP 03-0123 Upgrade Main Steam Line and MSRV Tailpipe Supports (TPO Modification)
3. RWP 03-0190 Floc Recycle Tank Inspection (Millstone Event for Abandoned Rooms Commitment)