{{#Wiki_filter:Point Beach Nuclear Plant Committed to Nucl Operated by Nuclear Management Company, LLC January 26,2007                                                                      NRC 2007-0007 10 CFR 50.80 10 CFR 50.90 10 CFR 72.210 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266, 50-301 and 72-005 License Nos. DPR-24 and DPR-27 Application for Order and Conforminq License Amendments to Transfer Facilitv Operating Licenses Pursuant to Section 184 of the Atomic Energy Act of 1954, as amended ("AEA) and 10 CFR 50.80, Nuclear Management Company, LLC ("NMC"), Wisconsin Electric Power Company ("WEPCO"), and FPL Energy Point Beach, LLC ("FPLE Point Beach")
{{#Wiki_filter:}}
(collectively, "the parties":),hereby submit the enclosed application to the Nuclear Regulatory Commission ("NRC") for an order consenting to the transfer of Facility Operating License Nos. DPR-24 and DPR-27 (the "Licenses") for Point Beach Nuclear Plant ("Point Beach"). This Application seeks NRC's consent to the transfer by NMC of its operating authority and by WEPCO of its ownership interests under the Licenses for Point Beach to FPLE Point Beach. This Application also requests conforming administrative amendments to the Licenses to delete references to WEPCO and NMC and to authorize FPLE Point Beach to possess, use, and operate Point Beach at its location near Two Rivers, Wisconsin, and to receive, possess, or use related licensed materials under the same conditions and authorizations included in the License.
Affirmations by NMC, WEPCO and FPLE Point Beach are included at the end of the Application.
This application includes a request that the NRC issue the Part 71 Quality Assurance Program Approval for Radioactive Material Packages (NRC Form 31 I ) for Point Beach, assigned to FPLE Point Beach.
Transfer of the Licenses will also result in FPLE Point Beach being authorized pursuant to the general license in 10 CFR § 72.210 to store spent fuel in the Independent Spent Fuel Storage Installation (ISFSI) at Point Beach. FPLE Point Beach will assume all of 6590 Nuclear Road    Two Rivers, Wisconsin 54241 Telephone: 920.755.2321
 
Document Control Desk Page 2 NMCs obligations and commitments under this general license and under all NRC orders pertaining thereto.
FPLE Point Beach is a for-profit Wisconsin Limited Liability Company created to hold the Point Beach ownership and operating interests being transferred. FPLE Point Beach is an indirect, wholly-owned subsidiary of FPL Energy, LLC (FPLE), one of the nations largest independent power producers. FPLE is a wholly-owned subsidiary of FPL Group Capital, Inc., which in turn is a wholly-owned subsidiary of FPL Group, Inc. (FPL Group). Through its affiliates, FPL Group is a major producer of electrical energy, with over 30,000 MW of generation capacity in operation in the United States and substantial nuclear experience through the operation of five nuclear units by its subsidiaries Florida Power & Light Company (FP&L) and FPLE. As of December 31, 2005, FPL Group reported assets exceeding $33 billion and recorded annual revenues for its 2005 fiscal year greater than $11.8 billion. FPL Groups regulated utility, FP&L, has been in business for more than 75 years, and FPL Group has leveraged its expertise in generation to build a rapidly growing independent power production business with facilities in operation, construction, or advanced stages of development in 26 states.
The information included in the Application demonstrates the technical and financial qualifications of FPLE Point Beach with respect to the Point Beach operating and ownership interests being acquired, as well as FPLE Point Beachs method for decommissioning funding assurance for those interests.
The Application references separately bound Enclosures 5P and 6P, which contain confidential information proprietary to FPLE Point Beach. Proprietary Enclosures 5P and 6P will be submitted directly from FPLE Point Beach with a request that they be withheld from public disclosure pursuant to the regulations set forth in 10 CFR 2.390 on the basis that they contain confidential commercial and financial information.
Non-proprietary versions of these enclosures, suitable for public disclosure, are provided as Enclosures 5NP and 6NP with the Application.
The parties expect to receive all required regulatory approvals and close this transaction on or before August 31, 2007. Accordingly, FPLE Point Beach, WEPCO, and NMC request that the NRC review this application on a schedule that will permit the issuance of the NRC order consenting to the transfer and the approval of the conforming administrative license amendments as promptly as possible and in any event by July 1, 2007. Such consent should be immediately effective upon issuance and should permit the transfer and implementation of the conforming license amendments to occur up to one year after issuance or such later date as the NRC may permit. The parties will inform the NRC of any significant changes in the status of other required regulatory approvals or other developments that affect the schedule.
WEPCO and FPLE Point Beach have also signed an Interim Operating Agreement that would permit WEPCO, at its option, and upon receipt of applicable regulatory approvals, to transfer operational authority to FPLE Point Beach prior to the Closing. Should
 
Document Control Desk Page 3 WEPCO exercise this option, FPLE Point Beach would operate Point Beach in the manner described in this application. As part of this application, WEPCO, NMC, and FPLE Point Beach are also seeking the NRCs consent to permit the transfer of operational authority for Point Beach from NMC to FPLE Point Beach prior to closing should WEPCO choose to exercise that option.
This letter contains no new commitments or revisions to existing commitments.
In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the designated Wisconsin Official.
If the NRC requires additional information concerning this Application, please contact Monica Ray, Point Beach Regulatory Affairs Manager, at 920-755-7633.
Service upon the applicants of any comments, hearing requests, intervention petitions, or other pleadings should be made to:
For FPLE Point Beach:
Mitchell S. Ross Associate General Counsel FPL Energy Point Beach, LLC 700 Universe Blvd.
Juno Beach, Florida 33408 Telephone: 561-691-7126 Facsimile: 561-691-7135 Email: mitch_ross@fpl.com For WEPCO:
Arthur H. Domby Troutman Sanders LLP 600 Peachtree Street Atlanta, Georgia 30308 Telephone: 404-885-3130 Facsimile: 404-962-6546 Email: arthur.domby@troutmansanders.com
 
Document Control Desk Page 4 For NMC:
Jonathan Rogoff Vice President, General Counsel and Secretary Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Telephone: 715-377-3316 Facsimile: 715-386-1013 Email: jonathan.rogoff@nmcco.com In addition, please place Messrs. Ross, Domby, and Rogoff on the NRC correspondence distribution list for all correspondence related to this application.
Very truly yours, Dennis L. Koehl d
Site Vice President, Point B ach Nuclear Plant Nuclear Management Company, LLC
 
Document Control Desk Page 5 Very truly yours, F. D. Kuester Executive Vice President and Chief Operating Officer Wisconsin Electric Power Company
 
Document Control Desk Page 6 Very truly yours,
%\d        *.c Raiiv . Kundalkar vice President FPL Energy Point Beach, LLC Attachment cc:    Regional Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC Director, Spent Fuel Project Office PSCW
 
ATTACHMENT TO NRC 2007-0007 APPLICATION FOR ORDER AND CONFORMING LICENSE AMENDMENTS TO TRANSFER FACILITY OPERATING LICENSES DPR-24 and DPR-27 6590 Nuclear Road
* Two Rivers, Wisconsin 54241 Telephone: 920.755.2321
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of                      )            Docket Nos. 50-266/Unit 1 Point Beach Nuclear Plant              )                          50-301/Unit 2 72-005/ISFSI APPLICATION FOR ORDER AND CONFORMING LICENSE AMENDMENTS TO TRANSFER FACILITY OPERATING LICENSES DPR-24 AND DPR-27_
I.      Introduction/Overview Pursuant to 10 CFR 50.80, Nuclear Management Company, LLC (NMC), Wisconsin Electric Power Company (WEPCO), and FPL Energy Point Beach, LLC (FPLE Point Beach) hereby apply to the Nuclear Regulatory Commission (NRC) for an order consenting to the transfer of Facility Operating Licenses DPR-24 and DPR-27 (the Licenses) for the Point Beach Nuclear Plant (Point Beach). This application seeks NRCs consent to the transfer by NMC of its operating authority and by WEPCO of its ownership interest under the Licenses to FPLE Point Beach. This application also requests conforming amendments to the Licenses to delete references to WEPCO and NMC, and to authorize FPLE Point Beach to possess, use, and operate Point Beach, and to receive, possess, or use related licensed materials under the applicable conditions and authorizations included in the Licenses.
This application does not request any amendments to the Licenses other than those administrative amendments necessary to reflect FPLE Point Beach as the new operator and owner, and to delete provisions dealing solely with the transferring entities. This application 1
 
does not request approval of any physical changes in Point Beach or any changes to the conduct of operations. After transfer of the Licenses, Point Beach will continue to be operated and maintained in accordance with Point Beachs current licensing bases.
Marked-up pages showing the requested changes to the Licenses are provided as a to this Application. Pursuant to 10 CFR 2.1315, these proposed amendments to the Licenses involve no significant hazards consideration, because the application does nothing more than conform the Licenses to reflect their transfer.
Transfer of the Licenses will also result in FPLE Point Beach being authorized pursuant to the general license in 10 CFR 72.210 to store spent fuel in the Independent Spent Fuel Storage Installation at Point Beach. FPLE Point Beach will assume all of NMCs obligations and commitments under this general license and all NRC orders pertaining thereto. Consistent with 10 CFR 2.1315, the assumption of NMC responsibilities related to the Independent Spent Fuel Storage Installation raises no genuine issue associated with the public health and safety.
In summary, the proposed transfer of the Licenses upon the sale of Point Beach to FPLE Point Beach will be consistent with the requirements set forth in the Atomic Energy Act of 1954, as amended (AEA), NRC regulations, and relevant NRC licenses and orders. No physical changes will be made to Point Beach, and there will be no changes in the day-to-day operation of the facility. The proposed transfer of the Licenses and conforming administrative amendments will not involve any changes to the current Point Beach design or licensing bases, and will not have any adverse impact on the public health and safety nor be inimical to the common defense and security. This Application therefore requests that the NRC consent to the transfer in accordance with 10 CFR 50.80 and approve the conforming administrative amendments pursuant to 10 CFR 50.92.
2
 
As a potential, interim step toward the sale of Point Beach, WEPCO and FPLE Point Beach have also signed an Interim Operating Agreement that would permit WEPCO, at its option, after completion of the spring 2007 Unit 1 refueling outage, and upon receipt of applicable regulatory approvals, to transfer operational authority (but not ownership) to FPLE Point Beach prior to the closing of the sale of Point Beach (the Interim Operating Approach).
As part of this application, WEPCO, FPLE Point Beach, and NMC are also seeking the NRCs consent to permit the transfer of operational authority for Point Beach from NMC to FPLE Point Beach prior to closing should WEPCO choose to exercise that approach.        This transfer of the Licenses would involve the transfer of operational authority from NMC to FPLE Point Beach only, and would not change the financial responsibilities or qualifications or the decommissioning funding status of WEPCO as the 100% owner of Point Beach.
II. Statement of Purpose of the Transfer of Licenses and the Nature of the Transaction Making the Transfer of Licenses Desirable A.      Sale of Point Beach The parties are requesting the transfer of the Licenses to enable FPLE Point Beachs purchase of WEPCOs 100% interest in Point Beach. On December 19, 2006, WEPCO, FPLE Point Beach, and FPLE Point Beachs indirect parent, FPL Group Capital, Inc. (FPL Group Capital), executed an Asset Sale Agreement (ASA) and other transaction documents for the purchase and sale of Point Beach from WEPCO to FPLE Point Beach.            This transaction will enable FPLE Point Beach to leverage the existing Florida Power & Light Company, FPL Energy Seabrook, LLC, and FPL Energy Duane Arnold, LLC nuclear fleet resources and expertise in the operation of Point Beach and include Point Beach in its fleet operations. In turn, WEPCO will have access to a reliable source of energy pursuant to a long-term power purchase agreement for 3
 
the output of Point Beach, while reducing customer and shareholder financial and operational uncertainty associated with the ownership of a single nuclear generating facility.
Point Beach is located about thirty miles southeast of Green Bay and about ninety miles north-northeast of Milwaukee in east central Wisconsin (Manitowoc County) on the west shore of Lake Michigan near Two Rivers, Wisconsin. Point Beach consists of two Westinghouse pressurized light-water moderated and cooled system units originally designed to generate 1518.5 megawatt thermal (MWt), or approximately 523.8 megawatt electric (MWe). Each unit has undergone a low pressure turbine retrofit modification which increases the unit design output to approximately 538 MWe. In 2002, a measurement uncertainty recapture power uprate was performed increasing each unit's rated thermal power level to 1540 MWt.
The United States Atomic Energy Commission (AEC) issued the construction permit for Point Beach Unit 1 on July 19, 1967, and for Unit 2 on July 25, 1968. The Licenses were issued by the AEC on October 5, 1970, for Unit 1 and March 8, 1973 for Unit 2. NRC issued renewed Licenses on December 22, 2005, for Units 1 and 2 for a period of twenty (20) years beyond the initial expiration dates of October 5, 2010, for Unit 1 and March 8, 2013, for Unit 2; accordingly, the renewed Point Beach Licenses will expire in 2030 and 2033, respectively.
Upon closing (and subject to the NRCs consent for transfer of the Point Beach Licenses and issuance of appropriate amendments to the Licenses), FPLE Point Beach will assume title to WEPCOs 100% interest in the facility, including all equipment, spare parts, fixtures, inventory, and other property necessary for the operation and maintenance of Point Beach. FPLE Point Beach will take title to the acquired interest in the Independent Spent Fuel Storage Installation and all spent nuclear fuel and other licensed materials at or associated with, as well as nuclear fuel procured for, Point Beach. FPLE Point Beach will also assume responsibility for the 4
 
operation, maintenance, and eventual decommissioning of the facility.            The assets to be transferred will include all records and documents necessary for operation, maintenance, and decommissioning of Point Beach, including all documents comprising the current licensing basis of the unit. Certain transmission and distribution assets on the site will continue to be owned by American Transmission Company (ATC) and will be operated under an Interconnection Agreement between ATC and FPLE Point Beach, which will assure compliance with NRC requirements. The existing Interconnection Agreement between ATC and WEPCO will be assigned to FPLE Point Beach at closing. FPLE Point Beach will own the real property at the Point Beach site on which all transmission and distribution assets are located, and will grant ATC appropriate easements for operation and maintenance of the assets retained by ATC.
At closing, FPLE Point Beach will assume responsibility for the eventual decommissioning of the plant. The decommissioning fund balance (qualified and non-qualified funds) maintained under a trust agreement by WEPCO is expected to be approximately
$893 Million as of August 31, 2007, the anticipated date for closing the transaction for the sale by WEPCO and the purchase by FPLE Point Beach of the Point Beach assets. FPLE Point Beach will receive at closing from WEPCOs qualified funds at least an amount equal to the NRC minimum formula amount, as calculated pursuant to 10 CFR 50.75 (the NRC Minimum).
A decision to transfer less than the entire qualified fund balance will be based on the response to a private letter ruling request filed with the Internal Revenue Service (IRS). WEPCO has an option, upon receipt of regulatory approvals, to transfer more than the NRC Minimum, up to the entire qualified fund balance of approximately $578 Million, to FPLE Point Beach at closing.
WEPCO and FPLE Point Beach have agreed to transfer at closing to an external trust fund established by FPLE Point Beach, and segregated from FPLE Point Beach assets and outside its 5
 
administrative control, at least an amount equal to the NRC minimum formula amount; FPLE Point Beachs trust fund agreement would be in a form acceptable to the NRC. None of the non-qualified funds currently held in trust for WEPCO (approximately $305 Million) would be transferred to FPLE Point Beach.
FPLE Point Beach will make offers of employment to employees of WEPCO and NMC who are employed at Point Beach, or whose work responsibilities are involved principally in the operation of Point Beach assets. As part of this requirement, FPLE Point Beach will assume the four collective bargaining agreements covering represented WEPCO and NMC members of the Point Beach workforce.
No physical changes to the plant are being proposed as part of this application. The conforming amendments that are being requested are limited to those amendments necessary to reflect the new owner/operator and its organization, and to delete references to WEPCO and NMC. FPLE Point Beach will assume all regulatory commitments and will continue to comply with the current licensing basis of the facility.
B.      Option to Transfer Operational Authority Prior to Closing As a potential interim step to the sale of Point Beach, WEPCO and FPLE Point Beach have also signed an Interim Operating Agreement that would permit WEPCO, at its option, after completion of the spring 2007 Unit 1 refueling outage, and upon receipt of applicable regulatory approvals, to transfer operational authority to FPLE Point Beach prior to the closing. As part of this application, WEPCO, FPLE Point Beach, and NMC are also seeking NRCs consent to permit the transfer of operational authority for Point Beach from NMC to FPLE Point Beach prior to closing should WEPCO choose to pursue the Interim Operating Approach.
6
 
WEPCOs implementation of the Interim Operating Approach would involve the transfer of operational authority from NMC to FPLE Point Beach, including the transfer to FPLE Point Beach of NMC employees employed at Point Beach or whose work responsibilities are involved principally in the operation of Point Beach and assumption by FPLE Point Beach of the three collective bargaining agreements covering represented NMC members of the Point Beach workforce. WEPCO employees working at the Plant, however, would remain employed by WEPCO and supervised by FPLE Point Beach until closing. Thus, there is no change in the statement of the technical qualifications that would be dedicated to the operation of Point Beach, as demonstrated above for the change in operator and owner.
The Interim Operating Approach would retain WEPCO as the owner of Point Beach, and would not change the financial qualifications or the decommissioning funding assurance responsibilities of WEPCO. WEPCO would continue to be responsible for funding the safe operations, maintenance, and decommissioning for Point Beach as it is now. Under the NRCs financial qualifications rule at 10 CFR 50.33(f), WEPCOs status as an electric utility as that term is defined in 10 CFR 50.2 does not require WEPCO to demonstrate financial qualifications to carry out licensed activities at Point Beach. Additionally, WEPCOs obligation to provide financial assurance for decommissioning of Point Beach is not changed under the Interim Operating Option. The decommissioning fund balance (qualified and non-qualified funds) in WEPCOs      decommissioning      trust accounts  is  approximately    $882    Million  as  of December 31, 2006, which is well in excess of the NRC Minimum.
7
 
III. General Information Regarding Transferee The information required in an application for the transfer of licenses pursuant to 10 C.F.R. 50.80 is set forth below. This information demonstrates that the requested transfer complies with the requirements of the AEA and applicable NRC regulations.
A.      Name and Address The name and registered office of the transferee/proposed licensee currently is:
FPL Energy Point Beach, LLC 700 Universe Boulevard Juno Beach, Florida 33408 B.      Description of Business FPLE Point Beach is a Wisconsin limited liability company formed to acquire and operate Point Beach. FPLE Point Beach will be an Exempt Wholesale Generator.
C.      Organization and Management FPLE Point Beach is a Wisconsin limited liability company. Its principal place of business will be Wisconsin.
As a limited liability company, FPLE Point Beach has no directors or management committee. The names and addresses of the principal officers of FPLE Point Beach, all of whom are U.S. citizens, are listed below:
F. Mitchell Davidson - President Citizenship:                  United States Business address:              700 Universe Boulevard Juno Beach, FL 33408 Robert E. Barrett - Vice President Citizenship:                  United States Business address:              700 Universe Boulevard Juno Beach, FL 33408 8
 
James A. Keener - Vice President Citizenship:                United States Business address:            700 Universe Boulevard Juno Beach, FL 33408 Michael OSullivan - Vice President Citizenship:                United States Business address:            700 Universe Boulevard Juno Beach, FL 33408 Manuel A. Sanchez - Vice President Citizenship:                United States Business address:            700 Universe Boulevard Juno Beach, FL 33408 John A. Stall - Vice President Citizenship:                United States Business address:            700 Universe Boulevard Juno Beach, FL 33408 Rajiv S. Kundalkar - Vice President Citizenship:                United States Business address:            700 Universe Boulevard Juno Beach, FL 33408 William L. Yeager - Vice President Citizenship:                United States Business address:            700 Universe Boulevard Juno Beach, FL 33408 Mark R. Sorensen - Treasurer Citizenship:                United States Business address:            700 Universe Boulevard Juno Beach, FL 33408 9
 
Charles R. Schultz - Secretary Citizenship:                  United States Business address:            700 Universe Boulevard Juno Beach, FL 33408 Rita W. Costantino - Assistant Secretary Citizenship:                  United States Business address:            700 Universe Boulevard Juno Beach, FL 33408 C.      No Foreign Ownership or Control FPLE Point Beach is not owned, controlled or dominated by an alien, a foreign corporation, or a foreign government.
D.      No Agency In seeking to become the licensed owner and operator of Point Beach, FPLE Point Beach is not acting as the agent or representative of another person. As the licensed operator of Point Beach after the transfer of the Licenses, FPLE Point Beach will act for itself.
E.      Relationship to Shareholders FPLE Point Beach is a direct, wholly-owned subsidiary of ESI Energy, LLC, which is a direct, wholly-owned subsidiary of FPL Energy, LLC (FPL Energy). FPL Energy is in turn a direct, wholly-owned subsidiary of FPL Group Capital, which is a direct, wholly-owned subsidiary of FPL Group Inc. (FPL Group). FPL Group is a public utility holding company incorporated in 1984 under the laws of the state of Florida. This corporate relationship is depicted in Enclosure 2 to this Application.
FPL Group Capital will at closing enter into a Support Agreement with FPLE Point Beach to make funding of up to $70 Million available to FPLE Point Beach. Pursuant to an existing guaranty between FPL Group and FPL Group Capital, FPL Group absolutely and 10
 
unconditionally guarantees certain obligations of FPL Group Capital, and these guaranteed obligations encompass the Support Agreement with FPLE Point Beach. FPLE Point Beach will have the right to obtain funds committed in the Support Agreement from FPL Group Capital to the extent FPLE Point Beach determines necessary to pay the expenses of safely operating and maintaining Point Beach, protect the public health and safety, and meet NRC requirements.
Through its affiliates Florida Power & Light Company (FP&L) and FPL Energy, FPL Group is a major producer of electric energy, with over 30,000 MWe of generation capacity in operation in the United States. FPL Group has been in business for more than 20 years and has leveraged its expertise in generation to build a rapidly growing independent power producer business with facilities in operation, construction, or advanced stages of development in 26 states. FPL Group is a publicly traded company with shares trading on the New York Stock Exchange. Further information on FPL Group is provided below and in enclosures to this Application.
FPL Group Capital has senior unsecured debt ratings of A- and A2 by Standard & Poors and Moodys, respectively. In addition, FPL Group Capital, as a wholly-owned subsidiary, benefits from the financial strength of FPL Group. The FPL Group Annual Report and 10K for 2005 is provided in Enclosure 3. FPL Group enjoys a corporate credit rating of A by Standard
& Poors. Through its wholly-owned subsidiaries, FPL Group serves more than four million retail electric customers in Florida, and produces more than 30,000 MW of electricity by operating fossil, hydroelectric, and nuclear units in an efficient mix of generation technologies.
As of December 31, 2005, FPL Group reported assets exceeding $33 Billion and recorded annual revenues for its 2005 fiscal year greater than $11.8 Billion. Thus, there is reasonable assurance that FPL Group Capital can meet its commitments to FPLE Point Beach.
11
 
F. Technical Qualifications FPLE Point Beach will make offers of employment with comparable compensation and benefits to employees of NMC and WEPCO who are employed at Point Beach, or whose work responsibilities involve principally the operation of any Point Beach assets. Thus, substantially all of Point Beachs plant staff and on-site operating organization, as well as off-site employees involved principally in Point Beach operation, are expected to become FPLE Point Beach employees after the transfer of the Licenses. Therefore, the technical qualifications of the organization operating Point Beach will be essentially unaffected.
The Point Beach on-site nuclear organization will report operationally through the Site Vice President to William E. Webster, Jr., Vice President of Operations, Florida Power and Light Company (FP&L) and will report directly to J. A. Stall, who is FP&L and FPL Energys Senior Vice President, Nuclear and Chief Nuclear Officer. As Chief Nuclear Officer, Mr. Stall is responsible for all nuclear activities at FPL Group, including the safe operation and maintenance of the St. Lucie Nuclear Plant, Units 1 and 2, the Turkey Point Nuclear Plant, Units 3 and 4, Seabrook Station and Duane Arnold Energy Center. The Site Vice Presidents at each licensed facility are subject to Mr. Stalls oversight and direction with respect to licensed activities at the facility. Mr. Stall has been in this position since 2001. Mr. Stall is also Senior Vice President of FPLE Point Beach. Mr. Stall is a career nuclear professional with 30 years of nuclear operating experience. Prior to joining FP&L in 1996 as the Site Vice President at the St. Lucie Nuclear Plant, he spent 19 years with Virginia Power Company at the North Anna Nuclear Plant.
Mr. Stall was also Vice President, Nuclear Engineering at FP&L from 2000 to 2001.                  A statement of the education and experience of Mr. Stall is provided as Enclosure 4.
12
 
The on-site organization and plant staff, including senior managers, will remain essentially unchanged by the transfer.          Similarly, other than possible realignment of administrative and support services (such as accounting, business services, and information technology), the organizational structure of the onsite organization, including lines of authority and communication, is not expected to be changed by the transfer. Certain offsite support services currently being performed by NMC will be assumed by FPLE Point Beach. If FPLE Point Beach determines that any other senior management changes will be made contemporaneously with the transfer, FPLE Point Beach will ensure that the new individuals meet all existing qualification requirements and will inform the NRC and provide the NRC with their resumes prior to the transfer of the Licenses.
While FPLE Point Beach will not be relying on other organizations to establish its technical qualifications, the extensive experience and technical capabilities of FP&L, FPLE Seabrook and FPLE Duane Arnold are a valuable resource available to FPLE Point Beach.
FP&L has an exemplary safety and operational record at its Turkey Point and St. Lucie plants, having, for example, achieved high rankings for performance and safety from the World Association of Nuclear Operators (WANO) and the NRC, while also achieving a capacity factor in excess of 90 percent. FPLE Seabrook and FPLE Duane Arnold have also successfully operated Seabrook Station and DAEC, respectively, since acquisition of the controlling interests in Seabrook in 2002 and DAEC in 2006, respectively. FPLE Point Beach will operate Point Beach under the same safe, conservative operating philosophies that have resulted in the successful operation of the plants currently owned and operated by FP&L, FPLE Seabrook and FPLE Duane Arnold. This level of experience and capability in an affiliated company provides 13
 
added assurance that FPLE Point Beach will have the technical qualifications necessary to safely and reliably conduct licensed activities at Point Beach.
G.        Financial Qualifications In accordance with 10 CFR 50.33(f) and the Standard Review Plan on Power Reactor Licensee Financial Qualifications and Decommissioning Funding Assurance (NUREG-1577, Rev. 1), a projected income statement for the five-year period from August 31, 2007, until August 31, 2011 (Projected Income Statement), is provided in Enclosure 5P, which will be submitted under separate cover from FPLE Point Beach. (Enclosure 5P is proprietary to FPLE Point Beach; Enclosure 5NP, attached hereto, is a redacted, non-proprietary version suitable for public disclosure). 1 The Projected Income Statement, based on an assumed 92% annual capacity factor, shows that FPLE Point Beachs anticipated revenues from sales of energy and capacity from Point Beach provide reasonable assurance of an adequate source of funds to meet FPLE Point Beachs anticipated expenses. Also included in Enclosures 5NP and 5P is a second Projected Income Statement based on the average capacity factor for the last 5 years of operations of Point Beach (87%), as well as a third sensitivity analysis assuming operating revenue for a hypothetical 10% decrease in generating capacity below the average of the previous five year performance of the plant (78%).
The revenues in the Projected Income Statement are based on FPLE Point Beachs sale of 100% of Point Beachs energy generation at prices established under a long-term power purchase agreement between WEPCO and FPLE Point Beach. All scenarios demonstrate reasonable assurance of an adequate source of funds to meet FPLE Point Beachs anticipated expenses.
1 An affidavit regarding proprietary treatment of proprietary enclosures 5P and 6P will be included with the separate transmittal of the proprietary enclosures.
14
 
FPLE Point Beach has entered into a Power Purchase Agreement (PPA) with WEPCO providing for the sale of all of the power from Point Beach to WEPCO through the current NRC License terms of 2030 for Unit 1 and 2033 for Unit 2. Prior to closing of the transaction, WEPCO has the option, upon regulatory approval, to elect a PPA term of sixteen (16) years for Unit 1 and seventeen (17) years for Unit 2.
Operating expenses, with the exception of depreciation, are based on forecasted generation costs developed by FPL Energy, which are also included as part of the Projected Income Statement. Depreciation expense is based on FPLE Point Beachs actual purchase price.
The Projected Income Statement shows that there is reasonable assurance that FPLE Point Beach will have sufficient funds to cover its share of operating costs.
In addition to the Projected Income Statement, FPLE Point Beach is providing as P (under separate cover) a projected opening balance sheet showing its anticipated assets, liabilities, and capital structure as of the closing date. (Enclosure 6P is proprietary to FPLE Point Beach; Enclosure 6NP, attached hereto, is a redacted, non-proprietary version suitable for public disclosure). Further, to provide added assurance that FPLE Point Beach will have sufficient funds available to meet its operating expenses for Point Beach, FPL Group Capital will at closing enter into a Support Agreement with FPLE Point Beach to make funding of up to $70 million available to FPLE Point Beach. Under the terms of the Support Agreement, a form of which is attached as Enclosure 7 hereto, FPLE Point Beach will have the right to obtain such funds from FPL Group Capital to the extent FPLE Point Beach determines necessary to pay the expenses of safely operating and maintaining Point Beach, protect the public health and safety, and meet NRC requirements. This funding assurance will, if necessary, also meet any obligations associated with nuclear liability premiums, including FPLE Point Beachs share of 15
 
retrospective premiums pursuant to 10 CFR 140.21, and required nuclear property insurance.
Absent a further sale or transfer requiring NRC approval, the Support Agreement will not terminate until Point Beach permanently ceases commercial operation, and may not be modified or amended without thirty (30) days prior written notice to the NRC.
The level of funding provided by the Support Agreement covers the approximate O&M costs that Point Beach would expect to incur over a six-month outage, as suggested by the NRCs Standard Review Plan (NUREG-1577, Rev. 1, at p. 5), and provides added assurance that FPLE Point Beach is financially qualified to conduct licensed activities at Point Beach.
H. Decommissioning Funding Assurance As stated earlier, FPLE Point Beach will assume responsibility for eventual decommissioning of Point Beach. FPLE Point Beach will receive an amount at least equal to the NRC Minimum from WEPCOs qualified fund, upon closing of the transaction, which will be placed in an external trust fund maintained by FPLE Point Beach. Depending upon action by the IRS in response to a private letter ruling request and other regulatory actions, WEPCO may transfer more than the NRC Minimum, up to the entire qualified fund balance (estimated to be approximately $563 Million at closing), to the FPLE Point Beach trust fund at closing. As stated earlier, these funds will be held in external trust funds segregated from FPLE Point Beach assets and outside its administrative control. Investment of the funds will be managed in accordance with applicable requirements in 10 C.F.R. 50.75(h)(1). A proposed form of external trust is attached as Enclosure 8.
The NRC Minimum funding level for decommissioning Point Beach, estimated as of December 2006, is $360 Million, as calculated in accordance with 10 CFR 50.75(c), NRC 16
 
Regulatory Guide 1.159, and NUREG-1307, Rev. 11.                      Enclosure 9 provides a worksheet showing this calculation.
I.        Antitrust Review The NRC has determined that antitrust reviews of post-operating license transfer applications are neither required nor authorized by the AEA, and therefore no antitrust information is required in connection with this Application. 2 J.        Other Licensing Considerations
: 1.      Spent Fuel Contracts and Spent Fuel Management Upon closing, FPLE Point Beach will assume title to and financial responsibility for spent nuclear fuel at or associated with Point Beach to the same extent as presently held by WEPCO. WEPCO will assign or convey and FPLE Point Beach will assume WEPCOs rights and obligations under the Standard Contract with the Department of Energy (DOE). After closing, FPLE Point Beach will also assume the right to recover post-closing damages resulting from the DOEs failure to commence the removal, transportation, acceptance or any delay in accepting spent nuclear fuel for disposal pursuant to the Standard Contract and the Nuclear Waste Policy Act. WEPCO will remain liable for fees payable to DOE under the Standard Contract accrued or related to electricity generated and sold prior to closing.
Transfer of the Licenses will result in FPLE Point Beach being authorized pursuant to the general license in 10 CFR 72.210 to store spent fuel in the Independent Spent Fuel Storage Installation at Point Beach. FPLE Point Beach will assume all of NMCs obligations and commitments under this general license and all NRC orders pertaining thereto. FPLE Point 2
Final Rule, Antitrust Review authority: Clarification, 65 Fed. Reg. 44,649 (July 19, 2000); see also Kansas Gas and Electric Co. (Wolf Creek Generating Station, Unit 1), CLI-99-19, 49 NRC 441 (June 18, 1999).
17
 
Beach will provide an update of registrations required by 10 C.F.R. § 72.212(b)(1)(ii) for casks in use within thirty (30) days after the closing.
: 2.      Nuclear Insurance In accordance with Article IV of the NRC Indemnity Agreement for Point Beach, the parties request NRC approval of the assignment and transfer of the Price Anderson Indemnity Agreement for Point Beach to FPLE Point Beach upon consent to the proposed transfer of the Licenses. FPLE Point Beachs Projected Income Statements and financial arrangements with FPL Group Capital provides adequate assurance that FPLE Point Beach will be able to pay annual retrospective premiums for Point Beach, pursuant to 10 CFR 140.21(e)-(f) . Prior to the transfer of the Licenses, FPLE Point Beach will obtain all required nuclear property damage insurance pursuant to 10 CFR 50.54(w) and nuclear energy liability insurance pursuant to Section 170 of the AEA and 10 CFR Part 140.
: 3.      Off-site Power ATC currently provides off-site power to Point Beach over transmission and distribution facilities owned by ATC pursuant to the Generation Transmission Interconnection Agreement by and between WEPCO and ATC dated as of November 1, 2000, as revised by the Second Revision issued on January 2, 2002 (ATC Interconnection Agreement). Functionally, Point Beachs interconnection with the ATC system will not change as a result of the proposed license transfer. WEPCO will assign the ATC Interconnection Agreement to FPLE Point Beach upon closing of the transaction. FPLE Point Beach will operate its interconnection facilities relating to Point Beach in compliance with NRCs maintenance rule (10 CFR 50.65) and other NRC requirements and licensee commitments.          The ATC Interconnection Agreement and other arrangements for power supply will enable FPLE Point Beach to have a reliable interconnection 18
 
to and source of offsite power meeting all NRC requirements. As the licensee, FPLE Point Beach will remain responsible for ensuring compliance with all applicable NRC requirements.
: 4.      Control of Exclusion Area FPLE Point Beach will own or control all real property within the exclusion area of Point Beach. While ATC will retain easements allowing access to its transmission and distribution facilities at the site, FPLE Point Beach will maintain the right to control activities and remove or exclude personnel in these areas.
: 5.      Continuation of the Current Licensing Basis This application does not request approval of or involve any physical changes in the facility, in plant configuration, or to the conduct of operations. After the transfer of the Licenses, the facility will continue to be operated and maintained in accordance with its licensing basis, and FPLE Point Beach will assume all regulatory commitments. Other than the change in licensee and the few related organizational changes described in this Application, there will be no change in the current licensing basis for Point Beach associated with the transfer of the Licenses.
Pursuant to the ASA, FPLE Point Beach will acquire all documents, correspondence, books, records, medical records, operating, safety and maintenance manuals, inspection reports, drawings, models, engineering designs, blueprints, as-built plans, specifications, procedures, studies, reports, quality assurance records, purchasing records and equipment repair, data, safety, maintenance or service records relating to the design, construction, licensing, regulation, operation or decommissioning of the facility. FPLE Point Beach will also acquire any rights to any documents owned by third parties and licensed to the current operator which are used in or necessary to the licensing, operation, or decommissioning of the facility.
19
: a.      Quality Assurance Program Upon transfer, FPLE Point Beach will adopt the current 10 CFR Part 50, Appendix B Quality Assurance (QA) Program that is implemented by NMC. FPLE Point Beach anticipates that no substantive changes will be made to the existing QA organization as a result of the transfer of the Licenses to FPLE Point Beach. FPLE Point Beach anticipates that no changes will be made as a result of the transfer of the Licenses that will result in a reduction in the commitments in the QA Program descriptions previously accepted by the NRC.
Any future changes that may be made to the existing Point Beach QA Program developed and implemented by the current licensees will be made in accordance with 10 CFR 50.54(a). If FPLE Point Beach or NMC identify any changes to the QA Program that would result in a reduction in commitments, application to the NRC will be made, and such proposed changes will not be implemented until approved by the NRC. Determinations as to whether any proposed change(s) would result in a reduction in commitments will be made in accordance with Point Beachs currently approved plans, programs and procedures.
The Point Beach QA Program satisfies the requirements of 10 CFR 71.101(f) for radioactive material packages. Those portions of the QA Program applicable to radioactive waste shipments are not being substantively revised from that previously approved by the NRC.
After the Part 50 license transfer, FPLE Point Beach intends to apply the QA Program to the same Part 71 activities as those previously approved.
Accordingly, FPLE Point Beach, WEPCO, and NMC request that the NRC issue the Part 71 Quality Assurance Program Approval for Radioactive Material Packages (NRC Form 311) for Point Beach, assigned to FPLE Point Beach, effective on the date of the Part 50 license transfer.
20
: b.      Emergency Preparedness Upon transfer, FPLE Point Beach will assume the authority and responsibility for functions necessary to fulfill the emergency planning and preparedness requirements specified in 10 CFR 50.47(b) and 10 CFR Part 50, Appendix E, and will assume the existing Point Beach emergency plan developed and implemented by the current licensees.            FPLE Point Beach anticipates that no changes to the emergency plan will be made that will result in a decrease in the effectiveness of the plan, and that the plan will continue to meet the standards of 10 CFR 50.47(b) and the requirements of 10 CFR Part 50, Appendix E. The transfer of the Licenses will not adversely affect the effectiveness of the emergency planning organization or compliance with emergency preparedness requirements.
Any changes made to the existing Point Beach emergency plan will be made in accordance with 10 CFR 50.54(q). Any specific emergency plan changes will be submitted to the NRC within thirty (30) days after the changes are made, pursuant to 10 CFR 50.54(q) and 10 CFR Part 50, Appendix E, Section IV. If NMC or FPLE Point Beach were to identify any proposed changes that would decrease the effectiveness of the approved emergency plan, application to the NRC will be made and such proposed changes will not be implemented until approved by the NRC. Determinations as to whether any proposed change(s) would result in a decrease in effectiveness will be made in accordance with Point Beachs currently approved plan, programs, and procedures.
FPLE Point Beach anticipates that no substantive changes will be made to the existing emergency organization. Ownership of off-site emergency sirens and other off-site emergency response equipment will be transferred to FPLE Point Beach, and any easements and contracts for the siren locations and leases for off-site emergency response facilities will be assigned to 21
 
FPLE Point Beach.        Existing agreements for support from organizations and agencies not affiliated with WEPCO will be assigned to FPLE Point Beach. WEPCO and FPLE Point Beach plan to notify the parties to such agreements in advance of the transfer of Point Beach to FPLE Point Beach and advise those parties of FPLE Point Beachs responsibility for management and operation of Point Beach, effective as of the transfer date.
In sum, the transfer of the Licenses will not adversely affect compliance with emergency preparedness requirements.
: c.      Security Plan Upon transfer of the Licenses, FPLE Point Beach will assume the authority and responsibility for the functions necessary to fulfill the security planning requirements specified in 10 CFR Part 73, and will assume the existing NRC-approved physical security, guard training and qualification, and safeguards contingency plans developed and implemented by the current licensee, as well as all commitments in response to the NRCs Security Orders pertaining to Point Beach. FPLE Point Beach anticipates that no changes will be made as a result of the transfer of the Licenses that will result in a decrease in the effectiveness of the plans, and that the plans will continue to meet existing regulatory standards.
Any changes made to the plans will be made in accordance with 10 CFR 50.54(p). Any specific security plan changes will be submitted to the NRC within two months after the changes are made, pursuant to 10 CFR 50.54(p)(2). If FPLE Point Beach or NMC identify any proposed change that would decrease the effectiveness of the approved security plans, application to the NRC will be made, and such proposed changes will not be implemented until approved by the NRC. Determination as to whether any proposed change(s) would result in a decrease in 22
 
effectiveness will be made in accordance with Point Beachs currently approved security plan, programs, and procedures.
: d. Final Safety Analysis Report The proposed transfer of the Licenses and conforming administrative License amendments will not change or invalidate information presently appearing in the Final Safety Analysis Report (FSAR) for Point Beach, with the exception of the information changed as a result of this application. Changes necessary to accommodate the proposed transfer and conforming administrative License amendments will be incorporated into the FSAR in accordance with 10 CFR 50.71(e) following NRC approval of the request for consent to transfer the Licenses.
K.      Restricted Data and Classified Nuclear Security Information This Application does not contain any Restricted Data or other classified defense information, and it is not expected that any such information will be required by the licensed activities at Point Beach. In the event that licensed activities do involve Restricted Data in the future, FPLE Point Beach agrees that it will appropriately safeguard such information and it will not permit any individual to have access to Restricted Data or National Security Information until the Office of Personnel Management investigates and reports to the NRC on the character, associations and loyalty of such individual, and the NRC determines that permitting such person to have access to Restricted Data will not endanger the common defense and security of the United States.
L.      Environmental Considerations The proposed transfer of the Licenses will not result in any change in the types, or any increase in the amounts, of any effluents that may be released offsite, and will not cause any 23
 
increase in individual or cumulative occupational radiation exposure. Further, as specified in 10 CFR 51.22(c)(21), the NRC has determined that license transfers are categorically exempted from further environmental review. Accordingly, the transfer of the Licenses will involve no significant environmental impact.
M. Interim Operating Agreement As a potential interim step to the sale of Point Beach, WEPCO and FPLE Point Beach have also signed an Interim Operating Agreement that would permit WEPCO, at its option, after completion of the spring 2007 Unit 1 refueling outage, and upon receipt of applicable regulatory approvals, to transfer operational authority to FPLE Point Beach prior to the Closing. Should WEPCO exercise this Interim Operating Approach, FPLE Point Beach would operate Point Beach in the manner described in this application. As part of this application, WEPCO, NMC, and FPLE Point Beach are also seeking the NRCs consent to permit the transfer of operational authority for Point Beach from NMC to FPLE Point Beach prior to closing should WEPCO choose to exercise that option.
The Interim Operating Approach would involve the transfer of operational authority from NMC to FPLE Point Beach, but would not change the financial qualifications or the decommissioning funding status of WEPCO as the owner of Point Beach. WEPCO would continue to be responsible for funding the safe operations, maintenance, and decommissioning for Point Beach as it is now. Under the NRCs financial qualifications rule at 10 CFR 50.33(f),
WEPCOs status as an electric utility as that term is defined in 10 CFR 50.2 does not require WEPCO to demonstrate financial qualifications to carry out licensed activities at Point Beach.
Additionally, WEPCOs obligation to provide financial assurance for decommissioning of Point Beach is not changed under the Interim Operating Option. The decommissioning fund balance 24
 
