Accumulators 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.1 Accumulators LCO
3.5.1 APPLICABILITY
Four ECCS accumulators shall be OPERABLE.
MODES 1 and 2.
MODE 3 with reactor coolant system pressure > 1000 psig.
NOTES..
- 1.
In MODE 3. all accumul ator discharge isolati on valves may be closed and energized for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> during the performance of reactor coolant system hydrostatic testing.
- 2.
In MODE 3, one accumul ator discharge isolati on valve may be closed and energized for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for accumulator check valve leakage testing.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One accumulator A.1 Restore boron 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable due to concentration to boron concentration within limits of not within limits of SR 3.5.1.4.
B.
One accumulator B.1 Restore accumulator to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable for OPERABLE status.
reasons other than Condition A.
(continued)
INDIAN POINT 3 3.5.1-1 Amendment 222