ML042360250: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Accumulators 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.1 Accumulators LCO 3.5.1           Four ECCS accumulators shall be OPERABLE.
{{#Wiki_filter:Accumulators 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.1 Accumulators LCO  
APPLICABILITY:      MODES 1 and 2.
 
====3.5.1 APPLICABILITY====
Four ECCS accumulators shall be OPERABLE.
MODES 1 and 2.
MODE 3 with reactor coolant system pressure > 1000 psig.
MODE 3 with reactor coolant system pressure > 1000 psig.
NOTES..     --
NOTES..
: 1. In MODE 3. all accumul ator discharge isolati on valves may be closed and energized for up to 8 hours during the performance of reactor coolant system hydrostatic testing.
: 1.
: 2. In MODE 3, one accumul ator discharge isolati on valve may be closed and energized for up to 8 hours for accumulator check valve leakage testing.
In MODE 3. all accumul ator discharge isolati on valves may be closed and energized for up to 8 hours during the performance of reactor coolant system hydrostatic testing.
ACTIONS CONDITION                   REQUIRED ACTION           COMPLETION TIME A. One accumulator             A.1       Restore boron           72 hours inoperable due to                   concentration to boron concentration                 within limits of not within limits of                 SR 3.5.1.4.
: 2.
In MODE 3, one accumul ator discharge isolati on valve may be closed and energized for up to 8 hours for accumulator check valve leakage testing.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One accumulator A.1 Restore boron 72 hours inoperable due to concentration to boron concentration within limits of not within limits of SR 3.5.1.4.
SR 3.5.1.4.
SR 3.5.1.4.
B. One accumulator           B.1       Restore accumulator to 24 hours inoperable for                     OPERABLE status.
B.
One accumulator B.1 Restore accumulator to 24 hours inoperable for OPERABLE status.
reasons other than Condition A.
reasons other than Condition A.
(continued)
(continued)
INDIAN POINT 3                           3.5.1-1                           Amendment 222}}
INDIAN POINT 3 3.5.1-1 Amendment 222}}

Latest revision as of 01:43, 16 January 2025

Technical Specification for Indian Point, Unit No. 3
ML042360250
Person / Time
Site: Indian Point 
Issue date: 08/18/2004
From:
NRC/NRR/DLPM
To:
References
TAC MC2301
Download: ML042360250 (1)


Text

Accumulators 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.1 Accumulators LCO

3.5.1 APPLICABILITY

Four ECCS accumulators shall be OPERABLE.

MODES 1 and 2.

MODE 3 with reactor coolant system pressure > 1000 psig.

NOTES..

1.

In MODE 3. all accumul ator discharge isolati on valves may be closed and energized for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> during the performance of reactor coolant system hydrostatic testing.

2.

In MODE 3, one accumul ator discharge isolati on valve may be closed and energized for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for accumulator check valve leakage testing.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One accumulator A.1 Restore boron 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable due to concentration to boron concentration within limits of not within limits of SR 3.5.1.4.

SR 3.5.1.4.

B.

One accumulator B.1 Restore accumulator to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable for OPERABLE status.

reasons other than Condition A.

(continued)

INDIAN POINT 3 3.5.1-1 Amendment 222