(qualified and non-qualified funds) in WEPCOs decommissioning trust accounts is
$882 Million as of December 31, 2006, which is well in excess of the NRC Minimum.
Marked-up pages showing the requested changes to the Licenses to implement the Interim Operating Option are provided as Enclosure 1b to this Application.        Pursuant to 10 CFR 2.1315, these proposed License amendments involve no significant hazards consideration, because the application does nothing more than conform the Licenses to reflect the Interim Operating Option.
IV. Schedule The parties are seeking to complete the proposed transaction promptly, consistent with receipt of all required regulatory approvals. WEPCO and FPLE Point Beach anticipate closing on or before August 31, 2007. Accordingly, the parties request that the NRC complete its review and issue the transfer consent and conforming Licenses amendments expeditiously, with a target date of July 1, 2007.      This date would be consistent with the NRCs stated objective of completing uncontested license transfer reviews in three to four months, and would permit the transfer of operational authority of Point Beach to FPLE Point Beach prior to closing should WEPCO select that option . WEPCO has an economic incentive to close between July 1, 2007 and August 30, 2007.
The parties request and expect that, consistent with past NRC practice, the NRCs consent will be effective immediately upon issuance and will permit the transfer and implementation of the conforming Licenses amendments, either for the Interim Operating Option followed by ownership at closing or both operating authority and ownership at closing, at any time within twelve (12) months following the date of issuance by the NRC. Consistent also with 25
 
past NRC practice, the consent would also require notification to the NRC of the actual date and time of transfer of either operating authority or ownership as approved by the consent order .
The sale and purchase of Point Beach also requires approvals or actions from other federal agencies, including the Federal Energy Regulatory Commission, Federal Trade Commission or Department of Justice, Federal Communications Commission, and from state public utility commissions and environmental agencies. The parties will keep the NRC staff informed as to the status of these necessary approvals and will notify the NRC staff when they are ready for the conforming amendments to the Licenses to be issued.
V.      Conclusions For the foregoing reasons, the proposed transfer of the Licenses will not: (1) have any adverse impact on the operation of Point Beach; (2) adversely affect the managerial, technical or financial qualifications of the licensed operator of the facility; (3) impair any licensees financial qualifications; (4) result in foreign ownership, control or domination over any NRC licensee; or (5) require any additional NRC reviews. In conclusion, the proposed transfer will not be inimical to the common defense and security or result in any undue risk to public health and safety, and will be consistent with the requirements of the AEA and the NRC regulations.
Accordingly, and based on the foregoing information, the parties respectfully request that the NRC issue (1) an Order approving the transfer of WEPCOs ownership interest in Point Beach and NMCs operating authority to FPLE Point Beach, and (2) the associated conforming administrative amendments to Facility Operating Licenses No. DPR-24 and DPR-27, either sequentially, as described in the Interim Operating Option, or together at closing.
26
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of                      1            Docket Nos. 50-266RJnit 1 Point Beach Nuclear Plant            1                            50-301/Unit 2 72-005lISFSI AFFIRMATION I, F. D. Kuester, being duly sworn, hereby depose and state that I am the Executive Vice President and Chief Operating Officer of Wisconsin Electric Power Company (WEPCO); that I am duly authorized to file with the Nuclear Reg~latoryCommission the attached Application for Order and Conforming License Amendments to Transfer Facility Operating Licenses DPR-24 and DPR-27; that I am familiar with the content thereof; and that the matters set forth therein pertaining to WEPCO are true and correct to the best of my knowledge and belief.
F. D. Kuester Executive Vice President & Chief Operating Officer STATE OF WISCONSIN                    1 COUNTY OF MILWAUKEE                  1 Subscribed and sworn to before me, a Notary Public in the State of Wisconsin, t h i - s a a y of January, 2007.
Notary Public in and for the State of Wisconsin My Commission expires:
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of                      )              Docket Nos. 50-266AJnit 1 Point Beach Nuclear Plant            )                            50-301AJnit 2 72-005lISFSI AFFIRMATION I, Dennis L. Koehl, being duly sworn, hereby depose and state that I am the Site Vice President, Point Beach Nuclear Plant, for Nuclear Management Company, LLC (NMC); that I am duly authorized to file with the Nuclear Regulatory Commission the attached Application for Order and Conforming License Amendments to Transfer Facility Operating Licenses DPR-24 and DPR-27; that I am familiar with the content thereof; and that the matters set forth therein pertaining to NMC and the Point Beach Nuclear Plant are true and correct to the best of my knowledge and belief.                                                              /
Dennis L. Koehl                  /
Site Vice President, Point Beach Nuclear Plant STATE OF WISCONSIN                    )
COUNTY OF MANITOWOC                  )
G Subscribed and sworn to before me, a Notary Public in the State of Wisconsin, thi*    - day of January, 2007.                                  .d                      --
otary Public in and for the State of \Visconsin My Commission expires:  &&,C                      9
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of                        1              Docket Nos. 50-266Nnit 1 Point Beach Nuclear Plant              1                            50-301/Unit 2 72-OOSIISFSI AFFIRMATION I, Rajiv S. Kundalkar, being d.uly sworn, hereby depose and state that I am Vice President of FPL Energy Point Beach, LLC, (F:PLE Point Beach); that I am duly authorized to file with the Nuclear Regulatory Commission the attached Application For Order And Conforming License Amendments To Transfer Facility Operating Licenses DPR-24 And DPR-27; that I am familiar with the content thereof; and that the matters set forth therein pertaining to FPLE Point Beach, including the information in Enclosures 5P and 6P provided under separate cover, are true and correct to the best of my knovrrfedge and belief.
V 2
Rajiv S. Kundalkar Vice President STATE OF FLORIDA                        )
COUNTY OF PALM BEACH                    1 Subscribed and sworn to before me, a Notary Public in the State of Florida, thid5$ay of January, 2007 kdotiiry public in and for the State of Florida w                                                                        6~2(a  -0 7 NOTARY PUBLIC-STATE OF FLORID/              My Commission expires:
Joanne S. k i F h m m ~
Commission # DDW902 Expires: jUNE 26, 2009 Bonded Thm Atlantic Bonding CQ., Inc
 
LIST OF ENCLOSURES a  Proposed changes to Facility Operating Licenses Associated with the Proposed Transfer of the Point Beach Nuclear Plant from Wisconsin Electric Power Company and Nuclear Management Company to FPL Energy Point Beach, LLC b  Proposed Facility Operating Licenses Associated with the Proposed Transfer of Operating Authority of the Point Beach Nuclear Plant from Nuclear Management Company to FPL Energy Point Beach, LLC (for Interim Operating Option)    FPL Energy Point Beach, LLC Corporate Structure    FPL Group, Inc. Annual Report and 10K for 2005    Resume of J. A. Stall P  Projected Income Statement for FPL Energy Point Beach, LLC (Proprietary - under separate cover) NP Projected Income Statement for FPL Energy Point Beach, LLC (Non-Proprietary) P  FPL Energy Point Beach, LLC Projected Opening Balance Sheet (Proprietary - under separate cover) NP FPL Energy Point Beach, LLC Projected Opening Balance Sheet (Non-Proprietary)    Form of Support Agreement between FPL Group Capital Inc. and FPL Energy Point Beach, LLC    Form of Post-Closing Decommissioning Trust Agreement    Decommissioning Funding Worksheet 30
 
Enclosure 1a Application for Order and Conforming License Amendments to Transfer Facility Operating Licenses Proposed Changes to the Facility Operating Licenses Associated with the Proposed Transfer of Point Beach Nuclear Plant from Wisconsin Electric Power Company and Nuclear Management Company to FPL Energy Point Beach, LLC
: 1.      Reason for the Changes.
Wisconsin Electric Power Company (WEPCO) is selling all of its ownership interests in Point Beach Nuclear Plant, located in Two Rivers, Wisconsin, to FPL Energy Point Beach, LLC (FPLE Point Beach), necessitating the submittal of conforming changes to the Facility Operating Licenses (including appendices) for the Units. The proposed changes delete references to Nuclear Management Company (NMC) as the operator of Point Beach and WEPCO, as an owner of Point Beach, and replace them with references to FPLE Point Beach. Other minor administrative changes are also being implemented as shown below to facilitate the transfer of the Licenses.
: 2.      Basis for the Changes.
After the transfer of the Licenses, NMC and WEPCO will retain no responsibility for the regulatory obligations contained in Licenses DPR-24 and DPR-27 for Point Beach.
Accordingly, the entity to which that responsibility is being transferred, FPLE Point Beach, must be identified in the Facility Operating Licenses.
: 3.      Safety Assessment.
The proposed changes to the Facility Operating Licenses for Point Beach identify FPL Energy Point Beach as the operator and a new owner of the facility and make minor changes that support the transfer of the Licenses. No physical modifications are being made to plant systems or components nor are any significant changes in day-to-day operation of the units being made. Therefore, the proposed changes are administrative in nature and will not adversely affect nuclear safety or safe plant operation.
: 4.      Description of the Proposed Changes.
The proposed changes to the Facility Operating Licenses for Point Beach (including Appendices A and B) include the following: (1) the deletion of references to WEPCO and NMC as owner and operator of Point Beach, respectively, and (2) the authorization of FPLE Point Beach to possess, use, and operate Point Beach under essentially the same conditions and authorization included in the existing Licenses. Two footnotes containing historical references to the former licensees are also being deleted.
Both markups of the Facility Operating Licenses pages and clean, typed versions of those pages follow (additions are double-underlined; deletions are strikethrough).
 
FPL ENERGY POINT BEACH, LLC WISCONSIN ELECTRIC POWER COMPANY NUCLEAR MANAGEMENT COMPANY, LLC DOCKET NO. 50-266 RENEWED FACILITY OPERATING LICENSE Renewed License No. DPR-24
: 1. The Nuclear Regulatory Commission (NRC or the Commission), having previously made the findings set forth in License DPR-24 issued on October 5, 1970, has now found that:
A. The application to renew operating License No. DPR-24 filed by Nuclear Management Company, LLC (NMC) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter 1, and all required notifications to other agencies or bodies have been duly made; B. Construction of the Point Beach Nuclear Plant Unit 1 (the facility) has been substantially completed, in conformity with Provisional Construction Permit No. CPPR-32, as amended, the application as amended, the provisions of the Act, and the rules and regulations of the Commission; C. Actions have been identified and have been or will be taken with respect to (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1); and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by the renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, for the facility, and that any changes made to the facilitys current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commissions regulations; D. The facility will operate in conformity with the application as amended, the provisions of the Act, and the rules and regulations of the Commission; E. There is reasonable assurance (1) that the activities authorized by the renewed operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the regulations of the Commission set forth in 10 CFR Chapter 1;
 
F. NMC (FPLE Point Beach) is technically qualified and Wisconsin Electric Power Company 1 is financially qualified to engage in the activities authorized by this renewed operating license in accordance with the regulations of the Commission set forth in 10 CFR Chapter 1; G. The applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements," have been satisfied; and H. The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public.
: 2.      This renewed operating license applies to the Point Beach Nuclear Plant Unit 1, a closed cycle, pressurized, light water moderated and cooled reactor, and associated steam generators and electric generating equipment (the facility). The facility is located on the Point Beach site, in the Town of Two Creeks, Manitowoc County, Wisconsin, and is described in the Final Safety Analysis Report (FSAR), as supplemented and amended.
: 3.      Subject to the conditions and requirements incorporated herein the Commission hereby licenses:
A. Pursuant to Section 104b of the Act and 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities," (FPLE Point Beach) Wisconsin Electric Power Company to possess, and NMC to use and operate the facility at the designated location on the Point Beach site in accordance with the procedures and limitations set forth in this renewed operating license; B. Pursuant to the Act and 10 CFR Part 70, NMC (FPLE Point Beach) to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts, required for reactor operation, as described in Final Facility Description and Safety Analysis Report, as supplemented and amended as of March 17, 1976; C. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, NMC (FPLE Point Beach) to receive, possess and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; 1
On December 31, 1977, Wisconsin Electric Power Company and Wisconsin Michigan Power Company (formerly the licensees) merged with Wisconsin Electric Power Company surviving the merger. Effective on the date of the merger, Wisconsin Electric Power Company remained as the licensee. NMC succeeds Wisconsin Electric Power Company as operator of the Point Beach Nuclear Plant, Unit 1. Consequently, NMC is authorized to act as agent for Wisconsin Electric Power Company and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
Renewed License No. DPR-24
 
D. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, NMC (FPLE Point Beach) to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and E. Pursuant to the Act and 10 CFR Parts 30 and 70, NMC (FPLE Point Beach) to possess such byproduct and special nuclear materials as may be produced by the operation of the facility, but not to separate such materials retained within the fuel cladding.
: 4. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Sections 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
A. Maximum Power Levels NMC (FPLE Point Beach) is authorized to operate the facility at reactor core power levels not in excess of 1540 megawatts thermal.
B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 223, are hereby incorporated in the renewed operating license.
NMC (FPLE Point Beach) shall operate the facility in accordance with Technical Specifications.
C. Spent Fuel Pool Modification The licensee 2 is authorized to modify the spent fuel storage pool to increase its storage capacity from 351 to 1502 assemblies as described in licensee's application dated March 21, 1978, as supplemented and amended. In the event that the on-site verification check for poison material in the poison assemblies discloses any missing boron plates, the NRC shall be notified and an on-site test on every poison assembly shall be performed.
2 Reference to the licensee in License Conditions 4.C, 4.E and 4.H refers to Wisconsin Electric Power Company and is maintained for historical purposes.
Renewed License No. DPR-24 Amendment No. 223
 
D. Physical Protection NMC (FPLE Point Beach) shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: Nuclear Management Company Point Beach Nuclear Plant Physical Security Plan, (Revision 0), submitted by letter dated October 18, 2004.
E. Safety Injection Logic The licensee is authorized to modify the safety injection actuation logic and actuation power supplies and related changes as described in licensee's application for amendment dated April 27, 1979, as supplemented May 7, 1979. In the interim period until the power supply modification has been completed, should any DC powered safety injection actuation channel be in a failed condition for greater than one hour, the unit shall thereafter be shutdown using normal procedures and placed in a block-permissive condition for safety injection actuation.
F. NMC (FPLE Point Beach) shall implement and maintain in effect all provisions of the approved fire protection program as described in the FSAR for the facility and as approved in the Safety Evaluation Report dated August 2, 1979 (and Supplements dated October 21, 1980, January 22, 1981, and July 27, 1988) and the safety evaluation issued January 8, 1997, for Technical Specification Amendment No. 170, subject to the following provision:
NMC (FPLE Point Beach) may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
G. Secondary Water Chemistry Monitoring Program NMC (FPLE Point Beach) shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:
: 1. Identification of a sampling schedule for the critical parameters and control points for these parameters;
: 2. Identification of the procedures used to quantify parameters that are critical to control points;
: 3. Identification of process sampling points;
: 4. Procedure for the recording and management of data;
: 5. Procedures defining corrective actions for off control point chemistry condition; and Renewed License No. DPR-24
: 6. A procedure for identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.
H. The licensee is authorized to repair Unit 1 steam generators by replacement of major components. Repairs shall be conducted in accordance with the licensee's commitments identified in the Commission approved Point Beach Nuclear Plant Unit No. 1 Steam Generator Repair Report dated August 9, 1982 and revised March 1, 1983 and additional commitments identified in the staff's related safety evaluation.
I. The FSAR supplement, dated February 25, 2004, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the FSAR required by 10 CFR 50.71(e)(4) following the issuance of this renewed operating license. Until that update is complete, NMC (FPLE Point Beach) may make changes to the programs and activities described in the supplement without prior Commission approval, provided that NMC (FPLE Point Beach) evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
J. The FSAR supplement, dated February 25, 2004, as revised, describes certain future activities to be completed prior to the period of extended operation. NMC (FPLE Point Beach) shall complete these activities no later than October 5, 2010, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.
K. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.
L. Additional Conditions The additional conditions contained in Appendix C, as revised through Amendment No. 201, are hereby incorporated into this license. NMC (FPLE Point Beach) shall operate the facility in accordance with the additional conditions.
: 5. The issuance of this renewed operating license is without prejudice to subsequent licensing action which may be taken by the Commission with regard to the ongoing rulemaking hearing on the Interim Acceptance Criteria for Emergency Core Cooling Systems (Docket No. RM 50-1).
Renewed License No. DPR-24
: 6. This renewed operating license is effective as of the date of issuance, and shall expire at midnight on October 5, 2030.
FOR THE NUCLEAR REGULATORY COMMISSION
                                              /RA/
R. W. Borchardt, Deputy Director Office of Nuclear Reactor Regulation Attachments:
: 1. Appendix A - Technical Specifications
: 2. Appendix B - Environmental Technical Specifications
: 3. Appendix C - Additional Conditions Date of Issuance: December 22, 2005 Renewed License No. DPR-24
 
FPL ENERGY POINT BEACH, LLC WISCONSIN ELECTRIC POWER COMPANY NUCLEAR MANAGEMENT COMPANY, LLC DOCKET NO. 50-301 RENEWED FACILITY OPERATING LICENSE Renewed License No. DPR-27
: 1. The Nuclear Regulatory Commission (NRC or the Commission), having previously made the findings set forth in License DPR-27 issued on March 8, 1973, has now found that:
A. The application to renew operating License No. DPR-27 filed by Nuclear Management Company, LLC (NMC) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter 1, and all required notifications to other agencies or bodies have been duly made; B. Construction of the Point Beach Nuclear Plant Unit 2 (the facility) has been substantially completed, in conformity with Provisional Construction Permit No. CPPR-47, the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. Actions have been identified and have been or will be taken with respect to (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1); and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by the renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, for the facility, and that any changes made to the facilitys current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commissions regulations; D. The facility will operate in conformity with the application as amended, the provisions of the Act, and the rules and regulations of the Commission; E. There is reasonable assurance (1) that the activities authorized by the renewed operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission;
 
F. NMC (FPLE Point Beach) is technically qualified and Wisconsin Electric Power Company 1 is financially qualified to engage in the activities authorized by this renewed operating license in accordance with the rules and regulations of the Commission; G. The Wisconsin Electric Power Company and NMC (FPLE Point Beach) has satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements" of the Commission's regulations; H. The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public; and I. In accordance with the requirements of 10 CFR Part 51 (formerly Appendix D to Part 50), the renewed operating license should be issued subject to conditions for protection of the environment set forth in the Technical Specifications incorporated herein.
: 2.      This renewed operating license applies to the Point Beach Nuclear Plant Unit 2, a closed cycle, pressurized, light water moderated and cooled reactor, and associated steam generators and electric generating equipment (the facility). The facility is located on the Point Beach site, in the Town of Two Creeks, Manitowoc County, Wisconsin, and is described in the Final Safety Analysis Report (FSAR), as supplemented and amended.
: 3.      Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
A. Pursuant to Section 104b of the Act and 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities," Wisconsin Electric Power Company (FPLE Point Beach) to possess, and NMC to use and operate the facility at the designated location on the Point Beach site in accordance with the procedures and limitations set forth in this renewed operating license; B. Pursuant to the Act and 10 CFR Part 70, NMC (FPLE Point Beach) to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in Final Facility Description and Safety Analysis Report, as supplemented and amended as of March 17, 1976; 1
On December 31, 1977, Wisconsin Electric Power Company and Wisconsin Michigan Power Company (formerly the licensees) merged with Wisconsin Electric Power Company surviving the merger. Effective on the date of the merger, Wisconsin Electric Power Company remained as the licensee. Nuclear Management Company, LLC, hereinafter referred to as NMC, succeeds Wisconsin Electric Power Company as operator of the Point Beach Nuclear Plant, Unit 2. Consequently, NMC is authorized to act as agent for Wisconsin Electric Power Company and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.
Renewed License No. DPR-27
 
C. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, NMC (FPLE Point Beach)to receive, possess and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed source for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; D. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, NMC (FPLE Point Beach) to receive, possess and use in amounts as required any byproduct, source of special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and E. Pursuant to the Act and 10 CFR Parts 30 and 70, NMC (FPLE Point Beach) to possess such byproduct and special nuclear materials as may be produced by the operation of the facility, but not to separate such materials retained within the fuel cladding.
: 4. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Sections 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
A. Maximum Power Levels NMC (FPLE Point Beach) is authorized to operate the facility at reactor core power levels not in excess of 1540 megawatts thermal.
B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 229, are hereby incorporated in the renewed operating license.
NMC (FPLE Point Beach) shall operate the facility in accordance with Technical Specifications.
C. Spent Fuel Pool Modification The licensee 2 is authorized to modify the spent fuel storage pool to increase its storage capacity from 351 to 1502 assemblies as described in licensee's application dated March 21, 1978, as supplemented and amended. In the event that the on-site verification check for poison material in the poison assemblies discloses any missing boron plates, the NRC shall be notified and an on-site test on every poison assembly shall be performed.
2 Reference to the licensee in License Conditions 4.C and 4.E refers to Wisconsin Electric Power Company and is maintained for historical purposes.
Renewed License No. DPR-27 Amendment No. 229
 
D. Physical Protection NMC (FPLE Point Beach) shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: Nuclear Management Company Point Beach Nuclear Plant Physical Security Plan, (Revision 0), submitted by letter dated October 18, 2004.
E. Safety Injection Logic The licensee is authorized to modify the safety injection actuation logic and actuation power supplies and related changes as described in licensee's application for amendment dated April 27, 1979, as supplemented May 7, 1979. In the interim period until the power supply modification has been completed, should any DC powered safety injection actuation channel be in a failed condition for greater than one hour, the unit shall thereafter be shut down using normal procedures and placed in a block-permissive condition for safety injection actuation.
F. NMC (FPLE Point Beach) shall implement and maintain in effect all provisions of the approved fire protection program as described in the FSAR for the facility and as approved in the Safety Evaluation Report dated August 2, 1979 (and Supplements dated October 21, 1980, January 22, 1981, and July 27, 1988) and the safety evaluation issued January 8, 1997, for Technical Specifications Amendment No. 174, subject to the following provision:
NMC (FPLE Point Beach) may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
G. Secondary Water Chemistry Monitoring Program NMC (FPLE Point Beach) shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:
: 1. Identification of a sampling schedule for the critical parameters and control points for these parameters;
: 2. Identification of the procedures used to quantify parameters that are critical to control points;
: 3. Identification of process sampling points;
: 4. Procedure for the recording and management of data;
: 5. Procedures defining corrective actions for off control point chemistry condition; and Renewed License No. DPR-27
: 6. A procedure for identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.
H. The FSAR supplement, dated February 25, 2004, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the FSAR required by 10 CFR 50.71(e)(4) following the issuance of this renewed operating license. Until that update is complete, NMC (FPLE Point Beach) may make changes to the programs and activities described in the supplement without prior Commission approval, provided that NMC (FPLE Point Beach) evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
I. The FSAR supplement, dated February 25, 2004, as revised, describes certain future activities to be completed prior to the period of extended operation. NMC (FPLE Point Beach) shall complete these activities no later than March 8, 2013, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.
J. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.
K. Additional Conditions The additional conditions contained in Appendix C, as revised through Amendment No. 206, are hereby incorporated into this license. NMC (FPLE Point Beach) shall operate the facility in accordance with the additional conditions.
: 5. The issuance of this renewed operating license is without prejudice to subsequent licensing action which may be taken by the Commission with regard to the ongoing rulemaking hearing on the Interim Acceptance Criteria for Emergency Core Cooling Systems (Docket No. RM 50-1).
Renewed License No. DPR-27
: 6. This renewed operating license is effective as of the date of issuance, and shall expire at midnight on March 8, 2033.
FOR THE NUCLEAR REGULATORY COMMISSION
                                            /RA/
R. W. Borchardt, Deputy Director Office of Nuclear Reactor Regulation Attachments:
: 1. Appendix A -Technical Specifications
: 2. Appendix B - Environmental Technical Specifications
: 3. Appendix C - Additional Conditions Date of Issuance: December 22, 2005 Renewed License No. DPR-27
 
APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE DPR-24 FPL Energy Point Beach Nuclear Management Company, LLC shall comply with the following conditions and the schedules noted below:
Amendment                                                                                        Implementation Number      Additional Conditions                                                                    Date 174      Deleted 174      This amendment is authorized contingent on compliance with commitments                Immediately provided by the licensee to operate Point Beach Nuclear Plant in accordance with its service water system analyses and approved procedures. Specifically, each unit will utilize only one component cooling water heat exchanger until such time as analyses are completed and the service water system reconfigured as necessary to allow operation of one or both units with two heat exchangers in service. If two component cooling water heat exchangers are required in one or both units for maintaining acceptable component cooling water temperature prior to completion of necessary analyses to allow operation in the required configuration, the service water system will be considered in an unanalyzed condition, declared inoperable, and action taken as specified by TS LCO 3.0.3 except for short periods of time as necessary to effect procedurally controlled changes in system lineups and unit operating conditions.
201      The licensee is authorized to relocate certain Technical Specification                Immediately requirements previously included in Appendix A to licensee controlled documents, as described in Table R, Relocated Specifications and Removal of Details Matrix, attached to the NRC Staffs safety evaluation dated August 8, 2001. These requirements shall be relocated to the appropriate documents no later than December 31, 2001.
201      The schedule for performing Surveillance Requirements (SRs) that are new or            Immediately revised in Amendment 201 shall be as follows:
For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval that begins on the date of implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.
For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance is due at the end of the first surveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extended surveillance interval begins upon completion of the last surveillance performed prior to the implementation of this amendment.
Point Beach Unit 1                                C-1                                Amendment No. 201
 
APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE DPR-27 FPL Energy Point Beach Nuclear Management Company, LLC shall comply with the following conditions and the schedules noted below:
Amendment                                                                                        Implementation Number      Additional Conditions                                                                    Date 178      Deleted 178      This amendment is authorized contingent on compliance with commitments                Immediately provided by the licensee to operate Point Beach Nuclear Plant in accordance with its service water system analyses and approved procedures. Specifically, each unit will utilize only one component cooling water heat exchanger until such time as analyses are completed and the service water system reconfigured as necessary to allow operation of one or both units with two heat exchangers in service. If two component cooling water heat exchangers are required in one or both units for maintaining acceptable component cooling water temperature prior to completion of necessary analyses to allow operation in the required configuration, the service water system will be considered in an unanalyzed condition, declared inoperable, and action taken as specified by TS LCO 3.0.3 except for short periods of time as necessary to effect procedurally controlled changes in system lineups and unit operating conditions.
206      The licensee is authorized to relocate certain Technical Specification                Immediately requirements previously included in Appendix A to licensee controlled documents, as described in Table R, Relocated Specifications and Removal of Details Matrix, attached to the NRC Staffs safety evaluation dated August 8, 2001. These requirements shall be relocated to the appropriate documents no later than December 31, 2001.
206      The schedule for performing Surveillance Requirements (SRs) that are new or            Immediately revised in Amendment 206 shall be as follows:
For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval that begins on the date of implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.
For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance is due at the end of the first surveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extended surveillance interval begins upon completion of the last surveillance performed prior to the implementation of this amendment.
Point Beach Unit 2                                C-1                                Amendment No. 206
 
APPENDIX A TO FACILITY OPERATING LICENSE DPR-24 AND FACILITY OPERATING LICENSE DPR-27 FOR POINT BEACH NUCLEAR PLANT UNIT NOS. 1 AND 2 WISCONSIN ELECTRIC POWER COMPANY WISCONSIN MICHIGAN POWER COMPANY NUCLEAR MANAGEMENT COMPANY, LLC FPL ENERGY POINT BEACH, LLC DOCKET NOS. 50-266 AND 50-301
 
Design Features 4.0 4.0  DESIGN FEATURES 4.1  Site Location The Point Beach Nuclear Plant is located on property owned by Wisconsin Electric Power Company FPL Energy Point Beach, LLC at a site on the shore of Lake Michigan, approximately 30 miles southeast of the city of Green Bay. The minimum distance from the reactor containment center line to the site exclusion boundary as defined in 10 CFR 100.3 is 1200 meters.
 
4.2  Reactor Core 4.2.1  Fuel Assemblies The reactor shall contain 121 fuel assemblies. Each assembly shall consist of a matrix of Zircaloy-4 or ZIRLO TM fuel rods with an initial composition of natural or slightly enriched uranium dioxide (UO2 ) as fuel material. Limited substitutions of zirconium alloy or stainless steel filler rods or vacancies for fuel rods, in accordance with approved applications of fuel rod configurations, may be used. Fuel assemblies shall be limited to those fuel designs that have been analyzed with applicable NRC staff approved codes and methods and shown by tests or analyses to comply with all fuel safety design bases. A limited number of lead test assemblies that have not completed representative testing may be placed in nonlimiting core regions.
4.2.2  Rod Cluster Control (RCC) Assemblies The reactor core shall contain 33 RCC assemblies. The control material shall be silver indium cadmium alloy clad with stainless steel as approved by the NRC.
 
Point Beach                                4.0 - 6            Unit 1 - Amendment No. 201 Unit 2 - Amendment No. 206
 
APPENDIX B TO FACILITY OPERATING LICENSE DPR-24 AND FACILITY OPERATING LICENSE DPR-27 FOR POINT BEACH NUCLEAR PLANT UNIT NOS. 1 AND 2 WISCONSIN ELECTRIC POWER COMPANY WISCONSIN MICHIGAN POWER COMPANY NUCLEAR MANAGEMENT COMPANY, LLC FPL ENERGY POINT BEACH, LLC DOCKET NOS. 50-266 AND 50-301 Unit 1 - Amendment No. 197 Unit 2 - Amendment No. 202
: 16. NONRADIOLOGICAL TECHNICAL SPECIFICATIONS 16.1 Definitions The definitions for terms used in these Nonradiological Technical Specifications for Unit 1 and 2 are stated below.
WPDES Permit The WPDES permit is the Wisconsin Pollutant Discharge Elimination System Permit No. WI-0000957 issued by the State of Wisconsin Department of Natural Resources for FPL Energy Point Beach, LLC the Wisconsin Electric Power Company, Point Beach Nuclear Plant, and as subsequently amended.
Unit 1 - Amendment No. 109                        16.1-1                        December 3, 1987 Unit 2 - Amendment No. 112
 
Enclosure 1a Revised (Clean) Changes to the Facility Operating Licenses
 
FPL ENERGY POINT BEACH, LLC DOCKET NO. 50-266 RENEWED FACILITY OPERATING LICENSE Renewed License No. DPR-24
: 1. The Nuclear Regulatory Commission (NRC or the Commission), having previously made the findings set forth in License DPR-24 issued on October 5, 1970, has now found that:
A. The application to renew operating License No. DPR-24 filed by Nuclear Management Company, LLC (NMC) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter 1, and all required notifications to other agencies or bodies have been duly made; B. Construction of the Point Beach Nuclear Plant Unit 1 (the facility) has been substantially completed, in conformity with Provisional Construction Permit No. CPPR-32, as amended, the application as amended, the provisions of the Act, and the rules and regulations of the Commission; C. Actions have been identified and have been or will be taken with respect to (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1); and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by the renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, for the facility, and that any changes made to the facilitys current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commissions regulations; D. The facility will operate in conformity with the application as amended, the provisions of the Act, and the rules and regulations of the Commission; E. There is reasonable assurance (1) that the activities authorized by the renewed operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the regulations of the Commission set forth in 10 CFR Chapter 1; Amendment No.
 
F. (FPLE Point Beach) is technically and financially qualified to engage in the activities authorized by this renewed operating license in accordance with the regulations of the Commission set forth in 10 CFR Chapter 1; G. The applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements," have been satisfied; and H. The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public.
: 2. This renewed operating license applies to the Point Beach Nuclear Plant Unit 1, a closed cycle, pressurized, light water moderated and cooled reactor, and associated steam generators and electric generating equipment (the facility). The facility is located on the Point Beach site, in the Town of Two Creeks, Manitowoc County, Wisconsin, and is described in the Final Safety Analysis Report (FSAR), as supplemented and amended.
: 3. Subject to the conditions and requirements incorporated herein the Commission hereby licenses:
A. Pursuant to Section 104b of the Act and 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities," (FPLE Point Beach) to possess, use and operate the facility at the designated location on the Point Beach site in accordance with the procedures and limitations set forth in this renewed operating license; B. Pursuant to the Act and 10 CFR Part 70, (FPLE Point Beach) to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts, required for reactor operation, as described in Final Facility Description and Safety Analysis Report, as supplemented and amended as of March 17, 1976; C. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, (FPLE Point Beach) to receive, possess and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; Renewed License No. DPR-24 Amendment No.
 
D. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, (FPLE Point Beach) to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and E. Pursuant to the Act and 10 CFR Parts 30 and 70, (FPLE Point Beach) to possess such byproduct and special nuclear materials as may be produced by the operation of the facility, but not to separate such materials retained within the fuel cladding.
: 4. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Sections 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
A. Maximum Power Levels (FPLE Point Beach) is authorized to operate the facility at reactor core power levels not in excess of 1540 megawatts thermal.
B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 223, are hereby incorporated in the renewed operating license.
(FPLE Point Beach) shall operate the facility in accordance with Technical Specifications.
C. Spent Fuel Pool Modification The licensee is authorized to modify the spent fuel storage pool to increase its storage capacity from 351 to 1502 assemblies as described in licensee's application dated March 21, 1978, as supplemented and amended. In the event that the on-site verification check for poison material in the poison assemblies discloses any missing boron plates, the NRC shall be notified and an on-site test on every poison assembly shall be performed.
Renewed License No. DPR-24 Amendment No.
 
D. Physical Protection (FPLE Point Beach) shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: Nuclear Management Company Point Beach Nuclear Plant Physical Security Plan, (Revision 0), submitted by letter dated October 18, 2004.
E. Safety Injection Logic The licensee is authorized to modify the safety injection actuation logic and actuation power supplies and related changes as described in licensee's application for amendment dated April 27, 1979, as supplemented May 7, 1979. In the interim period until the power supply modification has been completed, should any DC powered safety injection actuation channel be in a failed condition for greater than one hour, the unit shall thereafter be shutdown using normal procedures and placed in a block-permissive condition for safety injection actuation.
F. (FPLE Point Beach) shall implement and maintain in effect all provisions of the approved fire protection program as described in the FSAR for the facility and as approved in the Safety Evaluation Report dated August 2, 1979 (and Supplements dated October 21, 1980, January 22, 1981, and July 27, 1988) and the safety evaluation issued January 8, 1997, for Technical Specification Amendment No. 170, subject to the following provision:
(FPLE Point Beach) may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
G. Secondary Water Chemistry Monitoring Program (FPLE Point Beach) shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:
: 1. Identification of a sampling schedule for the critical parameters and control points for these parameters;
: 2. Identification of the procedures used to quantify parameters that are critical to control points;
: 3. Identification of process sampling points;
: 4. Procedure for the recording and management of data;
: 5. Procedures defining corrective actions for off control point chemistry condition; and Renewed License No. DPR-24 Amendment No.
: 6. A procedure for identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.
H. The licensee is authorized to repair Unit 1 steam generators by replacement of major components. Repairs shall be conducted in accordance with the licensee's commitments identified in the Commission approved Point Beach Nuclear Plant Unit No. 1 Steam Generator Repair Report dated August 9, 1982 and revised March 1, 1983 and additional commitments identified in the staff's related safety evaluation.
I. The FSAR supplement, dated February 25, 2004, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the FSAR required by 10 CFR 50.71(e)(4) following the issuance of this renewed operating license. Until that update is complete, (FPLE Point Beach) may make changes to the programs and activities described in the supplement without prior Commission approval, provided that (FPLE Point Beach) evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
J. The FSAR supplement, dated February 25, 2004, as revised, describes certain future activities to be completed prior to the period of extended operation. (FPLE Point Beach) shall complete these activities no later than October 5, 2010, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.
K. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.
L. Additional Conditions The additional conditions contained in Appendix C, as revised through Amendment No. 201, are hereby incorporated into this license. (FPLE Point Beach) shall operate the facility in accordance with the additional conditions.
: 5. The issuance of this renewed operating license is without prejudice to subsequent licensing action which may be taken by the Commission with regard to the ongoing rulemaking hearing on the Interim Acceptance Criteria for Emergency Core Cooling Systems (Docket No. RM 50-1).
Renewed License No. DPR-24 Amendment No.
: 6. This renewed operating license is effective as of the date of issuance, and shall expire at midnight on October 5, 2030.
FOR THE NUCLEAR REGULATORY COMMISSION
                                              /RA/
R. W. Borchardt, Deputy Director Office of Nuclear Reactor Regulation Attachments:
: 1. Appendix A - Technical Specifications
: 2. Appendix B - Environmental Technical Specifications
: 3. Appendix C - Additional Conditions Date of Issuance: December 22, 2005 Renewed License No. DPR-24
 
FPL ENERGY POINT BEACH, LLC DOCKET NO. 50-301 RENEWED FACILITY OPERATING LICENSE Renewed License No. DPR-27
: 1. The Nuclear Regulatory Commission (NRC or the Commission), having previously made the findings set forth in License DPR-27 issued on March 8, 1973, has now found that:
A. The application to renew operating License No. DPR-27 filed by Nuclear Management Company, LLC (NMC) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter 1, and all required notifications to other agencies or bodies have been duly made; B. Construction of the Point Beach Nuclear Plant Unit 2 (the facility) has been substantially completed, in conformity with Provisional Construction Permit No. CPPR-47, the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. Actions have been identified and have been or will be taken with respect to (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1); and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by the renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, for the facility, and that any changes made to the facilitys current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commissions regulations; D. The facility will operate in conformity with the application as amended, the provisions of the Act, and the rules and regulations of the Commission; E. There is reasonable assurance (1) that the activities authorized by the renewed operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission; Amendment No.
 
F. (FPLE Point Beach) is technically and financially qualified to engage in the activities authorized by this renewed operating license in accordance with the rules and regulations of the Commission; G. (FPLE Point Beach) has satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements" of the Commission's regulations; H. The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public; and I. In accordance with the requirements of 10 CFR Part 51 (formerly Appendix D to Part 50), the renewed operating license should be issued subject to conditions for protection of the environment set forth in the Technical Specifications incorporated herein.
: 2. This renewed operating license applies to the Point Beach Nuclear Plant Unit 2, a closed cycle, pressurized, light water moderated and cooled reactor, and associated steam generators and electric generating equipment (the facility). The facility is located on the Point Beach site, in the Town of Two Creeks, Manitowoc County, Wisconsin, and is described in the Final Safety Analysis Report (FSAR), as supplemented and amended.
: 3. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
A. Pursuant to Section 104b of the Act and 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities," (FPLE Point Beach) to possess, use and operate the facility at the designated location on the Point Beach site in accordance with the procedures and limitations set forth in this renewed operating license; B. Pursuant to the Act and 10 CFR Part 70, (FPLE Point Beach) to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in Final Facility Description and Safety Analysis Report, as supplemented and amended as of March 17, 1976; Renewed License No. DPR-27 Amendment No.
 
C. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, (FPLE Point Beach) to receive, possess and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed source for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; D. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, (FPLE Point Beach) to receive, possess and use in amounts as required any byproduct, source of special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and E. Pursuant to the Act and 10 CFR Parts 30 and 70, (FPLE Point Beach) to possess such byproduct and special nuclear materials as may be produced by the operation of the facility, but not to separate such materials retained within the fuel cladding.
: 4. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Sections 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
A. Maximum Power Levels (FPLE Point Beach) is authorized to operate the facility at reactor core power levels not in excess of 1540 megawatts thermal.
B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 229, are hereby incorporated in the renewed operating license.
(FPLE Point Beach) shall operate the facility in accordance with Technical Specifications.
C. Spent Fuel Pool Modification The licensee is authorized to modify the spent fuel storage pool to increase its storage capacity from 351 to 1502 assemblies as described in licensee's application dated March 21, 1978, as supplemented and amended. In the event that the on-site verification check for poison material in the poison assemblies discloses any missing boron plates, the NRC shall be notified and an on-site test on every poison assembly shall be performed.
Renewed License No. DPR-27 Amendment No.
 
D. Physical Protection (FPLE Point Beach) shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: Nuclear Management Company Point Beach Nuclear Plant Physical Security Plan, (Revision 0), submitted by letter dated October 18, 2004.
E. Safety Injection Logic The licensee is authorized to modify the safety injection actuation logic and actuation power supplies and related changes as described in licensee's application for amendment dated April 27, 1979, as supplemented May 7, 1979. In the interim period until the power supply modification has been completed, should any DC powered safety injection actuation channel be in a failed condition for greater than one hour, the unit shall thereafter be shut down using normal procedures and placed in a block-permissive condition for safety injection actuation.
F. (FPLE Point Beach) shall implement and maintain in effect all provisions of the approved fire protection program as described in the FSAR for the facility and as approved in the Safety Evaluation Report dated August 2, 1979 (and Supplements dated October 21, 1980, January 22, 1981, and July 27, 1988) and the safety evaluation issued January 8, 1997, for Technical Specifications Amendment No. 174, subject to the following provision:
(FPLE Point Beach) may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
G. Secondary Water Chemistry Monitoring Program (FPLE Point Beach) shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:
: 1. Identification of a sampling schedule for the critical parameters and control points for these parameters;
: 2. Identification of the procedures used to quantify parameters that are critical to control points;
: 3. Identification of process sampling points;
: 4. Procedure for the recording and management of data;
: 5. Procedures defining corrective actions for off control point chemistry condition; and Renewed License No. DPR-27 Amendment No.
: 6. A procedure for identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.
H. The FSAR supplement, dated February 25, 2004, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the FSAR required by 10 CFR 50.71(e)(4) following the issuance of this renewed operating license. Until that update is complete, (FPLE Point Beach) may make changes to the programs and activities described in the supplement without prior Commission approval, provided that (FPLE Point Beach) evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
I. The FSAR supplement, dated February 25, 2004, as revised, describes certain future activities to be completed prior to the period of extended operation. (FPLE Point Beach) shall complete these activities no later than March 8, 2013, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.
J. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.
K. Additional Conditions The additional conditions contained in Appendix C, as revised through Amendment No. 206, are hereby incorporated into this license. (FPLE Point Beach) shall operate the facility in accordance with the additional conditions.
: 5. The issuance of this renewed operating license is without prejudice to subsequent licensing action which may be taken by the Commission with regard to the ongoing rulemaking hearing on the Interim Acceptance Criteria for Emergency Core Cooling Systems (Docket No. RM 50-1).
Renewed License No. DPR-27 Amendment No.
: 6. This renewed operating license is effective as of the date of issuance, and shall expire at midnight on March 8, 2033.
FOR THE NUCLEAR REGULATORY COMMISSION
                                            /RA/
R. W. Borchardt, Deputy Director Office of Nuclear Reactor Regulation Attachments:
: 1. Appendix A -Technical Specifications
: 2. Appendix B - Environmental Technical Specifications
: 3. Appendix C - Additional Conditions Date of Issuance: December 22, 2005 Renewed License No. DPR-27
 
APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE DPR-24 FPL Energy Point Beach, LLC shall comply with the following conditions and the schedules noted below:
Amendment                                                                                        Implementation Number    Additional Conditions                                                                    Date 174      Deleted 174      This amendment is authorized contingent on compliance with commitments                Immediately provided by the licensee to operate Point Beach Nuclear Plant in accordance with its service water system analyses and approved procedures. Specifically, each unit will utilize only one component cooling water heat exchanger until such time as analyses are completed and the service water system reconfigured as necessary to allow operation of one or both units with two heat exchangers in service. If two component cooling water heat exchangers are required in one or both units for maintaining acceptable component cooling water temperature prior to completion of necessary analyses to allow operation in the required configuration, the service water system will be considered in an unanalyzed condition, declared inoperable, and action taken as specified by TS LCO 3.0.3 except for short periods of time as necessary to effect procedurally controlled changes in system lineups and unit operating conditions.
201      The licensee is authorized to relocate certain Technical Specification                Immediately requirements previously included in Appendix A to licensee controlled documents, as described in Table R, Relocated Specifications and Removal of Details Matrix, attached to the NRC Staffs safety evaluation dated August 8, 2001. These requirements shall be relocated to the appropriate documents no later than December 31, 2001.
201      The schedule for performing Surveillance Requirements (SRs) that are new or            Immediately revised in Amendment 201 shall be as follows:
For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval that begins on the date of implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.
For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance is due at the end of the first surveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extended surveillance interval begins upon completion of the last surveillance performed prior to the implementation of this amendment.
Point Beach Unit 1                                C-1                                Amendment No.
 
APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE DPR-27 FPL Energy Point Beach, LLC shall comply with the following conditions and the schedules noted below:
Amendment                                                                                        Implementation Number    Additional Conditions                                                                    Date 178      Deleted 178      This amendment is authorized contingent on compliance with commitments                Immediately provided by the licensee to operate Point Beach Nuclear Plant in accordance with its service water system analyses and approved procedures. Specifically, each unit will utilize only one component cooling water heat exchanger until such time as analyses are completed and the service water system reconfigured as necessary to allow operation of one or both units with two heat exchangers in service. If two component cooling water heat exchangers are required in one or both units for maintaining acceptable component cooling water temperature prior to completion of necessary analyses to allow operation in the required configuration, the service water system will be considered in an unanalyzed condition, declared inoperable, and action taken as specified by TS LCO 3.0.3 except for short periods of time as necessary to effect procedurally controlled changes in system lineups and unit operating conditions.
206      The licensee is authorized to relocate certain Technical Specification                Immediately requirements previously included in Appendix A to licensee controlled documents, as described in Table R, Relocated Specifications and Removal of Details Matrix, attached to the NRC Staffs safety evaluation dated August 8, 2001. These requirements shall be relocated to the appropriate documents no later than December 31, 2001.
206      The schedule for performing Surveillance Requirements (SRs) that are new or            Immediately revised in Amendment 206 shall be as follows:
For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval that begins on the date of implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.
For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance is due at the end of the first surveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extended surveillance interval begins upon completion of the last surveillance performed prior to the implementation of this amendment.
Point Beach Unit 2                                C-1                                Amendment No.
 
