ML041410095: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:L Thomas Alexion - QUESTIONS ON RESIDUAL STRESSES Paae 1 1 From: | ||
Thomas Alexion To: | |||
DAVANT, GUY H Date: | |||
4/1/04 12:46PM | |||
==Subject:== | ==Subject:== | ||
QUESTIONS ON RESIDUAL STRESSES Guy, See the attached. | QUESTIONS ON RESIDUAL STRESSES | ||
: Guy, See the attached. | |||
Tom | Tom | ||
"-,. 11 | |||
I C:\W1ND0WS\TEMP\GW100001.TMP | ......1 I C:\\W1ND0WS\\TEMP\\GW100001.TMP Page 1 I C:\\WINDOWS\\TEMP\\GWIOOOOl.TMP Pane 1 I Mail Envelope Properties (406C557A.25C: 0: 20628) | ||
==Subject:== | ==Subject:== | ||
QUESTIONS ON RESIDUAL STRESSES | Creation Date: | ||
From: | |||
Created By: | |||
QUESTIONS ON RESIDUAL STRESSES 4/1/04 12:46PM Thomas Alexion TWA@nrc.gov Recipients entergy.com GDAVANT (DAVANT, GUY H) | |||
Action Date & Time Route entergy.com Post Office Files ResidualStresses.wpd MESSAGE Options Auto Delete: | |||
Expiration Date: | |||
Notify Recipients: | |||
Priority: | |||
Reply Requested: | |||
Return Notification: | |||
Concealed | |||
==Subject:== | ==Subject:== | ||
Security: | |||
To Be Delivered: | |||
Status Tracking: | |||
Delivered Pending Size 2509 655 Date & Time 04/01/04 12:43PM 04/01/04 12:46PM No None Yes Standard No None No Standard Immediate Delivered & Opened | |||
QUESTIONS RELATED TO RESIDUAL STRESSES RELIEF REQUEST R&R-006 ARKANSAS NUCLEAR ONE, UNIT 1 | QUESTIONS RELATED TO RESIDUAL STRESSES RELIEF REQUEST R&R-006 ARKANSAS NUCLEAR ONE, UNIT 1 | ||
: 1. In the ANO Calculation 86-E-0074-156, weld residual stresses were not considered. | : 1. | ||
In the ANO Calculation 86-E-0074-156, weld residual stresses were not considered. | |||
The revised analysis considered the weld residual stresses. Discuss the technical basis for including the residual stresses in the revised analysis and excluding the residual stresses in the previous analysis. | The revised analysis considered the weld residual stresses. Discuss the technical basis for including the residual stresses in the revised analysis and excluding the residual stresses in the previous analysis. | ||
: 2. Clarify whether the J-groove weld and butter weld were heat treated to relieve residual stresses during ANO-1 reactor vessel head fabrication. | : 2. | ||
: 3. How many plants has Framatome performed the same J-groove weld calculations, as performed for the ANO-1 plant?}} | Clarify whether the J-groove weld and butter weld were heat treated to relieve residual stresses during ANO-1 reactor vessel head fabrication. | ||
: 3. | |||
How many plants has Framatome performed the same J-groove weld calculations, as performed for the ANO-1 plant?}} | |||
Latest revision as of 02:56, 16 January 2025
| ML041410095 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/01/2004 |
| From: | Alexion T NRC/NRR/DLPM/LPD4 |
| To: | Davant G Entergy Operations |
| Alexion T W, NRR/DLPM, 415-1326 | |
| References | |
| Download: ML041410095 (3) | |
Text
L Thomas Alexion - QUESTIONS ON RESIDUAL STRESSES Paae 1 1 From:
Thomas Alexion To:
DAVANT, GUY H Date:
4/1/04 12:46PM
Subject:
QUESTIONS ON RESIDUAL STRESSES
- Guy, See the attached.
Tom
"-,. 11
......1 I C:\\W1ND0WS\\TEMP\\GW100001.TMP Page 1 I C:\\WINDOWS\\TEMP\\GWIOOOOl.TMP Pane 1 I Mail Envelope Properties (406C557A.25C: 0: 20628)
Subject:
Creation Date:
From:
Created By:
QUESTIONS ON RESIDUAL STRESSES 4/1/04 12:46PM Thomas Alexion TWA@nrc.gov Recipients entergy.com GDAVANT (DAVANT, GUY H)
Action Date & Time Route entergy.com Post Office Files ResidualStresses.wpd MESSAGE Options Auto Delete:
Expiration Date:
Notify Recipients:
Priority:
Reply Requested:
Return Notification:
Concealed
Subject:
Security:
To Be Delivered:
Status Tracking:
Delivered Pending Size 2509 655 Date & Time 04/01/04 12:43PM 04/01/04 12:46PM No None Yes Standard No None No Standard Immediate Delivered & Opened
QUESTIONS RELATED TO RESIDUAL STRESSES RELIEF REQUEST R&R-006 ARKANSAS NUCLEAR ONE, UNIT 1
- 1.
In the ANO Calculation 86-E-0074-156, weld residual stresses were not considered.
The revised analysis considered the weld residual stresses. Discuss the technical basis for including the residual stresses in the revised analysis and excluding the residual stresses in the previous analysis.
- 2.
Clarify whether the J-groove weld and butter weld were heat treated to relieve residual stresses during ANO-1 reactor vessel head fabrication.
- 3.
How many plants has Framatome performed the same J-groove weld calculations, as performed for the ANO-1 plant?