Personnel and Man-Rem by Work and Job Function
ML041270035
Person / Time
Site: Pilgrim
Issue date: 04/28/2004
From: Ford B
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.04.038, RG-1.016
Download: ML041270035 (3)


Text

m Entergy Entergy Nuclear Operations, Inc.

Pilgrm Station 600 Rocky Hill Road Plyrnouth, MA 02360 April 28, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Personnel and Man-Rem by Work and Job Function LETTER NUMBER:

2.04.038 The enclosed table, "Number of Personnel and Man-Rem by Work and Job Function," for calendar year 2003 is submitted in accordance with Technical Specification 5.6.1, and as recommended by Regulatory Guide 1.16. The tabulation supplements the reporting requirement of 10 CFR 20.2206(b).

The total dose measured by Self-indicating Dosimeter (SID) was 259.844 Rem. SID measurements are used for tracking dose assigned by job functions. In part, Technical Specification 5.6.1 specifies that in the aggregate, at least 80% of the total whole body dose received from external sources should be assigned to specific major work functions. The total dose was accounted via radiation work permits assigned to specific major work functions.

There are no commitments contained in this letter.

Please feel free to contact Douglas Ellis, (508) 830-8160, if there are any questions regarding this subject.

Sincerely, Bryan Ford Licensing Manager DWE/dm

Enclosure:

(as stated) cc:

Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior NRC Resident Inspector

ENTERGY NUCLEAR OPERATIONS / PILGRIM NUCLEAR POWER STATION ANNUAL REPORT for Year 2003 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION All Personnel

  • Total Man-Rem Station l

Utility Contractors i l

Station l

Utility Contractors Work & Job Function Employees I Employees l and Others l l Employees I Employees I and Others Reactor Operation & Surveillance

-Maintenance Personnel 62 1

52 1.849 0.001 0.172

-Operations Personnel 132 6

189 18.489 0.007 2.086

-Health Physics Personnel 41 20 67 6.712 1.840 1.687

-Supervisory Personnel 75 9

43 0.689 0.004 0.140

-Engineering Personnel 60 18 48 0.736 0.048 0.152 Routine Maintenance

-Maintenance Personnel 165 58 775 36.104 7.125 66.083

-Operations Personnel 51 0

15 2.397 0.000 0.347.

-Health Physics Personnel 32 9

50 3.039 0.458 9.488-

-Supervisory Personnel 36 0

13 2.589 0.000 0.781

-Engineering Personnel 105 21 120 3.704 1.985 11.697 Inservice Inspection

-Maintenance Personnel 15 19 261 0.390 0.446 35.177

-Operations Personnel 21 0

0 0.592 0.000 0.000

-Health Physics Personnel 5

1 7

0.067 0.058 0.083

-Supervisory Personnel 8

0 2

0.666 0.000 0.050

-Engineering Personnel 21 5

23 0.630 0.189 2.567 Special Maintenance"**

-Maintenance Personnel 4

0 100 0.026 0.000 12.660

-Operations Personnel 1

0 1

0.002 0.000 0.021

-Health Physics Personnel 5

1 4

0.096 0.015 0.143

-Supervisory Personnel 1

0 0

0.241 0.000 0.000

-Engineering Personnel 6

2 7

0.202 0.119 0.122 Waste Processing

-Maintenance Personnel 62 6

36 2.961 0.117 0.405

-Operations Personnel 35 0

7 0.563 0.000 0.958

-Health Physics Personnel 24 3

37 0.762 0.052 0.968

-Supervisory Personnel 7

0 4

0.252 0.000 0.391

-Engineering Personnel 3

0 5

0.121 0.000 0.090 Refueling

-Maintenance Personnel 83 8

60 2.339 0.102 5.515

-Operations Personnel 44 0

0 0.851 0.000 0.000

-Health Physics Personnel 15 2

23 0.582 0.088 2.305

-Supervisory Personnel 13 0

2 0.136 0.000 0.003

-Engineering Personnel 21 3

42 0.276 0.011 5.030

ENTERGY NUCLEAR OPERATIONS I PILGRIM NUCLEAR POWER STATION ANNUAL REPORT for Year 2003 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION All Personnel

  • Total Man-Rem Station Utility Contractors Station Utility Contractors Totals by Work & Job Function Employees I Employees I and Others I I Employees I Employees I and Others

-Maintenance Personnel 391 92 1284 43.669 7.791 120.012

-Operations Personnel 284 6

212 22.893 0.007 3.412

-Health Physics Personnel 122 36 188 11.257 2.509 14.674

-Supervisory Personnel 140 9

64 4.573 0.004 1.364

-Engineering Personnel 216 49 245 5.669 2.352 19.658 Grand Totals**

1153 192 1993 88.061 12.663 159.120

  • Workers may be counted In more than one category.
    • Total dose by self-indicating dosimeter is 259.844 Rem. Total TEDE dose is 250.192 Rem.
      • Special Maintenance Work
1. RWP 03-0093 Torus Diving, Desludging and Inspection (ECCS Suction Strainer Loading)
2. RWP 03-0123 Upgrade Main Steam Line and MSRV Tailpipe Supports (TPO Modification)
3. RWP 03-0190 Floc Recycle Tank Inspection (Millstone Event for Abandoned Rooms Commitment)