APPENDIX A TO FACILITY OPERATING LICENSE DPR-24 AND FACILITY OPERATING LICENSE DPR-27 FOR POINT BEACH NUCLEAR PLANT UNIT NOS. 1 AND 2 FPL ENERGY POINT BEACH, LLC DOCKET NOS. 50-266 AND 50-301
 
Design Features 4.0 4.0  DESIGN FEATURES 4.1  Site Location The Point Beach Nuclear Plant is located on property owned by FPL Energy Point Beach, LLC at a site on the shore of Lake Michigan, approximately 30 miles southeast of the city of Green Bay. The minimum distance from the reactor containment center line to the site exclusion boundary as defined in 10 CFR 100.3 is 1200 meters.
 
4.2  Reactor Core 4.2.2  Fuel Assemblies The reactor shall contain 121 fuel assemblies. Each assembly shall consist of a matrix of Zircaloy-4 or ZIRLO TM fuel rods with an initial composition of natural or slightly enriched uranium dioxide (UO2 ) as fuel material. Limited substitutions of zirconium alloy or stainless steel filler rods or vacancies for fuel rods, in accordance with approved applications of fuel rod configurations, may be used. Fuel assemblies shall be limited to those fuel designs that have been analyzed with applicable NRC staff approved codes and methods and shown by tests or analyses to comply with all fuel safety design bases. A limited number of lead test assemblies that have not completed representative testing may be placed in nonlimiting core regions.
4.2.2  Rod Cluster Control (RCC) Assemblies The reactor core shall contain 33 RCC assemblies. The control material shall be silver indium cadmium alloy clad with stainless steel as approved by the NRC.
 
Point Beach                                4.0 - 6                Unit 1 - Amendment No.
Unit 2 - Amendment No.
 
APPENDIX B TO FACILITY OPERATING LICENSE DPR-24 AND FACILITY OPERATING LICENSE DPR-27 FOR POINT BEACH NUCLEAR PLANT UNIT NOS. 1 AND 2 FPL ENERGY POINT BEACH, LLC DOCKET NOS. 50-266 AND 50-301 Unit 1 - Amendment No.
Unit 2 - Amendment No.
: 16. NONRADIOLOGICAL TECHNICAL SPECIFICATIONS 16.1 Definitions The definitions for terms used in these Nonradiological Technical Specifications for Unit 1 and 2 are stated below.
WPDES Permit The WPDES permit is the Wisconsin Pollutant Discharge Elimination System Permit No. WI-0000957 issued by the State of Wisconsin Department of Natural Resources for FPL Energy Point Beach, LLC, Point Beach Nuclear Plant, and as subsequently amended.
Unit 1 - Amendment No.                            16.1-1 Unit 2 - Amendment No.
 
Enclosure 1b Application for Order and Conforming License Amendments to Transfer Facility Operating Licenses Proposed Changes to the Facility Operating Licenses Associated with the Proposed Transfer of Operating Authority for the Point Beach Nuclear Plant from Nuclear Management Company to FPL Energy Point Beach, LLC (for Interim Operating Option)
: 1.      Reason for the Changes.
Wisconsin Electric Power Company (WEPCO) desires to transfer operational authority over its Point Beach Nuclear Plant, located in Two Rivers, Wisconsin, to FPL Energy Point Beach, LLC (FPLE Point Beach), necessitating the submittal of conforming changes to the Facility Operating Licenses (including appendices) for the Units. The proposed changes delete references to Nuclear Management Company (NMC) as the operator of Point Beach and replace them with references to FPLE Point Beach. Other minor administrative changes are also being implemented as shown below to facilitate the transfer of the Licenses.
: 2.      Basis for the Changes.
After the transfer of the Licenses, NMC will retain no responsibility for the regulatory obligations contained in Licenses DPR-24 and DPR-27 for Point Beach. Accordingly, the entity to which that responsibility is being transferred, FPLE Point Beach, must be identified in the Facility Operating Licenses.
: 3.      Safety Assessment.
The proposed changes to the Facility Operating Licenses for Point Beach identify FPL Energy Point Beach as the operator of the facility and make minor changes that support the transfer of the Licenses. No physical modifications are being made to plant systems or components nor are any significant changes in day-to-day operation of the units being made. Therefore, the proposed changes are administrative in nature and will not adversely affect nuclear safety or safe plant operation.
: 4.      Description of the Proposed Changes.
The proposed changes to the Facility Operating Licenses for Point Beach include the following: (1) the deletion of references to NMC as operator of Point Beach, and (2) the authorization of FPLE Point Beach to possess, use, and operate Point Beach under essentially the same conditions and authorization included in the existing Licenses.
Both markups of the Facility Operating Licenses pages and clean, typed versions of those pages follow (additions are double-underlined; deletions are strikethrough).
 
FPL ENERGY POINT BEACH, LLC WISCONSIN ELECTRIC POWER COMPANY NUCLEAR MANAGEMENT COMPANY, LLC DOCKET NO. 50-266 RENEWED FACILITY OPERATING LICENSE Renewed License No. DPR-24
: 1. The Nuclear Regulatory Commission (NRC or the Commission), having previously made the findings set forth in License DPR-24 issued on October 5, 1970, has now found that:
A. The application to renew operating License No. DPR-24 filed by Nuclear Management Company, LLC (NMC) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter 1, and all required notifications to other agencies or bodies have been duly made; B. Construction of the Point Beach Nuclear Plant Unit 1 (the facility) has been substantially completed, in conformity with Provisional Construction Permit No. CPPR-32, as amended, the application as amended, the provisions of the Act, and the rules and regulations of the Commission; C. Actions have been identified and have been or will be taken with respect to (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1); and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by the renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, for the facility, and that any changes made to the facilitys current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commissions regulations; D. The facility will operate in conformity with the application as amended, the provisions of the Act, and the rules and regulations of the Commission; E. There is reasonable assurance (1) that the activities authorized by the renewed operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the regulations of the Commission set forth in 10 CFR Chapter 1;
 
F. NMC (FPLE Point Beach) is technically qualified and Wisconsin Electric Power Company 1 is financially qualified to engage in the activities authorized by this renewed operating license in accordance with the regulations of the Commission set forth in 10 CFR Chapter 1; G. The applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements," have been satisfied; and H. The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public.
: 2.      This renewed operating license applies to the Point Beach Nuclear Plant Unit 1, a closed cycle, pressurized, light water moderated and cooled reactor, and associated steam generators and electric generating equipment (the facility). The facility is located on the Point Beach site, in the Town of Two Creeks, Manitowoc County, Wisconsin, and is described in the Final Safety Analysis Report (FSAR), as supplemented and amended.
: 3.      Subject to the conditions and requirements incorporated herein the Commission hereby licenses:
A. Pursuant to Section 104b of the Act and 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities," Wisconsin Electric Power Company to possess, and (FPLE Point Beach) NMC to use and operate the facility at the designated location on the Point Beach site in accordance with the procedures and limitations set forth in this renewed operating license; B. Pursuant to the Act and 10 CFR Part 70, NMC (FPLE Point Beach) to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts, required for reactor operation, as described in Final Facility Description and Safety Analysis Report, as supplemented and amended as of March 17, 1976; C. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, NMC (FPLE Point Beach) to receive, possess and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; 1
On December 31, 1977, Wisconsin Electric Power Company and Wisconsin Michigan Power Company (formerly the licensees) merged with Wisconsin Electric Power Company surviving the merger. Effective on the date of the merger, Wisconsin Electric Power Company remained as the licensee. FPLE Point Beach NMC succeeds Nuclear Management Company, LLC, which succeeded Wisconsin Electric Power Company as operator of the Point Beach Nuclear Plant, Unit 1.
Consequently, FPLE Point Beach NMC is authorized to act as agent for Wisconsin Electric Power Company and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
Renewed License No. DPR-24
 
D. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, NMC (FPLE Point Beach) to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and E. Pursuant to the Act and 10 CFR Parts 30 and 70, NMC (FPLE Point Beach) to possess such byproduct and special nuclear materials as may be produced by the operation of the facility, but not to separate such materials retained within the fuel cladding.
: 4. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Sections 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
A. Maximum Power Levels NMC (FPLE Point Beach) is authorized to operate the facility at reactor core power levels not in excess of 1540 megawatts thermal.
B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 223, are hereby incorporated in the renewed operating license.
NMC (FPLE Point Beach) shall operate the facility in accordance with Technical Specifications.
C. Spent Fuel Pool Modification The licensee 2 is authorized to modify the spent fuel storage pool to increase its storage capacity from 351 to 1502 assemblies as described in licensee's application dated March 21, 1978, as supplemented and amended. In the event that the on-site verification check for poison material in the poison assemblies discloses any missing boron plates, the NRC shall be notified and an on-site test on every poison assembly shall be performed.
2 Reference to the licensee in License Conditions 4.C, 4.E and 4.H refers to Wisconsin Electric Power Company and is maintained for historical purposes.
Renewed License No. DPR-24 Amendment No. 223
 
D. Physical Protection NMC (FPLE Point Beach) shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: Nuclear Management Company Point Beach Nuclear Plant Physical Security Plan, (Revision 0), submitted by letter dated October 18, 2004.
E. Safety Injection Logic The licensee is authorized to modify the safety injection actuation logic and actuation power supplies and related changes as described in licensee's application for amendment dated April 27, 1979, as supplemented May 7, 1979. In the interim period until the power supply modification has been completed, should any DC powered safety injection actuation channel be in a failed condition for greater than one hour, the unit shall thereafter be shutdown using normal procedures and placed in a block-permissive condition for safety injection actuation.
F. NMC (FPLE Point Beach) shall implement and maintain in effect all provisions of the approved fire protection program as described in the FSAR for the facility and as approved in the Safety Evaluation Report dated August 2, 1979 (and Supplements dated October 21, 1980, January 22, 1981, and July 27, 1988) and the safety evaluation issued January 8, 1997, for Technical Specification Amendment No. 170, subject to the following provision:
NMC (FPLE Point Beach) may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
G. Secondary Water Chemistry Monitoring Program NMC (FPLE Point Beach) shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:
: 1. Identification of a sampling schedule for the critical parameters and control points for these parameters;
: 2. Identification of the procedures used to quantify parameters that are critical to control points;
: 3. Identification of process sampling points;
: 4. Procedure for the recording and management of data;
: 5. Procedures defining corrective actions for off control point chemistry condition; and Renewed License No. DPR-24
: 6. A procedure for identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.
H. The licensee is authorized to repair Unit 1 steam generators by replacement of major components. Repairs shall be conducted in accordance with the licensee's commitments identified in the Commission approved Point Beach Nuclear Plant Unit No. 1 Steam Generator Repair Report dated August 9, 1982 and revised March 1, 1983 and additional commitments identified in the staff's related safety evaluation.
I. The FSAR supplement, dated February 25, 2004, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the FSAR required by 10 CFR 50.71(e)(4) following the issuance of this renewed operating license. Until that update is complete, NMC (FPLE Point Beach) may make changes to the programs and activities described in the supplement without prior Commission approval, provided that NMC (FPLE Point Beach) evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
J. The FSAR supplement, dated February 25, 2004, as revised, describes certain future activities to be completed prior to the period of extended operation. NMC (FPLE Point Beach) shall complete these activities no later than October 5, 2010, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.
K. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.
L. Additional Conditions The additional conditions contained in Appendix C, as revised through Amendment No. 201, are hereby incorporated into this license. NMC (FPLE Point Beach) shall operate the facility in accordance with the additional conditions.
: 5. The issuance of this renewed operating license is without prejudice to subsequent licensing action which may be taken by the Commission with regard to the ongoing rulemaking hearing on the Interim Acceptance Criteria for Emergency Core Cooling Systems (Docket No. RM 50-1).
Renewed License No. DPR-24
: 6. This renewed operating license is effective as of the date of issuance, and shall expire at midnight on October 5, 2030.
FOR THE NUCLEAR REGULATORY COMMISSION
                                              /RA/
R. W. Borchardt, Deputy Director Office of Nuclear Reactor Regulation Attachments:
: 1. Appendix A - Technical Specifications
: 2. Appendix B - Environmental Technical Specifications
: 3. Appendix C - Additional Conditions Date of Issuance: December 22, 2005 Renewed License No. DPR-24
 
FPL ENERGY POINT BEACH, LLC WISCONSIN ELECTRIC POWER COMPANY NUCLEAR MANAGEMENT COMPANY, LLC DOCKET NO. 50-301 RENEWED FACILITY OPERATING LICENSE Renewed License No. DPR-27
: 1. The Nuclear Regulatory Commission (NRC or the Commission), having previously made the findings set forth in License DPR-27 issued on March 8, 1973, has now found that:
A. The application to renew operating License No. DPR-27 filed by Nuclear Management Company, LLC (NMC) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter 1, and all required notifications to other agencies or bodies have been duly made; B. Construction of the Point Beach Nuclear Plant Unit 2 (the facility) has been substantially completed, in conformity with Provisional Construction Permit No. CPPR-47, the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. Actions have been identified and have been or will be taken with respect to (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1); and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by the renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, for the facility, and that any changes made to the facilitys current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commissions regulations; D. The facility will operate in conformity with the application as amended, the provisions of the Act, and the rules and regulations of the Commission; E. There is reasonable assurance (1) that the activities authorized by the renewed operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission;
 
F. NMC (FPLE Point Beach) is technically qualified and Wisconsin Electric Power Company 1 is financially qualified to engage in the activities authorized by this renewed operating license in accordance with the rules and regulations of the Commission; G. The Wisconsin Electric Power Company and NMC (FPLE Point Beach) has satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements" of the Commission's regulations; H. The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public; and I. In accordance with the requirements of 10 CFR Part 51 (formerly Appendix D to Part 50), the renewed operating license should be issued subject to conditions for protection of the environment set forth in the Technical Specifications incorporated herein.
: 2.      This renewed operating license applies to the Point Beach Nuclear Plant Unit 2, a closed cycle, pressurized, light water moderated and cooled reactor, and associated steam generators and electric generating equipment (the facility). The facility is located on the Point Beach site, in the Town of Two Creeks, Manitowoc County, Wisconsin, and is described in the Final Safety Analysis Report (FSAR), as supplemented and amended.
: 3.      Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
A. Pursuant to Section 104b of the Act and 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities," Wisconsin Electric Power Company to possess, and (FPLE Point Beach) NMC to use and operate the facility at the designated location on the Point Beach site in accordance with the procedures and limitations set forth in this renewed operating license; B. Pursuant to the Act and 10 CFR Part 70, NMC (FPLE Point Beach) to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in Final Facility Description and Safety Analysis Report, as supplemented and amended as of March 17, 1976; 1
On December 31, 1977, Wisconsin Electric Power Company and Wisconsin Michigan Power Company (formerly the licensees) merged with Wisconsin Electric Power Company surviving the merger. Effective on the date of the merger, Wisconsin Electric Power Company remained as the licensee. FPL Energy Point Beach, Nuclear Management Company, LLC, hereinafter referred to as FPLE Point Beach NMC, succeeds Nuclear Management Company, LLC, which succeeded Wisconsin Electric Power Company as operator of the Point Beach Nuclear Plant, Unit 2. Consequently, FPLE Point Beach NMC is authorized to act as agent for Wisconsin Electric Power Company and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.
Renewed License No. DPR-27
 
C. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, NMC (FPLE Point Beach)to receive, possess and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed source for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; D. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, NMC (FPLE Point Beach) to receive, possess and use in amounts as required any byproduct, source of special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and E. Pursuant to the Act and 10 CFR Parts 30 and 70, NMC (FPLE Point Beach) to possess such byproduct and special nuclear materials as may be produced by the operation of the facility, but not to separate such materials retained within the fuel cladding.
: 4. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Sections 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
A. Maximum Power Levels NMC (FPLE Point Beach) is authorized to operate the facility at reactor core power levels not in excess of 1540 megawatts thermal.
B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 229, are hereby incorporated in the renewed operating license.
NMC (FPLE Point Beach) shall operate the facility in accordance with Technical Specifications.
C. Spent Fuel Pool Modification The licensee 2 is authorized to modify the spent fuel storage pool to increase its storage capacity from 351 to 1502 assemblies as described in licensee's application dated March 21, 1978, as supplemented and amended. In the event that the on-site verification check for poison material in the poison assemblies discloses any missing boron plates, the NRC shall be notified and an on-site test on every poison assembly shall be performed.
2 Reference to the licensee in License Conditions 4.C and 4.E refers to Wisconsin Electric Power Company and is maintained for historical purposes.
Renewed License No. DPR-27 Amendment No. 229
 
D. Physical Protection NMC (FPLE Point Beach) shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: Nuclear Management Company Point Beach Nuclear Plant Physical Security Plan, (Revision 0), submitted by letter dated October 18, 2004.
E. Safety Injection Logic The licensee is authorized to modify the safety injection actuation logic and actuation power supplies and related changes as described in licensee's application for amendment dated April 27, 1979, as supplemented May 7, 1979. In the interim period until the power supply modification has been completed, should any DC powered safety injection actuation channel be in a failed condition for greater than one hour, the unit shall thereafter be shut down using normal procedures and placed in a block-permissive condition for safety injection actuation.
F. NMC (FPLE Point Beach) shall implement and maintain in effect all provisions of the approved fire protection program as described in the FSAR for the facility and as approved in the Safety Evaluation Report dated August 2, 1979 (and Supplements dated October 21, 1980, January 22, 1981, and July 27, 1988) and the safety evaluation issued January 8, 1997, for Technical Specifications Amendment No. 174, subject to the following provision:
NMC (FPLE Point Beach)may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
G. Secondary Water Chemistry Monitoring Program NMC (FPLE Point Beach) shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:
: 1. Identification of a sampling schedule for the critical parameters and control points for these parameters;
: 2. Identification of the procedures used to quantify parameters that are critical to control points;
: 3. Identification of process sampling points;
: 4. Procedure for the recording and management of data;
: 5. Procedures defining corrective actions for off control point chemistry condition; and Renewed License No. DPR-27
: 6. A procedure for identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.
H. The FSAR supplement, dated February 25, 2004, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the FSAR required by 10 CFR 50.71(e)(4) following the issuance of this renewed operating license. Until that update is complete, NMC (FPLE Point Beach) may make changes to the programs and activities described in the supplement without prior Commission approval, provided that NMC (FPLE Point Beach) evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
I. The FSAR supplement, dated February 25, 2004, as revised, describes certain future activities to be completed prior to the period of extended operation. NMC (FPLE Point Beach) shall complete these activities no later than March 8, 2013, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.
J. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.
K. Additional Conditions The additional conditions contained in Appendix C, as revised through Amendment No. 206, are hereby incorporated into this license. NMC (FPLE Point Beach) shall operate the facility in accordance with the additional conditions.
: 5. The issuance of this renewed operating license is without prejudice to subsequent licensing action which may be taken by the Commission with regard to the ongoing rulemaking hearing on the Interim Acceptance Criteria for Emergency Core Cooling Systems (Docket No. RM 50-1).
Renewed License No. DPR-27
: 6. This renewed operating license is effective as of the date of issuance, and shall expire at midnight on March 8, 2033.
FOR THE NUCLEAR REGULATORY COMMISSION
                                            /RA/
R. W. Borchardt, Deputy Director Office of Nuclear Reactor Regulation Attachments:
: 1. Appendix A -Technical Specifications
: 2. Appendix B - Environmental Technical Specifications
: 3. Appendix C - Additional Conditions Date of Issuance: December 22, 2005 Renewed License No. DPR-27
 
APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE DPR-24 FPL Energy Point Beach Nuclear Management Company, LLC shall comply with the following conditions and the schedules noted below:
Amendment                                                                                        Implementation Number      Additional Conditions                                                                    Date 174      Deleted 174      This amendment is authorized contingent on compliance with commitments                Immediately provided by the licensee to operate Point Beach Nuclear Plant in accordance with its service water system analyses and approved procedures. Specifically, each unit will utilize only one component cooling water heat exchanger until such time as analyses are completed and the service water system reconfigured as necessary to allow operation of one or both units with two heat exchangers in service. If two component cooling water heat exchangers are required in one or both units for maintaining acceptable component cooling water temperature prior to completion of necessary analyses to allow operation in the required configuration, the service water system will be considered in an unanalyzed condition, declared inoperable, and action taken as specified by TS LCO 3.0.3 except for short periods of time as necessary to effect procedurally controlled changes in system lineups and unit operating conditions.
201      The licensee is authorized to relocate certain Technical Specification                Immediately requirements previously included in Appendix A to licensee controlled documents, as described in Table R, Relocated Specifications and Removal of Details Matrix, attached to the NRC Staffs safety evaluation dated August 8, 2001. These requirements shall be relocated to the appropriate documents no later than December 31, 2001.
201      The schedule for performing Surveillance Requirements (SRs) that are new or            Immediately revised in Amendment 201 shall be as follows:
For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval that begins on the date of implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.
For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance is due at the end of the first surveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extended surveillance interval begins upon completion of the last surveillance performed prior to the implementation of this amendment.
Point Beach Unit 1                                C-1                                Amendment No. 201
 
APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE DPR-27 FPL Energy Point Beach Nuclear Management Company, LLC shall comply with the following conditions and the schedules noted below:
Amendment                                                                                        Implementation Number      Additional Conditions                                                                    Date 178      Deleted 178      This amendment is authorized contingent on compliance with commitments                Immediately provided by the licensee to operate Point Beach Nuclear Plant in accordance with its service water system analyses and approved procedures. Specifically, each unit will utilize only one component cooling water heat exchanger until such time as analyses are completed and the service water system reconfigured as necessary to allow operation of one or both units with two heat exchangers in service. If two component cooling water heat exchangers are required in one or both units for maintaining acceptable component cooling water temperature prior to completion of necessary analyses to allow operation in the required configuration, the service water system will be considered in an unanalyzed condition, declared inoperable, and action taken as specified by TS LCO 3.0.3 except for short periods of time as necessary to effect procedurally controlled changes in system lineups and unit operating conditions.
206      The licensee is authorized to relocate certain Technical Specification                Immediately requirements previously included in Appendix A to licensee controlled documents, as described in Table R, Relocated Specifications and Removal of Details Matrix, attached to the NRC Staffs safety evaluation dated August 8, 2001. These requirements shall be relocated to the appropriate documents no later than December 31, 2001.
206      The schedule for performing Surveillance Requirements (SRs) that are new or            Immediately revised in Amendment 206 shall be as follows:
For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval that begins on the date of implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.
For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance is due at the end of the first surveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extended surveillance interval begins upon completion of the last surveillance performed prior to the implementation of this amendment.
Point Beach Unit 2                                C-1                                Amendment No. 206
 
APPENDIX A TO FACILITY OPERATING LICENSE DPR-24 AND FACILITY OPERATING LICENSE DPR-27 FOR POINT BEACH NUCLEAR PLANT UNIT NOS. 1 AND 2 WISCONSIN ELECTRIC POWER COMPANY WISCONSIN MICHIGAN POWER COMPANY NUCLEAR MANAGEMENT COMPANY, LLC FPL ENERGY POINT BEACH, LLC DOCKET NOS. 50-266 AND 50-301
 
APPENDIX B TO FACILITY OPERATING LICENSE DPR-24 AND FACILITY OPERATING LICENSE DPR-27 FOR POINT BEACH NUCLEAR PLANT UNIT NOS. 1 AND 2 WISCONSIN ELECTRIC POWER COMPANY WISCONSIN MICHIGAN POWER COMPANY NUCLEAR MANAGEMENT COMPANY, LLC FPL ENERGY POINT BEACH, LLC DOCKET NOS. 50-266 AND 50-301 Unit 1 - Amendment No. 197 Unit 2 - Amendment No. 202
 
Enclosure 1b Revised (Clean) Changes to the Facility Operating Licenses
 
FPL ENERGY POINT BEACH, LLC WISCONSIN ELECTRIC POWER COMPANY DOCKET NO. 50-266 RENEWED FACILITY OPERATING LICENSE Renewed License No. DPR-24
: 1. The Nuclear Regulatory Commission (NRC or the Commission), having previously made the findings set forth in License DPR-24 issued on October 5, 1970, has now found that:
A. The application to renew operating License No. DPR-24 filed by Nuclear Management Company, LLC (NMC) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter 1, and all required notifications to other agencies or bodies have been duly made; B. Construction of the Point Beach Nuclear Plant Unit 1 (the facility) has been substantially completed, in conformity with Provisional Construction Permit No. CPPR-32, as amended, the application as amended, the provisions of the Act, and the rules and regulations of the Commission; C. Actions have been identified and have been or will be taken with respect to (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1); and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by the renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, for the facility, and that any changes made to the facilitys current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commissions regulations; D. The facility will operate in conformity with the application as amended, the provisions of the Act, and the rules and regulations of the Commission; E. There is reasonable assurance (1) that the activities authorized by the renewed operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the regulations of the Commission set forth in 10 CFR Chapter 1; Amendment No.
 
F. (FPLE Point Beach) is technically qualified and Wisconsin Electric Power Company 1 is financially qualified to engage in the activities authorized by this renewed operating license in accordance with the regulations of the Commission set forth in 10 CFR Chapter 1; G. The applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements," have been satisfied; and H. The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public.
: 2.      This renewed operating license applies to the Point Beach Nuclear Plant Unit 1, a closed cycle, pressurized, light water moderated and cooled reactor, and associated steam generators and electric generating equipment (the facility). The facility is located on the Point Beach site, in the Town of Two Creeks, Manitowoc County, Wisconsin, and is described in the Final Safety Analysis Report (FSAR), as supplemented and amended.
: 3.      Subject to the conditions and requirements incorporated herein the Commission hereby licenses:
A. Pursuant to Section 104b of the Act and 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities," Wisconsin Electric Power Company to possess, and (FPLE Point Beach) to use and operate the facility at the designated location on the Point Beach site in accordance with the procedures and limitations set forth in this renewed operating license; B. Pursuant to the Act and 10 CFR Part 70, (FPLE Point Beach) to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts, required for reactor operation, as described in Final Facility Description and Safety Analysis Report, as supplemented and amended as of March 17, 1976; C. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, (FPLE Point Beach) to receive, possess and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; 1
On December 31, 1977, Wisconsin Electric Power Company and Wisconsin Michigan Power Company (formerly the licensees) merged with Wisconsin Electric Power Company surviving the merger. Effective on the date of the merger, Wisconsin Electric Power Company remained as the licensee. FPLE Point Beach succeeds Nuclear Management Company, LLC, which succeeded Wisconsin Electric Power Company as operator of the Point Beach Nuclear Plant, Unit 1.
Consequently, FPLE Point Beach is authorized to act as agent for Wisconsin Electric Power Company and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
Renewed License No. DPR-24 Amendment No.
 
D. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, (FPLE Point Beach) to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and E. Pursuant to the Act and 10 CFR Parts 30 and 70, (FPLE Point Beach) to possess such byproduct and special nuclear materials as may be produced by the operation of the facility, but not to separate such materials retained within the fuel cladding.
: 4. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Sections 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
A. Maximum Power Levels (FPLE Point Beach) is authorized to operate the facility at reactor core power levels not in excess of 1540 megawatts thermal.
B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 223, are hereby incorporated in the renewed operating license.
(FPLE Point Beach) shall operate the facility in accordance with Technical Specifications.
C. Spent Fuel Pool Modification The licensee 2 is authorized to modify the spent fuel storage pool to increase its storage capacity from 351 to 1502 assemblies as described in licensee's application dated March 21, 1978, as supplemented and amended. In the event that the on-site verification check for poison material in the poison assemblies discloses any missing boron plates, the NRC shall be notified and an on-site test on every poison assembly shall be performed.
2 Reference to the licensee in License Conditions 4.C, 4.E and 4.H refers to Wisconsin Electric Power Company and is maintained for historical purposes.
Renewed License No. DPR-24 Amendment No.
 
D. Physical Protection (FPLE Point Beach) shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: Nuclear Management Company Point Beach Nuclear Plant Physical Security Plan, (Revision 0), submitted by letter dated October 18, 2004.
E. Safety Injection Logic The licensee is authorized to modify the safety injection actuation logic and actuation power supplies and related changes as described in licensee's application for amendment dated April 27, 1979, as supplemented May 7, 1979. In the interim period until the power supply modification has been completed, should any DC powered safety injection actuation channel be in a failed condition for greater than one hour, the unit shall thereafter be shutdown using normal procedures and placed in a block-permissive condition for safety injection actuation.
F. (FPLE Point Beach) shall implement and maintain in effect all provisions of the approved fire protection program as described in the FSAR for the facility and as approved in the Safety Evaluation Report dated August 2, 1979 (and Supplements dated October 21, 1980, January 22, 1981, and July 27, 1988) and the safety evaluation issued January 8, 1997, for Technical Specification Amendment No. 170, subject to the following provision:
(FPLE Point Beach) may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
G. Secondary Water Chemistry Monitoring Program (FPLE Point Beach) shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:
: 1. Identification of a sampling schedule for the critical parameters and control points for these parameters;
: 2. Identification of the procedures used to quantify parameters that are critical to control points;
: 3. Identification of process sampling points;
: 4. Procedure for the recording and management of data;
: 5. Procedures defining corrective actions for off control point chemistry condition; and Renewed License No. DPR-24 Amendment No.
: 6. A procedure for identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.
H. The licensee is authorized to repair Unit 1 steam generators by replacement of major components. Repairs shall be conducted in accordance with the licensee's commitments identified in the Commission approved Point Beach Nuclear Plant Unit No. 1 Steam Generator Repair Report dated August 9, 1982 and revised March 1, 1983 and additional commitments identified in the staff's related safety evaluation.
I. The FSAR supplement, dated February 25, 2004, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the FSAR required by 10 CFR 50.71(e)(4) following the issuance of this renewed operating license. Until that update is complete, (FPLE Point Beach) may make changes to the programs and activities described in the supplement without prior Commission approval, provided that (FPLE Point Beach) evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
J. The FSAR supplement, dated February 25, 2004, as revised, describes certain future activities to be completed prior to the period of extended operation. (FPLE Point Beach) shall complete these activities no later than October 5, 2010, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.
K. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.
L. Additional Conditions The additional conditions contained in Appendix C, as revised through Amendment No. 201, are hereby incorporated into this license. (FPLE Point Beach) shall operate the facility in accordance with the additional conditions.
: 5. The issuance of this renewed operating license is without prejudice to subsequent licensing action which may be taken by the Commission with regard to the ongoing rulemaking hearing on the Interim Acceptance Criteria for Emergency Core Cooling Systems (Docket No. RM 50-1).
Renewed License No. DPR-24 Amendment No.
: 6. This renewed operating license is effective as of the date of issuance, and shall expire at midnight on October 5, 2030.
FOR THE NUCLEAR REGULATORY COMMISSION
                                              /RA/
R. W. Borchardt, Deputy Director Office of Nuclear Reactor Regulation Attachments:
: 1. Appendix A - Technical Specifications
: 2. Appendix B - Environmental Technical Specifications
: 3. Appendix C - Additional Conditions Date of Issuance: December 22, 2005 Renewed License No. DPR-24
 
FPL ENERGY POINT BEACH, LLC WISCONSIN ELECTRIC POWER COMPANY DOCKET NO. 50-301 RENEWED FACILITY OPERATING LICENSE Renewed License No. DPR-27
: 1. The Nuclear Regulatory Commission (NRC or the Commission), having previously made the findings set forth in License DPR-27 issued on March 8, 1973, has now found that:
A. The application to renew operating License No. DPR-27 filed by Nuclear Management Company, LLC (NMC) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter 1, and all required notifications to other agencies or bodies have been duly made; B. Construction of the Point Beach Nuclear Plant Unit 2 (the facility) has been substantially completed, in conformity with Provisional Construction Permit No. CPPR-47, the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. Actions have been identified and have been or will be taken with respect to (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1); and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by the renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, for the facility, and that any changes made to the facilitys current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commissions regulations; D. The facility will operate in conformity with the application as amended, the provisions of the Act, and the rules and regulations of the Commission; E. There is reasonable assurance (1) that the activities authorized by the renewed operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission; Amendment No.
 
F. (FPLE Point Beach) is technically qualified and Wisconsin Electric Power Company 1 is financially qualified to engage in the activities authorized by this renewed operating license in accordance with the rules and regulations of the Commission; G. The Wisconsin Electric Power Company and (FPLE Point Beach) has satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements" of the Commission's regulations; H. The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public; and I. In accordance with the requirements of 10 CFR Part 51 (formerly Appendix D to Part 50), the renewed operating license should be issued subject to conditions for protection of the environment set forth in the Technical Specifications incorporated herein.
: 2.      This renewed operating license applies to the Point Beach Nuclear Plant Unit 2, a closed cycle, pressurized, light water moderated and cooled reactor, and associated steam generators and electric generating equipment (the facility). The facility is located on the Point Beach site, in the Town of Two Creeks, Manitowoc County, Wisconsin, and is described in the Final Safety Analysis Report (FSAR), as supplemented and amended.
: 3.      Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
A. Pursuant to Section 104b of the Act and 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities," Wisconsin Electric Power Company to possess, and (FPLE Point Beach) to use and operate the facility at the designated location on the Point Beach site in accordance with the procedures and limitations set forth in this renewed operating license; B. Pursuant to the Act and 10 CFR Part 70, (FPLE Point Beach) to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in Final Facility Description and Safety Analysis Report, as supplemented and amended as of March 17, 1976; 1
On December 31, 1977, Wisconsin Electric Power Company and Wisconsin Michigan Power Company (formerly the licensees) merged with Wisconsin Electric Power Company surviving the merger. Effective on the date of the merger, Wisconsin Electric Power Company remained as the licensee. FPL Energy Point Beach, LLC, hereinafter referred to as FPLE Point Beach, succeeds Nuclear Management Company, LLC, which succeeded Wisconsin Electric Power Company as operator of the Point Beach Nuclear Plant, Unit 2. Consequently, FPLE Point Beach is authorized to act as agent for Wisconsin Electric Power Company and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.
Renewed License No. DPR-27 Amendment No.
 
C. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, (FPLE Point Beach)to receive, possess and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed source for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; D. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, (FPLE Point Beach) to receive, possess and use in amounts as required any byproduct, source of special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and E. Pursuant to the Act and 10 CFR Parts 30 and 70, (FPLE Point Beach) to possess such byproduct and special nuclear materials as may be produced by the operation of the facility, but not to separate such materials retained within the fuel cladding.
: 4. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Sections 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
A. Maximum Power Levels (FPLE Point Beach) is authorized to operate the facility at reactor core power levels not in excess of 1540 megawatts thermal.
B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 229, are hereby incorporated in the renewed operating license.
(FPLE Point Beach) shall operate the facility in accordance with Technical Specifications.
C. Spent Fuel Pool Modification The licensee 2 is authorized to modify the spent fuel storage pool to increase its storage capacity from 351 to 1502 assemblies as described in licensee's application dated March 21, 1978, as supplemented and amended. In the event that the on-site verification check for poison material in the poison assemblies discloses any missing boron plates, the NRC shall be notified and an on-site test on every poison assembly shall be performed.
2 Reference to the licensee in License Conditions 4.C and 4.E refers to Wisconsin Electric Power Company and is maintained for historical purposes.
Renewed License No. DPR-27 Amendment No.
 
D. Physical Protection (FPLE Point Beach) shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: Nuclear Management Company Point Beach Nuclear Plant Physical Security Plan, (Revision 0), submitted by letter dated October 18, 2004.
E. Safety Injection Logic The licensee is authorized to modify the safety injection actuation logic and actuation power supplies and related changes as described in licensee's application for amendment dated April 27, 1979, as supplemented May 7, 1979. In the interim period until the power supply modification has been completed, should any DC powered safety injection actuation channel be in a failed condition for greater than one hour, the unit shall thereafter be shut down using normal procedures and placed in a block-permissive condition for safety injection actuation.
F. (FPLE Point Beach) shall implement and maintain in effect all provisions of the approved fire protection program as described in the FSAR for the facility and as approved in the Safety Evaluation Report dated August 2, 1979 (and Supplements dated October 21, 1980, January 22, 1981, and July 27, 1988) and the safety evaluation issued January 8, 1997, for Technical Specifications Amendment No. 174, subject to the following provision:
(FPLE Point Beach) may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
G. Secondary Water Chemistry Monitoring Program (FPLE Point Beach) shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:
: 1. Identification of a sampling schedule for the critical parameters and control points for these parameters;
: 2. Identification of the procedures used to quantify parameters that are critical to control points;
: 3. Identification of process sampling points;
: 4. Procedure for the recording and management of data;
: 5. Procedures defining corrective actions for off control point chemistry condition; and Renewed License No. DPR-27 Amendment No.
: 6. A procedure for identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.
H. The FSAR supplement, dated February 25, 2004, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the FSAR required by 10 CFR 50.71(e)(4) following the issuance of this renewed operating license. Until that update is complete, (FPLE Point Beach) may make changes to the programs and activities described in the supplement without prior Commission approval, provided that (FPLE Point Beach) evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
I. The FSAR supplement, dated February 25, 2004, as revised, describes certain future activities to be completed prior to the period of extended operation. (FPLE Point Beach) shall complete these activities no later than March 8, 2013, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.
J. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.
K. Additional Conditions The additional conditions contained in Appendix C, as revised through Amendment No. 206, are hereby incorporated into this license. (FPLE Point Beach) shall operate the facility in accordance with the additional conditions.
: 5. The issuance of this renewed operating license is without prejudice to subsequent licensing action which may be taken by the Commission with regard to the ongoing rulemaking hearing on the Interim Acceptance Criteria for Emergency Core Cooling Systems (Docket No. RM 50-1).
Renewed License No. DPR-27 Amendment No.
: 6. This renewed operating license is effective as of the date of issuance, and shall expire at midnight on March 8, 2033.
FOR THE NUCLEAR REGULATORY COMMISSION
                                            /RA/
R. W. Borchardt, Deputy Director Office of Nuclear Reactor Regulation Attachments:
: 1. Appendix A -Technical Specifications
: 2. Appendix B - Environmental Technical Specifications
: 3. Appendix C - Additional Conditions Date of Issuance: December 22, 2005 Renewed License No. DPR-27
 
APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE DPR-24 FPL Energy Point Beach, LLC shall comply with the following conditions and the schedules noted below:
Amendment                                                                                        Implementation Number    Additional Conditions                                                                    Date 174      Deleted 174      This amendment is authorized contingent on compliance with commitments                Immediately provided by the licensee to operate Point Beach Nuclear Plant in accordance with its service water system analyses and approved procedures. Specifically, each unit will utilize only one component cooling water heat exchanger until such time as analyses are completed and the service water system reconfigured as necessary to allow operation of one or both units with two heat exchangers in service. If two component cooling water heat exchangers are required in one or both units for maintaining acceptable component cooling water temperature prior to completion of necessary analyses to allow operation in the required configuration, the service water system will be considered in an unanalyzed condition, declared inoperable, and action taken as specified by TS LCO 3.0.3 except for short periods of time as necessary to effect procedurally controlled changes in system lineups and unit operating conditions.
201      The licensee is authorized to relocate certain Technical Specification                Immediately requirements previously included in Appendix A to licensee controlled documents, as described in Table R, Relocated Specifications and Removal of Details Matrix, attached to the NRC Staffs safety evaluation dated August 8, 2001. These requirements shall be relocated to the appropriate documents no later than December 31, 2001.
201      The schedule for performing Surveillance Requirements (SRs) that are new or            Immediately revised in Amendment 201 shall be as follows:
For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval that begins on the date of implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.
For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance is due at the end of the first surveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extended surveillance interval begins upon completion of the last surveillance performed prior to the implementation of this amendment.
Point Beach Unit 1                                C-1                                Amendment No.
 
APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE DPR-27 FPL Energy Point Beach, LLC shall comply with the following conditions and the schedules noted below:
Amendment                                                                                        Implementation Number    Additional Conditions                                                                    Date 178      Deleted 178      This amendment is authorized contingent on compliance with commitments                Immediately provided by the licensee to operate Point Beach Nuclear Plant in accordance with its service water system analyses and approved procedures. Specifically, each unit will utilize only one component cooling water heat exchanger until such time as analyses are completed and the service water system reconfigured as necessary to allow operation of one or both units with two heat exchangers in service. If two component cooling water heat exchangers are required in one or both units for maintaining acceptable component cooling water temperature prior to completion of necessary analyses to allow operation in the required configuration, the service water system will be considered in an unanalyzed condition, declared inoperable, and action taken as specified by TS LCO 3.0.3 except for short periods of time as necessary to effect procedurally controlled changes in system lineups and unit operating conditions.
206      The licensee is authorized to relocate certain Technical Specification                Immediately requirements previously included in Appendix A to licensee controlled documents, as described in Table R, Relocated Specifications and Removal of Details Matrix, attached to the NRC Staffs safety evaluation dated August 8, 2001. These requirements shall be relocated to the appropriate documents no later than December 31, 2001.
206      The schedule for performing Surveillance Requirements (SRs) that are new or            Immediately revised in Amendment 206 shall be as follows:
For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval that begins on the date of implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.
For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance is due at the end of the first surveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extended surveillance interval begins upon completion of the last surveillance performed prior to the implementation of this amendment.
Point Beach Unit 2                                C-1                                Amendment No.
 
APPENDIX A TO FACILITY OPERATING LICENSE DPR-24 AND FACILITY OPERATING LICENSE DPR-27 FOR POINT BEACH NUCLEAR PLANT UNIT NOS. 1 AND 2 WISCONSIN ELECTRIC POWER COMPANY WISCONSIN MICHIGAN POWER COMPANY FPL ENERGY POINT BEACH, LLC DOCKET NOS. 50-266 AND 50-301
 
APPENDIX B TO FACILITY OPERATING LICENSE DPR-24 AND FACILITY OPERATING LICENSE DPR-27 FOR POINT BEACH NUCLEAR PLANT UNIT NOS. 1 AND 2 WISCONSIN ELECTRIC POWER COMPANY WISCONSIN MICHIGAN POWER COMPANY FPL ENERGY POINT BEACH, LLC DOCKET NOS. 50-266 AND 50-301 Unit 1 - Amendment No. 197 Unit 2 - Amendment No. 202
 
Enclosure 2 Application for Order and Conforming License Amendments to Transfer Facility Operating Licenses FPL Energy Point Beach, LLC Corporate Structure FPL Group S&P    Issuer Rating A S&P    Senior Unsec. A -
Moodys NA FP&L                                        FPL Group Capital S&P    Issuer        A S&P    Issuer        A S&P    Senior Sec. A S&P    Senior Unsec. A -
Moodys Issuer        A1 Moodys Senior Unsec A2 Senior Sec. AA3 Fibernet                    FPL Energy ESI Other FPL Energy Point Beach, LLC Subsidiaries
 
Enclosure 3 Application for Order and Conforming License Amendments to Transfer Facility Operating Licenses FPL Group, Inc. Annual Report and 10K for 2005
 
UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 10-K
[XI ANNUAL REPORT PURSUANT TO SECTION 1 3 OR 15(d)
OF THE SECURITIES EXCHANGE ACT OF 1934 For the fiscal year ended        December 31, 2005
[ ] TRANSITION REPORT PURSUANT TO SECTION 1 3 OR 15(d)
OF THE SECURITIES EXCHANGE ACT OF 1934 Commission                                              Exact name of registrants as specified in their                                            IRS Employer File                                            charters, address of principal executive offices and                                          Identification Number                                                        registrants' telephone number                                                        Number 59-244941 9 FPL GROUP, INC.
FLORIDA POWER & LIGHT COMPANY                                                                        59-0247775 7 0 0 Universe Boulevard Juno Beach, Florida 33408 (561) 694-4000 State or other jurisdiction of incorporation or organization:                                    Florida Name of exchange on which registered Securities registered pursuant to Section 12(b) of the Act:
FPL Group, Inc.: Common Stock, $0.01 Par Value and Preferred Share Purchase Rights                                                  New York Stock Exchange Florida Power & Light Company: None Securities registered pursuant to Section 12(g) of the Act: None lndicate by check mark if the registrants are well-known seasoned issuers, as defined in Rule 405 of the Securities Act of 1933 FPL Group, lnc. Yes A No              -                        Florida Power & Light Company Yes      -      No X lndicate by check mark if the registrants are not required to file reports pursuant to Section 13 or Section 15(d) of the Securities Exchange Act of 1934.
FPL Group, Inc. Yes - No A                                      Florida Power & Light Company Yes X No              -
lndicate by check mark whether the registrants (1) have filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months and (2) have been subject to such filing requirements for the past 90 days FPL Group, lnc. Yes                No -                        Florida Power & Light Company Yes - No A lndicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K is not contained herein, and will not be contained, to the best of registrants' knowledge, in definitive proxy or information statements incorporated by reference in Part Ill of this Form 10-K or any amendment to this Form 10-K. [ ]
lndicate by check mark whether the registrants are a large accelerated filer, an accelerated filer, or a non-accelerated filer. See definition of "large accelerated filer and accelerated file? in Rule 12b-2 of the Securities Exchange Act of 1934.
FPL Group, lnc. Large Accelerated Filer A Accelerated Filer            -    Non-Accelerated Filer -
Florida Power & Light Company Large Accelerated Filer -Accelerated Filer          -      Non-Accelerated Filer A lndicate by check mark whether the registrants are shell companies (as defined in Rule 12b-2 of the Securities Exchange Act of 1934). Yes - No Aggregate market value of the voting and non-voting common equity of FPL Group, Inc. held by non-affiliates as of June 30, 2005 (based on the closing market price on the Composite Tape on June 30, 2005) was $16,536,560,740, There was no voting or non-voting common equity of Florida Power & Light Company held by non-affiliates as of June 30. 2005.
The number of shares outstanding of FPL Group, Inc. common stock, as of the latest practicable date: Common Stock, $0.01 par value, outstanding at January 31, 2006: 394,857,526 shares.
As of January 31, 2006, there were issued and outstanding 1,000 shares of Florida Power & Light Company common stock, without par value, all of which were held, beneficially and of record, by FPL Group, Inc.
DOCUMENTS INCORPORATED BY REFERENCE Portions of FPL Group, Inc.'s Proxy Statement for the 2006 Annual Meeting of Shareholders are incorporated by reference in Part Ill hereof This combined Form 10-K represents separate filings by FPL Group, Inc. and Florida Power & Light Company. Information contained herein relating to an individual registrant is filed by that registrant on its own behalf. Florida Power & Light Company makes no representations as to the information relating to FPL Group, Inc.'s other operations.
Florida Power & Light Company meets the conditions set forth under General Instruction (I)(l)(a) and (b) of Form 10-K and is therefore filing this form with reduced disclosure format.
 
DEFINITIONS Acronyms and defined terms used in the text include the following:
Term                                Meaning AFUDC                                allowance for funds used during construction BART                                Best Available Retrofit Technology capacity clause                      capacity cost recovery clause, as established by the FPSC charter                              restated articles of incorporation, as amended, of FPL Group or FPL, as the case may be Constellation Energy                Constellation Energy Group, Inc.
CRDM                                control rod drive mechanism DOE                                  U.S. Department of Energy Duane Arnold                        Duane Arnold Energy Center EMF                                  electric and magnetic fields EMT                                  Energy Marketing & Trading 2005 Energy Act                      Energy Policy Act of 2005 environmental clause                environmental compliance cost recovery clause, as established by the FPSC ERCOT                                Electric Reliability Council of Texas EPA                                  U.S. Environmental Protection Agency FAS                                  Statement of Financial Accounting Standards No.
FASB                                Financial Accounting Standards Board FDEP                                Florida Department of Environmental Protection FERC                                Federal Energy Regulatory Commission FGT                                  Florida Gas Transmission Company FIN                                  FASB Interpretation No.
FMPA                                Florida Municipal Power Agency FPL                                  Florida Power & Light Company FPL Energy                          FPL Energy, LLC FPL FiberNet                        FPL FiberNet, LLC FPL Group                            FPL Group, Inc.
FPL Group Capital                    FPL Group Capital Inc FPSC                                Florida Public Service Commission fuel clause                          fuel and purchased power cost recovery clause, as established by the FPSC Gexa                                Gexa Energy, LP GridFlorida                          GridFlorida LLC Gulfstream                          Gulfstream Natural Gas System, L.L.C.
Holding Company Act                  Holding Company Act of 2005 IARC                                International Agency for Research on Cancer IRS                                  Internal Revenue Service ISO                                  independent system operator kv                                  kilovolt kwh                                  kilowatt-hour LIBOR                                London InterBank Offered Rate Managements Discussion              Item 7. Managements Discussion and Analysis of Financial Condition and Results of Operations MAPP                                Mid-Continent Area Power Pool mortgage                            mortgage and deed of trust dated as of January 1, 1944, from FPL to Deutsche Bank Trust Company Americas, as supplemented and amended mw                                  megawatt(s)
NEPOOL                              New England Power Pool NERC                                North American Electric Reliability Council Note ___                            note ___ to consolidated financial statements NRC                                  U.S. Nuclear Regulatory Commission Nuclear Waste Policy Act            Nuclear Waste Policy Act of 1982 NYPP                                New York Power Pool O&M expenses                        other operations and maintenance expenses in the consolidated statements of income PJM                                  PJM Interconnection, L.L.C.
PMI                                  FPL Energy Power Marketing, Inc.
PTC                                  production tax credits PURPA                                Public Utility Regulatory Policies Act of 1978, as amended qualifying facilities                non-utility power production facilities meeting the requirements of a qualifying facility under the PURPA RFC                                  ReliabilityFirst Corporation RFP                                  request for proposal ROE                                  return on common equity RTO                                  regional transmission organization Seabrook                            Seabrook Station SEC                                  U.S. Securities and Exchange Commission SERC                                Southeastern Electric Reliability Council SPP                                  Southwest Power Pool VIE                                  variable interest entity WECC                                Western Electricity Coordinating Council FPL Group, FPL, FPL Group Capital and FPL Energy each have subsidiaries and affiliates with names that include FPL, FPL Energy, FPLE and similar references. For convenience and simplicity, in this report the terms FPL Group, FPL, FPL Group Capital and FPL Energy are sometimes used as abbreviated references to specific subsidiaries, affiliates or groups of subsidiaries or affiliates. The precise meaning depends on the context.
2
 
TABLE OF CONTENTS Page No.
Definitions                                                                                                                    2 Forward-Looking Statements                                                                                                    3 PART I Item 1.      Business                                                                                                        4 Item 1A.      Risk Factors                                                                                                    15 Item 1B.      Unresolved Staff Comments                                                                                      18 Item 2.      Properties                                                                                                      18 Item 3.      Legal Proceedings                                                                                              20 Item 4.      Submission of Matters to a Vote of Security Holders                                                            23 PART II Item 5.      Market for the Registrants Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities                                                                                        24 Item 6.      Selected Financial Data                                                                                        25 Item 7.      Managements Discussion and Analysis of Financial Condition and Results of Operations                          25 Item 7A.      Quantitative and Qualitative Disclosures About Market Risk                                                      43 Item 8.      Financial Statements and Supplementary Data                                                                    44 Item 9.      Changes in and Disagreements with Accountants on Accounting and Financial Disclosure                            89 Item 9A.      Controls and Procedures                                                                                        89 Item 9B.      Other Information                                                                                              89 PART III Item 10.      Directors and Executive Officers of the Registrant                                                              90 Item 11.      Executive Compensation                                                                                          90 Item 12.      Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters                  90 Item 13.      Certain Relationships and Related Transactions                                                                  90 Item 14.      Principal Accountant Fees and Services                                                                          90 PART IV Item 15.      Exhibits and Financial Statement Schedules                                                                      92 Signatures                                                                                                                    99 FORWARD-LOOKING STATEMENTS This report includes forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Any statements that express, or involve discussions as to, expectations, beliefs, plans, objectives, assumptions or future events or performance (often, but not always, through the use of words or phrases such as will likely result, are expected to, will continue, is anticipated, believe, could, estimated, may, plan, potential, projection, target, outlook) are not statements of historical facts and may be forward-looking. Forward-looking statements involve estimates, assumptions and uncertainties. Accordingly, any such statements are qualified in their entirety by reference to important factors included in Part I, Item 1A. Risk Factors (in addition to any assumptions and other factors referred to specifically in connection with such forward-looking statements) that could have a significant impact on FPL Groups and/or FPLs operations and financial results, and could cause FPL Groups and/or FPLs actual results to differ materially from those contained in forward-looking statements made by or on behalf of FPL Group and/or FPL in this combined Form 10-K, in presentations, on their respective websites, in response to questions or otherwise.
Any forward-looking statement speaks only as of the date on which such statement is made, and FPL Group and FPL undertake no obligation to update any forward-looking statement to reflect events or circumstances, including unanticipated events, after the date on which such statement is made. New factors emerge from time to time and it is not possible for management to predict all of such factors, nor can it assess the impact of each such factor on the business or the extent to which any factor, or combination of factors, may cause actual results to differ materially from those contained in any forward-looking statement.
3
 
PART I Item 1. Business FPL GROUP FPL Group was incorporated in 1984 under the laws of Florida. FPL Groups principal subsidiary, FPL, is a rate-regulated utility engaged primarily in the generation, transmission, distribution and sale of electric energy. FPL Group Capital, a wholly-owned subsidiary of FPL Group, holds the capital stock and provides funding for FPL Groups operating subsidiaries other than FPL. The business activities of these operating subsidiaries primarily consist of FPL Energys competitive energy business. At December 31, 2005, FPL Group and its subsidiaries employed approximately 12,400 people. For financial information regarding FPL Groups business segments, see Note 17.
In August 2005, President Bush signed into law the 2005 Energy Act, which substantially affected the regulation of energy companies. The 2005 Energy Act included provisions that, among other things, amended federal energy laws, provided the FERC with new oversight responsibilities, repealed the Public Utility Holding Company Act of 1935, as amended, which regulated the financial structure of certain utility holding companies and, among other things, restricted mergers and acquisitions in the electric industry, and enacted the Holding Company Act. FPL Group is a holding company, as defined in the Holding Company Act.
In December 2005, FPL Group and Constellation Energy announced a proposed merger. The combined company is expected to be the nations largest competitive energy supplier based on generation and have the second largest electric utility portfolio based on number of customers served. The companies are working to complete the merger by the end of 2006. However, completion of the merger and the actual closing date depend upon the satisfaction of a number of conditions, including shareholder approvals and the receipt of required regulatory approvals. For additional information concerning the proposed merger, see Note 2.
Website Access to SEC Filings. FPL Group and FPL make their SEC filings, including their annual report on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K, and any amendments to those reports, available free of charge on the internet website, www.fplgroup.com, as soon as reasonably practicable after they are electronically filed with or furnished to the SEC.
FPL OPERATIONS General. FPL was incorporated under the laws of Florida in 1925 and is a wholly-owned subsidiary of FPL Group. FPL supplies electric service to a population of more than eight million throughout most of the east and lower west coasts of Florida. During 2005, FPL served approximately 4.3 million customer accounts. The percentage of FPLs operating revenues by customer class was as follows:
Years Ended December 31, 2005      2004      2003 Residential                                                                                          55%      54%        56%
Commercial                                                                                          37        37          37 Industrial                                                                                            3        3          3 Other, including deferred or recovered clause revenues, the net change in unbilled revenues and any provision for retail rate refund                                        5        6          4 100%      100%        100%
FPL currently holds 174 franchise agreements to provide electric service in various municipalities and counties in Florida with varying expiration dates through 2035. Of the 174 franchise agreements, four expire in 2006, 18 expire in 2007 and 85 expire during the period 2008 through 2015. Ongoing negotiations are taking place to renew franchises with upcoming expirations. FPL considers its franchises to be adequate for the conduct of its business.
See the discussion of the proposed merger with Constellation Energy under FPL Group above.
Regulation. FPLs retail operations provided approximately 99% of FPLs 2005 operating revenues. Retail operations are regulated by the FPSC, which has jurisdiction over retail rates, service territory, issuances of securities, planning, siting and construction of facilities and other matters. FPL is also subject to regulation by the FERC with respect to certain aspects of its operations, including the acquisition and disposition of facilities, interchange and transmission services and wholesale purchases and sales of electric energy. In addition, FPLs nuclear power plants are subject to the jurisdiction of the NRC. NRC regulations govern the granting of licenses for the construction, operation and retirement of nuclear power plants and subject these plants to continuing review and regulation.
Retail Ratemaking. The underlying concept of utility ratemaking is to set rates at a level that allows the utility the opportunity to collect from customers total revenues (revenue requirements) equal to its cost of providing service, including a reasonable rate of return on invested capital. To accomplish this, the FPSC uses various ratemaking mechanisms.
4
 
The basic costs of providing electric service, other than fuel and certain other costs, are recovered through base rates, which are designed to recover the costs of constructing, operating and maintaining the utility system. These basic costs include O&M expenses, depreciation and taxes, as well as a return on FPLs investment in assets used and useful in providing electric service (rate base). The rate of return on rate base approximates FPLs weighted-average cost of capital, which includes its costs for debt and preferred stock and, typically, an allowed ROE. The FPSC monitors FPLs actual ROE through a surveillance report that is filed monthly by FPL with the FPSC. The FPSC does not provide assurance that an allowed ROE will be achieved. Base rates are determined in rate proceedings or through negotiations, which occur at irregular intervals at the initiative of FPL, the FPSC, the State of Florida Office of Public Counsel or a substantially affected party.
In August 2005, FPL and all of the interveners in its 2005 rate case filing signed a stipulation and settlement agreement regarding FPLs retail base rates, which was subsequently approved by the FPSC (2005 rate agreement). The 2005 rate agreement will be in effect through December 31, 2009, and thereafter shall remain in effect until terminated on the date new retail base rates become effective pursuant to an FPSC order. The 2005 rate agreement replaced a rate agreement that was effective April 15, 2002 through December 31, 2005 (2002 rate agreement).
The 2005 rate agreement provides that retail base rates will not increase during the term of the agreement except to allow recovery of the revenue requirements of any power plant approved pursuant to the Florida Power Plant Siting Act (Siting Act) that achieves commercial operation during the term of the 2005 rate agreement. The 2005 rate agreement also continues the revenue sharing mechanism in FPLs 2002 rate agreement, whereby revenues from retail base operations in excess of certain thresholds will be shared with customers on the basis of two-thirds refunded to customers and one-third retained by FPL. Revenues from retail base operations in excess of a second, higher threshold (cap) will be refunded 100% to customers. The revenue sharing threshold and cap for 2006 will be $3,991 million and $4,156 million, respectively, which was established by using the 2005 revenue sharing threshold and cap of $3,880 million and $4,040 million, respectively, and increasing them by the average annual growth rate in retail kwh sales for the ten-year period ending December 31, 2005. For each succeeding year, retail base rate revenue sharing threshold and cap amounts will be established by increasing the prior years threshold and cap by the sum of the following: (i) the average annual growth rate in retail kwh sales for the ten-year period ending December 31 of the preceding year multiplied by the prior years retail base rate revenue sharing threshold and cap and (ii) the amount of any incremental base rate increases for power plants approved pursuant to the Siting Act that achieve commercial operation during the term of the 2005 rate agreement.
Under the terms of the 2005 rate agreement: (i) FPLs electric property depreciation rates will be based upon the comprehensive depreciation studies it filed with the FPSC in March 2005; however, FPL may reduce depreciation by up to
$125 million annually, (ii) FPL suspended contributions of approximately $79 million per year to its nuclear decommissioning fund beginning in September 2005, (iii) FPL suspended contributions of $20.3 million per year to its storm and property insurance reserve beginning in January 2006 and has the ability to recover prudently incurred storm restoration costs, either through securitization pursuant to Section 366.8260 of the Florida Statutes or through surcharges, and (iv) FPL will be allowed to recover through a cost recovery clause prudently incurred incremental costs associated with complying with an FPSC or FERC order regarding a regional transmission organization.
FPL will not have an authorized regulatory ROE under the 2005 rate agreement for the purpose of addressing earnings levels. For all other regulatory purposes, FPL will have an ROE of 11.75%. The revenue sharing mechanism described above will be the appropriate and exclusive mechanism to address earnings levels. However, if FPLs regulatory ROE, as reported to the FPSC in FPLs monthly earnings surveillance report, falls below 10% during the term of the 2005 rate agreement, FPL may petition the FPSC to amend its base rates.
The 2002 rate agreement provided for a $250 million annual reduction in retail base revenues allocated to all customers by reducing customers base rates and service charges by approximately 7%, as well as a revenue sharing mechanism based on stated thresholds. During the term of the 2002 rate agreement, FPL did not have an authorized regulatory ROE range for the purpose of addressing earnings levels and FPL reduced depreciation on its plant in service by $125 million each year.
Fuel costs are recovered from customers through levelized charges per kwh established under the fuel clause. These charges are calculated annually based on estimated fuel costs and estimated customer usage for the following year, plus or minus a true-up adjustment to reflect the variance of actual costs and usage from the estimates used in setting the fuel adjustment charges for prior periods. An adjustment to the levelized charges may be approved during the course of a year to reflect a projected variance based on actual costs and usage. Due to the significant increase in fuel costs during 2005, FPL filed several revisions to its estimated true-up adjustment. In 2005, approximately $4.1 billion of costs were recovered through the fuel clause. The FPSC has approved a risk management fuel procurement program which is intended to reduce the risk of unexpected fuel price volatility by locking in fuel prices for a portion of FPLs fuel requirements. The results of the program are reviewed by the FPSC as part of the annual review of fuel costs. See Energy Marketing and Trading, Management's Discussion - Results of Operations, Note 1 - Regulation and Note 4.
Capacity payments to other utilities and generating companies for purchased power are recovered from customers through the capacity clause and base rates. In 2005, approximately $651 million of costs were recovered through the capacity clause. Costs associated with implementing energy conservation programs totaled approximately $176 million in 2005 and were recovered from customers through the energy conservation cost recovery clause. Costs of complying with federal, state and local environmental regulations enacted after April 1993 totaled $24 million in 2005 and are recovered through the environmental clause to the extent not included in base rates.
5
 
FPL was impacted by Hurricanes Dennis, Katrina, Rita and Wilma in 2005 and by Hurricanes Charley, Frances and Jeanne in 2004. These hurricanes did major damage in parts of FPLs service territory and collectively resulted in customer power outages in 2005 and 2004 of 5.3 million and 5.4 million, respectively. At December 31, 2005, storm restoration costs incurred by FPL during 2005 and 2004 exceeded the amount in the storm and property insurance reserve. At December 31, 2005, FPLs storm reserve deficiency totaled approximately $1.1 billion. The storm reserve deficiency associated with the 2004 hurricanes, plus interest, is being recovered primarily through a storm damage surcharge applied to retail customer bills over a 36-month period that began in February 2005, and totaled approximately $297 million at December 31, 2005. The remaining balance of the storm reserve deficiency primarily relates to the storm restoration costs associated with 2005 hurricanes. In January 2006, FPL petitioned the FPSC for approval to recover approximately $1.7 billion of storm costs through the issuance of $1,050 million of storm recovery bonds pursuant to the securitization provisions of Section 366.8260 of the Florida Statutes. The storm bond proceeds will provide for the net-of-tax recovery of the remaining balance of the unrecovered hurricane costs of $1,040 million (estimated balance as of July 31, 2006) and the replenishment of the storm reserve to approximately $650 million. If the FPSC determines that the storm restoration costs should not be securitized and instead should be recovered through another means, FPL has recommended as an alternative recovering the 2005 hurricane costs through a surcharge over approximately three years and implementing a separate surcharge to fund a $650 million storm reserve. The FPSCs decision is expected in May 2006. On February 2, 2006, several interested parties filed a motion to dismiss FPLs petition, claiming that the petition did not satisfy certain technical requirements. FPL filed its response to the motion on February 6, 2006, asserting that the requirements cited are not applicable to FPL's petition and which were met in any event. The FPSC has the right to review FPL's storm charges for prudence, and has the authority to determine the manner and timing of recovery. See Note 1  Storm Reserve Deficiency.
In January 2006, the FPSC held an electric infrastructure workshop to discuss the damage to electric utility facilities incurred due to recent hurricanes and to explore ways of minimizing damage and resulting outages to customers in the future. Presentations on hurricane issues were made by representatives of city governments, vendors and the Florida utilities. On January 30, 2006, FPL filed a report with the FPSC outlining its Storm Secure Plan, a new initiative to enhance its electrical grid as a result of heightened hurricane activity and in response to concerns expressed by the community, state leaders and regulators. On February 7, 2006, the FPSC approved a rule that requires the Florida electric utilities to inspect their transmission and distribution wood poles on an eight-year inspection cycle and file an annual report with the FPSC regarding such inspections. The FPSC has scheduled a meeting for February 27, 2006 to discuss what the next step(s) will be.
The FPSC has the authority to disallow recovery of costs that it considers excessive or imprudently incurred. Such costs may include, among others, O&M expenses, the cost of replacing power lost when fossil and nuclear units are unavailable, storm restoration costs and costs associated with the construction or acquisition of new facilities.
Competition. FPL currently faces competition from other suppliers of electrical energy to wholesale customers and from alternative energy sources and self-generation for other customer groups, primarily industrial customers. In 2005, operating revenues from wholesale and industrial customers combined represented approximately 4% of FPL's total operating revenues. Various states, other than Florida, have enacted legislation or have state commissions that have issued orders designed to allow retail customers to choose their electricity supplier. Such a regulatory restructuring, if enacted in Florida, would most likely result in a shift from cost-based rates to market-based rates for energy production and other services provided to retail customers. Although the legislation and initiatives in other states vary substantially, common areas of focus include when market-based pricing will be available for wholesale and retail customers, what existing prudently incurred costs in excess of the market-based price will be recoverable and whether generating assets should be separated from transmission, distribution and other assets. It is generally believed that transmission and distribution activities would remain regulated. Within the last few years, these state restructuring efforts have diminished, and several states have delayed the implementation or reversed previously approved restructuring legislation and rules. Management believes it is unlikely there will be any state actions to restructure the retail electric industry in Florida in the near future. If the basis of regulation for some or all of FPL's business changes from cost-based regulation, existing regulatory assets and liabilities would be written off unless regulators specify an alternative means of recovery or refund. Further, other aspects of the business, such as generation assets and long-term power purchase commitments, would need to be reviewed to assess their recoverability in a changed regulatory environment. See Note 1 - Regulation.
The FPSC promotes cost competitiveness in the building of new steam generating capacity by requiring investor-owned electric utilities, such as FPL, to issue an RFP. The RFP process allows independent power producers and others to bid to supply the needed generating capacity. If a bidder has the most cost-effective alternative, meets other criteria such as financial viability and demonstrates adequate expertise and experience in building and/or operating generation capacity of the type proposed, the investor-owned electric utility would seek to negotiate a power purchase agreement with the selected bidder and request that the FPSC approve the terms of the power purchase agreement and, if appropriate, provide the required authorization for the construction of the bidders generation capacity. In August 2005, FPL issued part one of a two-part RFP for additional power resources beginning in 2009. FPL's self-build approach calls for building two approximately 1,200 mw natural gas-fired combined-cycle units in western Palm Beach County, Florida, that would be operational in 2009 and 2010. In January 2006, after evaluating alternative proposals, FPL concluded that its self-build approach is the most cost-effective alternative to satisfy the need for additional power resources in 2009 and 2010. FPL plans to issue part two of this RFP in 2006 soliciting competitive bids for additional power resources beginning in 2012. FPL's self-build approach calls for building two approximately 850 mw advanced technology coal generating units that would be operational in 2012 and 2013.
6
 
The FERC has jurisdiction over potential changes that could affect competition in wholesale transactions. In 1999, the FERC issued its final order on RTOs which, under a variety of structures, provides for the independent operation of transmission systems for a given geographic area. In early 2001, the FERC approved GridFlorida (FPLs, Progress Energy Florida, Inc.s and Tampa Electric Companys proposed RTO) as the RTO for peninsular Florida. In late 2001, the FPSC determined that the RTO as proposed was not in the best interest of Florida customers and required the companies to develop a modified proposal. In early 2002, FPL, Progress Energy Florida, Inc. and Tampa Electric Company filed a modified RTO proposal with the FPSC changing the structure of GridFlorida from a for-profit transmission company to a non-profit ISO. In late 2002, the FPSC approved many of the aspects of the modified RTO proposal, administratively approving recovery of GridFloridas incremental costs through the capacity clause. During 2004, the FPSC held workshops to address additional GridFlorida issues. In 2005, an independent consulting firm performed a cost benefit analysis of GridFlorida and concluded that GridFlorida would not be cost effective for the retail customers of the GridFlorida participants. In January 2006, FPL and the other GridFlorida participants petitioned the FPSC to approve the withdrawal of the GridFlorida proposal.
System Capability and Load. During 2005, FPL completed the addition of approximately 1,900 mw of natural gas combined-cycle generation at its Martin and Manatee sites. FPL is currently constructing an 1,150 mw natural gas-fired plant at its Turkey Point site with a planned in-service date of mid-2007. See Competition above regarding an RFP for additional power generation resources beginning in 2009.
At December 31, 2005, FPLs resources for serving load consisted of 23,768 mw, of which 20,777 mw are from FPL-owned facilities (see Item 2  Generating Facilities) and 2,991 mw are obtained through purchased power contracts (see Note 16 -
Contracts). FPL's projected reserve margin for the summer of 2006 is approximately 19.5%. This reserve margin will be achieved through the combination of output from FPL's generating units, purchased power contracts and the capability to reduce peak demand through the implementation of load management, which was estimated to be 1,387 mw at December 31, 2005. Occasionally, unusually cold temperatures during the winter months result in significant increases in electricity usage for short periods of time. However, customer usage and operating revenues are typically higher during the summer months largely due to the prevalent use of air conditioning in FPL's service territory. During the summer of 2005, FPL set four all-time system peaks: 21,220 mw on July 5, 2005, 21,434 mw on July 6, 2005, 21,611 mw on July 21, 2005 and 22,361 on August 17, 2005. FPL had adequate resources available at the time of these peaks to meet customer demand.
Capital Expenditures. Capital expenditures at FPL include, among other things, the cost for construction or acquisition of additional facilities and equipment to meet customer demand, as well as capital improvements to and maintenance of existing facilities. FPL's capital expenditures totaled $1.8 billion in 2005 (including AFUDC of approximately $41 million), $1.4 billion in 2004 (including AFUDC of approximately $48 million) and $1.4 billion in 2003 (including AFUDC of approximately $18 million). Capital expenditures for 2006 through 2010 are estimated as follows:
2006            2007            2008          2009          2010          Total FPL:                                                                                                              (millions)
Generation: (a)
New (b)                                                            $    255        $    520        $    605      $    660      $    500        $ 2,540 Existing                                                                450              455            330            395            285          1,915 Transmission and distribution                                              750              665            640            640            645          3,340 Nuclear fuel                                                                  75            120              85            125            135            540 General and other                                                          145              170            165            160            165            805 Total                                                              $ 1,675          $ 1,930        $ 1,825        $ 1,980        $ 1,730        $ 9,140 (a)  Includes AFUDC of approximately $39 million, $30 million, $51 million, $72 million and $71 million in 2006, 2007, 2008, 2009 and 2010, respectively.
(b)  Includes generating structures, transmission interconnection and integration, licensing and AFUDC.
These estimates are subject to continuing review and adjustment and actual capital expenditures may vary from these estimates. See Management's Discussion  Liquidity and Capital Resources and Note 16  Commitments.
Nuclear Operations. FPL owns and operates four nuclear units, two at Turkey Point and two at St. Lucie. Turkey Point Units Nos. 3 and 4 received operating license extensions in 2002, which give FPL the option to operate these units until 2032 and 2033, respectively. The NRC extended the operating licenses for St. Lucie Units Nos. 1 and 2 during 2003, which give FPL the option to operate these units until 2036 and 2043, respectively. The original license expiration dates for Turkey Point Units Nos. 3 and 4 and St. Lucie Units Nos. 1 and 2 were 2012, 2013, 2016 and 2023, respectively. The depreciation and decommissioning rates approved as part of the 2005 rate agreement reflect the license extensions received for Turkey Point Units Nos. 3 and 4 and St. Lucie Units Nos. 1 and 2. The nuclear units are periodically removed from service to accommodate normal refueling and maintenance outages, repairs and certain other modifications. Scheduled nuclear refueling outages typically require the unit to be removed from service for approximately 30 days. Scheduled nuclear refueling outages by unit are as follows:
Refueling Outage Unit                                        Most Recent                          Next Scheduled St. Lucie Unit No. 1                                    Fall 2005                              Spring 2007 St. Lucie Unit No. 2                                    January 2005                          Spring 2006 Turkey Point Unit No. 3                                  Fall 2004                              Spring 2006 Turkey Point Unit No. 4                                  Spring 2005                            Fall 2006 7
 
The NRCs regulations require FPL to submit a plan for decontamination and decommissioning five years prior to the projected end of plant operation. FPLs current plans, under the extended operating licenses, provide for prompt dismantlement of Turkey Point Units Nos. 3 and 4 with decommissioning activities commencing in 2032 and 2033, respectively. Current plans provide for St. Lucie Unit No. 1 to be mothballed beginning in 2036 with decommissioning activities to be integrated with the prompt dismantlement of St. Lucie Unit No. 2 at the end of its useful life in 2043. See estimated decommissioning cost data in Note 1 - Decommissioning of Nuclear Plants, Dismantlement of Plants and Other Accrued Asset Removal Costs.
In 2003, the NRC issued an order requiring all pressurized water reactor licensees, including FPL, to perform visual and volumetric inspections of reactor vessel heads at each unit's scheduled refueling outage to identify if degradation such as cracking or corrosion has occurred. In conjunction with the NRC order, FPL has performed visual and volumetric inspections of its nuclear units' reactor vessel heads during their scheduled refueling outages since October 2002. FPL replaced the reactor vessel heads at Turkey Point Unit No. 3, Turkey Point Unit No. 4 and St. Lucie Unit No. 1 during their scheduled refueling outages in the fall of 2004, spring of 2005 and fall of 2005, respectively, and therefore no further inspections will be required at these units until 2009. The inspections during scheduled refueling outages at St. Lucie Unit No. 2 revealed CRDM nozzles with cracks, which were repaired during the outages in 2003 and 2005. It is anticipated that additional CRDM nozzle repairs will be needed at St. Lucie Unit No. 2's next scheduled outage. FPL intends to replace the reactor vessel head at St.
Lucie Unit No. 2 during its fall 2007 scheduled refueling outage. The cost to replace St. Lucie Unit No. 2's reactor vessel head, including AFUDC, is included in FPL's estimated capital expenditures. See Managements Discussion - Results of Operations - FPL and Note 16 - Commitments.
St. Lucie Unit No. 2's steam generators are reaching the end of their useful life. As flaws are identified in individual tubes, they are plugged in order to prevent the tubes from leaking during plant operations. To date, 18.9% of these tubes have been plugged. In January 2005, FPL received permission from the NRC to plug up to 30% of St. Lucie Unit No. 2's steam generator tubes. Current projections indicate that the 30% tube plugging limit could be exceeded during St. Lucie Unit No. 2's next scheduled refueling outage. FPL is planning to repair any tubes exceeding the 30% tube plugging limit by inserting metal sleeves inside the degraded tubes (sleeving) and has requested NRC approval to sleeve degraded tubes as an alternative to plugging. Sleeving degraded tubes is expected to increase the cost and length of the outage. FPL intends to replace the steam generators along with the reactor vessel head at St. Lucie Unit No. 2 during its fall 2007 scheduled refueling outage. The cost to replace St. Lucie Unit No. 2s steam generators, including AFUDC, is included in FPLs estimated capital expenditures above. See Managements Discussion - Results of Operations - FPL and Note 16 -
Commitments. The replacement of the reactor vessel head and steam generators is expected to add approximately 55 days to the number of days St. Lucie Unit No. 2 is removed from service during a typical scheduled refueling outage.
During 2003, nuclear utilities, other than FPL, identified that pressurizer heater sleeves made with a particular material (alloy 600) were experiencing penetration cracks and leaks as a result of primary water stress corrosion cracking. As a result, in 2004, the NRC issued a bulletin requesting utilities to identify and inspect all alloy 600 and weld materials in all pressurizer locations and connected steam space piping. Due to the amount of time and cost associated with correcting potential leaks, FPL replaced St. Lucie Unit No. 1's pressurizer during its fall 2005 outage and plans to repair St. Lucie Unit No. 2's pressurizer heater sleeves and other penetrations during its scheduled refueling and steam generator and reactor vessel head replacement outage in the fall of 2007. The estimated cost is included in FPL's estimated capital expenditures above. Since the 2004 NRC bulletin was issued, no leaks have been identified based on inspections at St. Lucie Unit No.
: 2. See Note 16 - Commitments. All pressurizer penetrations and welds at Turkey Point Units Nos. 3 and 4 utilize a different material.
Fuel. FPL's generating plants use a variety of fuels. See Item 2 - Generating Facilities and Note 16 - Contracts. The diverse fuel options, along with purchased power, enable FPL to shift between sources of generation to achieve a more economical fuel mix.
FPL has four firm transportation contracts in place with FGT and one firm transportation contract with Gulfstream that together will satisfy substantially all of the anticipated needs for natural gas transportation at its existing units. The four existing FGT contracts expire between 2015 and 2022, while the Gulfstream contract expires in 2028. The two contracts expiring in 2015 may be extended by FPL until 2030. To the extent desirable, FPL can also purchase interruptible gas transportation service from FGT and Gulfstream based on pipeline availability. FPL has several short- and medium-term natural gas supply contracts to provide a portion of FPL's anticipated needs for natural gas. The remainder of FPL's gas requirements are purchased under other contracts and in the spot market.
FPL has, through its joint ownership interest in St. Johns River Power Park (SJRPP) Units Nos. 1 and 2, long-term coal supply and transportation contracts for a portion of the fuel needs for those units. All of the transportation requirements and a portion of the fuel supply needs for Scherer Unit No. 4 are covered by a series of annual and long-term contracts. FPL's remaining fuel requirements for these units will be obtained in the spot market. FPL's oil requirements are obtained under short-term contracts and in the spot market.
FPL leases nuclear fuel for all four of its nuclear units. See Note 1 - Nuclear Fuel. In 2003, FPL Group and FPL began consolidating the lessor entity in accordance with FIN 46, "Consolidation of Variable Interest Entities." See Note 9 -
FPL. The contracts for the supply, conversion, enrichment and fabrication of FPL's nuclear fuel have expiration dates ranging from December 2006 through 2013. Currently, FPL is storing spent fuel on site pending its removal by the DOE. Under the Nuclear Waste Policy Act, the DOE was required to construct permanent disposal facilities and take title to and provide 8
 
transportation and disposal for spent nuclear fuel by January 31, 1998 for a specified fee based on current generation from nuclear power plants. Through December 2005, FPL has paid approximately $541 million in such fees to the DOEs nuclear waste fund. The DOE did not meet its statutory obligation for disposal of spent nuclear fuel under the Nuclear Waste Policy Act. In 1997, a court ruled, in response to petitions filed by utilities, state governments and utility commissions, that the DOE could not assert a claim that its delay was unavoidable in any defense against lawsuits by utilities seeking money damages arising out of the DOEs failure to perform its obligations. In 1998, FPL filed a lawsuit against the DOE seeking damages caused by the DOEs failure to dispose of spent nuclear fuel from FPLs nuclear power plants. The matter is pending. In the interim, FPL is investigating other alternatives to provide adequate storage capacity for all of its spent nuclear fuel. Based on current projections, FPL will lose its ability to store additional spent fuel on site for St. Lucie Unit No. 1 in 2008, St. Lucie Unit No. 2 in 2007, Turkey Point Unit No. 3 in 2010 and Turkey Point Unit No. 4 in 2012. These projections are based on additional space provided by new cask pit area storage racks installed at the Turkey Point Units Nos. 3 and 4 and St. Lucie Unit No. 1 spent fuel pools in 2004. St. Lucie Unit No. 2s cask pit rack is expected to be completed in the summer of 2006, which will extend its capability to store spent fuel through 2010. In addition, degradation in a material used in the spent fuel pools at St. Lucie Unit No. 1 and Turkey Point Units Nos. 3 and 4 could result in implementation of alternative spent fuel storage options sooner than projected. FPL plans to begin using dry storage casks to store spent fuel at the St. Lucie Units prior to 2009 and at the Turkey Point Units prior to 2010, which would extend their capability to store spent fuel indefinitely. The cost for the dry storage casks is included in FPL's estimated capital expenditures above.
In 2002, the governor of Nevada submitted a Notice of Disapproval to Congress regarding President Bush's recommendation to develop Yucca Mountain as a nuclear waste depository. The Yucca Mountain site is the DOE's recommended location to store and dispose of spent nuclear fuel and high-level radioactive waste. During May and July 2002, Congress overrode the Notice of Disapproval through a majority vote of both houses. The President signed the joint resolution of Congress into law in 2002. The State of Nevada has initiated legal actions to attempt to block the project. In 2004, the U.S. Court of Appeals for the District of Columbia Circuit ruled on a series of challenges to the statutes and regulations established to govern a nuclear waste depository at the Yucca Mountain site. The court denied all the challenges except for one, regarding an EPA rule governing the time period the public would be protected from hypothetical radiation leaks at the Yucca Mountain repository. The court's decision will likely result in revisions to the EPA's and NRC's licensing rules for Yucca Mountain and could further delay the licensing process for Yucca Mountain. The DOE is no longer projecting when the nuclear waste depository will be completed.
Energy Marketing and Trading. EMT, a division of FPL, buys and sells wholesale energy commodities, such as natural gas, oil and electricity. EMT procures natural gas and oil for FPL's use in power generation and sells excess gas, oil and electricity. EMT also uses derivative instruments, such as swaps, options and forwards to manage the commodity price risk inherent in fuel and electricity sales and purchases. Substantially all of the results of EMT's activities are passed through to customers in the fuel or capacity clauses. See Retail Ratemaking, Management's Discussion - Energy Marketing and Trading and Market Risk Sensitivity and Note 4.
Environmental. Federal, state and local environmental laws and regulations cover air and water quality, land use, power plant and transmission line siting, EMF from power lines and substations, oil discharge from transformers, lead paint, asbestos, noise and aesthetics, solid waste, natural resources, wildlife mortality and other environmental matters. Compliance with these laws and regulations increases the cost of electric service by requiring, among other things, changes in the design and operation of existing facilities and changes or delays in the location, design, construction and operation of new facilities. During 2005, FPL spent approximately $41 million on capital additions to comply with environmental laws and regulations. FPL's capital expenditures to comply with environmental laws and regulations are estimated to be $236 million for 2006 through 2008, including approximately $89 million in 2006, and are included in estimated capital expenditures set forth in Capital Expenditures above. Environmental regulations are subject to change. The following is a discussion of emerging federal initiatives and rules that could potentially affect FPL. FPL would generally seek recovery under its environmental clause for compliance costs associated with any new environmental laws and regulations.
Climate Change  As a participant in President Bush's Climate Leader Program to reduce greenhouse gas intensity in the United States by 18% by 2012, FPL has inventoried its greenhouse gas emission rates and FPL Group has committed to a 2008 reduction target of 18% below a 2001 baseline emission rate measured in pounds per megawatt-hour. FPL believes that the planned operation of its generating portfolio, along with its current efficiency initiatives, greenhouse gas management efforts and increased use of renewable energy, will allow it to achieve this target.
In addition to the voluntary initiative, the U.S. Congress is considering several legislative proposals that would establish new mandatory regulatory requirements and reduction targets for greenhouse gases. Based on the most current reference data available from government sources, FPL is among the lowest emitters of greenhouse gases measured by its rate of emissions to generation in pounds per megawatt-hour. However, these legislative proposals have differing methods of implementation and the impact on FPL's generating units and/or the financial impact (either positive or negative) to FPL Group and FPL could be material, depending on the eventual structure of a mandatory program.
Multi-Pollutant Legislation  The U.S. Congress and the Bush Administration are considering several legislative proposals that would establish new regulatory requirements and reduction targets for sulfur dioxide, nitrogen oxide, mercury, and in some proposals, carbon dioxide. Based on the most current reference data available from government sources, FPL is among the lowest generators of these emissions when measured by its rate of emissions to generation in pounds per megawatt-hour. However, these multi-pollutant proposals have differing methods of implementation and the impact on FPL's generating 9
 
units and/or the financial impact (either positive or negative) to FPL Group and FPL could be material, depending on the eventual structure of any legislation enacted.
Clean Air Act Mercury/Nickel Rule  In 2005, the EPA proposed a final rule to regulate mercury emissions from coal-fired electric utility steam generating units under Section 111 of the Clean Air Act. The EPAs proposed final rule seeks to reduce mercury emissions starting in 2010 through "cobenefits" reduction occurring as a result of pollution control equipment currently installed or to be installed in response to the Clean Air Interstate Rule or other environmental rules. This proposed final rule would also allow the EPA to implement a mercury emissions trading program. There is considerable opposition to the proposed final rule from environmental groups, which contend that there should be more stringent control of mercury emissions. While the final requirements are uncertain, it is possible that Scherer Unit No. 4, St. Johns River Power Park Units Nos. 1 and 2 and certain coal-fired units from which FPL purchases power, may be required to add additional pollution control equipment or purchase emission allowances in order to achieve compliance with the proposed mercury emission limits.
During 2005, the EPA determined that new data indicated that nickel emissions from oil-fired units should not be regulated under Section 112 of the Clean Air Act, which set Maximum Achievable Control Technology standards, and as a result the EPA published a final rule delisting nickel from the requirements of regulation under Section 112. Both the mercury and nickel rulemaking decisions are being challenged by various states and environmental groups.
Clean Air Interstate Rule (CAIR)  In 2005, the EPA published a final CAIR that requires sulfur dioxide (SO2) and nitrogen oxide (NOx) emissions reductions from electric generating units in 28 states where their emissions are transported to downwind states allegedly resulting in fine particulate (PM 2.5) and ozone non-attainment. The final rule requires phased reductions in SO2 emissions by 2010 and by 2015, and reductions in NOx emissions by 2009 and by 2015, eventually reaching a nationwide reduction of 65% below a 2002 baseline emission rate for each. In the final rule, through the use of modeling data, the states in which FPL facilities are located were determined to be contributors of PM 2.5 and/or ozone production in downwind states. However, FPL believes that the emissions from most of its Florida generating facilities are not affecting the non-attainment status of downwind areas. In July 2005, FPL Group filed a petition for reconsideration with the EPA and a lawsuit in the U.S. Court of Appeals for the District of Columbia challenging the SO2 and NOx provisions in CAIR. In November 2005, the EPA agreed to reconsider several issues raised regarding the final rule. The EPA plans to issue a decision on all issues by March 15, 2006. While the final requirements are uncertain, it is possible that the FPL generating facilities in Florida and Georgia may be required to add additional SO2 and NOx controls or purchase emissions allowances to meet the compliance requirements of the final rule.
Clean Air Visibility Rule  In 2005, the EPA issued the Clean Air Visibility Rule to address regional haze in areas which include certain national park and wilderness areas through the installation of BART for electric generating units. BART eligible units include those built between 1962 and 1977 that have the potential to emit more than 250 tons of visibility-impairing pollution a year. The rule requires states to identify the facilities required to install BART controls by 2008 and allows for a five-year period to implement pollution controls. While the impact of final BART requirements are uncertain, it is possible that some of FPLs BART eligible units may be required to add additional controls or switch fuels to meet the BART compliance requirements.
Clean Water Act Section 316(b)  In 2004, the EPA issued a rule under Section 316(b) of the Clean Water Act to address intake structures at existing power plants with once-through cooling water systems. The rule requires FPL to demonstrate that it has met or will meet new impingement mortality (the loss of organisms against screens and other exclusion devices) and/or entrainment (the loss of organisms by passing them through the cooling system) reductions by complying with one of five alternatives, including the authorized use of technology, operational measures or restoration measures, and may involve the performance of biological studies. The rules will impact eight of FPLs generating facilities (Cape Canaveral, Cutler, Fort Myers, Lauderdale, Port Everglades, Sanford, Riviera and St. Lucie). FPL will be conducting the necessary studies/analyses over the next several years and implementing solutions based upon regulatory approvals. The total cost of these solutions, as well as any ongoing biological monitoring that may be required, has not yet been determined.
Electric and Magnetic Fields. Since the 1970s, there has been public, scientific, and regulatory attention given to the question of whether EMF causes or contributes to adverse health effects. These fields exist whenever there is a flow of electricity, including in power lines, appliances and building wiring. Some epidemiological studies (which typically examine the incidence of disease in population groups) have reported a statistical association between EMF and some types of cancer, including childhood and adult leukemia. Other studies have not reported any such relationship. Neither these epidemiological studies nor the more controlled laboratory studies of EMF have produced conclusive evidence that EMF causes or contributes to any adverse health effects.
In 1999, the National Institute of Environmental Health Sciences, at the culmination of a five-year federally supported research effort, pronounced that the scientific support for an EMF-cancer link is marginal and concluded that the probability that EMF exposure is truly a health hazard is small but cannot be completely discounted.
In 2001, the IARC conducted an evaluation of power frequency EMF and cancer; it classified power frequency magnetic fields as "possibly carcinogenic" based on an association with childhood leukemia reported in some epidemiology studies. The IARC did not conclude that power frequency EMF cause or contribute to the development of childhood leukemia or any other cancer. In 2002, the California Department of Health Services (DHS) submitted its EMF Risk Evaluation report to the California Public Utility Commission. The report concluded in part that "To one degree or another, all three of the DHS 10
 
scientists are inclined to believe that EMF can cause some degree of increased risk of childhood leukemia, adult brain cancer, Lou Gehrigs Disease, and miscarriage."
In 2002, the National Institute of Environmental Health Sciences said in a booklet it published on EMF: "For most health outcomes, there is no evidence that EMF exposures have adverse effects. There is some evidence from epidemiology studies that exposure to power-frequency EMF is associated with an increased risk for childhood leukemia. This association is difficult to interpret in the absence of reproducible laboratory evidence or a scientific explanation that links magnetic fields with childhood leukemia."
Florida has had EMF regulations in place for many years, and FPL believes it is in compliance with the FDEP regulations regarding EMF levels within and at the edge of the rights of way for transmission lines. Future changes in the FDEP regulations could require additional capital expenditures by FPL for such things as increasing the right of way corridors or relocating or reconfiguring transmission facilities. It is not presently known whether any such expenditures will be required. Currently, there are no such changes proposed to the FDEP regulations.
Employees. FPL had approximately 10,200 employees at December 31, 2005. Approximately 32% of the employees are represented by the International Brotherhood of Electrical Workers (IBEW) under a collective bargaining agreement with FPL that expires October 31, 2008.
FPL ENERGY OPERATIONS General. FPL Energy, a wholly-owned subsidiary of FPL Group Capital, was formed in 1998 to aggregate FPL Groups existing competitive energy business. It is a limited liability company organized under the laws of Delaware. FPL Energy through its subsidiaries currently owns, develops, constructs, manages and operates domestic electric-generating facilities in wholesale energy markets. FPL Energy also provides full service requirements services to distribution utilities in certain markets. FPL Energy manages or participates in the management of approximately 90% of its projects, which represent approximately 97% of the net generating capacity in which FPL Energy has an ownership interest. At December 31, 2005, FPL Energy had ownership interests in operating independent power projects with a net generating capability totaling 12,053 mw (see Item 2 - Generating Facilities). Generation capacity spans various regions, thereby reducing overall volatility related to varying market conditions and seasonality on a portfolio basis. At December 31, 2005, the percentage of capacity by NERC region or power pool was:
NERC Region/Power Pool                            Percentage of Generation Capacity MAPP/RFC/SPP/ERCOT                                                37%
NEPOOL/NYPP                                                      24%
SERC/PJM                                                          23%
WECC                                                              16%
Fuel sources for these projects were as follows:
Fuel Source                                      Percentage of Generation Capacity Natural Gas                                                      54%
Wind                                                              26%
Nuclear                                                            9%
Oil                                                                6%
Hydro                                                              3%
Other                                                              2%
In June 2005, a wholly-owned subsidiary of FPL Group completed the acquisition of Gexa Corp., a retail electric provider in Texas, which serves approximately 1,200 mw of peak load to over 160,000 commercial and residential customers as of December 31, 2005. The Texas commodity markets have recently experienced significant price increases, which have led some regulators, government officials and other interested parties to call for a review of the structure and operation of the Texas retail market. FPL Energy is unable to predict whether such review will occur or result in any changes to the market structure. However, if changes occur in the market structure, such changes could affect Gexa's ability to sign and retain new and existing customers. FPL Energy will continue to monitor these events.
FPL Energy expects its future capacity growth to come primarily from wind development benefiting from the extension of the production tax credit program through 2007 for new wind facilities, as well as from asset acquisitions. FPL Energy plans to add approximately 625 mw to 750 mw of new wind generation in each of 2006 and 2007, including over 700 mw which are currently under construction or have been approved by FPL Group's board of directors. In January 2006, FPL Energy completed the acquisition of a 70% interest in Duane Arnold. See Nuclear Operations. Also, see the discussion of the proposed merger with Constellation Energy under FPL Group above.
11
 
FPL Energys capital expenditures and investments totaled approximately $0.9 billion, $0.4 billion and $1.6 billion in 2005, 2004 and 2003, respectively. Capital expenditures for 2006 through 2010 are estimated as follows:
2006            2007            2008            2009          2010            Total (millions)
FPL Energy:
Wind (a)                                  $    960        $    930        $      5      $      5      $      5      $ 1,905 Nuclear (b)                                      495              85            40              85            100            805 Gas                                                45              15            15              5              -            80 Other                                              10              10            10            10              10              50 Total                                    $ 1,510          $ 1,040        $    70        $  105        $    115        $ 2,840 (a)  Capital expenditures for new wind projects are estimated through 2007, when eligibility for PTCs for new wind projects is scheduled to expire.
(b)  Includes nuclear fuel and, in 2006, the acquisition of a 70% interest in Duane Arnold (see Nuclear Operations).
These estimates are subject to continuing review and adjustment and actual capital expenditures may vary from these estimates. See Managements Discussion  Liquidity and Capital Resources and Note 16  Commitments.
Regulation. At December 31, 2005, FPL Energy had ownership interests in operating independent power projects that have received exempt wholesale generator status as defined under the Holding Company Act, which represent approximately 96% of FPL Energys net generating capacity. Exempt wholesale generators own or operate a facility exclusively to sell electricity to wholesale customers. They are barred from selling electricity directly to retail customers. FPL Energys exempt wholesale generators produce electricity from wind, hydropower, fossil fuels and nuclear facilities. In addition, approximately 4% of FPL Energys net generating capacity has qualifying facility status under PURPA. FPL Energys qualifying facilities generate electricity from wind, solar, fossil fuels, biomass or waste-product combustion. Qualifying facility status exempts the projects from, among other things, many of the provisions of the Federal Power Act, as well as state laws and regulations relating to rates and financial or organizational regulation of electric utilities. While projects with qualifying facility and exempt wholesale generator status are exempt from various restrictions, each project must still comply with other federal, state and local laws, including those regarding siting, construction, operation, licensing, pollution abatement and other environmental laws.
FPL Energy continues to evaluate developing regional market designs. California is scheduled to implement a revised market design in 2007. ERCOT is considering adopting a revised market design with potential implementation in 2009. In both markets, the final market design is not fully known at this time and FPL Energy is currently unable to determine the effects, if any, on its operations resulting from the implementation of such market designs.
Competition. Competitive wholesale markets in the United States continue to evolve and vary by geographic region. Revenues from electricity sales in these markets will vary based on the prices obtainable for energy, capacity and other ancillary services. Some of the factors affecting success in these markets include the ability to operate generating assets efficiently and reliably, the price and supply of fuel, transmission constraints, wind and hydro resources (weather conditions), competition from new sources of generation, effective risk management, demand growth and exposure to legal and regulatory changes.
Expanded competition in a frequently changing regulatory environment presents both opportunities and risks for FPL Energy. Opportunities exist for the selective acquisition of generation assets divested under deregulation plans or available from other competitors and for the construction and operation of efficient plants that can sell power in competitive markets. FPL Energy seeks to reduce its market risk by having a diversified portfolio, by fuel type and location, as well as by contracting for the sale of a significant amount of the electricity output of its plants. As of December 31, 2005, FPL Energy had 86% of its on-peak capacity under contract for 2006. Over the last several years, contracting for the sale of electricity output was more difficult as a result of overcapacity in certain regions and diminished market liquidity due to fewer creditworthy counterparties. However, the major markets in which FPL Energy operates have shown signs of continued improvement since 2004, such as improved spark spreads and energy prices in ERCOT and NEPOOL. The combination of new wind projects, expected increase in contribution from merchant assets and asset acquisitions are expected to be the key drivers in supporting FPL Energys growth over the next few years.
Portfolio by Category. FPL Energys assets can be categorized into the following three groups: wind assets, contracted assets and merchant assets.
12
 
As of December 31, 2005, FPL Energys capacity under contract for 2006 and 2007 was as follows:
2006                                      2007 Available                    % MW            Available              % MW Project Portfolio Category                                                      MW  (a)
Under Contract            MW  (a)
Under Contract Wind                                                                              3,166                  97% (b)            3,287              93% (b)
(c)
Contracted                                                                        2,461                  99% (b)            2,461              99% (b)
(d)
Merchant:
NEPOOL                                                                        2,281                  74% (e)            2,454              49% (e)
ERCOT                                                                        2,598                  87% (e)            2,627              37% (e)
All other                                                                    1,417                  58% (e)            1,372              18% (e)
(f)
Total portfolio                                                                11,921                    86% (e)            12,200              65% (e)
(a)  Weighted to reflect projected in-service dates, planned maintenance, Seabrooks planned refueling outage and power uprate in 2006, the acquisition of a 70%
interest, or approximately 415 mw, in Duane Arnold and its planned refueling outage in 2007, and expected production from renewable resource assets.
(b)  Reflects round-the-clock mw under contract.
(c)  Includes all projects with mid- to long-term purchase power contracts for substantially all of their output.
(d)  Includes only those facilities that require active hedging.
(e)  Represents on-peak mw under contract.
(f)  Totals may not add due to rounding.
Wind Assets  At December 31, 2005, FPL Energy had ownership interests in wind plants with a combined capacity of approximately 3,192 mw (net ownership). The majority of these wind assets have contracts with utilities and power marketers predominantly under fixed-price agreements with expiration dates ranging from 2011 to 2030. FPL Energy operates all but six of these wind facilities. Approximately 92% of FPL Energys net ownership in wind facilities has received exempt wholesale generator status as defined under the Holding Company Act. The remaining facilities have qualifying facility status under PURPA. FPL Energys wind facilities are located in fifteen states, thereby reducing weather-related performance risk on a portfolio basis.
FPL Energy plans to add approximately 625 mw to 750 mw of new wind generation in each of 2006 and 2007, including over 700 mw which are currently under construction or have been approved by FPL Groups board of directors.
Contracted - At December 31, 2005, FPL Energy had 2,046 mw of contracted assets. The contracted category includes all projects with mid- to long-term contracts for substantially all of their output. Essentially all of these contracted assets were under power sales contracts with utilities, with contract expiration dates ranging from 2008 to 2020 and have firm fuel and transportation agreements with expiration dates ranging from 2009 to 2033. Approximately 1,776 mw of this capacity is gas-fired generation. The remaining 270 mw uses a variety of fuels and technologies such as waste-to-energy, oil, solar, coal and petroleum coke. As of December 31, 2005, approximately 89% of FPL Energy's contracted generating capacity is from power plants that have received exempt wholesale generator status under the Holding Company Act, while the remaining 11% have qualifying facility status under PURPA. In January 2006, FPL Energy completed the acquisition of a 70% interest, or approximately 415 mw, in Duane Arnold. FPL Energy is selling its share of the output of Duane Arnold to Interstate Power and Light Company, a subsidiary of Alliant Energy Corporation (IP&L), under a long-term contract expiring in 2014. See Nuclear Operations below.
Merchant Assets - At December 31, 2005, FPL Energy's portfolio of merchant assets includes 6,815 mw of owned nuclear, natural gas, oil and hydro generation, of which 2,700 mw is located in the ERCOT region, 2,643 mw in the NEPOOL region and 1,472 mw in other regions. The merchant assets include 877 mw of peak generating facilities. Merchant assets are plants that do not have long-term power sales agreements to sell their output and therefore require active marketing and hedging. Approximately 77% of the merchant assets have gas supply agreements or a combination of gas supply and transportation agreements to provide for on-peak gas requirements. PMI uses derivative instruments (primarily swaps, options and forwards) to lock in pricing and manage the commodity price risk inherent in power sales and fuel purchases. Reducing market risk through these instruments introduces other types of risk however, primarily counterparty and operational risks.
Nuclear Operations. FPL Energy owns an 88.23% undivided interest, or 1,076 mw, in Seabrook, a nuclear power plant located in New Hampshire. FPL Energy is responsible for all plant operations and the ultimate decommissioning of the plant, the cost of which will be shared on a pro-rata basis by the joint owners. See estimated decommissioning cost data in Note 1
- Decommissioning of Nuclear Plants, Dismantlement of Plants and Other Accrued Asset Removal Costs - FPL Energy. In December 2005, FPL Energy obtained NRC approval to extend the unit's operating license from 2026 to 2030 to recapture the period of non-operation from 1986 to 1990. FPL Energy intends to seek approval from the NRC to renew the unit's operating license for an additional 20 years. If granted, this approval would extend the term of the NRC operating license for Seabrook to 2050. In May 2005, Seabrook completed its first phase of a power uprate which increased FPL Energy's net plant output from 1,024 mw to 1,076 mw. Seabrook is periodically removed from service to accommodate normal refueling and maintenance outages, repairs and certain other modifications. Seabrook is scheduled to complete the second phase of the uprate during its next scheduled refueling outage in the fall of 2006, the estimated future costs of which are included in FPL Energy's estimated capital expenditures above. The uprate is anticipated to increase Seabrook's net plant output to 1,106 mw.
13
 
In 2003, the NRC issued an order requiring all pressurized water reactor licensees, including Seabrook, to perform visual and volumetric inspections of reactor vessel heads at certain scheduled refueling outages to identify if degradation such as cracking or corrosion has occurred. Seabrook will be required to perform 100% visual and volumetric inspections during the fall 2006 refueling outage, and subsequently, visual inspections every third refueling outage and volumetric inspections every fourth refueling outage.
Seabrook has several contracts for the supply, conversion, enrichment and fabrication of nuclear fuel with expiration dates ranging from 2006 to 2014. See Note 16 - Contracts. Currently, Seabrook is storing spent fuel on site pending its removal by the DOE. Under the Nuclear Waste Policy Act, the DOE was required to construct permanent disposal facilities and take title to and provide transportation and disposal for spent nuclear fuel by January 31, 1998 for a specified fee based on current generation from nuclear power plants. The total cumulative amount of such fees paid to the DOE's nuclear waste fund for Seabrook, including amounts paid by all joint owners since the start of Seabrook's operation, is approximately $122 million, of which FPL Energy has paid approximately $24 million since the date of the Seabrook acquisition. In 2004, FPL Energy and Seabrook's other joint owners filed a lawsuit against the DOE seeking damages caused by the DOE's failure to dispose of spent nuclear fuel from the Seabrook facility. The matter is pending. For details on the current status of permanent fuel storage with the DOE see FPL Operations - Fuel. Based on current projections, FPL Energy will lose its ability to store spent fuel at Seabrook as early as 2009. FPL Energy is proceeding with a dry cask storage system which will be placed into commercial operation prior to 2009, the cost of which is included in FPL Energy's estimated capital expenditures above. This would allow for all of Seabrook's spent fuel to be stored on site, including spent fuel storage through its license extension period of 2050, if granted.
In January 2006, FPL Energy completed the acquisition of a 70% interest, or approximately 415 mw, in Duane Arnold, a nuclear power plant located near Cedar Rapids, Iowa, from IP&L. FPL Energy is selling its share of the output of Duane Arnold to IP&L, under a long-term contract expiring in 2014. FPL Energy is responsible for management and operation of the plant, as well as for the ultimate decommissioning of the facility, the cost of which will be shared on a pro-rata basis by the joint owners. FPL Energy expects to file for a license extension for the plant in 2009, which, if approved, will enable the plant to continue to operate for an additional 20 years beyond its current license expiration of 2014. Duane Arnold's next scheduled refueling outage is in February 2007. Duane Arnold is using a spent fuel pool and dry cask storage for storing its spent fuel.
Energy Marketing and Trading. PMI, a subsidiary of FPL Energy, buys and sells wholesale energy commodities, such as natural gas, oil and electricity. PMI procures natural gas and oil for FPL Energy's use in power generation. PMI also sells the output from FPL Energy's plants which has not been sold under long-term contracts and purchases replacement power. PMI uses derivative instruments, such as swaps, options and forwards to manage the risk associated with fluctuating commodity prices and to optimize the value of FPL Energy's power generation assets. To a lesser extent, PMI engages in limited energy trading activities to take advantage of expected future favorable price movements. FPL Energy also provides full service requirements services to distribution utilities in certain markets. These services include load-following services, which require the supplier of energy to vary the quantity delivered based on the load demand needs of the customer, as well as various ancillary services. The results of PMI's activities are recognized in FPL Energy's operating results. See Management's Discussion - Energy Marketing and Trading and Market Risk Sensitivity, Note 1 - Energy Trading and Note 4.
Environmental. FPL Energy is subject to the same environmental laws and regulations and is affected by the same emerging issues included in the discussion of FPL's business (see FPL Operations - Environmental). While the final requirements for Section 111 of the Clean Air Act for mercury emissions are uncertain, it is possible that the final Clean Air Act Mercury/Nickel Rule may require a 44 mw coal-fired FPL Energy unit in California to add additional pollution control equipment or purchase emission allowances in order to achieve compliance with the proposed mercury emission limits. In addition, while the impact of final BART requirements of the Clean Air Visibility Rule are uncertain, it is possible that two of FPL Energy's BART eligible units located in Maine may be required to add additional controls or switch fuels to meet the BART compliance requirements. Furthermore, pursuant to a rule under Section 316(b) of the Clean Water Act, two FPL Energy plants (Seabrook and an oil-fired plant in Maine) will be required to demonstrate that they currently meet, or will meet, the prescribed performance standards for the reduction of impingement and/or entrainment at their cooling water intakes through technology, operational measures or restoration measures. FPL Energy will be conducting the necessary studies/analyses over the next several years and implementing solutions based upon regulatory approvals. The total cost of these solutions, as well as any ongoing biological monitoring that may be required, has not yet been determined.
During 2005, FPL Energy spent approximately $2 million on capital additions to comply with environmental laws and regulations. FPL Energy's capital additions to comply with environmental laws and regulations are estimated to be $5 million for 2006 through 2008, including approximately $1 million in 2006, and are included in estimated capital expenditures set forth in General above.
Employees. FPL Energy had approximately 2,030 employees at December 31, 2005. Subsidiaries of FPL Energy have collective bargaining agreements with the IBEW and the Utility Workers Union of America (UWUA), which expire in February 2008 and September 2008, respectively. The IBEW and the UWUA represented approximately 5% and 10%, respectively, of FPL Energy's employees.
14
 
OTHER FPL GROUP OPERATIONS FPL Groups Corporate and Other segment represents other business activities, primarily FPL FiberNet, that are not separately reportable. See Note 17.
FPL FiberNet. FPL FiberNet was formed in 2000 to enhance the value of FPL Groups fiber-optic network assets that were originally built to support FPL operations. Accordingly, in 2000, FPLs existing fiber-optic lines were transferred to FPL FiberNet. FPL FiberNet is a limited liability company organized under the laws of Delaware. FPL FiberNet leases wholesale fiber-optic network capacity and dark fiber to FPL and other customers, primarily telephone, internet and other telecommunications companies. Dark fiber in the Florida metro market is also sold to third parties. FPL FiberNets primary business focus is the Florida metro market. Metro networks cover Miami, Ft. Lauderdale, West Palm Beach, Tampa, St.
Petersburg, Orlando and Jacksonville. FPL FiberNet also has a long-haul network within Florida that leases bandwidth at wholesale rates. At December 31, 2005, FPL FiberNets network consisted of approximately 2,500 route miles, which interconnect major cities throughout Florida.
At December 31, 2005, FPL Groups investment in FPL FiberNet totaled approximately $203 million. FPL FiberNet invested approximately $11 million during 2005 and plans to invest a total of $55 million over the next five years to meet customers specific requirements and sustain its fiber-optic network.
EXECUTIVE OFFICERS OF FPL GROUP (a)
Name                                  Age      Position                                                                                    Effective Date Paul I. Cutler                        46      Treasurer and Assistant Secretary of FPL Group                                              February 19, 2003 Treasurer and Assistant Secretary of FPL                                                    February 18, 2003 K. Michael Davis                      59      Controller and Chief Accounting Officer of FPL Group                                        May 13, 1991 Vice President, Accounting, Controller and Chief Accounting Officer of FPL                                                                          July 1, 1991 Moray P. Dewhurst                      50      Vice President, Finance and Chief Financial Officer of FPL Group                            July 17, 2001 Senior Vice President, Finance and Chief Financial Officer of FPL                          July 19, 2001 Robert H. Escoto                      52      Vice President, Human Resources of FPL Group                                                January 25, 2005 Assistant Secretary of FPL Group                                                            November 9, 2004 Senior Vice President, Human Resources of FPL                                              February 21, 2005 Assistant Secretary of FPL                                                                  January 25, 2005 Lewis Hay, III                        50      President and Chief Executive Officer of FPL Group                                          June 11, 2001 Chairman of the Board of FPL Group                                                          January 1, 2002 Chairman of the Board and Chief Executive Officer of FPL                                    January 1, 2002 Robert L. McGrath                      52      Vice President, Engineering, Construction & Corporate Services of FPL Group                                                                  February 21, 2005 Senior Vice President, Engineering, Construction & Corporate Services of FPL                                                                        February 21, 2005 Armando J. Olivera                    56      President of FPL                                                                            June 24, 2003 James L. Robo                          43      Vice President, Corporate Development and Strategy of FPL Group                            March 11, 2002 President of FPL Energy                                                                    July 26, 2002 Antonio Rodriguez                      63      Senior Vice President, Power Generation Division of FPL                                    July 1, 1999 John A. Stall                          51      Senior Vice President, Nuclear Division of FPL                                              June 4, 2001 Edward F. Tancer                      44      Vice President & General Counsel of FPL Group                                              February 21, 2005 Assistant Secretary of FPL Group                                                            January 1, 1997 Senior Vice President & General Counsel of FPL                                              February 21, 2005 Assistant Secretary of FPL                                                                  January 1, 1997 (a) Executive officers are elected annually by, and serve at the pleasure of, their respective boards of directors. Except as noted below, each officer has held his present position for five years or more and his employment history is continuous. The business experience of the executive officers is as follows: Mr. Cutler was assistant treasurer of FPL Group from May 1999 to February 2003. He was assistant treasurer of FPL from May 1997 to February 2003. Mr. Cutler has served as assistant secretary of FPL Group and FPL since December 1997. Prior to July 17, 2001, Mr. Dewhurst was senior partner of Dean & Company, a management consulting and investment firm that he co-founded in 1993. Mr. Escoto was vice president, human resources of FPL from March 2004 to February 2005. Mr.
Escoto has served as vice president, human resources of FPL Energy since April 2002. Prior to that, Mr. Escoto was director of human resources of FPL. Mr. Hay was president of FPL Energy from March 2000 to December 2001. Mr. McGrath was senior vice president, engineering and construction of FPL from November 2002 to February 2005 and treasurer of FPL Group and FPL from January 2000 to November 2002. He was also vice president, finance and chief financial officer of FPL Energy from June 2000 to November 2002. Mr. Olivera was senior vice president, power systems of FPL from July 1999 to June 2003. Prior to March 2002, Mr. Robo was president and chief executive officer of TIP, a GE Capital Company that provides trailer and storage equipment services, and GE Capital Modular Space, a supplier of mobile and modular buildings. Mr. Stall was vice president of nuclear engineering of FPL from January 2000 to June 2001. Mr.
Tancer was associate general counsel of FPL Group from April 2003 to February 2005. He was also vice president and general counsel of FPL Energy from February 2001 to February 2005.
Item 1A. Risk Factors Risks Relating to FPL Groups and FPLs Business FPL Group and FPL are subject to complex laws and regulations and to changes in laws and regulations as well as changing governmental policies and regulatory actions, including initiatives regarding deregulation and restructuring of the energy industry. FPL holds franchise agreements with local municipalities and counties, and must renegotiate expiring agreements. These factors may have a negative impact on the business and results of operations of FPL Group and FPL.
15
* FPL Group and FPL are subject to complex laws and regulations, and to changes in laws or regulations, including the PURPA, the Holding Company Act, the Federal Power Act, the Atomic Energy Act of 1954, as amended, the 2005 Energy Act and certain sections of the Florida statutes relating to public utilities, changing governmental policies and regulatory actions, including those of the FERC, the FPSC and the legislatures and utility commissions of other states in which FPL Group has operations, and the NRC, with respect to, among other things, allowed rates of return, industry and rate structure, operation of nuclear power facilities, operation and construction of plant facilities, operation and construction of transmission facilities, acquisition, disposal, depreciation and amortization of assets and facilities, recovery of fuel and purchased power costs, decommissioning costs, ROE and equity ratio limits, and present or prospective wholesale and retail competition (including but not limited to retail wheeling and transmission costs). The FPSC has the authority to disallow recovery by FPL of any and all costs that it considers excessive or imprudently incurred. The regulatory process generally restricts FPLs ability to grow earnings and does not provide any assurance as to achievement of earnings levels.
* FPL Group and FPL are subject to extensive federal, state and local environmental statutes as well as the effect of changes in or additions to applicable statutes, rules and regulations relating to air quality, water quality, waste management, wildlife mortality, natural resources and health and safety that could, among other things, restrict or limit the output of certain facilities or the use of certain fuels required for the production of electricity and/or require additional pollution control equipment and otherwise increase costs. There are significant capital, operating and other costs associated with compliance with these environmental statutes, rules and regulations, and those costs could be even more significant in the future.
* FPL Group and FPL operate in a changing market environment influenced by various legislative and regulatory initiatives regarding deregulation, regulation or restructuring of the energy industry, including deregulation or restructuring of the production and sale of electricity. FPL Group and its subsidiaries will need to adapt to these changes and may face increasing competitive pressure.
* FPL Groups and FPLs results of operations could be affected by FPLs ability to renegotiate franchise agreements with municipalities and counties in Florida.
The operation of power generation facilities, including nuclear facilities, involves significant risks that could adversely affect the results of operations and financial condition of FPL Group and FPL.
* The operation of power generation facilities involves many risks, including start up risks, breakdown or failure of equipment, transmission lines or pipelines, use of new technology, the dependence on a specific fuel source, including the supply and transportation of fuel, or the impact of unusual or adverse weather conditions (including natural disasters such as hurricanes), as well as the risk of performance below expected or contracted levels of output or efficiency. This could result in lost revenues and/or increased expenses, including the requirement to purchase power in the market at potentially higher prices to meet its contractual obligations. Insurance, warranties or performance guarantees may not cover any or all of the lost revenues or increased expenses, including the cost of replacement power. In addition to these risks, FPL Groups and FPLs nuclear units face certain risks that are unique to the nuclear industry including the ability to store and/or dispose of spent nuclear fuel, the potential payment of significant retrospective insurance premiums, as well as additional regulatory actions up to and including shutdown of the units stemming from public safety concerns, whether at FPL Groups and FPLs plants, or at the plants of other nuclear operators. Breakdown or failure of an operating facility of FPL Energy may prevent the facility from performing under applicable power sales agreements which, in certain situations, could result in termination of the agreement or incurring a liability for liquidated damages.
The construction of, and capital improvements to, power generation facilities involve substantial risks. Should construction or capital improvement efforts be unsuccessful, the results of operations and financial condition of FPL Group and FPL could be adversely affected.
* FPL Groups and FPLs ability to successfully and timely complete their power generation facilities currently under construction, those projects yet to begin construction or capital improvements to existing facilities within established budgets is contingent upon many variables and subject to substantial risks. Should any such efforts be unsuccessful, FPL Group and FPL could be subject to additional costs, termination payments under committed contracts, and/or the write-off of their investment in the project or improvement.
The use of derivative contracts by FPL Group and FPL in the normal course of business could result in financial losses that negatively impact the results of operations of FPL Group and FPL.
* FPL Group and FPL use derivative instruments, such as swaps, options and forwards to manage their commodity and financial market risks, and to a lesser extent, engage in limited trading activities. FPL Group could recognize financial losses as a result of volatility in the market values of these contracts, or if a counterparty fails to perform. In the absence of actively quoted market prices and pricing information from external sources, the valuation of these derivative instruments involves managements judgment or use of estimates. As a result, changes in the underlying assumptions or use of alternative valuation methods could affect the reported fair value of these contracts. In addition, FPLs use of such instruments could be subject to prudency challenges and if found imprudent, cost recovery could be disallowed by the FPSC.
FPL Groups competitive energy business is subject to risks, many of which are beyond the control of FPL Group, that may reduce the revenues and adversely impact the results of operations and financial condition of FPL Group.
16
* There are other risks associated with FPL Groups competitive energy business. In addition to risks discussed elsewhere, risk factors specifically affecting FPL Energys success in competitive wholesale markets include the ability to efficiently develop and operate generating assets, the successful and timely completion of project restructuring activities, maintenance of the qualifying facility status of certain projects, the price and supply of fuel (including transportation),
transmission constraints, competition from new sources of generation, excess generation capacity and demand for power. There can be significant volatility in market prices for fuel and electricity, and there are other financial, counterparty and market risks that are beyond the control of FPL Energy. FPL Energys inability or failure to effectively hedge its assets or positions against changes in commodity prices, interest rates, counterparty credit risk or other risk measures could significantly impair FPL Groups future financial results. In keeping with industry trends, a portion of FPL Energys power generation facilities operate wholly or partially without long-term power purchase agreements. As a result, power from these facilities is sold on the spot market or on a short-term contractual basis, which may affect the volatility of FPL Groups financial results. In addition, FPL Energys business depends upon transmission facilities owned and operated by others; if transmission is disrupted or capacity is inadequate or unavailable, FPL Energys ability to sell and deliver its wholesale power may be limited.
FPL Groups ability to successfully identify, complete and integrate acquisitions, including the proposed merger with Constellation Energy is subject to significant risks, including the effect of increased competition for acquisitions resulting from the consolidation of the power industry.
* FPL Group is likely to encounter significant competition for acquisition opportunities that may become available as a result of the consolidation of the power industry, in general, as well as the passage of the 2005 Energy Act. In addition, FPL Group may be unable to identify attractive acquisition opportunities at favorable prices and to successfully and timely complete and integrate them.
* FPL Groups ability to successfully complete and integrate the proposed merger between FPL Group and Constellation Energy is subject to certain risks and uncertainties including the ability to obtain governmental approvals of the transaction on the proposed terms, conditions and schedule; the failure of FPL Group or Constellation Energys shareholders to approve the transaction; the risk that anticipated synergies will not be achieved or will take longer to achieve than expected; disruption from the transaction making it more difficult to maintain relationships with customers, employees, suppliers or governmental entities; unexpected transaction costs or liabilities; economic conditions; and other specific factors discussed in documents filed with the SEC by both FPL Group and Constellation Energy. These risks, as well as other risks associated with the merger, will be more fully discussed in the joint proxy statement/prospectus that will be included in the Registration Statement on Form S-4 that Constellation Energy will file with the SEC in connection with the proposed merger.
Because FPL Group and FPL rely on access to capital markets, the inability to maintain current credit ratings and access capital markets on favorable terms may limit the ability of FPL Group and FPL to grow their businesses and would likely increase interest costs.
* FPL Group and FPL rely on access to capital markets as a significant source of liquidity for capital requirements not satisfied by operating cash flows. The inability of FPL Group, FPL Group Capital and FPL to maintain their current credit ratings could affect their ability to raise capital on favorable terms, particularly during times of uncertainty in the capital markets, which, in turn, could impact FPL Groups and FPLs ability to grow their businesses and would likely increase their interest costs.
Customer growth in FPLs service area affects FPL Groups results of operations.
* FPL Groups results of operations are affected by the growth in customer accounts in FPLs service area. Customer growth can be affected by population growth as well as economic factors in Florida, including job and income growth, housing starts and new home prices. Customer growth directly influences the demand for electricity and the need for additional power generation and power delivery facilities at FPL.
Weather affects FPL Groups and FPLs results of operations.
* FPL Groups and FPLs results of operations are affected by changes in the weather. Weather conditions directly influence the demand for electricity and natural gas and affect the price of energy commodities, and can affect the production of electricity at wind and hydro-powered facilities. FPL Groups and FPLs results of operations can be affected by the impact of severe weather which can be destructive, causing outages and/or property damage, may affect fuel supply, and could require additional costs to be incurred. At FPL, recovery of these costs is subject to FPSC approval.
FPL Group and FPL are subject to costs and other effects of legal proceedings as well as changes in or additions to applicable tax laws, rates or policies, rates of inflation, accounting standards, securities laws and corporate governance requirements.
* FPL Group and FPL are subject to costs and other effects of legal and administrative proceedings, settlements, investigations and claims, as well as the effect of new, or changes in, tax laws, rates or policies, rates of inflation, accounting standards, securities laws and corporate governance requirements.
Threats of terrorism and catastrophic events that could result from terrorism may impact the operations of FPL Group and FPL in unpredictable ways.
17
* FPL Group and FPL are subject to direct and indirect effects of terrorist threats and activities. Generation and transmission facilities, in general, have been identified as potential targets. The effects of terrorist threats and activities include, among other things, terrorist actions or responses to such actions or threats, the inability to generate, purchase or transmit power, the risk of a significant slowdown in growth or a decline in the U.S. economy, delay in economic recovery in the U.S., and the increased cost and adequacy of security and insurance.
The ability of FPL Group and FPL to obtain insurance and the terms of any available insurance coverage could be affected by national, state or local events and company-specific events.
* FPL Groups and FPLs ability to obtain insurance, and the cost of and coverage provided by such insurance, could be affected by national, state or local events as well as company-specific events.
FPL Group and FPL are subject to employee workforce factors that could affect the businesses and financial condition of FPL Group and FPL.
* FPL Group and FPL are subject to employee workforce factors, including loss or retirement of key executives, availability of qualified personnel, collective bargaining agreements with union employees and work stoppage that could affect the businesses and financial condition of FPL Group and FPL.
Item 1B. Unresolved Staff Comments None Item 2. Properties FPL Group and its subsidiaries maintain properties which are adequate for their operations. At December 31, 2005, the electric generating, transmission, distribution and general facilities of FPL represented approximately 45%, 12%, 37% and 6%, respectively, of FPLs gross investment in electric utility plant in service.
Generating Facilities. At December 31, 2005, FPL Group had the following generating facilities:
Net Capability FPL Facilities                                        Location                                No. of Units    Fuel                        (mw) (a)
Nuclear St. Lucie                                          Hutchinson Island, FL                        2          Nuclear                        1,553 (b)
Turkey Point                                      Florida City, FL                              2          Nuclear                        1,386 Steam turbines Cape Canaveral                                    Cocoa, FL                                    2          Oil/Gas                          798 Cutler                                            Miami, FL                                    2          Gas                              170 Manatee                                            Parrish, FL                                  2          Oil/Gas                        1,620 Martin                                            Indiantown, FL                                2          Oil/Gas                        1,643 Port Everglades                                    Port Everglades, FL                          4          Oil/Gas                        1,200 Riviera                                            Riviera Beach, FL                            2          Oil/Gas                          556 St. Johns River Power Park                        Jacksonville, FL                              2          Coal/Petroleum Coke              232 (c)
Sanford                                            Lake Monroe, FL                              1          Oil/Gas                          138 Scherer                                            Monroe County, GA                            1          Coal                            639 (d)
Turkey Point                                      Florida City, FL                              2          Oil/Gas                          785 Combined-cycle Fort Myers                                        Fort Myers, FL                                1          Gas                            1,441 Lauderdale                                        Dania, FL                                    2          Gas/Oil                          859 Manatee                                            Parrish, FL                                  1          Gas                            1,107 Martin                                            Indiantown, FL                                1          Gas/Oil                        1,107 Martin                                            Indiantown, FL                                2          Gas                              899 Putnam                                            Palatka, FL                                  2          Gas/Oil                          494 Sanford                                            Lake Monroe, FL                              2          Gas                            1,904 Simple-cycle combustion turbines Fort Myers                                        Fort Myers, FL                                1          Gas/Oil                          326 Gas turbines/diesels Fort Myers                                        Fort Myers, FL                              12          Oil                              648 Lauderdale                                        Dania, FL                                    24          Oil/Gas                          840 Port Everglades                                    Port Everglades, FL                          12          Oil/Gas                          420 Turkey Point                                      Florida City, FL                              5          Oil                              12 TOTAL                                                                                                                                        20,777 (e)
(a) Represents FPLs net ownership interest in plant capacity.
(b) Excludes Orlando Utilities Commissions and the FMPAs combined share of approximately 15% of St. Lucie Unit No. 2.
(c)  Represents FPLs 20% ownership interest in each of St. Johns River Power Park Units Nos. 1 and 2, which are jointly owned with JEA.
(d) Represents FPLs approximately 76% ownership of Scherer Unit No. 4, which is jointly owned with JEA.
(e) Substantially all of FPLs properties are subject to the lien of FPLs mortgage.
18
 
No. of                                    Net Capability FPL Energy Facilities                      Location                                                      Units      Fuel                            (mw)(a)
Wind Cabazon                                Riverside County, CA                                            53      Wind                                  40 Callahan Divide (b)                    Taylor County, TX                                                76      Wind                                114 (b)
Cerro Gordo                            Cerro Gordo County, IA                                          55      Wind                                  41 Delaware Mountain                      Culberson County, TX                                            39      Wind                                  30 Diablo Wind                            Alameda County, CA                                              31      Wind                                  21 Gray County                            Gray County, KS                                                170      Wind                                112 Green Mountain                          Somerset County, PA                                              8      Wind                                  10 Green Power                            Riverside County, CA                                            22      Wind                                  17 Hancock County (b)                      Hancock County, IA                                              148      Wind                                  98 (b)
High Winds                              Solano County, CA                                                90      Wind                                162 (b)
Horse Hollow                            Taylor County, TX                                              140      Wind                                210 Indian Mesa                            Upton County, TX                                                125      Wind                                  83 King Mountain                          Upton County, TX                                                215      Wind                                281 Lake Benton II (b)                      Pipestone County, MN                                            138      Wind                                104 (b)
Meyersdale                              Somerset County, PA                                              20      Wind                                  30 Mill Run                                Fayette County, PA                                              10      Wind                                  15 (b)
Montfort                                Iowa County, WI                                                  20      Wind                                  30 Mountaineer (b)                        Preston & Tucker Counties, WV                                    44      Wind                                  66 (b)
New Mexico                              Quay & Debaca Counties, NM                                      136      Wind                                204 (b)
North Dakota                            LaMoure County, ND                                              41      Wind                                  62 (b)
Oklahoma / Sooner                      Harper & Woodward Counties, OK                                  68      Wind                                102 Sky River                              Kern County, CA                                                342      Wind                                  77 Somerset Wind Power                    Somerset County, PA                                              6      Wind                                  9 South Dakota (b)                        Hyde County, SD                                                  27      Wind                                  41 Southwest Mesa (b)                      Upton & Crockett Counties, TX                                  107      Wind                                  75 Stateline (b)                          Umatilla County, OR and Walla Walla County, WA                  454      Wind                                300 Vansycle (b)                            Umatilla County, OR                                              38      Wind                                  25 Victory Garden                          Kern County, CA                                                  96      Wind                                  22 (b)
Waymart                                Wayne County, PA                                                43      Wind                                  65 Weatherford Wind                        Custer County, OK                                                98      Wind                                147 Wilton Wind                            Burleigh County, ND                                              21      Wind                                  31 (c)
Windpower Partners 1994 (b)            Culberson County, TX                                            112      Wind                                  27 Woodward Mountain                      Upton & Pecos Counties, TX                                      242      Wind                                160 Wyoming (b)                            Uinta County, WY                                                80      Wind                                144 (d)
Investments in joint ventures          Various                                                      3,199                                          237 Total Wind                                                                                                                                      3,192 Contracted Bayswater (b)                          Far Rockaway, NY                                                  2      Gas                                  56 Calhoun (b)                            Eastaboga, AL                                                    4      Gas                                  668 Doswell (b)                            Ashland, VA                                                      6      Gas/Oil                            708 Jamaica Bay (b)                        Far Rockaway, NY                                                  2      Oil/Gas                              54 Port of Stockton                        Stockton, CA                                                      1      Coal/Petroleum Coke                  44 (e)
Investments in joint ventures          Various                                                          18                                          516 Total Contracted                                                                                                                                2,046 Merchant Blythe Energy                          Blythe, CA                                                        3      Gas                                507 Doswell - Expansion (b)                Ashland, VA                                                      1      Gas/Oil                            171 Forney                                  Forney, TX                                                        8      Gas                              1,700 Lamar Power Partners                    Paris, TX                                                        6      Gas                              1,000 Maine                                  Various - ME                                                      6      Oil                                656 (f)
Maine                                  Various - ME                                                    83      Hydro                                361 Marcus Hook 50                          Marcus Hook, PA                                                  1      Gas                                  50 (b)
Marcus Hook 750                        Marcus Hook, PA                                                  4      Gas                                  744 (b)
RISEP                                  Johnston, RI                                                      3      Gas                                  550 Seabrook                                Seabrook, NH                                                      1      Nuclear                          1,076 (g)
Total Merchant                                                                                                                                  6,815 TOTAL                                                                                                                                                12,053 (a) Represents FPL Energy's net ownership interest in plant capacity, and does not include the January 2006 acquisition of a 70% interest, or approximately 415 mw, in Duane Arnold.
(b) These consolidated generating facilities are encumbered by liens against their assets securing various financings.
(c)  Represents partial operations as of December 31, 2005 with the remaining 18 mw operational in January 2006.
(d) Represents plants with no more than 50% ownership using wind technology.
(e) Represents plants with no more than 50% ownership using fuels and technologies such as gas, waste-to-energy, solar and coal.
(f)  Excludes 10 other energy-related partners' combined share of 38.22%.
(g) Excludes Massachusetts Municipal Wholesale Electric Company's, Taunton Municipal Lighting Plant's and Hudson Light & Power Department's combined share of 11.77%.
19
 
Transmission and Distribution. At December 31, 2005, FPL owned and operated the following electric transmission and distribution lines:
Nominal                  Overhead Lines                Trench and Submarine Voltage                    Pole Miles                    Cables Miles 500 kv                                1,106 (a)                          -
230 kv                                2,771                            25 138 kv                                1,588                            50 115 kv                                  752                              -
69 kv                                  164                            14 Less than 69 kv                      41,343                        24,427 Total                                47,724                        24,516 (a) Includes approximately 75 miles owned jointly with JEA.
In addition, at December 31, 2005, FPL owned and operated 543 substations, one of which is jointly owned. See Note 8.
Character of Ownership. Substantially all of FPLs properties are subject to the lien of FPLs mortgage, which secures most debt securities issued by FPL. The majority of FPL Groups principal properties are held by FPL in fee and are free from other encumbrances, subject to minor exceptions, none of which is of such a nature as to substantially impair the usefulness to FPL of such properties. Some of FPLs electric lines are located on land not owned in fee but are covered by necessary consents of governmental authorities or rights obtained from owners of private property. A number of FPL Energys generating facilities are encumbered by liens against their assets securing various financings. See Generating Facilities and Note 1 - Electric Plant, Depreciation and Amortization.
Item 3. Legal Proceedings In November 1999, the Attorney General of the United States, on behalf of the EPA, brought an action in the U.S. District Court for the Northern District of Georgia against Georgia Power Company and other subsidiaries of The Southern Company for certain alleged violations of the Prevention of Significant Deterioration (PSD) provisions and the New Source Performance Standards (NSPS) of the Clean Air Act. In May 2001, the EPA amended its complaint. The amended complaint alleges, among other things, that Georgia Power Company constructed and is continuing to operate Scherer Unit No. 4, in which FPL owns a 76% interest, without obtaining a PSD permit, without complying with NSPS requirements, and without applying best available control technology for nitrogen oxides, sulfur dioxides and particulate matter as required by the Clean Air Act. It also alleges that unspecified major modifications have been made at Scherer Unit No. 4 that require its compliance with the aforementioned Clean Air Act provisions. The EPA seeks injunctive relief requiring the installation of best available control technology and civil penalties of up to $25,000 per day for each violation from an unspecified date after June 1, 1975 through January 30, 1997 and $27,500 per day for each violation thereafter. The EPA further revised its civil penalty rule in February 2004, such that the maximum penalty is $32,500 per day for each violation after March 15, 2004. Georgia Power Company has answered the amended complaint, asserting that it has complied with all requirements of the Clean Air Act, denying the plaintiff's allegations of liability, denying that the plaintiff is entitled to any of the relief that it seeks and raising various other defenses. In June 2001, the federal district court stayed discovery and administratively closed the case pending resolution of the EPA's motion for consolidation of discovery in several Clean Air Act cases that was filed with a Multi-District Litigation (MDL) panel. In August 2001, the MDL panel denied the motion for consolidation. In September 2001, the EPA moved that the federal district court reopen this case for purposes of discovery. Georgia Power Company opposed that motion asking that the case remain closed until the Eleventh Circuit Court of Appeals ruled on the Tennessee Valley Authority's (TVA) appeal of an EPA administrative compliance order relating to legal issues that are also central to this case. In August 2002, the federal district court denied without prejudice the EPA's motion to reopen. In June 2003, the Eleventh Circuit issued its order dismissing the TVA's appeal because it found the provision of the Clean Air Act allowing the EPA to issue binding administrative compliance orders was unconstitutional, and hence found that the TVA order was a non-final order that courts of appeal do not have jurisdiction to review. In September 2003, the Eleventh Circuit denied the EPA's motion for rehearing. In May 2004, the U.S. Supreme Court denied the EPA's petition for review of the Eleventh Circuit order. The EPA has not yet moved to reopen the Georgia Power Company case.
In November 2001, J. W. and Ernestine M. Thomas, Chester and Marie Jenkins (since substituted for by Hazel and Lamar Jenkins), and Ray Norman and Jack Teague, as Co-Personal Representatives on behalf of the Estate of Robert L. Johns, served FPL Group, FPL, FPL FiberNet, FPL Group Capital and FPL Investments, Inc. (FPL Investments) as defendants in a civil action filed in the Circuit Court for Suwanee County, Florida. This action was purportedly on behalf of all property owners in Florida (excluding railroad and public rights of way) whose property is encumbered by easements in favor of FPL, and on whose property defendants have installed or intend to install fiber-optic cable which defendants currently lease, license or convey or intend to lease, license or convey for non-electric transmission or distribution purposes. The lawsuit alleged that FPL's easements do not permit the installation and use of fiber-optic cable for general communication purposes. The plaintiffs asserted claims for unlawful detainer, unjust enrichment and constructive trust and sought injunctive relief and compensatory damages. In May 2002, plaintiffs filed an amended complaint, adding allegations regarding the installation of wireless communications equipment on some easements, and adding a claim for declaratory relief. Defendants filed an answer and affirmative defenses to the amended complaint in August 2002. Motions for summary judgment by FPL Group, 20
 
FPL Group Capital and FPL Investments were granted, and they were dismissed from this lawsuit. In February 2004, the plaintiffs filed a motion for leave to file their third amended complaint adding four more plaintiffs and seeking leave to add a claim for punitive damages, and a hearing on this motion was held on April 29, 2005. In July 2005, the parties executed a settlement agreement, subject to court approval. The settlement resolved all aspects of the case and does not contain any admission of liability or wrongdoing by any of the FPL Group companies. The court entered its final order and judgment approving the settlement in January 2006.
In August 2001, FMPA filed with the U.S. Court of Appeals for the District of Columbia (DC Circuit) a petition for review asking the DC Circuit to reverse and remand orders of the FERC denying FMPAs request for credits for transmission facilities owned by FMPA members. The transmission credits sought by FMPA would offset the transmission charges that FPL bills FMPA for network transmission service to FMPAs member cities. FMPA member cities have been taking network transmission service under FPLs open access transmission tariff since 1996. In the orders appealed by FMPA, the FERC ruled that FMPA would be entitled to credits for any FMPA facilities that were "integrated" with the FPL transmission system. Based on the evidence submitted, the FERC concluded that none of the FMPA facilities met the integration test and, therefore, FMPA was not entitled to credits against FPLs charges for transmission service. In January 2003, the DC Circuit upheld the FERCs order denying FMPA credits for its facilities; in March 2003, the DC Circuit denied FMPAs rehearing request of the DC Circuits decision; and in October 2003, the U.S. Supreme Court denied FMPAs petition for review of the DC Circuits decision.
FMPA also has requested that the FERC decide the same crediting issue in a separate FERC proceeding. That proceeding dates back to a filing by FPL in 1993 of a comprehensive restructuring of its then-existing tariff structure. All issues in that case were settled in September 2000 except for three issues reserved by FMPA: (i) the crediting issue, (ii) treatment of behind-the-meter generation and load ratio pricing for network integration transmission service, and (iii) exclusions from FPLs transmission rates of the costs of FPLs facilities that failed to meet the same integration test that was applied to FMPAs facilities with respect to the crediting issue. In December 2003, the FERC issued an order addressing the three reserved issues. With respect to the crediting issue, the FERC stated that it had previously determined that FMPA was not entitled to credits for its facilities in the related proceeding discussed above and saw no persuasive reason to revisit that determination in this proceeding. Regarding the issue of behind-the-meter generation, the FERC stated that it had addressed the issue of load ratio pricing for network integration transmission service and the related issue of behind-the-meter generation in Order Nos. 888 and 888-A, and saw no persuasive reason to revisit that determination in this proceeding. With respect to the third issue, the FERC directed FPL to make a compliance filing of a proposed rate schedule that does not include those facilities of FPL that fail to meet the same integration test applied to the FMPA facilities.
In January 2004, FMPA requested a "conditional rehearing on the Commissions failure to order rate credits solely in the event that Commission does not adequately reduce FPLs rate base to achieve comparability," and challenging the FERCs determination not to revisit the issue of behind-the-meter generation and load ratio pricing for network integration transmission service. In March 2004, the FERC issued an order denying FMPAs rehearing request. In April 2004, FMPA petitioned the DC Circuit for review of the FERCs December 2003 order and March 2004 order. FMPA filed its initial brief in that proceeding in October 2004. FMPAs arguments are limited to the issue of behind-the-meter generation and load ratio pricing for network integration transmission service in instances when, according to FMPA, FPL cannot provide transmission service because of "physical transmission limitations." In June 2005, the DC Circuit remanded the case to the FERC for further consideration. The DC Circuit concluded that the FERC failed to explain in its orders why network customers should be charged by the transmission provider for network service that the provider is physically constrained from offering and why physical impossibility should not be recognized as an exception to the general rule against permitting partial load ratio pricing for network customers. The DC Circuit noted that it was not reaching a determination on whether charging on a full load basis in fact is unjust and unreasonable under the circumstances, that it was not defining what constitutes physical impossibility, and that it was not determining whether FMPA made a showing of impossibility. In December 2005, the FERC issued an order on remand answering the DC Circuits question by finding that FPL is entitled to load ratio share pricing, notwithstanding constraints on a third-partys system. In January 2006, FMPA filed a rehearing request of this order with the FERC.
In May 2004, FPL made a compliance filing of a proposed rate schedule that does not include those facilities of FPL that fail to meet the same integration test that was applied to the FMPA facilities. Pursuant to this filing, 1.63% of FPL's transmission facilities do not satisfy the integration standard and FPL's current network transmission rate would be reduced by $0.02 per kilowatt (kw) per month. In June 2004, FMPA filed a protest to FPL's compliance filing, which protest would exclude approximately 30% of FPL's transmission facilities and reduce FPL's current network transmission rate by approximately
$0.41 per kw per month. In January 2005, the FERC issued an order on FPL's compliance filing. In the order, the FERC accepted FPL's standards for analyzing the transmission system and agreed that FPL's "Georgia Ties" and "Turkey Point Lines" are part of FPL's integrated grid. The FERC required FPL to make an additional compliance filing removing the cost of all radial transmission lines from transmission rates, rather than only radial lines that serve one customer, analyzing the FPL transmission system to remove the cost of any transmission facilities that provide only "unneeded redundancy," and calculating rate adjustments using 1993 data rather than 1998 data. FPL made this compliance filing in April 2005, reducing FPLs rate $0.04 per kw per month resulting in a refund obligation to FMPA of approximately $3 million at December 31, 2005. In May 2005, FMPA protested FPLs compliance filing, claiming that FPL had not followed the FERCs mandate and argued that FPLs rates should be reduced by an additional $0.20, potentially resulting in a refund obligation to FMPA of approximately $18 million at December 31, 2005. Any reduction in FPLs network service rate also would apply effective January 1, 2004 to Seminole Electric Cooperative Inc. (Seminole), FPLs other network customer. The refund obligation to Seminole at December 31, 2005 would be approximately $1 million under FPLs filing and approximately $5 million based on FMPAs position.
21
 
In December 2005, the FERC issued an order accepting FPLs April 2005 compliance filing in part, rejecting it in part, and directing the submission of a further compliance filing. The FERC accepted FPLs compliance filing wherein FPL proposed a reduction in its rate base created by the exclusion of certain radial lines valued at $29 million net plant. However, the FERC concluded that it is not clear whether FPL failed to test its non-radial facilities in a manner comparable to the way it tested FMPAs facilities. The December 2005 order asks FPL to make a further compliance filing in 60 days to explain the meaning of "unserved load" as it applies to Florida Reliability Coordinating Council (FRCC) standards, and to remove from rates any facility where the unserved load occurred only as a result of the contingency facility. The FERC noted that FRCC and NERC standards allow for the controlled loss of load on radial facilities and that FPL tested FMPA facilities for loss of local load as well as load at other load centers. FPL filed a rehearing request in January 2006, contending that the FERC misapplied FRCC/NERC planning criteria for radial facilities to network systems and misinterpreted the test FPL applied to FMPA facilities. FPL also filed a request to delay the compliance filing pending FERC action on FPLs rehearing request.
In 1995 and 1996, FPL Group, through an indirect subsidiary, purchased from Adelphia Communications Corporation (Adelphia) 1,091,524 shares of Adelphia common stock and 20,000 shares of Adelphia preferred stock (convertible into 2,358,490 shares of Adelphia common stock) for an aggregate price of approximately $35,900,000. On January 29, 1999, Adelphia repurchased all of these shares for $149,213,130 in cash. On June 24, 2004, Adelphia, Adelphia Cablevision, L.L.C. and the Official Committee of Unsecured Creditors of Adelphia filed a complaint against FPL Group and its indirect subsidiary in the U.S. Bankruptcy Court, Southern District of New York. The complaint alleges that the repurchase of these shares by Adelphia was a fraudulent transfer, in that at the time of the transaction Adelphia (i) was insolvent or was rendered insolvent, (ii) did not receive reasonably equivalent value in exchange for the cash it paid, and (iii) was engaged or about to engage in a business or transaction for which any property remaining with Adelphia had unreasonably small capital. The complaint seeks the recovery for the benefit of Adelphia's bankruptcy estate of the cash paid for the repurchased shares, plus interest. FPL Group has filed an answer to the complaint and discovery has commenced. FPL Group believes that the complaint is without merit because, among other reasons, Adelphia will be unable to demonstrate that (i) Adelphia's repurchase of shares from FPL Group, which repurchase was at the market value for those shares, was not for reasonably equivalent value, (ii) Adelphia was insolvent at the time of the repurchase, or (iii) the repurchase left Adelphia with unreasonably small capital. The case has been set for trial in August 2007.
In February 2003, Scott and Rebecca Finestone brought an action on behalf of themselves and their son Zachary Finestone in the U.S. District Court for the Southern District of Florida alleging that their son has developed cancer (neuroblastoma) as a result of the release and/or dissipation into the air, water, soil and underground areas of radioactive and non-radioactive hazardous materials, including strontium 90, and the release of other toxic materials from FPL's St. Lucie nuclear power plant. The complaint, as subsequently amended, includes counts against FPL for strict liability for allegedly engaging in an ultra-hazardous activity and for alleged negligence in operating the plant in a manner that allowed emissions of the foregoing materials and failing to limit its release of nuclear fission products as prescribed by federal and state laws and regulations. The plaintiffs seek damages in excess of $1 million. In January 2006, the court granted FPL's motion for final summary judgment and dismissed the case. On February 8, 2006, the plaintiffs filed a notice of appeal of the courts decision granting final summary judgment for FPL.
In May 2003, Tish Blake and John Lowe, as personal representatives of the Estate of Ashton Lowe, on behalf of the estate and themselves, as surviving parents, brought an action in the U.S. District Court for the Southern District of Florida alleging that their son developed cancer (medulo-blastoma) as a result of the release and/or dissipation into the air, water, soil and underground areas of radioactive and non-radioactive hazardous materials, including strontium 90, and the release of other toxic materials from FPL's St. Lucie nuclear power plant. The allegations, counts and damages demanded in the complaint, as subsequently amended, are virtually identical to those contained in the Finestone lawsuit described above. In January 2006, the court granted FPL's motion for final summary judgment and dismissed the case. On February 8, 2006, the plaintiffs filed a notice of appeal of the courts decision granting final summary judgment for FPL.
In August 2003, Pedro C. and Emilia Roig brought an action on behalf of themselves and their son, Pedro Anthony Roig, in th the Circuit Court of the 11 Judicial Circuit in and for Miami-Dade County, Florida (the state court), which was removed in October 2003 to the U.S. District Court for the Southern District of Florida, against Aventis Pasteur and a number of other named and unnamed drug manufacturing and distribution companies and FPL, alleging that their son has suffered toxic neurological effects from mercury poisoning. The sources of mercury exposure are alleged to be vaccines containing a preservative called thimerosal that were allegedly manufactured and distributed by the drug companies, mercury amalgam dental fillings, and emissions from FPL power plants in southeast Florida. The complaint includes counts against all defendants for civil battery and against FPL for alleged negligence in operating the plants such that the son was exposed to mercury and other heavy metals emissions. The damages demanded from FPL are for injuries and losses allegedly suffered by the son as a result of his exposure to the plants' mercury emissions and the parents' alleged pain and suffering, medical expenses, loss of wages, and loss of their son's services and companionship. No amount of damages is specified. The U.S.
District Court remanded the action back to the state court. The drug manufacturing and distribution companies have moved to dismiss the action. Plaintiffs and FPL have agreed that FPL will not respond to the complaint until the state court rules on those motions.
In December 2003, Edward and Janis Shiflett brought an action on behalf of themselves and their son, Phillip Benjamin th Shiflett, in the Circuit Court of the 18 Judicial Circuit in and for Brevard County, Florida (the state court), which was removed in January 2004 to the U.S. District Court for the Middle District of Florida, against Aventis Pasteur and a number of other named and unnamed drug manufacturing and distribution companies, FPL and the Orlando Utilities Commission, alleging 22
 
that their son has suffered toxic neurological effects from mercury poisoning. The allegations, counts and damages demanded in the complaint with respect to FPL are virtually identical to those contained in the Roig lawsuit described above. FPLs motion to dismiss the complaint was denied. The U.S. District Court subsequently remanded the action back to the state court. All parties anticipate that the drug manufacturing and distribution companies will move to dismiss the action. Plaintiffs and FPL have agreed that FPL will not respond to the complaint until the state court rules on those motions.
In October 2004, TXU Portfolio Management Company (TXU) served FPL Energy Pecos Wind I, LP, FPL Energy Pecos Wind I GP, LLC, FPL Energy Pecos Wind II, LP, FPL Energy Pecos Wind II GP, LLC and Indian Mesa Wind Farm, LP (FPL Energy Affiliates) as defendants in a civil action filed in the District Court in Dallas County, Texas. The petition alleges that the FPL Energy Affiliates had a contractual obligation to produce and sell to TXU a minimum quantity of energy each year and that the FPL Energy Affiliates failed to meet this obligation. The plaintiff has asserted claims for breach of contract and declaratory judgment and seeks damages of approximately $21 million. The FPL Energy Affiliates filed their answer and counterclaim in November 2004, denying the allegations. The counterclaim, as now amended, asserts claims for conversion, breach of fiduciary duty, breach of warranty, conspiracy, breach of contract and fraud and seeks termination of the contract and damages. At the end of 2005, TXU amended its complaint to add FPL Group, FPL Energy, FPL Group Capital and ESI Energy, LLC, as defendants. Motions to dismiss those entities as defendants have been filed. The case is in discovery and has been set for trial in October 2006.
In November 2005, Peter Rabbino and Legal Computer Consultants, Inc. brought a civil action against FPL in the Circuit Court for Broward County, Florida. This action is purportedly on behalf of all customers of FPL that lost power due to Hurricane Wilma. No class certification motion has been filed to date. The two count complaint alleges, in Count I, breach of contract and, in Count II, violation of a statute. Count I alleges that FPL failed to sufficiently maintain its system to prevent power outages due to inclement weather, including hurricanes. This count seeks injunctive relief requiring FPL to bury its lines or install stronger poles and consequential damages. Count II alleges that FPL is statutorily obligated to provide sufficient, adequate and efficient service and that FPL was grossly negligent in carrying out this obligation resulting in damages to its customers due to Hurricane Wilma. This count seeks injunctive relief and consequential damages identical to that sought in Count I. FPL filed a motion to dismiss based on a number of legal grounds, including the exclusive jurisdiction of the FPSC to govern these types of disputes. On February 8, 2006, the court granted FPLs motion to dismiss, dismissing all claims in Count I with prejudice, and dismissing Count II without prejudice except as to any claims for injunctive relief, which were dismissed with prejudice.
In addition to those legal proceedings discussed above, FPL Group and its subsidiaries, including FPL, are involved in a number of other legal proceedings and claims in the ordinary course of their businesses. In addition, generating plants in which FPL Group or FPL have an ownership interest are involved in legal proceedings and claims, the liabilities from which, if any, would be shared by FPL Group or FPL.
In the event that FPL Group and FPL do not prevail in these lawsuits, there may be a material adverse effect on their financial statements. However, FPL Group and FPL believe that they have meritorious defenses to all the pending litigation and proceedings discussed above under the heading Litigation and are vigorously defending the lawsuits. While management is unable to predict with certainty the outcome of the legal proceedings and claims discussed or described herein, based on current knowledge it is not expected that their ultimate resolution, individually or collectively, will have a material adverse effect on the financial statements.
Item 4. Submission of Matters to a Vote of Security Holders None 23
 
PART II Item 5. Market for the Registrants Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities Common Stock Data. All of FPLs common stock is owned by FPL Group. FPL Groups common stock is traded on the New York Stock Exchange. The high and low sales prices for the common stock of FPL Group as reported in the consolidated transaction reporting system of the New York Stock Exchange for each quarter during the past two years are as follows:
2005                            2004 Quarter                  High            Low              High            Low First                        $  41.38      $  35.90        $  34.41        $ 31.67 Second                      $  42.72      $  39.16        $  33.63        $ 30.10 Third                        $  48.11      $  40.30        $  34.93        $ 31.21 Fourth                      $  48.05      $  40.75        $  38.05        $ 33.67 Approximate Number of Shareholders. As of the close of business on January 31, 2006, there were 32,364 holders of record of FPL Groups common stock.
Dividends. Quarterly dividends have been paid on common stock of FPL Group during the past two years in the following amounts per share:
Quarter                2005          2004 First                  $ 0.355        $    0.31 Second                  $ 0.355        $    0.31 Third                  $ 0.355        $    0.34 Fourth                  $ 0.355        $    0.34 The amount and timing of dividends payable on FPL Groups common stock are within the sole discretion of FPL Groups board of directors. The board of directors reviews the dividend rate at least annually (generally in February) to determine its appropriateness in light of FPL Groups financial position and results of operations, legislative and regulatory developments affecting the electric utility industry in general and FPL in particular, competitive conditions and any other factors the board deems relevant. The ability of FPL Group to pay dividends on its common stock is dependent upon, among other things, dividends paid to it by its subsidiaries, primarily FPL. There are no restrictions in effect that currently limit FPLs ability to pay dividends to FPL Group. In February 2006, FPL Group announced that it would increase its quarterly dividend on its common stock from $0.355 to $0.375. See Managements Discussion  Liquidity and Capital Resources with respect to dividend restrictions and Note 12  Common Stock Dividend Restrictions regarding dividends paid by FPL to FPL Group.
Issuer Purchases of Equity Securities.
The following table presents information regarding purchases made by FPL Group of its common stock:
Maximum Number of Total Number                  Average                      Total Number of                      Shares that May Yet be of Shares                  Price Paid            Shares Purchased as Part of a                  Purchased Under the Period                    Purchased (a)                Per Share (a)          Publicly Announced Program                          Program (b)
(thousands) 10/1/05 - 10/31/05                      5,350                $    44.93                                -                                  20,000 11/1/05 - 11/30/05                    422,826                  $    41.38                                -                                  20,000 12/1/05 - 12/31/05                        229                $    41.56                                -                                  20,000 Total                      428,405                                                            -
(a) Represents: (1) shares of common stock purchased by FPL Group in the open market in accordance with the terms and conditions of the FPL Group Amended and Restated Long-Term Incentive Plan (LTIP), which provides for the purchase of such shares in connection with grants and vesting of stock awards and (2) shares of common stock purchased from employees to pay certain withholding taxes upon the vesting of stock awards granted to such employees under the LTIP. The November 2005 period also includes 171,132 shares forfeited by an employee pursuant to an agreement without any payment by FPL Group.
(b) In February 2005, FPL Groups board of directors authorized a common stock repurchase plan of up to 20 million shares of common stock (after giving effect to the 2005 stock split) over an unspecified period, which plan was ratified and confirmed by FPLs Groups board of directors in December 2005.
24
 
Item 6. Selected Financial Data Years Ended December 31, 2005            2004            2003              2002            2001 SELECTED DATA OF FPL GROUP (millions, except per share amounts):
Operating revenues                                                                          $  11,846      $  10,522      $    9,630      $    8,173      $    8,217 Income before cumulative effect of changes in accounting principles                          $      885 (a) $      887 (a)  $      893 (a)  $        695 (b)  $      781 (c)
Cumulative effect of adopting FAS 142, net of income taxes of $143                          $          -    $          -    $        -    $      (222 )    $          -
Cumulative effect of adopting FIN 46, net of income taxes of $2                              $          -    $          -    $        (3)    $          -    $          -
Net income                                                                                  $      885 (a) $      887 (a)
                                                                                                                                  $      890 (d)
                                                                                                                                                  $        473 (e)
                                                                                                                                                                    $      781 (c)
Earnings per share of common stock:
Earnings per share before cumulative effect of changes in accounting principles                                                                  $      2.33 (a) $      2.47 (a)
                                                                                                                                  $    2.52 (a)
                                                                                                                                                  $      2.01 (b)
                                                                                                                                                                    $      2.31 (c)
Cumulative effect of changes in accounting principles                                    $          -    $          -    $    (0.01)    $      (0.64 )    $          -
Earnings per share                                                                        $      2.33 (a) $      2.47 (a)
                                                                                                                                  $    2.51 (d)
                                                                                                                                                  $      1.37 (e)
                                                                                                                                                                    $      2.31 (c)
Earnings per share of common stock - assuming dilution:
Earnings per share before cumulative effect of changes in accounting principles                                                                  $      2.29 (a) $      2.45 (a)  $    2.51 (a)  $      2.01 (b)  $      2.31 (c)
Cumulative effect of changes in accounting principles                                    $          -    $          -    $    (0.01)    $      (0.64 )    $          -
Earnings per share                                                                        $      2.29 (a) $      2.45 (a)  $    2.50 (d)  $      1.37 (e)  $      2.31 (c)
Dividends paid per share of common stock                                                    $      1.42    $      1.30      $    1.20      $      1.16      $      1.12 Total assets (f)(g)                                                                          $  33,004      $  28,333      $  26,935      $    23,185      $  20,713 Long-term debt, excluding current maturities (f)                                            $    8,039    $    8,027      $    8,723      $    5,790      $    4,858 Obligations of FPL under capital lease, excluding current maturities (f)                    $          -    $          -    $        -    $        140      $      133 SELECTED DATA OF FPL (millions):
Operating revenues                                                                          $    9,528    $    8,734      $    8,293      $    7,378      $    7,477 Net income available to FPL Group                                                            $      748    $      749      $      733      $        717      $      679 (h)
Total assets (f)                                                                            $  22,726      $  19,114      $  17,817      $    16,032      $  15,174 Long-term debt, excluding current maturities (f)                                            $    3,271    $    2,813      $    3,074      $    2,364      $    2,579 Energy sales (kwh)                                                                              105,648        103,635          103,202          98,605          93,488 Energy sales:
Residential                                                                                      51.4%          50.7 %          51.8%            51.6 %          50.9%
Commercial                                                                                      41.1            40.6            40.1              40.6            40.6 Industrial                                                                                        3.7            3.8            3.9              4.1              4.4 Interchange power sales                                                                            2.0            2.9            2.3              1.8              2.2 Other (i)                                                                                          1.8            2.0            1.9              1.9              1.9 Total                                                                                              100.0%          100.0 %        100.0%          100.0 %          100.0%
(j)
Approximate 60-minute peak load (mw):
Summer season                                                                                22,361          20,545          19,668          19,219          18,754 Winter season                                                                                19,682          18,108          15,989          20,190          17,585 Average number of customer accounts (thousands):
Residential                                                                                    3,828          3,745          3,653            3,566            3,491 Commercial                                                                                        470            458            445              435              427 Industrial                                                                                        20              19            17                16              15 Other                                                                                                4              3              2                3                2 Total                                                                                              4,322          4,225          4,117            4,020            3,935 (k)
Average price per kwh (cents)                                                                      8.88            8.36            7.95              7.32            8.05 (a)  Includes net unrealized mark-to-market gains or losses associated with non-qualifying hedges.
(b)  Includes impairment and restructuring charges, charges related to certain wind projects and leveraged leases, a favorable settlement of litigation with the IRS and net unrealized mark-to-market gains associated with non-qualifying hedges.
(c)  Includes merger-related expenses and net unrealized mark-to-market gains associated with non-qualifying hedges.
(d)  Includes the cumulative effect of an accounting change and net unrealized mark-to-market gains associated with non-qualifying hedges.
(e)  Includes the cumulative effect of an accounting change, impairment and restructuring charges, charges related to certain wind projects and leveraged leases, a favorable settlement of litigation with the IRS and net unrealized mark-to-market gains associated with non-qualifying hedges.
(f)  Reflects the adoption of FIN 46 in July 2003. See Note 9.
(g)  Reflects the adoption of FAS 142 in January 2002.
(h)  Includes merger-related expenses.
(i)  Includes the net change in unbilled sales.
(j)  Winter season includes November and December of the current year and January to March of the following year.
(k)  Excludes interchange power sales, net change in unbilled revenues, deferrals/recoveries under cost recovery clauses and a provision, if any, for retail rate refund.
Item 7. Managements Discussion and Analysis of Financial Condition and Results of Operations This discussion should be read in conjunction with the Notes to Consolidated Financial Statements contained herein. In the discussion of Results of Operations below, all comparisons are with the corresponding items in the prior year.
Overview FPL Group is one of the nations largest providers of electricity-related services. Its principal subsidiary, FPL, serves more than eight million people throughout most of the east and lower west coasts of Florida. FPL Energy, FPL Groups competitive energy subsidiary, produces electricity primarily utilizing natural gas, wind and nuclear resources. Together, FPLs and FPL Energys generating assets represented approximately 32,800 mw of capacity at December 31, 2005. FPL FiberNet provides fiber-optic services to FPL, telecommunications companies and other customers throughout Florida. In December 2005, FPL Group entered into an agreement and plan of merger with Constellation Energy. The combined company is expected to be the nations largest competitive energy supplier based on generation and have the second largest electric utility portfolio based on the number of customers served. Completion of the merger and the actual closing date depend upon the satisfaction of a number of conditions, including shareholder approvals and the receipt of required regulatory approvals. The 25
 
parties believe that the proposed merger will offer both strategic and financial advantages in serving the energy marketplace, as well as generate significant cost savings and synergies, the majority of which are expected to come from the competitive energy businesses. These synergies are expected to result from consolidation of competitive energy business unit operations, sharing of best practices, improved procurement strategies and consolidation of systems and support activities. See Note 2.
FPL obtains its operating revenues primarily from the retail sale of electricity. In August 2005, FPL and all of the interveners in its 2005 rate case filing signed a stipulation and settlement agreement regarding FPLs retail base rates, which was subsequently approved by the FPSC. The 2005 rate agreement will be in effect through December 31, 2009, and thereafter shall remain in effect until terminated on the date new retail base rates become effective pursuant to an FPSC order. See Note 1 - Revenues and Rates. Over the last 10 years, FPL's average annual customer growth has been 2.2% while underlying usage growth has been 0.6%. FPL is meeting the increased demands of its customers by adding to its generation capacity and electric transmission and distribution infrastructure. FPL plans to add approximately 1,150 mw of combined-cycle generating capacity by 2007 at a total investment of approximately $580 million. FPL's O&M expenses increased in 2005 reflecting continued upward trends in nuclear maintenance and employee-related costs, as well as increased maintenance costs for fossil generation plants due to a number of FPL's older units going through major overhauls. These same factors, along with costs associated with enhancing FPL's transmission and distribution system and uncollectible accounts, are expected to increase O&M expenses in 2006. FPL's business strategy is to meet the increased demands of customer growth and focus on improving operating performance.
FPL Energy is in the competitive energy business with the majority of its operating revenues derived from wholesale electricity sales. Its market is diversified by region as well as by fuel source. As of December 31, 2005, approximately 86% of FPL Energy's expected 2006 capacity was hedged against commodity price volatility. If FPL Energy's plants do not perform as expected, this high degree of hedging could result in FPL Energy being required to purchase power, including transportation, in the market at potentially higher prices to meet its contractual obligations. FPL Energy's energy marketing and trading business is focused on reducing risk and extracting maximum value from its assets. FPL Energy, through its subsidiaries, is one of the largest producers of wind energy in the world, and with the extension of the production tax credit program through December 2007, plans to continue expanding its wind portfolio in 2006 and 2007 through construction of new facilities and selective acquisitions. FPL Energy's business strategy is to maximize the value of its current portfolio, expand its U.S.
market-leading wind position and build its portfolio through asset acquisitions.
Results of Operations Summary - FPL Group's net income for the years ended December 31, 2005, 2004 and 2003 was $885 million, $887 million and $890 million, respectively. See Note 17 for segment information. FPL Group's net income for the year ended December 31, 2005 reflects slightly reduced earnings at FPL and higher interest expense at Corporate and Other, partially offset by improved results at FPL Energy. FPL's 2005 results reflect strong customer growth and increased usage per retail customer despite the impact of increased hurricane activity in 2005 versus 2004, which were more than offset by higher O&M expenses, depreciation and amortization and interest charges. FPL Energys 2005 results improved primarily due to improved market conditions in the ERCOT and NEPOOL regions and the favorable effects of contract restructuring activities and asset sales, as well as the addition of new wind projects partially offset by higher interest expense. In addition, FPL Group's and FPL Energy's net income for 2005 reflect unrealized losses from non-qualifying hedges of $112 million while 2004 net income reflects unrealized losses of $3 million. The increase in unrealized mark-to-market losses associated with non-qualifying hedge activity for 2005 is primarily attributable to increased forward power and natural gas prices, as well as the reversal of previously recognized unrealized mark-to-market gains as the underlying transactions were realized during this period. As a general rule, a loss in the non-qualifying hedge category is offset by increases in the fair value of physical asset positions in the portfolio, which are not marked to market under generally accepted accounting principles. That is, the same factors that affected the decline in value of the hedges in general also increase the future value of nearly all of FPL Energys merchant assets. Results for Corporate and Other in 2005 reflect approximately $25 million in certain state tax benefits resulting from FPL Energy's growth throughout the United States, more than offset by higher interest expense and the absence of the effect of a prior year resolution of various tax issues. FPL Group's net income for the year ended December 31, 2004 reflects reduced earnings at FPL Energy partially offset by improved results at FPL. At Corporate and Other, the impact of the favorable resolution of certain tax issues was partially offset by higher interest expense. FPL's 2004 results improved as a result of strong customer growth and the settlement of shareholder litigation initiated in 2002 and 2003, but were partially offset by the impacts of three hurricanes that struck FPL's service territory during the third quarter of 2004, as well as lower customer usage due to overall milder weather. FPL Energy's 2004 results decreased due to the effect of restructuring activities during 2004 compared to 2003 and higher interest expense partially offset by increased earnings from its existing portfolio as well as project additions. In addition, FPL Group's and FPL Energys net income for 2004 reflect unrealized losses from non-qualifying hedges of $3 million while 2003 net income reflects unrealized gains of $22 million and a $3 million charge due to a change in accounting principle. FPL Group's effective tax rate for all periods presented reflect production tax credits for wind projects at FPL Energy. PTCs can significantly affect FPL Groups effective tax rate depending on the amount of pre-tax income and wind generation. See Note 1 - Income Taxes and Note 5.
FPL Group and its subsidiaries segregate unrealized mark-to-market gains and losses on derivative transactions into two categories. The first category, referred to as trading and managed hedge activities, represents the net unrealized effect of actively traded positions entered into to take advantage of market price movements and to optimize the value of generation assets and related contracts. The second category, referred to as non-qualifying hedges, represents the net unrealized effect of derivative transactions entered into as economic hedges (but which do not qualify for hedge accounting under FAS 133, 26
 
"Accounting for Derivative Instruments and Hedging Activities," as amended) and the ineffective portion of transactions accounted for as cash flow hedges. These derivative transactions have been entered into to reduce FPL Groups aggregate risk.
FPL Groups management uses earnings excluding certain items (adjusted earnings), which in 2005 and 2004 were the mark-to-market effect of non-qualifying hedges, internally for financial planning, for reporting of results to the Board of Directors and for FPL Groups employee incentive compensation plans. FPL Group also uses adjusted earnings when communicating its earnings outlook to analysts and investors. FPL Groups management believes adjusted earnings provide a more meaningful representation of the companys fundamental earnings power. Although the excluded items are properly included in the determination of net income in accordance with generally accepted accounting principles, both the size and nature of such items can make period to period comparisons of operations difficult and potentially confusing.
FPL - FPL's net income available to FPL Group for 2005, 2004 and 2003 was $748 million, $749 million and $733 million, respectively. During 2005, FPL's net income benefited from strong customer growth and increased customer usage due to overall improved weather conditions. However, the impact of increased hurricane activity, higher depreciation and amortization expense and increased O&M and interest expenses more than offset these benefits. During 2004, FPL's net income benefited from strong customer growth, underlying customer usage growth and lower O&M expenses, including reduced expenses associated with the settlement of shareholder litigation. In addition, AFUDC, primarily equity funds, increased during 2004 reflecting higher plant balances under construction. However, the effect of milder weather as compared to 2003, the impact of three hurricanes and higher depreciation and amortization expense partially offset these benefits.
In August 2005, FPL and all of the interveners in its 2005 rate case filing signed a stipulation and settlement agreement regarding FPL's retail base rates, which was subsequently approved by the FPSC. The 2005 rate agreement will be in effect through December 31, 2009, and thereafter shall remain in effect until terminated on the date new retail base rates become effective pursuant to an FPSC order. The 2005 rate agreement replaced a rate agreement that was effective April 15, 2002 through December 31, 2005.
The 2005 rate agreement provides that retail base rates will not increase during the term of the agreement except to allow recovery of the revenue requirements of any power plant approved pursuant to the Siting Act that achieves commercial operation during the term of the 2005 rate agreement. The 2005 rate agreement also continues the revenue sharing mechanism in FPL's 2002 rate agreement, whereby revenues from retail base operations in excess of certain thresholds will be shared with customers on the basis of two-thirds refunded to customers and one-third retained by FPL. Revenues from retail base operations in excess of a second, higher threshold (cap) will be refunded 100% to customers. The revenue sharing threshold and cap for 2006 will be $3,991 million and $4,156 million, respectively, which was established by using the 2005 revenue sharing threshold and cap of $3,880 million and $4,040 million, respectively, and increasing them by the average annual growth rate in retail kwh sales for the ten-year period ending December 31, 2005. For each succeeding year, retail base rate revenue sharing threshold and cap amounts will be established by increasing the prior year's threshold and cap by the sum of the following: (i) the average annual growth rate in retail kwh sales for the ten-year period ending December 31 of the preceding year multiplied by the prior year's retail base rate revenue sharing threshold and cap and (ii) the amount of any incremental base rate increases for power plants approved pursuant to the Siting Act that achieve commercial operation during the term of the 2005 rate agreement.
Under the terms of the 2005 rate agreement: (i) FPL's electric property depreciation rates will be based upon the comprehensive depreciation studies it filed with the FPSC in March 2005; however, FPL may reduce depreciation by up to
$125 million annually, (ii) FPL suspended contributions of approximately $79 million per year to its nuclear decommissioning fund beginning in September 2005, (iii) FPL suspended contributions of $20.3 million per year to its storm and property insurance reserve beginning in January 2006 and has the ability to recover prudently incurred storm restoration costs, either through securitization pursuant to Section 366.8260 of the Florida Statutes or through surcharges, and (iv) FPL will be allowed to recover through a cost recovery clause prudently incurred incremental costs associated with complying with an FPSC or FERC order regarding a regional transmission organization.
FPL will not have an authorized regulatory ROE under the 2005 rate agreement for the purpose of addressing earnings levels. For all other regulatory purposes, FPL will have an ROE of 11.75%. The revenue sharing mechanism described above will be the appropriate and exclusive mechanism to address earnings levels. However, if FPL's regulatory ROE, as reported to the FPSC in FPL's monthly earnings surveillance report, falls below 10% during the term of the 2005 rate agreement, FPL may petition the FPSC to amend its base rates.
The 2002 rate agreement provided for a $250 million annual reduction in retail base revenues allocated to all customers by reducing customers' base rates and service charges by approximately 7%, as well as a revenue sharing mechanism based on stated thresholds. During the term of the 2002 rate agreement, FPL did not have an authorized regulatory ROE range for the purpose of addressing earnings levels and FPL reduced depreciation on its plant in service by $125 million each year.
27
 
FPLs operating revenues consisted of the following:
Years Ended December 31, 2005        2004      2003 (millions)
Retail base operations                                                                          $ 3,658    $ 3,548  $ 3,560 Revenue refund provision                                                                              -            -      (3)
Cost recovery clauses and other pass-through costs                                                5,651      4,999      4,558 Other, primarily gas, transmission and wholesale sales and customer-related fees                    219          187      178 Total                                                                                          $ 9,528    $ 8,734  $ 8,293 The increase in retail base revenues for the year ended December 31, 2005 was primarily due to an increase in the average number of customer accounts as well as an increase in usage per retail customer. A 2.3% increase in the average number of customer accounts during 2005 increased revenue from retail base operations by approximately $82 million while the balance of the increase, or $28 million, was primarily due to a 0.5% increase in usage per retail customer. The majority of the growth in usage was due to the effects of overall improved weather conditions which was partially offset by increased hurricane activity in 2005 that caused customer service interruptions throughout FPLs service territory. The 2005 hurricanes resulted in lost revenues of approximately $52 million.
The decrease in retail base revenues in 2004 was primarily due to a decrease in usage per retail customer, partially offset by a 2.6% increase in the average number of customer accounts. A 2.7% decrease in usage per retail customer resulted in a decrease in revenues from retail base operations of approximately $100 million, primarily due to milder weather and customer service interruptions during the three hurricanes that struck FPLs service territory. The increase in the average number of customer accounts, as well as other factors, increased revenues from retail base operations by approximately $88 million. The 2004 hurricanes resulted in lost revenues of approximately $38 million.
Revenues from cost recovery clauses and other pass-through costs, such as franchise fees, revenue taxes and storm cost recoveries do not significantly affect net income; however, under- or over-recovery of such costs can significantly affect FPL Groups and FPLs operating cash flows. Fluctuations in these revenues, as well as in fuel, purchased power and interchange expense are primarily driven by changes in energy sales, fuel prices and capacity charges. Ordinarily, the fuel charge is set annually based on estimated fuel costs and estimated customer usage, plus or minus a true-up for prior period estimates. Effective January 1, 2003, the FPSC approved a risk management fuel procurement program, which is intended to reduce the risk of unexpected fuel price volatility by locking in fuel prices for a portion of FPLs fuel requirements. The results of the program are reviewed by the FPSC as part of the annual review of fuel costs. Revenues from cost recovery clauses and other pass-through costs increased effective January 1, 2005, primarily as a result of additional fuel clause revenues due to an increase of approximately 6% in the fuel clause recovery factor as a result of higher fuel prices. The effect of higher fuel prices also was the primary contributor to the $872 million increase in deferred clause and franchise expenses (current and noncurrent, collectively) on FPL Groups and FPLs consolidated balance sheets at December 31, 2005, and negatively affected FPL Groups and FPLs cash flows from operations for the year ended December 31, 2005. In February 2005, FPL began recovering the 2004 storm restoration cost deficiency from retail customers. For the year ended December 31, 2005, the amount billed to customers related to these storm restoration cost recoveries amounted to approximately $155 million and the corresponding expense for the amortization of the storm reserve deficiency is shown as a separate line on the consolidated statements of income. For further discussion, see Note 1 - Storm Reserve Deficiency.
FPL's O&M expenses increased approximately $79 million in 2005 primarily due to higher employee benefits expenses of approximately $28 million, higher nuclear maintenance costs of approximately $19 million and higher fossil generation costs of approximately $18 million, as well as the absence of a $21 million settlement related to shareholder litigation which reduced O&M expenses in 2004. In addition, part of the O&M expense increase relates to approximately $17 million of expenses associated with increased nuclear security costs which are recovered through the capacity clause. The overall increase in O&M expenses was partially offset by a reversal of a prior year reserve of approximately $15 million related to 2004 storm costs that were subsequently determined to be recoverable pursuant to a 2005 FPSC order. Increased employee benefits expenses are primarily associated with the absence of a pension transition credit that was fully amortized by the end of 2004 and higher employee costs. The increase in fossil generation expense relates primarily to the introduction of the Martin and Manatee expansion as well as timing of overhaul maintenance at some of the older generating units. Management expects to see a continued upward trend in O&M expenses for 2006, primarily driven by nuclear maintenance, uncollectible accounts as a result of higher customer bills primarily related to fuel charges and employee-related costs, as well as costs associated with enhancing FPL's transmission and distribution system as part of its Storm Secure Plan and an increase in maintenance costs for fossil generation plants as major overhauls continue for a number of older generating units. Partly offsetting the increased costs is the suspension of contributions to the storm and property insurance reserve as specified in the 2005 rate agreement.
In conjunction with an NRC order, FPL has performed visual and volumetric inspections of its nuclear units' reactor vessel heads during their scheduled refueling outages since October 2002. FPL replaced the reactor vessel heads at Turkey Point Unit No. 3, Turkey Point Unit No. 4 and St. Lucie Unit No. 1 during their scheduled refueling outages in the fall of 2004, spring of 2005 and fall of 2005, respectively, and therefore no further inspections will be required at these units until 2009. The inspections during scheduled refueling outages at St. Lucie Unit No. 2 revealed CRDM nozzles with cracks, which were 28
 
repaired during the outages in 2003 and 2005. It is anticipated that additional CRDM nozzle repairs will be needed at St.
Lucie Unit No. 2s next scheduled outage scheduled for the spring of 2006. FPL intends to replace the reactor vessel head at St. Lucie Unit No. 2 during its fall 2007 scheduled refueling outage. The estimated remaining cost to replace St. Lucie Unit No. 2s reactor vessel head, including AFUDC, is approximately $67 million and is included in FPLs estimated capital expenditures. See Note 16 - Commitments. The cost of performing inspections and any necessary repairs to the reactor vessel heads until they are replaced is being recognized as expense on a levelized basis over a five-year period beginning in 2002, as authorized by the FPSC, and amounted to approximately $11 million in 2005, $10 million in 2004 and $13 million in 2003.
St. Lucie Unit No. 2's steam generators are reaching the end of their useful life. As flaws are identified in individual tubes, they are plugged in order to prevent the tubes from leaking during plant operations. To date, 18.9% of these tubes have been plugged. In January 2005, FPL received permission from the NRC to plug up to 30% of St. Lucie Unit No. 2's steam generator tubes. Current projections indicate that the 30% tube plugging limit could be exceeded during St. Lucie Unit No. 2's next scheduled refueling outage in the spring of 2006. FPL is planning to repair any tubes exceeding the 30% tube plugging limit by inserting metal sleeves inside the degraded tubes (sleeving) and has requested NRC approval to sleeve degraded tubes as an alternative to plugging. Sleeving degraded tubes is expected to increase the cost and length of the outage. Costs accrued in 2005 associated with sleeving are reflected in the nuclear maintenance costs discussed above. FPL intends to replace the steam generators along with the reactor vessel head at St. Lucie Unit No. 2 during its fall 2007 scheduled refueling outage. The remaining cost to replace St. Lucie Unit No. 2s steam generators, including AFUDC, is approximately $200 million and is included in FPLs estimated capital expenditures. See Note 16 - Commitments.
In conjunction with a 2004 NRC bulletin, FPL must perform inspections of all alloy 600 and weld materials in pressurizer locations and connected steam space piping. Due to the amount of time and cost associated with correcting potential leaks, FPL replaced St. Lucie Unit No. 1's pressurizer during its fall 2005 outage and plans to repair St. Lucie Unit No. 2's pressurizer heater sleeves and other penetrations during its scheduled refueling and steam generator and reactor vessel head replacement outage in the fall of 2007. The estimated cost is included in FPL's estimated capital expenditures. See Note 16 - Commitments. Since the 2004 NRC bulletin was issued, no leaks have been identified based on inspections at St.
Lucie Unit No. 2. All pressurizer penetrations and welds at Turkey Point Units Nos. 3 and 4 utilize a different material.
In 2004, O&M expenses decreased $22 million primarily reflecting the receipt of approximately $21 million associated with the settlement of the shareholder litigation. The settlement was offset by higher nuclear maintenance costs of approximately $10 million, higher insurance costs of approximately $8 million and an increase in the provision for uncollectible accounts receivable of approximately $8 million in connection with the hurricanes. The remainder of the fluctuation in the 2004 O&M expenses was primarily due to the absence of certain legal expenses recorded in 2003.
For the year ended December 31, 2005, depreciation and amortization expense increased by $36 million of which approximately $23 million related to the addition of two new generating units at FPL's existing Martin and Manatee power plant sites, which became operational on June 30, 2005. The remainder of the increase is primarily due to FPL's continued investment in transmission and distribution expansion to support customer growth and demand. FPL expects to place an additional approximately 1,150 mw generating unit into service at its Turkey Point site by mid-2007. The increase in depreciation and amortization expense was partially offset by the suspension, in September 2005, of FPL's nuclear decommissioning accrual which totaled approximately $79 million annually. In addition, beginning in 2006, depreciation and amortization expense will also benefit from lower depreciation and decommissioning rates approved as part of the 2005 rate agreement reflecting mainly the 20-year license extensions received for Turkey Point Units Nos. 3 and 4 and St. Lucie Units Nos. 1 and 2. Depreciation and amortization expense in 2004 increased by $17 million, reflecting continued growth of electric utility plant in service to help meet increasing customer demand.
Interest charges for 2005 and 2004 increased primarily due to an increase of approximately 30 basis points and 40 basis points, respectively, in average interest rates and higher average debt balances used to fund increased investment in generation, transmission and distribution expansion and to pay for storm restoration costs. Interest income, included in other
- net in FPL's consolidated statements of income, increased in 2005 by approximately $14 million primarily due to interest accrued on the unrecovered balance of the storm reserve deficiency and on deferred costs associated with nuclear security as approved by the FPSC.
FPL currently faces competition from other suppliers of electrical energy to wholesale customers and from alternative energy sources and self-generation for other customer groups, primarily industrial customers. In 2005, operating revenues from wholesale and industrial customers combined represented approximately 4% of FPL's total operating revenues. Various states, other than Florida, have enacted legislation or have state commissions that have issued orders designed to allow retail customers to choose their electricity supplier. Such a regulatory restructuring, if enacted in Florida, would most likely result in a shift from cost-based rates to market-based rates for energy production and other services provided to retail customers. Although the legislation and initiatives in other states vary substantially, common areas of focus include when market-based pricing will be available for wholesale and retail customers, what existing prudently incurred costs in excess of the market-based price will be recoverable and whether generating assets should be separated from transmission, distribution and other assets. It is generally believed that transmission and distribution activities would remain regulated. Within the last few years, these state restructuring efforts have diminished, and several states have delayed the implementation or reversed previously approved restructuring legislation and rules. Management believes it is unlikely there will be any state actions to restructure the retail electric industry in Florida in the near future. If the basis of regulation for some or all of FPL's business changes from cost-based regulation, existing regulatory assets and liabilities would be written 29
 
off unless regulators specify an alternative means of recovery or refund. Further, other aspects of the business, such as generation assets and long-term power purchase commitments, would need to be reviewed to assess their recoverability in a changed regulatory environment. See Note 1 - Regulation.
The FPSC promotes cost competitiveness in the building of new steam generating capacity by requiring investor-owned electric utilities, such as FPL, to issue an RFP. The RFP process allows independent power producers and others to bid to supply the needed generating capacity. If a bidder has the most cost-effective alternative, meets other criteria such as financial viability and demonstrates adequate expertise and experience in building and/or operating generation capacity of the type proposed, the investor-owned electric utility would seek to negotiate a power purchase agreement with the selected bidder and request that the FPSC approve the terms of the power purchase agreement and, if appropriate, provide the required authorization for the construction of the bidders generation capacity. In August 2005, FPL issued part one of a two-part RFP for additional power resources beginning in 2009. FPL's self-build approach calls for building two approximately 1,200 mw natural gas-fired combined-cycle units in western Palm Beach County, Florida that would be operational in 2009 and 2010. In January 2006, after evaluating alternative proposals, FPL concluded that its self-build approach is the most cost-effective alternative to satisfy the need for additional power resources in 2009 and 2010. FPL plans to issue part two of this RFP in 2006 soliciting competitive bids for additional power resources beginning in 2012. FPL's self-build approach calls for building two approximately 850 mw advanced technology coal generating units that would be operational in 2012 and 2013.
The FERC has jurisdiction over potential changes that could affect competition in wholesale transactions. In 1999, the FERC issued its final order on RTOs which, under a variety of structures, provides for the independent operation of transmission systems for a given geographic area. In early 2001, the FERC approved GridFlorida (FPL's, Progress Energy Florida, Inc.'s and Tampa Electric Company's proposed RTO) as the RTO for peninsular Florida. In late 2001, the FPSC determined that the RTO as proposed was not in the best interest of Florida customers and required the companies to develop a modified proposal. In early 2002, FPL, Progress Energy Florida, Inc. and Tampa Electric Company filed a modified RTO proposal with the FPSC changing the structure of GridFlorida from a for-profit transmission company to a non-profit ISO. In late 2002, the FPSC approved many of the aspects of the modified RTO proposal, administratively approving recovery of GridFlorida's incremental costs through the capacity clause. During 2004, the FPSC held workshops to address additional GridFlorida issues. In 2005, an independent consulting firm performed a cost benefit analysis of GridFlorida and concluded that GridFlorida would not be cost effective for the retail customers of the GridFlorida participants. In January 2006, FPL and the other GridFlorida participants petitioned the FPSC to approve the withdrawal of the GridFlorida proposal.
FPL Energy - FPL Energys net income for 2005, 2004, and 2003 was $187 million, $172 million and $194 million, respectively, and included net unrealized mark-to-market gains (losses) on non-qualifying hedges of approximately $(112) million, $(3) million and $22 million, respectively. For further discussion of derivative instruments, see Note 4.
In 2005, net income benefited from improved results of the existing portfolio primarily reflecting improved market conditions and higher prices in the ERCOT and NEPOOL regions, as well as the favorable effects of contract restructurings, asset sales and the addition of new projects, primarily wind, partially offset by higher interest expense and lost revenues related to the planned Seabrook outage in 2005.
FPL Energys net income for the year ended December 31, 2004 decreased primarily as a result of approximately $50 million of higher net losses associated with restructuring activities and higher interest expense, partially offset by the addition of new projects, primarily wind, and improved results of the existing portfolio primarily due to improved market conditions, particularly in the NEPOOL region, and the absence of an outage at Seabrook that affected 2003 results.
FPL Energy added over 1,300 mw of gas-fired, wind and solar generation since late 2004 which added approximately $29 million to net income. This contribution was partially offset by losses associated with Gexa, a retail electric provider in Texas acquired in June 2005. The net effect of these additions resulted in a net increase to 2005 net income of approximately $14 million. FPL Energys operating revenues increased $516 million in 2005 primarily driven by improved market conditions mainly in the ERCOT and NEPOOL regions, project additions and improved hydro resources, partially offset by higher unrealized mark-to-market losses from non-qualifying hedge activity, lower generation at Seabrook due to its scheduled spring 2005 refueling outage and reduced wind resource. Operating expenses increased $552 million in 2005 primarily driven by increased fuel prices and generation in the ERCOT and NEPOOL regions as well as by project additions which also resulted in higher O&M and depreciation and amortization expenses. The increase in operating expenses was partially offset by higher unrealized mark-to-market gains from non-qualifying hedge activity. Included in operating expenses in 2004 are charges of approximately $81 million associated with the restructuring of the Marcus Hook steam contract discussed below. FPL Energy expects O&M expenses to increase in 2006, primarily related to costs associated with project additions and plant maintenance.
In 2005, earnings from investments in partnerships and joint ventures, presented as equity in earnings of equity method investees, increased $30 million primarily due to the positive effects of prior contract restructurings partially offset by lower gains from non-qualifying hedge activity.
For the year ended December 31, 2005, FPL Energys net income also reflected higher interest expense of $43 million associated with increased average debt balances due to growth in its asset base, as well as a 56 basis point increase in average interest rates. In addition, interest income increased by approximately $10 million in 2005 primarily related to higher investment income associated with the Seabrook decommissioning fund balance as well as interest income associated with a 30
 
bridge loan, which was originated early in 2005 in connection with an acquisition of a solar project and repaid in the third quarter of 2005. In addition, other - net in FPL Groups consolidated statements of income includes approximately $43 million of pre-tax gains on the sale of joint venture projects in California and a $12 million pre-tax benefit associated with obtaining an additional partnership interest in a coal plant in California. PTCs from FPL Energys wind projects are reflected in FPL Energys earnings. PTCs are recognized as wind energy is generated based upon a per kwh rate prescribed in applicable federal and state statutes, and amounted to approximately $129 million and $109 million in 2005 and 2004, respectively.
FPL Energys 2004 net income benefited from the full year effect of 3,904 mw of wind and fossil generation added during 2003 and 39 mw of wind generation added during 2004. In aggregate, these project additions added approximately $30 million to 2004 net income. FPL Energys operating revenues increased $453 million primarily driven by project additions, the commencement of a contract for the sale of the remaining 50% of the capacity of a natural gas-fired facility in Alabama, lack of a refueling outage at the Seabrook facility, improvements in the NEPOOL region aided by higher gas prices and volatility in the oil-gas price ratio and increased generation in the ERCOT region due to improved market conditions. Operating expenses increased $482 million, over half of which was fuel-related, primarily driven by project additions and the increased generation in the ERCOT region. Included in operating expenses in 2004 are charges of approximately $81 million associated with the restructuring of the Marcus Hook steam contract, which consisted of the write-off of an auxiliary boiler of approximately $33 million and a $48 million contract termination payment. As a result of changes in market conditions since initiation of the Marcus Hook project in the late 1990's, it became more economical to dispatch the plant during peak hours and uneconomical to operate the auxiliary boiler to satisfy the steam contract obligation when the plant is not running.
Earnings from investments in partnerships and joint ventures for the year ended December 31, 2004 increased $5 million from the prior year primarily due to the positive effects on operating results of prior contract restructurings, the receipt of a portion of a settlement related to a previous investment in an Indonesian project partially offset by unrealized losses from non-qualifying hedge activity in the portfolio in 2004 compared to gains in 2003. Also, during 2004, FPL Energy recorded a net gain of approximately $52 million on the termination of a gas supply contract and a steam agreement which was essentially offset by an impairment loss recorded as a result of agreeing to sell its interest in a combined-cycle power plant in Texas. The sale was completed in 2004.
FPL Energys net income for the year ended 2004 also reflected higher interest expense of $56 million due to growth in the business reflecting more projects being placed in service and the acquisition of new projects, as well as higher average interest rates of approximately 60 basis points. PTCs amounted to approximately $109 million and $78 million in 2004 and 2003, respectively.
In June 2005, a wholly-owned subsidiary of FPL Group completed the acquisition of Gexa Corp., a retail electric provider in Texas which was valued at approximately $73 million, payable in shares of FPL Group common stock. The Texas commodity markets have recently experienced significant price increases, which have led some regulators, government officials and other interested parties to call for a review of the structure and operation of the Texas retail market. FPL Energy is unable to predict whether such review will occur or result in any changes to the market structure. However, if changes occur in the market structure, such changes could affect Gexa's ability to sign and retain new and existing customers. FPL Energy will continue to monitor these events.
In January 2006, FPL Energy completed the acquisition of a 70% interest, or approximately 415 mw, in Duane Arnold, a nuclear power plant located near Cedar Rapids, Iowa, from IP&L. FPL Energy purchased the 70% interest, including nuclear fuel, inventory and other items for a total of approximately $373 million. FPL Energy is selling its share of the output of Duane Arnold to IP&L at a price of approximately $46 per mwh in 2006, escalating annually to approximately $61 per mwh in 2013, under a long-term contract expiring in 2014. FPL Energy is responsible for management and operation of the plant, as well as for the ultimate decommissioning of the facility, the cost of which will be shared on a pro-rata basis by the joint owners. FPL Energy received approximately $188 million of decommissioning funds at closing. FPL Energy expects to file for a license extension for the plant in 2009, which, if approved, will enable the plant to continue to operate for an additional 20 years beyond its current license expiration of 2014.
FPL Energy expects its future capacity growth to come primarily from wind development benefiting from the extension of the production tax credit program through 2007 for new wind facilities, as well as from asset acquisitions. FPL Energy plans to add approximately 625 mw to 750 mw of new wind generation in each of 2006 and 2007, including over 700 mw which are currently under construction or have been approved by FPL Group's board of directors.
Competitive wholesale markets in the United States continue to evolve and vary by geographic region. Revenues from electricity sales in these markets will vary based on the prices obtainable for energy, capacity and other ancillary services. Some of the factors affecting success in these markets include the ability to operate generating assets efficiently and reliably, the price and supply of fuel, transmission constraints, wind and hydro resources (weather conditions),
competition from new sources of generation, effective risk management, demand growth and exposure to legal and regulatory changes.
Expanded competition in a frequently changing regulatory environment presents both opportunities and risks for FPL Energy. Opportunities exist for the selective acquisition of generation assets divested under deregulation plans or available from other competitors and for the construction and operation of efficient plants that can sell power in competitive markets. FPL Energy seeks to reduce its market risk by having a diversified portfolio, by fuel type and location, as well as by contracting for the sale of a significant amount of the electricity output of its plants. As of December 31, 2005, FPL Energy 31
 
had 86% of its on-peak capacity under contract for 2006. Over the last several years, contracting for the sale of electricity output was more difficult as a result of overcapacity in certain regions and diminished market liquidity due to fewer creditworthy counterparties. However, the major markets in which FPL Energy operates have shown signs of continued improvement since 2004, such as improved sparks spreads and energy prices in ERCOT and NEPOOL. The combination of new wind projects, expected increase in contribution from merchant assets and asset acquisitions are expected to be the key drivers in supporting FPL Energys growth over the next few years.
FPL Energys earnings are subject to variability due to, among other things, operational performance, commodity price exposure, counterparty performance, weather conditions and project restructuring activities. FPL Energys exposure to commodity price risk is reduced by the degree of contract coverage obtained for 2006 and 2007. As of December 31, 2005, approximately 86% of FPL Energy's expected 2006 capacity was hedged against commodity price volatility. If FPL Energy's plants do not perform as expected, this high degree of hedging could result in FPL Energy being required to purchase power, including transportation, in the market at potentially higher prices to meet its contractual obligations. As of December 31, 2005, FPL Energys capacity under contract for 2006 and 2007 was as follows:
2006                                      2007 Available                    % MW            Available              % MW Project Portfolio Category                                                    MW (a)              Under Contract            MW (a)          Under Contract Wind                                                                              3,166                  97% (b)            3,287              93% (b)
Contracted (c)                                                                    2,461                  99% (b)            2,461              99% (b)
Merchant: (d)
NEPOOL                                                                        2,281                  74% (e)            2,454              49% (e)
ERCOT                                                                        2,598                  87% (e)            2,627              37% (e)
All other                                                                    1,417                  58% (e)            1,372              18% (e)
Total portfolio (f)                                                            11,921                    86% (e)            12,200              65% (e)
(a)  Weighted to reflect projected in-service dates, planned maintenance, Seabrooks planned refueling outage and power uprate in 2006, the acquisition of a 70%
interest, or approximately 415 mw, in Duane Arnold and its planned refueling outage in 2007, and expected production from renewable resource assets.
(b)  Reflects round-the-clock mw under contract.
(c)  Includes all projects with mid- to long-term purchase power contracts for substantially all of their output.
(d)  Includes only those facilities that require active hedging.
(e)  Represents on-peak mw under contract.
(f)  Totals may not add due to rounding.
FPL Energys results are affected by natural fluctuations in weather. In addition to the effect of temperature, which is reflected in commodity prices and demand, changes in weather affect production levels of the wind portfolio as well as the hydro units in Maine. In managing its exposure to commodity prices, FPL Energy is dependent upon its counterparties to perform under their contractual obligations. FPL Energy actively manages the trade-off between market risk and credit risk, as well as exposure with individual counterparties as a function of their creditworthiness. Substantially all of FPL Energys 2006 contracted revenues are with investment grade counterparties.
Corporate and Other - Corporate and Other is primarily comprised of interest expense, FPL FiberNet and other business activities as well as corporate interest income and expenses. Corporate and Other allocates interest charges to FPL Energy based on a deemed capital structure at FPL Energy of 50% debt for operating projects and 100% debt for projects under construction. Corporate and Other's net loss for the years ended December 31, 2005, 2004 and 2003 was $50 million, $34 million and $37 million, respectively. Results for Corporate and Other in 2005 reflect approximately $25 million in certain state tax benefits resulting from FPL Energy's growth throughout the United States and gains of approximately $10 million ($6 million after tax) from the sale and termination of leveraged lease agreements, which are included in gains (losses) on disposal of equity method investees and leveraged leases-net in FPL Group's consolidated statements of income. Operating expenses at Corporate and Other increased $18 million in 2005 primarily due to higher corporate expenses, including the absence of the pension transition credit that was fully amortized in 2004. Interest expense at Corporate and Other increased
$20 million primarily due to higher interest rates. Corporate and Other's 2005 results also reflect an increase in interest income of approximately $10 million primarily related to interest on a secured third party loan that was repaid in October 2005. Results from Corporate and Other for 2004 reflect certain state tax benefits resulting from FPL Energys growth throughout the United States as well as the resolution of other tax issues totaling approximately $30 million, partially offset by higher interest expenses and the absence of gains at FPL FiberNet associated with restructuring two transactions in 2003.
Liquidity and Capital Resources FPL Group and its subsidiaries, including FPL, require funds to support and grow their businesses. These funds are used for working capital, capital expenditures and investments in or acquisitions of assets and businesses, to pay maturing debt obligations and, from time to time, to redeem outstanding debt and/or repurchase common stock. It is anticipated that these requirements will be satisfied through a combination of internally generated funds and the issuance, from time to time, of debt and equity securities, consistent with FPL Group's and FPL's objective of maintaining, on a long-term basis, a capital structure that will support a strong investment grade credit rating. Credit ratings can affect FPL Group's, FPL's and FPL Group Capital's ability to obtain short- and long-term financing, the cost of such financing and the execution of their respective financing strategies.
FPL Group's cash flows from operating activities for the year ended December 31, 2005 reflect the receipt of cash collateral primarily from FPL's counterparties related to energy contracts (margin cash deposits), under-recovered fuel costs at FPL 32
 
caused primarily by higher than anticipated fuel costs, the payment of 2004 and 2005 storm restoration costs and recoveries from customers of a portion of the 2004 storm restoration costs. See Note 1 - Storm Reserve Deficiency. The cash collateral amounts associated with energy contracts can fluctuate significantly as a result of, among other things, commodity price movements in the underlying contracts.
FPL Groups cash flows from investing activities for the year ended December 31, 2005 reflect continuing investment by FPL to meet customer demand of approximately $1.6 billion and new investments at FPL Energy of approximately $815 million, as well as FPL Group Capitals receipt of approximately $218 million in full payment of a secured third party loan.
During 2005, FPL Group generated proceeds of approximately $2.7 billion from financing activities, including approximately
$575 million from the sale of FPL Group common stock related to the Corporate Units issued in February 2002, the issuance of $600 million in first mortgage bonds at FPL, approximately $821 million from the issuance of limited-recourse senior secured bonds, limited-recourse floating rate notes and draws on a construction revolver by FPL Energy subsidiaries, approximately $64 million related to the exercise of stock options and warrants and a net increase in commercial paper of
$667 million. During 2005, FPL Group used approximately $1.2 billion to pay off maturing debt, and redeem or make principal payments on debt and preferred stock. Maturities, redemptions and principal payments during 2005 included the maturity of $600 million in debentures at FPL Group Capital and $500 million in first mortgage bonds at FPL, the redemption of $5 million of FPL preferred stock held by third parties, a redemption of approximately $5 million in 7.35% bonds at FPL Group Capital and principal payments of approximately $110 million at FPL Energy. Also during 2005, FPL Energy subsidiaries entered into two interest rate swap agreements. One swap associated with a variable rate construction revolver, was to receive LIBOR and pay a fixed rate of 4.255% to hedge specified notional amounts ranging from approximately $4 million to $6 million through November 2007 and approximately $163 million from November 2007 until the related debt matures in June 2008. The other swap was to receive LIBOR and pay a fixed rate of 4.905% on $266 million of a limited recourse note. In addition, in November 2005, FPL Group Capital reset the annual interest rate on $506 million principal amount of its debentures due February 2008 from 5.0% to 5.551%. These debentures were originally issued in June 2002 in connection with FPL Group's publicly-traded equity units known as Corporate Units. The interest rate was reset as a result of FPL Group Capital remarketing these debentures. Neither FPL Group nor FPL Group Capital received any proceeds from the remarketing of the debentures. See further discussion of interest rate swaps in Note 10  Interest Rate Swaps.
In January 2006, FPL issued $400 million of 5.65% first mortgage bonds maturing in 2037. In February 2006, FPL Group paid net approximately $48 million to cancel approximately 4.2 million of its Corporate Units sold in June 2002. Also in February 2006, FPL Group issued approximately 8.7 million shares of common stock in return for approximately $296 million in proceeds, upon settlement of the stock purchase contracts issued in connection with its Corporate Units sold in June 2002.
The following provides various metrics regarding FPL Group's (including FPL's) and FPL's outstanding debt:
FPL Group                          FPL December 31,      December 31,  December 31,      December 31, 2005              2004          2005              2004 Weighted-average annual interest rate (a)                                5.9%              5.4%        5.2%              4.9%
Weighted-average life (years)                                            9.3              8.7        15.1              14.3 Annual average of floating rate debt to total debt (a)                    35%              31%          40%              34%
(a)  Calculations include interest rate swaps.
FPL was impacted by Hurricanes Dennis, Katrina, Rita and Wilma in 2005 and by Hurricanes Charley, Frances and Jeanne in 2004. These hurricanes did major damage in parts of FPL's service territory and collectively resulted in customer power outages in 2005 and 2004 of 5.3 million and 5.4 million, respectively. At December 31, 2005, storm restoration costs incurred by FPL during 2005 and 2004 exceeded the amount in the storm and property insurance reserve. At December 31, 2005, FPL's storm reserve deficiency totaled approximately $1.1 billion. The storm reserve deficiency associated with the 2004 hurricanes, plus interest, is being recovered primarily through a storm damage surcharge applied to retail customer bills over a 36-month period that began in February 2005, and totaled approximately $297 million at December 31, 2005. The remaining balance of the storm reserve deficiency primarily relates to the storm restoration costs associated with 2005 hurricanes. In January 2006, FPL petitioned the FPSC for approval to recover approximately $1.7 billion of storm costs through the issuance of $1,050 million of storm recovery bonds pursuant to the securitization provisions of Section 366.8260 of the Florida Statutes. The storm bond proceeds will provide for the net-of-tax recovery of the remaining balance of the unrecovered hurricane costs of $1,040 million (estimated balance as of July 31, 2006) and the replenishment of the storm reserve to approximately $650 million. If the FPSC determines that the storm restoration costs should not be securitized and instead should be recovered through another means, FPL has recommended as an alternative recovering the 2005 hurricane costs through a surcharge over approximately three years and implementing a separate surcharge to fund a $650 million storm reserve. The FPSC's decision is expected in May 2006. On February 2, 2006, several interested parties filed a motion to dismiss FPLs petition, claiming that the petition did not satisfy certain technical requirements. FPL filed its response to the motion on February 6, 2006, asserting that the requirements cited are not applicable to FPL's petition and which were met in any event. The FPSC has the right to review FPL's storm charges for prudence, and has the authority to determine the manner and timing of recovery. See Note 1  Storm Reserve Deficiency.
In January 2006, the FPSC held an electric infrastructure workshop to discuss the damage to electric utility facilities incurred due to recent hurricanes and to explore ways of minimizing damage and resulting outages to customers in the future. Presentations on hurricane issues were made by representatives of city governments, vendors and the Florida 33
 
utilities. On January 30, 2006, FPL filed a report with the FPSC outlining its Storm Secure Plan, a new initiative to enhance its electrical grid as a result of heightened hurricane activity and in response to concerns expressed by the community, state leaders and regulators. On February 7, 2006, the FPSC approved a rule that requires the Florida electric utilities to inspect their transmission and distribution wood poles on an eight-year inspection cycle and file an annual report with the FPSC regarding such inspections. The FPSC has scheduled a meeting for February 27, 2006 to discuss what the next step(s) will be.
FPL Groups charter does not limit the dividends that may be paid on its common stock. As a practical matter, the ability of FPL Group to pay dividends on its common stock is dependent upon, among other things, dividends paid to it by its subsidiaries, primarily FPL. During the first quarter of 2005, FPL Group increased its quarterly dividend on its common stock from $0.34 to $0.355 per share. In February 2006, FPL Group announced that it would increase its quarterly dividend on its common stock from $0.355 to $0.375. FPL pays dividends to FPL Group in a manner consistent with FPLs long-term targeted capital structure. FPL Group made capital contributions to FPL in 2003 of $600 million. FPLs mortgage contains provisions which, under certain conditions, restrict the payment of dividends to FPL Group and the issuance of additional first mortgage bonds. In light of FPLs current financial condition and level of earnings, management does not expect that planned financing activities or dividends would be affected by these limitations.
Under the mortgage securing FPLs first mortgage bonds, in some cases, the amount of retained earnings that FPL can use to pay cash dividends on its common stock is restricted. The restricted amount may change based on factors set out in the mortgage. Other than this restriction on the payment of common stock dividends, the mortgage does not restrict FPLs use of retained earnings. As of December 31, 2005, no retained earnings were restricted by these provisions of the mortgage.
FPL may issue first mortgage bonds under its mortgage subject to its meeting an adjusted net earnings test set forth in the mortgage, which generally requires adjusted net earnings to be at least twice the annual interest requirements on, or at least 10% of the aggregate principal amount of, FPLs first mortgage bonds including those to be issued and any other non-junior FPL indebtedness. As of December 31, 2005, after giving effect to the January 2006 issuance of $400 million 5.65% first mortgage bonds maturing in 2037, coverage for the 12 months ended December 31, 2005 would have been in excess of 8.5 times the annual interest requirements and 5 times the aggregate principal requirements. New first mortgage bonds are also limited to an amount equal to the sum of 60% of unfunded property additions after adjustments to offset property retirements, the amount of retired first mortgage bonds or qualified lien bonds and the amount of cash on deposit with the mortgage trustee. As of December 31, 2005, after giving effect to the January 2006 issuance of $400 million 5.65% first mortgage bonds maturing in 2037, FPL could have issued in excess of $5.5 billion of additional first mortgage bonds based on the unfunded property additions and in excess of $5.5 billion based on retired first mortgage bonds. As of December 31, 2005, no cash was deposited with the mortgage trustee for these purposes.
FPL Group and its subsidiaries, including FPL, have no credit rating downgrade triggers that would accelerate the maturity dates of debt outstanding. A change in ratings is not an event of default under applicable debt instruments, and while there are conditions to drawing on the credit facilities maintained by FPL Group Capital and FPL, the maintenance of a specific minimum level of credit rating is not a condition to drawing upon those credit facilities. However, commitment fees and interest rates on loans under the credit facilities agreements are tied to credit ratings and would increase or decrease when ratings are changed. A ratings downgrade also could reduce the accessibility and increase the cost of commercial paper issuances and additional or replacement credit facilities, and could result in the requirement that FPL Group subsidiaries, including FPL, post collateral under certain power purchase and other agreements. FPL Group subsidiaries, including FPL, may be required to post collateral in excess of collateral threshold amounts when FPL Groups exposure to the counterparty under the applicable trading agreement exceeds such threshold.
Securities of FPL Group and its subsidiaries are currently rated by Moodys Investors Service, Inc. (Moodys), Standard &
Poors Ratings Services (S&P) and Fitch Ratings (Fitch). At February 22, 2006, Moodys, S&P and Fitch had assigned the following credit ratings to FPL Group, FPL and FPL Group Capital:
(a)
Moodys (a)                S&P (a)                Fitch FPL Group:      (b)
Corporate credit rating                                                                                          A2                        A                      A FPL:    (b)
Corporate credit rating                                                                                          A1                    A/A-1                    N/A First mortgage bonds                                                                                            Aa3                        A                    AA-Pollution control, solid waste disposal and industrial development revenue bonds                                                                    Aa3/VMIG-1                      A                    A+
Commercial paper                                                                                                P-1                      A-1                    F-1 FPL Group Capital: (b)
Corporate credit rating                                                                                          N/A                    A/A-1                    N/A Debentures                                                                                                        A2                      A-                      A Commercial paper                                                                                                P-1                      A-1                    F-1 (a)  A security rating is not a recommendation to buy, sell or hold securities and should be evaluated independently of any other rating. The rating is subject to revision or withdrawal at any time by the assigning rating organization.
(b)  The outlook indicated by Moodys, S&P and Fitch is negative, watch negative and stable, respectively.
34
 
FPL Groups commitments at December 31, 2005 were as follows:
2006          2007          2008          2009            2010        Thereafter      Total (millions)
Long-term debt, including interest: (a)
FPL                                                        $    306      $      169    $    363    $      376      $    144      $ 5,694      $  7,052 FPL Energy                                                        322            690          547            206            199          1,346          3,310 Corporate and Other                                            1,321          1,189            577            666            18            914        4,685 Corporate Units                                                          2              -            -              -            -              -            2 Purchase obligations:
FPL (b)                                                        5,800          3,880          2,730        2,880          2,500          6,965        24,755 FPL Energy (c)                                                  1,335            614            56            56            56            779        2,896 Corporate and Other                                                  52              -            -              -            -              -          52 (d)
Asset retirement activities:
FPL    (e)
                                                                            -            -            -              -            -      11,571        11,571 FPL Energy (f)                                                          -            -            -              -            -        1,869          1,869 Total                                                          $ 9,138        $ 6,542        $ 4,273      $ 4,184        $ 2,917          $ 29,138      $ 56,192 (a)  Includes principal, interest and interest rate swaps. Variable rate interest was computed using December 31, 2005 rates.
(b)  Represents required capacity and minimum payments under long-term purchased power and fuel contracts, the majority of which is recoverable through various cost recovery clauses (see Note 16 - Contracts), and projected capital expenditures through 2010 to meet, among other things, increased electricity usage and customer growth, as well as capital improvements to and maintenance of existing facilities (see Note 16 - Commitments).
(c)  Represents firm commitments primarily in connection with the supply of wind turbines and towers, natural gas transportation, supply and storage, firm transmission service, nuclear fuel, a portion of its projected capital expenditures and in 2006 the acquisition of a 70% interest in Duane Arnold. See Note 16 -
Commitments and Contracts.
(d)  Represents expected cash payments adjusted for inflation for estimated costs to perform asset retirement activities.
(e)  At December 31, 2005, FPL had $2,083 million in restricted trust funds for the payment of future expenditures to decommission FPL's nuclear units, which are included in nuclear decommissioning reserve funds.
(f)  At December 31, 2005, FPL Energy's 88.23% portion of Seabrook's restricted trust fund for the payment of future expenditures to decommission Seabrook was
    $318 million and is included in FPL Group's nuclear decommissioning reserve funds.
FPL Group and FPL obtain letters of credit and issue guarantees to facilitate commercial transactions with third parties and financings. At December 31, 2005, FPL Group had standby letters of credit of approximately $927 million ($14 million for FPL) and approximately $5,540 million notional amount of guarantees ($265 million for FPL), of which approximately $5,423 million ($249 million for FPL) have expirations within the next five years. These letters of credit and guarantees support the buying and selling of wholesale energy commodities, debt-related reserves and other contractual agreements. FPL Group and FPL believe it is unlikely that they would be required to perform or otherwise incur any losses associated with these letters of credit and guarantees. At December 31, 2005, FPL Group and FPL did not have any liabilities recorded for these letters of credit and guarantees. In addition, FPL Group has guaranteed certain payment obligations of FPL Group Capital, including most of those under FPL Group Capitals debt, including all of its debentures and commercial paper issuances, as well as most of its guarantees, and FPL Group Capital has guaranteed certain debt and other obligations of FPL Energy and its subsidiaries. See Note 16 - Commitments.
In addition to the above, FPL Energy has guaranteed certain performance obligations of a power plant owned by a wholly-owned subsidiary as part of a power purchase agreement that expires in 2027. Under this agreement, the subsidiary could incur market-based liquidated damages for failure to meet contractual minimum outputs. In addition, certain subsidiaries of FPL Energy have contracts that require certain projects to meet annual minimum generation amounts. Failure to meet the annual minimum generation amounts would result in the FPL Energy subsidiary incurring specified liquidated damages. Based on past performance of these and similar projects and current forward prices, management believes that the exposure associated with these guarantees is not material.
Bank revolving lines of credit currently available to FPL Group and its subsidiaries, including FPL, are as follows:
FPL (a)            FPL Group Capital                    Total                Maturity Date (millions)
$ 2,000                  $      2,500                  $ 4,500              November 2010 (a)  Excludes a $100 million senior secured revolving credit facility of a consolidated FPL VIE that leases nuclear fuel to FPL, which matures in June 2009 and is available only to the VIE.
These credit facilities provide for the issuance of letters of credit up to $4.5 billion and are available to support the companies' commercial paper programs and to provide additional liquidity in the event of a loss to the companies' or their subsidiaries' operating facilities (including, in the case of FPL, a transmission and distribution property loss), as well as for general corporate purposes. At December 31, 2005, letters of credit totaling $598 million were outstanding under FPL Group Capital's credit facilities and no amounts were outstanding under FPL's credit facilities. FPL Group (which guarantees the payment of FPL Group Capital's credit facilities pursuant to a 1998 guarantee agreement) is required to maintain a minimum ratio of funded debt to total capitalization under the terms of FPL Group Capital's credit facility. FPL is required to maintain a minimum ratio of funded debt to total capitalization under the terms of FPL's credit facility. At December 31, 2005, each of FPL Group and FPL was in compliance with its respective ratio.
35
 
In addition, at December 31, 2005, FPL Energy had a $50 million letter of credit outstanding. Also, FPL Group Capital and FPL have each established an uncommitted credit facility with a bank to be used for general corporate purposes. The bank may at its discretion, upon the request of FPL Group Capital or FPL, make a short-term loan or loans to FPL Group Capital or FPL in an aggregate amount determined by the bank, which is subject to change at any time. The terms of the specific borrowings under the uncommitted credit facilities, including maturity, are set at the time borrowing requests are made by FPL Group Capital or FPL. At December 31, 2005, there were no amounts outstanding for either FPL Group Capital or FPL under the uncommitted credit facilities.
In addition to the bank lines of credit discussed above, a consolidated FPL VIE that leases nuclear fuel to FPL has established a $100 million senior secured revolving credit facility, which expires in June 2009, to provide backup support for its commercial paper program. FPL has provided an unconditional guarantee of the payment obligations of the VIE under the credit facility, which is included in the guarantee discussion above. At December 31, 2005, the VIE had no outstanding borrowings under the revolving credit facility and had approximately $59 million of commercial paper outstanding. FPL also provides an unconditional payment guarantee of the VIEs $135 million of 2.34% senior secured notes, maturing in June 2006, which is included in the guarantee discussion above.
At February 22, 2006, FPL Group and FPL Group Capital had $2.0 billion (issuable by either or both of them up to such aggregate amount) of available capacity under shelf registration statements. Securities that may be issued under the FPL Group and FPL Group Capital shelf registration statements, depending on the registrant, include common stock, stock purchase contracts, stock purchase units, preferred stock, senior debt securities, preferred trust securities and related subordinated debt securities, and guarantees relating to certain of those securities. This capacity is available for, among other things, new investment opportunities.
In February 2005, FPL Groups board of directors approved a two-for-one stock split of FPL Groups common stock effective March 15, 2005 (2005 stock split). FPL Groups authorized common stock increased from 400 million to 800 million shares. Also in February 2005, FPL Groups board of directors authorized a new common stock repurchase plan of up to 20 million shares of common stock (after giving effect to the 2005 stock split) over an unspecified period, which plan was ratified and confirmed by the board of directors in December 2005, and terminated a previous common stock repurchase plan. At December 31, 2005, no shares had been repurchased under the repurchase plan.
In June 2005, a wholly-owned subsidiary of FPL Group completed the acquisition of Gexa Corp., a retail electric provider in Texas, which serves approximately 1,200 mw of peak load to over 160,000 commercial and residential customers as of December 31, 2005. Each share of Gexa Corp.s outstanding common stock was converted into 0.1682 of a share of FPL Group common stock. Assuming the exercise of Gexa Corp.s options and warrants net of cash to be received upon exercise, the aggregate value of the consideration for the acquisition of Gexa Corp. was approximately $73 million, payable in shares of FPL Group common stock.
In December 2005, FPL Group and Constellation Energy entered into an agreement and plan of merger that is expected to create a combined company which will be the nations largest competitive energy supplier based on generation and have the second largest electric utility portfolio based on the number of customers served. Completion of the merger and the actual closing date depend upon the satisfaction of a number of conditions, including shareholder approvals and the receipt of required regulatory approvals. The parties believe that the proposed merger will offer both strategic and financial advantages in serving the energy marketplace, as well as generate significant cost savings and synergies, the majority of which are expected to come from the competitive energy businesses. These synergies are expected to result from consolidation of competitive energy business unit operations, sharing of best practices, improved procurement strategies and consolidation of systems and support activities. In a tax free, stock-for-stock exchange, each share of Constellation Energy common stock outstanding immediately prior to the merger will be converted into 1.444 shares of Constellation Energy common stock and each share of FPL Group common stock outstanding immediately prior to the merger will be converted into one share of Constellation Energy common stock. Upon completion of the merger, former FPL Group shareholders will own approximately 60 percent and Constellation Energys shareholders will own approximately 40 percent of the combined company. See Note 2.
New Accounting Rules and Interpretations Stock-Based Compensation - On January 1, 2006, FPL Group adopted FAS 123(R), "Share-Based Payment." The statement requires costs related to share-based payment transactions to be recognized in the financial statements based on grant-date fair value. Because FPL Group adopted the fair value recognition provisions of FAS 123, "Accounting for Stock-Based Compensation," on January 1, 2004, the adoption of FAS 123(R) will not have a significant financial impact for the year ending December 31, 2006.
Accounting for Conditional Asset Retirement Obligations - On December 31, 2005, FPL Group and FPL adopted FIN 47, "Accounting for Conditional Asset Retirement Obligations," an interpretation of FAS 143, "Accounting for Asset Retirement Obligations." See Note 15.
36
 
Critical Accounting Policies and Estimates The preparation of financial statements and related disclosures in conformity with generally accepted accounting principles requires management to exercise judgment and make estimates and assumptions where amounts are not subject to precise measurement or are dependent on future events.
Critical accounting policies and estimates, which are important to the portrayal of both FPL Groups and FPLs financial condition and results of operations and which require complex, subjective judgments are as follows:
Accounting for Derivatives and Hedging Activities - FPL Group and FPL use derivative instruments (primarily swaps, options and forwards) to manage the commodity price risk inherent in fuel and electricity contracts, optimize the value of power generation assets and related contracts and manage risks associated with changes in interest rates. To a lesser extent, FPL Group and FPL also engage in limited energy trading activities to take advantage of expected favorable price movements. Accounting pronouncements, which require the use of fair value accounting if certain conditions are met, apply not only to traditional financial derivative instruments, but to any contract having the accounting characteristics of a derivative.
Derivative instruments, when required to be marked to market under FAS 133, as amended, are recorded on the balance sheet at fair value. Fair values for some of the longer-term contracts where liquid markets are not available are based on internally developed models based on the forward prices for electricity and fuel. Forward prices represent the price at which a buyer or seller could contract today to purchase or sell a commodity at a future date. In general, the models estimate the fair value of a contract by calculating the present value of the difference between the contract price and the forward prices. The near term forward market for electricity is generally liquid and therefore the prices in the early years of the forward curves reflect observable market quotes. However, in the later years, the market is much less liquid and forward price curves must be developed using factors including the forward prices for the commodities used as fuel to generate electricity, the expected system heat rate (which measures the efficiency of power plants in converting fuel to electricity) in the region where the purchase or sale takes place, and a fundamental forecast of expected spot prices based on modeled supply and demand in the region. The assumptions in these models are critical since any changes therein could have a significant impact on the fair value of the contract. Substantially all changes in the fair value of derivatives held by FPL are deferred as a regulatory asset or liability until the contracts are settled. Upon settlement, any gains or losses will be passed through the fuel and capacity clauses. In non-rate regulated operations, predominantly FPL Energy, changes in derivative fair values are recognized in current earnings, unless the criteria for hedge accounting are met and the company elects to account for the derivative as a hedge. For those transactions accounted for as cash flow hedges, much of the effects of changes in fair value are reflected in other comprehensive income (OCI), a component of common shareholders' equity, rather than being recognized in current earnings. For those transactions accounted for as fair value hedges the effects of changes in fair value are reflected in current earnings offset by changes in the fair value of the item being hedged.
Since FAS 133 became effective in 2001, the FASB has discussed and, from time to time, issued implementation guidance related to FAS 133. In particular, much of the interpretive guidance affects when certain contracts for the purchase and sale of power and certain fuel supply contracts can be excluded from the provisions of FAS 133. Despite the large volume of implementation guidance, FAS 133 and the supplemental guidance does not provide specific guidance on all contract issues. As a result, significant judgment must be used in applying FAS 133 and its interpretations. The interpretation of FAS 133 continues to evolve. A result of changes in interpretation could be that contracts that currently are excluded from the provisions of FAS 133 would have to be recorded on the balance sheet at fair value, with changes in fair value recorded in the income statement.
During the fourth quarter of 2003, FPL Group and its subsidiaries adopted EITF 03-11, which precluded certain economic hedging transactions at FPL Energy from qualifying for hedge accounting treatment. Changes in fair value of those transactions are marked to market and reported in the non-qualifying hedge category and may result in volatility in the non-qualifying hedge category. The ongoing changes in accounting guidance relating to derivatives confirm management's belief in the importance of segregating the effects of the unrealized mark-to-market impact of non-qualifying hedges. Without any change in FPL Group's economic positions or the timing or amounts of future cash flows, a small change in classification of particular transactions can result in significant changes in net income. This could be significant to FPL Energy's results because often the economic offset to the positions which are required to be marked to market (such as the physical assets from which power is generated) are not marked to market. As a consequence, net income reflects only the movement in one part of economically linked transactions. Because of this, FPL Group's management continues to view results expressed excluding the unrealized mark-to-market impact of the non-qualifying hedges as a meaningful measure of current period performance. For additional information regarding derivative instruments, see Note 4 and also see Management's Discussion
- Energy Marketing and Trading and Market Risk Sensitivity.
Accounting for Pensions and Other Postretirement Benefits - FPL Group sponsors a qualified noncontributory defined benefit pension plan for substantially all employees of FPL Group and its subsidiaries. FPL Group also has a non-qualified supplemental defined benefit pension plan that provides benefits to higher-level employees. In addition to pension benefits, FPL Group sponsors a substantially contributory postretirement plan for health care and split dollar life insurance benefits (other benefits) for retirees of FPL Group and its subsidiaries meeting certain eligibility requirements. The qualified pension plan has a fully funded trust dedicated to providing the benefits under the plan. The other benefits plan has a partially funded trust dedicated to providing benefits related to life insurance.
37
 
FPL Groups pension income net of the cost of other benefits was approximately $53 million, $81 million and $78 million for the years ended December 31, 2005, 2004 and 2003, respectively. The corresponding amounts allocated to FPL were $38 million, $63 million and $60 million, respectively. Pension income and the cost of other benefits are included in O&M expenses, and are calculated using a number of actuarial assumptions. Those assumptions include an expected long-term rate of return on qualified plan assets of 7.75% for all years, assumed increases in future compensation levels of 4.0% for 2005 and 2004 and 4.5% for 2003, and a weighted-average discount rate of 5.50% for 2005 and 2004 and 6.00% for 2003, respectively. Based on current health care costs (as related to other benefits), the projected 2006 trend assumption used to measure the expected cost of health care benefits covered by the plans for all age groups are 8.50% for medical benefits and 10.50% for prescription drug benefits. The rates are assumed to decrease over the next eight years to the ultimate trend rate of 5.0% and remain at that level thereafter. The ultimate trend rate is assumed to be reached in 2013 for medical costs and 2017 for prescription drug costs. In developing these assumptions, FPL Group evaluated input from its actuaries, as well as information available in the marketplace. For the expected long-term rate of return on fund assets, FPL Group considered 10-year and 20-year historical median returns for a portfolio with an equity/bond asset mix similar to its funds. FPL Group also considered its funds historical compounded returns. FPL Group believes that 7.75% is a reasonable long-term rate of return on its plans assets. FPL Group will continue to evaluate all of its actuarial assumptions, including its expected rate of return, at least annually, and will adjust them as necessary.
FPL Group bases its determination of pension and other benefits expense or income on a market-related valuation of assets, which reduces year-to-year volatility. This market-related valuation recognizes investment gains or losses over a five-year period from the year in which they occur. Investment gains or losses for this purpose are the difference between the expected return calculated using the market-related value of assets and the actual return realized on those assets. Since the market-related value of assets recognizes gains or losses over a five-year period, the future value of assets will be affected as previously deferred gains or losses are recognized. Such gains and losses together with other differences between actual results and the estimates used in the actuarial valuations are deferred and recognized in determining pension and other benefits expense and income only when they exceed 10% of the greater of projected benefit obligations or the market-related value of assets.
Lowering the expected long-term rate of return on plan assets by 0.5% (from 7.75% to 7.25%) would have reduced FPL Groups net income for 2005 by approximately $14 million ($10 million for FPL). Lowering the discount rate assumption by 0.5% would have decreased FPL Groups net income for 2005 by approximately $5 million ($4 million for FPL). Raising the salary increase assumption by 0.5% would have decreased FPL Groups net income for 2005 by approximately $2 million ($1 million for FPL). Assumed health care cost trend rates can have a significant effect on the amounts reported for postretirement plans providing health care benefits. However, this effect is somewhat mitigated by the retiree cost sharing structure incorporated in FPL Groups other benefits plan. Increasing the assumed health care cost trend rates by 1% would have reduced FPL Groups net income for 2005 by approximately $1 million.
The fair value of plan assets has increased from $2.9 billion at September 30, 2004 to $3.1 billion at September 30, 2005 for the pension plan and decreased from $50 million at September 30, 2004 to $49 million at September 30, 2005 for other benefits. Management believes that, based on the actuarial assumptions and the well funded status of the pension plan, FPL Group will not be required to make any cash contributions to the qualified pension plan in the near future. In December 2005,
$24 million was transferred from the qualified pension plan as reimbursement for eligible retiree medical expenses paid by FPL Group during the year pursuant to the provisions of the Internal Revenue Code. FPL Group anticipates paying approximately $27 million for eligible retiree medical expenses on behalf of the other benefits plan during 2006 with substantially all of that amount being reimbursed through a transfer of assets from the qualified pension plan pursuant to the provisions of the Internal Revenue Code. See Note 3.
Carrying Value of Long-Lived Assets - FPL Group evaluates on an ongoing basis the recoverability of its assets for impairment whenever events or changes in circumstances indicate that the carrying amount may not be recoverable as described in FAS 144, "Accounting for the Impairment or Disposal of Long-Lived Assets."
Under that standard, an impairment loss is required to be recognized if the carrying value of the asset exceeds the undiscounted future net cash flows associated with that asset. The impairment loss to be recognized is the amount by which the carrying value of the long-lived asset exceeds the asset's fair value. In most instances, the fair value is determined by discounting estimated future cash flows using an appropriate interest rate.
The amount of future net cash flows, the timing of the cash flows and the determination of an appropriate interest rate all involve estimates and judgments about future events. In particular, the aggregate amount of cash flows determines whether an impairment exists, and the timing of the cash flows is critical in determining fair value. Because each assessment is based on the facts and circumstances associated with each long-lived asset, the effects of changes in assumptions cannot be generalized.
Nuclear Decommissioning and Fossil Dismantlement - FPL Group and FPL adopted FAS 143, Accounting for Asset Retirement Obligations and FIN 47, Accounting for Conditional Asset Retirement Obligations, effective January 1, 2003 and December 31, 2005, respectively. FAS 143 and FIN 47 require that a liability for the fair value of an asset retirement obligation (ARO) be recognized in the period in which it is incurred with the offsetting associated asset retirement costs capitalized as part of the carrying amount of the long-lived assets.
For ratemaking purposes, FPL accrues and funds for nuclear plant decommissioning costs over the expected service life of each unit based on studies that are filed with the FPSC at least every five years. FPL filed updated nuclear decommissioning 38
 
studies in 2005, which indicate that FPLs portion of the future cost of decommissioning its four nuclear units, including spent fuel storage, is $10.9 billion, or $2.0 billion in 2005 dollars. The 2005 studies reflect, among other things, the 20-year license extensions of FPL's nuclear units and support the suspension, effective September 2005, of the $79 million annual decommissioning accrual. At December 31, 2005, $2,351 million was accrued for nuclear decommissioning, of which $1,460 million was recorded as an ARO, $57 million was recorded as a capitalized net asset related to the ARO, $770 million was recorded as a regulatory liability and $178 million was included in accrued asset removal costs on the consolidated balance sheets. See Note 1 - Decommissioning of Nuclear Plants, Dismantlement of Plants and Other Accrued Asset Removal Costs and Note 15.
FPL accrues the cost of dismantling its fossil plants over the expected service life of each unit based on studies filed with the FPSC at least every four years. Unlike nuclear decommissioning, fossil dismantlement costs are not funded. The most recent studies, which became effective January 1, 2003, indicated that FPL's portion of the ultimate cost to dismantle its fossil units is $668 million. The majority of the dismantlement costs are not considered AROs. At December 31, 2005, the provision for fossil dismantlement was approximately $277 million and is included in accrued asset removal costs.
FPL Energy records a liability for the present value of Seabrook's expected decommissioning costs in accordance with FAS 143 and FIN 47. Comprehensive studies are filed with the New Hampshire Nuclear Decommissioning Financing Committee every four years, with updates provided annually. These studies indicate that FPL Energy's 88.23% portion of the ultimate cost of decommissioning Seabrook, including costs associated with spent fuel storage, is approximately $1,496 million, or
$604 million in 2005 dollars. At December 31, 2005, the ARO for Seabrook's nuclear decommissioning totaled approximately
$189 million. See Note 1 - Decommissioning of Nuclear Plants, Dismantlement of Plants and Other Accrued Asset Removal Costs and Note 15.
The calculation of the future cost of retiring long-lived assets, including nuclear decommissioning and fossil dismantlement costs, involves the use of estimates and judgments concerning the amount and timing of future expenditures and whether or not such costs are considered a legal obligation under FAS 143 and FIN 47. FPL Group and FPL also make interest rate, rate of return and inflation projections to determine funding requirements related to decommissioning. Periodically, FPL Group and FPL will be required to update their estimates and projections which can affect the annual expense amounts recognized, the liabilities recorded and the annual funding requirements for nuclear decommissioning costs.
Regulatory Accounting - FPL follows the accounting practices set forth in FAS 71, "Accounting for the Effects of Certain Types of Regulation." FAS 71 indicates that regulators can create assets and impose liabilities that would not be recorded by non-rate regulated entities. Regulatory assets and liabilities represent probable future revenues that will be recovered from or refunded to customers through the ratemaking process. If FPL were no longer subject to cost-based rate regulation, the existing regulatory assets and liabilities would be written off unless regulators specify an alternative means of recovery or refund. In addition, the FPSC has the authority to disallow recovery of costs that it considers excessive or imprudently incurred. Such costs may include, among others, O&M expenses, the cost of replacing power lost when fossil and nuclear units are unavailable, storm restoration costs and costs associated with the construction or acquisition of new facilities. The continued applicability of FAS 71 is assessed at each reporting period.
FPL's regulatory assets and liabilities are as follows:
December 31, 2005          2004 (millions)
Regulatory assets:
Current:
Deferred clause and franchise expenses                                                                $    795      $    230 Storm reserve deficiency                                                                              $    156      $    163 Derivatives                                                                                          $      -      $      9 Other                                                                                                $      7      $      -
Noncurrent:
Storm reserve deficiency                                                                              $    957      $    373 Deferred clause expenses                                                                              $    307      $      -
Unamortized loss on reacquired debt                                                                  $    42      $    45 Litigation settlement                                                                                $      -      $    45 Other                                                                                                $    37      $    38 Regulatory liabilities:
Current:
Deferred clause and franchise revenues                                                                $    32      $    30 Derivatives                                                                                          $    757      $      -
Noncurrent:
Accrued asset removal costs                                                                          $ 2,033        $ 2,012 Asset retirement obligation regulatory expense difference                                            $    786      $    266 Unamortized investment tax credits                                                                    $    62      $    81 Other                                                                                                $    90      $    106 See Note 1 for a discussion of FPL Group's and FPL's other significant accounting policies.
39
 
Energy Marketing and Trading and Market Risk Sensitivity Energy Marketing and Trading - Certain of FPL Group's subsidiaries, including FPL and FPL Energy, use derivative instruments (primarily swaps, options and forwards) to manage the commodity price risk inherent in the purchase and sale of fuel and electricity, as well as to optimize the value of power generation assets. To a lesser extent, FPL Group and FPL engage in limited energy trading activities to take advantage of expected future favorable price movements.
Derivative instruments, when required to be marked to market under FAS 133, as amended, are recorded on FPL Group's and FPL's consolidated balance sheets as either an asset or liability measured at fair value. At FPL, substantially all changes in fair value are deferred as a regulatory asset or liability until the contracts are settled. Upon settlement, any gains or losses are passed through the fuel clause or the capacity clause. For FPL Group's non-rate regulated operations, predominantly FPL Energy, essentially all changes in the derivatives' fair value for power purchases and sales and trading activities are recognized on a net basis in operating revenues; fuel purchases and sales are recognized net in fuel, purchased power and interchange expense; and the equity method investees' related activity is recognized in equity in earnings of equity method investees in FPL Group's consolidated statements of income unless hedge accounting is applied. See Note 4.
The changes in the fair value of FPL Group's consolidated subsidiaries' energy contract derivative instruments were as follows:
Hedges on Owned Assets FPL Cost        FPL Proprietary                  Non-                Recovery      Group Trading      Managed    Qualifying    OCI      Clauses        Total (millions)
Fair value of contracts outstanding at December 31, 2003                $          7 $        1 $          21 $    (11 ) $      94 $        112 Reclassification to realized at settlement of contracts                        (15)        (2)          (60)      1        (223 )        (299)
Effective portion of changes in fair value recorded in OCI                        -          -            -    (99 )          -          (99)
Ineffective portion of changes in fair value recorded in earnings                  -          -            (7)      -            -            (7)
Changes in fair value excluding reclassification to realized                    14          (1)          36        -        120          169 Fair value of contracts outstanding at December 31, 2004                          6        (2)          (10)    (109 )        (9 )        (124)
Reclassification to realized at settlement of contracts                          (6)        3            (9)    89        (617 )        (540)
Acquisition of Gexa contracts                                                      -          -          38        -            -            38 Effective portion of changes in fair value recorded in OCI                        -          -            -    (353 )          -        (353)
Ineffective portion of changes in fair value recorded in earnings                  -          -          (33)      -            -          (33)
Changes in fair value excluding reclassification to realized                      3        (2)        (162)      -      1,383        1,222 Fair value of contracts outstanding at December 31, 2005                          3        (1)        (176)    (373 )      757          210 Net option premium payments (receipts)                                            -          1            10        -          71            82 Total mark-to-market energy contract net assets (liabilities) at December 31, 2005                                                    $          3  $        -  $    (166) $  (373 ) $    828    $    292 FPL Group's total mark-to-market energy contract net assets (liabilities) at December 31, 2005 shown above are included in the consolidated balance sheets as follows:
December 31, 2005 (millions)
Derivative assets                                                                                                                  $    1,070 Other assets                                                                                                                                56 Other current liabilities                                                                                                                (449)
Other liabilities                                                                                                                        (385)
FPL Groups total mark-to-market energy contract net assets                                                                        $      292 40
 
The sources of fair value estimates and maturity of energy contract derivative instruments at December 31, 2005 were as follows:
Maturity 2006        2007        2008        2009          2010      Thereafter    Total (millions)
Proprietary Trading:
Actively quoted (i.e., exchange trade) prices                            $    (16)  $      1  $        -  $        -    $      -    $      -    $  (15)
Prices provided by other external sources                                      58            1            -            -          1            1          61 Modeled                                                                      (43)          -            -            -          -            -        (43)
Total                                                                          (1)          2            -            -          1            1            3 Owned Assets - Managed:
Actively quoted (i.e., exchange trade) prices                                (20)          -            -            -          -            -        (20)
Prices provided by other external sources                                      9            1            -            -          -            -          10 Modeled                                                                        9            -            -            -          -            -            9 Total                                                                          (2)          1            -            -          -            -          (1)
Owned Assets - Non-Qualifying:
Actively quoted (i.e., exchange trade) prices                                  88          22            (9)        (2)          (7)          (7)        85 Prices provided by other external sources                                    (144)        (58)          (8)        (1)          -          (17)      (228)
Modeled                                                                      (29)          1            -          (1)          (1)          (3)        (33)
Total                                                                        (85)        (35)        (17)          (4)          (8)        (27)      (176)
Owned Assets - OCI:
Actively quoted (i.e., exchange trade) prices                                  1            -            -            -          -            -            1 Prices provided by other external sources                                    (107)      (191)        (57)        (15)          (4)          -        (374)
Modeled                                                                        -            -            -            -          -            -            -
Total                                                                        (106)      (191)        (57)        (15)          (4)          -        (373)
Owned Assets - FPL Cost Recovery Clauses:
Actively quoted (i.e., exchange trade) prices                                690            -            -            -          -            -        690 Prices provided by other external sources                                      50            -            -            -          -            -          50 Modeled                                                                        17            -            -            -          -            -          17 Total                                                                        757            -            -            -          -            -        757 Total sources of fair value                                                  $    563    $  (223)  $    (74)  $    (19)    $    (11)    $    (26)    $  210 Market Risk Sensitivity - Financial instruments and positions affecting the financial statements of FPL Group and FPL described below are held primarily for purposes other than trading. Market risk is measured as the potential loss in fair value resulting from hypothetical reasonably possible changes in commodity prices, interest rates or equity prices over the next year. Management has established risk management policies to monitor and manage market risks. FPL Group's Exposure Management Committee (EMC), which is comprised of certain members of senior management, is responsible for the overall approval of market risk management policies and the delegation of approval and authorization levels. The EMC receives periodic updates on market positions and related exposures, credit exposures and overall risk management activities.
FPL Group and its subsidiaries are also exposed to credit risk through their energy marketing and trading operations. Credit risk is the risk that a financial loss will be incurred if a counterparty to a transaction does not fulfill its financial obligation. FPL Group manages counterparty credit risk for its subsidiaries with energy marketing and trading operations through established policies, including counterparty credit limits, and in some cases credit enhancements, such as cash prepayments, letters of credit, cash and other collateral and guarantees. Credit risk is also managed through the use of master netting agreements. FPL Group's credit department monitors current and forward credit exposure to counterparties and their affiliates, both on an individual and an aggregate basis.
Commodity price risk - FPL Group uses a value-at-risk (VaR) model to measure market risk in its trading and mark-to-market portfolios. The VaR is the estimated nominal loss of market value based on a one-day holding period at a 95% confidence level using historical simulation methodology. As of December 31, 2005 and 2004, the VaR figures are as follows:
Non-Qualifying Hedges and Hedges in OCI and Trading and Managed Hedges              FPL cost recovery clauses (a)                      Total FPL          FPL                      FPL          FPL                      FPL        FPL FPL        Energy        Group        FPL        Energy        Group          FPL        Energy      Group (millions)
December 31, 2004                                $      -    $      -    $      -    $    55    $      12    $      48    $    55    $    15  $        47 December 31, 2005                                $      -    $      -    $      -    $    114    $      38    $      98    $  114    $    38  $        98 Average for the period ended December 31, 2005                            $      -    $      1    $      1    $    57    $      40    $      48    $    57    $    40  $        49 (a)  Non-qualifying hedges are employed to reduce the market risk exposure to physical assets which are not marked to market. The VaR figures for the non-qualifying hedges and hedges in OCI and FPL cost recovery clauses category do not represent the economic exposure to commodity price movements.
Interest rate risk - FPL Group and FPL are exposed to risk resulting from changes in interest rates as a result of their respective issuances of debt, investments in nuclear decommissioning reserve funds and interest rate swaps. FPL Group and FPL manage their respective interest rate exposure by monitoring current interest rates, entering into interest rate swaps and adjusting their variable rate debt in relation to total capitalization.
41
 
The following are estimates of the fair value of FPL Groups and FPLs financial instruments:
December 31, 2005                  December 31, 2004 Carrying        Estimated        Carrying      Estimated Amount        Fair Value          Amount      Fair Value FPL Group:                                                                                              (millions)
Long-term debt, including current maturities                              $ 9,443        $ 9,540 (a)        $ 9,247      $ 9,611 (a)
Fixed income securities:
Nuclear decommissioning reserve funds                                  $  1,290      $  1,290 (b)      $  1,219    $  1,219 (b)
Other investments                                                      $      80      $      80 (b)      $      72    $      72 (b)
Interest rate swaps - net unrealized loss                                $      (9)    $      (9)(c)      $    (11)    $      (11)(c)
FPL:
Long-term debt, including current maturities                              $  3,406      $  3,416 (a)      $  3,311    $  3,438 (a)
Fixed income securities:
Nuclear decommissioning reserve funds                                  $  1,151      $  1,151 (b)      $  1,081        1,081 (b)
Interest rate swaps - net unrealized loss                                $        -    $        -        $      (2)    $      (2)(c)
(a)  Based on market prices provided by external sources.
(b)  Based on quoted market prices for these or similar issues.
(c)  Based on market prices modeled internally.
The nuclear decommissioning reserve funds of FPL Group consist of restricted funds set aside to cover the cost of decommissioning of FPL Group's and FPL's nuclear power plants. A portion of these funds is invested in fixed income debt securities carried at their market value. Adjustments to market value result in a corresponding adjustment to the related liability accounts based on current regulatory treatment for FPL. The market value adjustments of FPL Group's non-rate regulated operations result in a corresponding adjustment to OCI. See Note 10.
FPL Group and its subsidiaries use a combination of fixed rate and variable rate debt to manage interest rate exposure. Interest rate swaps are used to adjust and mitigate interest rate exposure when deemed appropriate based upon market conditions or when required by financing agreements. At December 31, 2005, the estimated fair value for FPL Group interest rate swaps was as follows:
Notional                  Effective                          Maturity          Rate                  Rate              Estimated Amount                        Date                              Date            Paid              Received              Fair Value (millions)                                                                                                              (millions)
Fair value hedges - FPL Group Capital:
      $ 150              July 2003                          September 2006        variable (a)          7.625%            $    (3)
      $ 150              July 2003                          September 2006        variable (b)          7.625%                  (3)
      $ 195              October 2004                      April 2006            variable (c)          3.250%                  (2)
      $ 55                October 2004                      April 2006            variable (d)          3.250%                    -
      $ 195              October 2004                      April 2006            variable (e)          3.250%                  (2)
      $ 55                October 2004                      April 2006            variable (f)          3.250%                    -
      $ 300              November 2004                      February 2007        variable (g)          4.086%                  (5)
      $ 275              December 2004                      February 2007        variable (h)          4.086%                  (4)
Total fair value hedges                                                                                                          (19)
Cash flow hedges - FPL Energy:
      $ 90                August 2002                        December 2007            4.410%          variable (i)                  1
      $ 185              August 2003                        November 2007            3.557%          variable (i)                  4
      $    6              February 2005                      June 2008                4.255%          variable (i)                  1
      $ 85                December 2003                      December 2017            4.245%          variable (i)                  3
      $ 28                April 2004                        December 2017            3.845%          variable (i)                  1
      $ 266              December 2005                      November 2019            4.905%          variable (i)                  -
Total cash flow hedges                                                                                                            10 Total interest rate hedges                                                                                                    $    (9)
(a)  Six-month LIBOR plus 4.9900%
(b)  Six-month LIBOR plus 4.9925%
(c)  Six-month LIBOR plus 0.0153%
(d)  Six-month LIBOR plus 0.0100%
(e)  Six-month LIBOR plus 0.1500%
(f)  Six-month LIBOR plus 0.1525%
(g)  Three-month LIBOR plus 0.50577%
(h)  Three-month LIBOR plus 0.4025%
(i)  Three-month LIBOR Based upon a hypothetical 10% decrease in interest rates, which is a reasonable near-term market change, the net fair value of FPL Group's net liabilities would increase by approximately $311 million ($171 million for FPL) at December 31, 2005.
42
 
Equity price risk - Included in the nuclear decommissioning reserve funds of FPL Group are marketable equity securities carried at their market value of approximately $1,113 million and $1,051 million ($933 million and $890 million for FPL) at December 31, 2005 and 2004, respectively. A hypothetical 10% decrease in the prices quoted by stock exchanges, which is a reasonable near-term market change, would result in a $111 million ($93 million for FPL) reduction in fair value and corresponding adjustments to the related liability accounts based on current regulatory treatment for FPL, or adjustments to OCI for FPL Group's non-rate regulated operations, at December 31, 2005.
Credit risk - For all derivative and contractual transactions, FPL Group's energy marketing and trading operations, which includes FPL's energy marketing and trading division, are exposed to losses in the event of nonperformance by counterparties to these transactions. Relevant considerations when assessing FPL Group's energy marketing and trading operations' credit risk exposure include:
* Operations are primarily concentrated in the energy industry.
* Trade receivables and other financial instruments are predominately with energy, utility and financial services related companies, as well as municipalities, cooperatives and other trading companies in the United States.
* Overall credit risk is managed through established credit policies.
* Prospective and existing customers are reviewed for creditworthiness based upon established standards, with customers not meeting minimum standards providing various credit enhancements or secured payment terms, such as letters of credit or the posting of cash collateral.
* The use of master netting agreements to offset cash and non-cash gains and losses arising from derivative instruments with the same counterparty. FPL Group's policy is to have master netting agreements in place with significant counterparties.
Based on FPL Group's policies and risk exposures related to credit, FPL Group and FPL do not anticipate a material adverse effect on their financial positions as a result of counterparty nonperformance. As of December 31, 2005, approximately 99%
of both FPL Group's and FPL's energy marketing and trading counterparty credit risk exposure is associated with companies that have investment grade credit ratings.
Item 7A. Quantitative and Qualitative Disclosures About Market Risk See Management's Discussion - Energy Marketing and Trading and Market Risk Sensitivity - Market Risk Sensitivity.
43
 
Item 8. Financial Statements and Supplementary Data MANAGEMENTS REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING FPL Group, Inc.s (FPL Group) and Florida Power & Light Companys (FPL) management are responsible for establishing and maintaining adequate internal control over financial reporting as defined in Rules 13a-15(f) and 15d-15(f) under the Securities Exchange Act of 1934. The consolidated financial statements, which in part are based on informed judgments and estimates made by management, have been prepared in conformity with generally accepted accounting principles applied on a consistent basis.
To aid in carrying out this responsibility, we, along with all other members of management, maintain a system of internal accounting control which is established after weighing the cost of such controls against the benefits derived. In the opinion of management, the overall system of internal accounting control provides reasonable assurance that the assets of FPL Group and its subsidiaries are safeguarded and that transactions are executed in accordance with managements authorization and are properly recorded for the preparation of financial statements. In addition, management believes the overall system of internal accounting control provides reasonable assurance that material errors or irregularities would be prevented or detected on a timely basis by employees in the normal course of their duties. Any system of internal accounting control, no matter how well designed, has inherent limitations, including the possibility that controls can be circumvented or overridden and misstatements due to error or fraud may occur and not be detected. Also, because of changes in conditions, internal control effectiveness may vary over time. Accordingly, even an effective system of internal control will provide only reasonable assurance with respect to financial statement preparation and reporting.
The system of internal accounting control is supported by written policies and guidelines, the selection and training of qualified employees, an organizational structure that provides an appropriate division of responsibility and a program of internal auditing. FPL Groups written policies include a Code of Business Conduct & Ethics that states managements policy on conflict of interest and ethical conduct. Compliance with the Code of Business Conduct & Ethics is confirmed annually by key personnel.
The Board of Directors pursues its oversight responsibility for financial reporting and accounting through its Audit Committee. This Committee, which is comprised entirely of outside directors, meets regularly with management, the internal auditors and the independent auditors to make inquiries as to the manner in which the responsibilities of each are being discharged. The independent auditors and the internal audit staff have free access to the Committee without managements presence to discuss auditing, internal accounting control and financial reporting matters.
In accordance with the SECs published guidance, we have excluded from our assessment the internal control over financial reporting for the entities that directly own the interests in each of the entities acquired in connection with the acquisition of Gexa Corp., which was acquired in June 2005, and whose financial statements reflect total assets and operating revenues representing less than 1% and approximately 3%, respectively, of FPL Groups consolidated total assets and operating revenues as of and for the year ended December 31, 2005. FPL Group does not consider the acquisition of Gexa Corp.
material to FPL Groups results of operations, financial position and cash flows.
Management assessed the effectiveness of FPL Group's and FPL's internal control over financial reporting as of December 31, 2005, using the criteria set forth by the Committee of Sponsoring Organizations of the Treadway Commission in the Internal Control - Integrated Framework and also the standards of the Public Company Accounting Oversight Board. Based on this assessment, management believes that FPL Group's and FPL's internal control over financial reporting was effective as of December 31, 2005.
FPL Group's and FPL's independent registered public accounting firm, Deloitte & Touche LLP, is engaged to express an opinion on FPL Group's and FPL's consolidated financial statements and an opinion on FPL Group's and FPL's internal control over financial reporting. Their reports are based on procedures believed by them to provide a reasonable basis to support such opinions. FPL Group's and FPL's independent registered public accounting firm has issued an attestation report on management's assessment of FPL Group's and FPL's internal control over financial reporting. That report appears on the following page.
LEWIS HAY, III                                                          MORAY P. DEWHURST Lewis Hay, III                                                          Moray P. Dewhurst Chairman, President and Chief                                            Vice President, Finance and Chief Executive Officer of FPL Group                                          Financial Officer of FPL Group and Chairman and Chief Executive                                        and Senior Vice President, Finance Officer of FPL                                                          and Chief Financial Officer of FPL K. MICHAEL DAVIS K. Michael Davis Controller and Chief Accounting Officer of FPL Group and Vice President, Accounting, Controller and Chief Accounting Officer of FPL 44
 
REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM To the Board of Directors and Shareholders FPL Group, Inc. and Florida Power & Light Company:
We have audited managements assessment, included in the accompanying Managements Report on Internal Control Over Financial Reporting, that FPL Group, Inc. and subsidiaries (FPL Group) and Florida Power & Light Company and subsidiaries (FPL) maintained effective internal control over financial reporting as of December 31, 2005, based on criteria established in Internal ControlIntegrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. As described in Managements Report on Internal Control Over Financial Reporting, management excluded from their assessment the internal control over financial reporting for the entities that directly own the interests in each of the entities acquired in connection with the acquisition of Gexa Corp., which was acquired on June 17, 2005 and whose financial statements reflect total assets and revenues constituting less than one percent and approximately three percent, respectively, of the related consolidated financial statement amounts of FPL Group as of and for the year ended December 31, 2005. Accordingly, our audit did not include the internal control over financial reporting for the entities that directly own the interests in each of the entities acquired in connection with the acquisition of Gexa Corp. FPL Group's management and FPL's management are responsible for maintaining effective internal control over financial reporting and for their assessment of the effectiveness of internal control over financial reporting. Our responsibility is to express an opinion on management's assessment and an opinion on the effectiveness of FPL Group's and FPL's internal control over financial reporting based on our audits.
We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audits included obtaining an understanding of internal control over financial reporting, evaluating management's assessment, testing and evaluating the design and operating effectiveness of internal control, and performing such other procedures as we considered necessary in the circumstances. We believe that our audits provide a reasonable basis for our opinions.
A company's internal control over financial reporting is a process designed by, or under the supervision of, the company's principal executive and principal financial officers, or persons performing similar functions, and effected by the company's board of directors, management, and other personnel to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company's internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company's assets that could have a material effect on the financial statements.
Because of the inherent limitations of internal control over financial reporting, including the possibility of collusion or improper management override of controls, material misstatements due to error or fraud may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.
In our opinion, management's assessment that FPL Group and FPL maintained effective internal control over financial reporting as of December 31, 2005, is fairly stated, in all material respects, based on the criteria established in Internal ControlIntegrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. Also in our opinion, FPL Group and FPL maintained, in all material respects, effective internal control over financial reporting as of December 31, 2005, based on the criteria established in Internal ControlIntegrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission.
We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States),
the consolidated financial statements as of and for the year ended December 31, 2005 of FPL Group and FPL and our report dated February 22, 2006 expressed an unqualified opinion on those financial statements.
DELOITTE & TOUCHE LLP Certified Public Accountants Miami, Florida February 22, 2006 45
 
REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM To the Board of Directors and Shareholders FPL Group, Inc. and Florida Power & Light Company:
We have audited the accompanying consolidated balance sheets of FPL Group, Inc. and subsidiaries (FPL Group) and the separate consolidated balance sheets of Florida Power & Light Company and subsidiaries (FPL) as of December 31, 2005 and 2004, and the related consolidated statements of income, common shareholders equity, and cash flows for each of the three years in the period ended December 31, 2005. These financial statements are the responsibility of the respective companys management. Our responsibility is to express an opinion on these financial statements based on our audits.
We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.
In our opinion, such consolidated financial statements present fairly, in all material respects, the financial position of FPL Group and the financial position of FPL at December 31, 2005 and 2004, and the respective results of their operations and their cash flows for each of the three years in the period ended December 31, 2005, in conformity with accounting principles generally accepted in the United States of America.
We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States),
the effectiveness of FPL Groups and FPLs internal control over financial reporting as of December 31, 2005, based on the criteria established in Internal ControlIntegrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated February 22, 2006 expressed an unqualified opinion on managements assessment of the effectiveness of FPL Groups and FPLs internal control over financial reporting and an unqualified opinion on the effectiveness of FPL Groups and FPLs internal control over financial reporting.
DELOITTE & TOUCHE LLP Certified Public Accountants Miami, Florida February 22, 2006 46
 
FPL GROUP, INC.
CONSOLIDATED STATEMENTS OF INCOME (millions, except per share amounts)
Years Ended December 31, 2005        2004      2003 OPERATING REVENUES                                                                    $ 11,846    $ 10,522  $ 9,630 OPERATING EXPENSES Fuel, purchased power and interchange                                                  6,171      5,217    4,539 Other operations and maintenance                                                      1,840      1,672    1,626 Restructuring charge                                                                        -        81        -
Amortization of storm reserve deficiency                                                  155          -        -
Depreciation and amortization                                                          1,285      1,198    1,105 Taxes other than income taxes                                                            931        882      829 Total operating expenses                                                          10,382      9,050    8,099 OPERATING INCOME                                                                          1,464      1,472    1,531 OTHER INCOME (DEDUCTIONS)
Interest charges                                                                        (593)      (489)    (379)
Preferred stock dividends - FPL                                                            -          -      (13)
Loss on redemption of preferred stock - FPL                                                -          -        (9)
Equity in earnings of equity method investees                                            124        94        89 Gains (losses) on disposal of equity method investees and leveraged leases - net                                                              52        (3)        6 Allowance for equity funds used during construction                                        28        37        14 Interest income                                                                            59        25        19 Other - net                                                                                23        18        3 Total other deductions - net                                                        (307)      (318)    (270)
INCOME FROM OPERATIONS BEFORE INCOME TAXES AND CUMULATIVE EFFECT OF CHANGE IN ACCOUNTING PRINCIPLE                                              1,157      1,154    1,261 INCOME TAXES                                                                                272        267      368 INCOME BEFORE CUMULATIVE EFFECT OF CHANGE IN ACCOUNTING PRINCIPLE                                                                  885        887      893 CUMULATIVE EFFECT OF ADOPTING FASB INTERPRETATION NO. 46, "CONSOLIDATION OF VARIABLE INTEREST ENTITIES," NET OF INCOME TAXES OF $2                                                                          -          -        (3)
NET INCOME                                                                            $    885  $    887  $    890 Earnings per share of common stock:
Earnings per share before cumulative effect of adopting FASB                        $    2.33  $  2.47  $  2.52 Interpretation No. 46 Cumulative effect of adopting FASB Interpretation No. 46                            $      -  $      -  $ (0.01)
Earnings per share                                                                  $    2.33  $  2.47  $ 2.51 Earnings per share of common stock - assuming dilution:
Earnings per share before cumulative effect of adopting FASB                        $    2.29  $  2.45  $  2.51 Interpretation No. 46 Cumulative effect of adopting FASB Interpretation No. 46                            $      -  $      -  $ (0.01)
Earnings per share                                                                  $    2.29  $  2.45  $ 2.50 Dividends per share of common stock                                                    $    1.42  $  1.30  $  1.20 Weighted-average number of common shares outstanding:
Basic                                                                                  380.1      358.6    355.1 Assuming dilution                                                                      385.7      361.7    356.3 The accompanying Notes to Consolidated Financial Statements are an integral part of these statements.
47
 
FPL GROUP, INC.
CONSOLIDATED BALANCE SHEETS (millions)
December 31, 2005          2004 PROPERTY, PLANT AND EQUIPMENT Electric utility plant in service and other property                                              $  31,886      $ 29,721 Nuclear fuel                                                                                            520            504 Construction work in progress                                                                            945          1,495 Less accumulated depreciation and amortization                                                      (10,888 )      (10,494 )
Total property, plant and equipment - net                                                          22,463          21,226 CURRENT ASSETS Cash and cash equivalents                                                                                530            225 Customer receivables, net of allowances of $34 and $37, respectively                                  1,064            785 Other receivables, net of allowances of $9 and $1, respectively                                          366            259 Materials, supplies and fossil fuel inventory - at average cost                                          567            394 Regulatory assets:
Deferred clause and franchise expenses                                                                795            230 Storm reserve deficiency                                                                              156            163 Derivatives                                                                                            -              9 Other                                                                                                  7              -
Derivatives                                                                                            1,074            110 Other                                                                                                    428            352 Total current assets                                                                                4,987          2,527 OTHER ASSETS Nuclear decommissioning reserve funds                                                                  2,401          2,271 Other investments                                                                                        467            740 Regulatory assets:
Storm reserve deficiency                                                                              957            373 Deferred clause expenses                                                                              307              -
Unamortized loss on reacquired debt                                                                    42              45 Litigation settlement                                                                                  -              45 Other                                                                                                  37              38 Other                                                                                                  1,343          1,068 Total other assets                                                                                  5,554          4,580 TOTAL ASSETS                                                                                          $  33,004      $ 28,333 CAPITALIZATION Common shareholders equity                                                                        $  8,499      $    7,537 Long-term debt                                                                                        8,039          8,027 Total capitalization                                                                              16,538          15,564 CURRENT LIABILITIES Commercial paper                                                                                      1,159            492 Current maturities of long-term debt and preferred stock                                              1,404          1,225 Accounts payable                                                                                      1,245            762 Customers deposits                                                                                      433            394 Margin cash deposits                                                                                    393              5 Accrued interest and taxes                                                                              253            227 Regulatory liabilities:
Deferred clause and franchise revenues                                                                32              30 Derivatives                                                                                          757              -
Derivatives                                                                                              463            118 Other                                                                                                  1,128            995 Total current liabilities                                                                          7,267          4,248 OTHER LIABILITIES AND DEFERRED CREDITS Asset retirement obligations                                                                          1,685          2,207 Accumulated deferred income taxes                                                                      3,015          2,685 Regulatory liabilities:
Accrued asset removal costs                                                                        2,033          2,012 Asset retirement obligation regulatory expense difference                                            786            266 Unamortized investment tax credits                                                                    62              81 Other                                                                                                  90            106 Other                                                                                                  1,528          1,164 Total other liabilities and deferred credits                                                        9,199          8,521 COMMITMENTS AND CONTINGENCIES TOTAL CAPITALIZATION AND LIABILITIES                                                                  $  33,004      $ 28,333 The accompanying Notes to Consolidated Financial Statements are an integral part of these statements.
48
 
FPL GROUP, INC.
CONSOLIDATED STATEMENTS OF CASH FLOWS (millions)
Years Ended December 31, 2005        2004        2003 CASH FLOWS FROM OPERATING ACTIVITIES Net income                                                                          $    885    $    887  $    890 Adjustments to reconcile net income to net cash provided by operating activities:
Depreciation and amortization                                                        1,242        1,153      1,060 Nuclear fuel amortization                                                              99          93          58 Cumulative effect of changes in accounting principles                                    -            -          5 Storm-related costs of FPL, net of insurance advances                                (659 )      (627 )        -
Amortization of storm reserve deficiency                                              155            -          -
Restructuring charges                                                                    -          33          -
Unrealized losses on marked to market energy contracts                                191          25        (12 )
Deferred income taxes and related regulatory credit                                    333          428        588 Cost recovery clauses and franchise fees                                              (825 )        144        (186 )
Equity in earnings of equity method investees                                        (124 )        (94 )      (89 )
Distribution of earnings from equity method investees                                  86          83          68 Changes in operating assets and liabilities:
Customer receivables                                                              (227 )        23        (161 )
Other receivables                                                                  (64 )        16          2 Material, supplies and fossil fuel inventory                                      (173 )        29          1 Other current assets                                                                (9 )        (10 )      (18 )
Deferred pension cost                                                              (70 )      (101 )      (123 )
Accounts payable                                                                    346          220        104 Customers deposits                                                                  32          42          41 Margin cash deposits                                                                387          (5 )        11 Income taxes                                                                        (51 )        108        (142 )
Interest and other taxes                                                            29          (2 )        57 Other current liabilities                                                          (95 )        80          90 Other liabilities                                                                  (21 )        65        (55 )
Other - net                                                                            80          60          65 Net cash provided by operating activities                                    1,547        2,650      2,254 CASH FLOWS FROM INVESTING ACTIVITIES Capital expenditures of FPL                                                              (1,616 )    (1,394 )    (1,383 )
Independent power investments                                                              (815 )      (476 )    (1,461 )
Nuclear fuel purchases                                                                    (102 )      (141 )      (42 )
Sale of independent power investments                                                        69          93          -
Loan repayments and capital distributions from equity method investees                      199            9          13 Proceeds from sale of securities                                                          2,928        2,207      2,735 Purchase of securities                                                                  (2,928 )    (2,207 )    (2,735 )
Contributions to special use funds                                                        (127 )      (148 )      (173 )
Reimbursements from special use funds                                                        8          218          -
Sale of Olympus Communications, L.P. note receivable                                          -          126          -
Funding of secured loan                                                                    (43 )      (128 )      (47 )
Repayment of secured loan                                                                  218            -          -
Proceeds from termination and sale of leveraged leases                                      58            -          -
Other - net                                                                                (14 )        (31 )        4 Net cash used in investing activities                                              (2,165 )    (1,872 )    (3,089 )
CASH FLOWS FROM FINANCING ACTIVITIES Issuances of long-term debt                                                              1,391          569      2,995 Retirements of long-term debt                                                            (1,215 )      (432 )      (431 )
Retirements of preferred stock - FPL                                                        (5 )          -        (228 )
Net change in short-term debt                                                              667        (423 )    (1,238 )
Issuances of common stock                                                                  639          110          73 Dividends on common stock                                                                  (544 )      (467 )      (425 )
Other - net                                                                                (10 )        (39 )      (48 )
Net cash provided by (used in) financing activities                                    923        (682 )      698 Net increase (decrease) in cash and cash equivalents                                          305          96        (137 )
Cash and cash equivalents at beginning of year                                                225          129        266 Cash and cash equivalents at end of year                                                $    530    $    225  $    129 SUPPLEMENTAL DISCLOSURES OF CASH FLOW INFORMATION Cash paid for interest (net of amount capitalized)                                    $    543    $    460  $    342 Cash paid (received) for income taxes - net                                            $      8    $    (254 ) $    (77 )
SUPPLEMENTAL SCHEDULE OF NONCASH INVESTING AND FINANCING ACTIVITIES Issuance of common stock and conversion of options and warrants in connection with the acquisition of Gexa Corp.                                                      $      74    $      -  $      -
Additions to capital lease obligations                                                $      -    $      -  $      41 Additions to debt through the adoption of FIN 46                                      $      -    $      -  $    515 Additions to property, plant and equipment - net through the adoption of FIN 46        $      -    $      -  $    346 The accompanying Notes to Consolidated Financial Statements are an integral part of these statements.
49
 
FPL GROUP, INC.
CONSOLIDATED STATEMENTS OF COMMON SHAREHOLDERS EQUITY (a)
(millions)
Common Stock (b)
Accumulated Additional                                Other                              Common Aggregate        Paid-In        Unearned          Comprehensive        Retained        Shareholders Shares      Par Value        Capital      Compensation        Income (Loss) (c)      Earnings            Equity Balances, December 31, 2002                          366          $ 4        $    3,282        $ (192)              $    16          $ 3,280 Net income                                          -            -                -              -                    -              890 Issuances of common stock, net of issuance cost of less than $1                    3              -              73              -                    -                -
Exercise of stock options and other incentive plan activity                          -            -              20              -                    -                -
Dividends on common stock                            -            -                -              -                    -              (425 )
Earned compensation under ESOP                      -            -              18              16                    -                -
Other comprehensive loss                            -            -                -              -                  (12)                -
Other                                                -            -                2            (5)                    -                -
Balances, December 31, 2003                          369 (d)          4            3,395          (181)                    4            3,745            $ 6,967 Net income                                          -            -                -              -                    -              887 Issuances of common stock, net of issuance cost of less than $1                    2              -              83              -                    -                -
Exercise of stock options and other incentive plan activity                          1              -              77              -                    -                -
Dividends on common stock                            -            -                -              -                    -              (467 )
Earned compensation under ESOP                      -            -              21              16                    -                -
Other comprehensive loss                            -            -                -              -                  (50)                -
Other                                                -            -                1              2                    -                -
(d)
Balances, December 31, 2004                          372              4            3,577          (163)                  (46)            4,165            $ 7,537 Net income                                          -            -                -              -                    -              885 Issuances of common stock, net of issuance cost of less than $1                  20              -              645              -                    -                -
Exercise of stock options and other incentive plan activity                          3              -              98              -                    -                -
Dividends on common stock                            -            -                -              -                    -              (544 )
Earned compensation under ESOP                      -            -              19              14                    -                -
Other comprehensive loss                            -            -                -              -                  (147)                -
Other                                                -            -                1            (9)                    -                -
(d)
Balances, December 31, 2005                          395          $ 4        $    4,340        $ (158)              $ (193)          $ 4,506              $ 8,499 (a)  Information pertaining to shares, aggregate par value and additional paid-in capital have been restated to reflect the two-for-one stock split effective March 15, 2005. See Note 12 - Earnings Per Share.
(b)  $0.01 par value, authorized - 800,000,000 shares, 800,000,000 shares and 600,000,000 shares at December 31, 2005, 2004 and 2003, respectively; outstanding shares 394,854,416, 372,351,756 and 368,528,254 at December 31, 2005, 2004 and 2003, respectively.
(c)  Comprehensive income, which includes net income and other comprehensive income (loss), totaled approximately $738 million, $837 million and $878 million for 2005, 2004 and 2003, respectively.
(d)  Outstanding and unallocated shares held by the Employee Stock Ownership Plan Trust totaled approximately 10 million, 11 million and 12 million at December 31, 2005, 2004 and 2003, respectively.
The accompanying Notes to Consolidated Financial Statements are an integral part of these statements.
50
 
FLORIDA POWER & LIGHT COMPANY CONSOLIDATED STATEMENTS OF INCOME (millions)
Years Ended December 31, 2005        2004      2003 OPERATING REVENUES                                                                      $ 9,528      $ 8,734  $ 8,293 OPERATING EXPENSES Fuel, purchased power and interchange                                                    4,910        4,467    4,047 Other operations and maintenance                                                        1,307        1,228    1,250 Amortization of storm reserve deficiency                                                  155            -        -
Depreciation and amortization                                                              951          915      898 Taxes other than income taxes                                                              858          809      769 Total operating expenses                                                              8,181        7,419    6,964 OPERATING INCOME                                                                            1,347        1,315    1,329 OTHER INCOME (DEDUCTIONS)
Interest charges                                                                          (224)        (183)    (173)
Allowance for equity funds used during construction                                        28          37        14 Other - net                                                                                  5          (10)      (12)
Total other deductions - net                                                          (191)        (156)    (171)
INCOME BEFORE INCOME TAXES                                                                  1,156        1,159    1,158 INCOME TAXES                                                                                  408          409      403 NET INCOME                                                                                    748          750      755 PREFERRED STOCK DIVIDENDS                                                                      -            1        13 LOSS ON REDEMPTION OF PREFERRED STOCK                                                          -            -        9 NET INCOME AVAILABLE TO FPL GROUP                                                        $    748    $    749  $    733 The accompanying Notes to Consolidated Financial Statements are an integral part of these statements.
51
 
FLORIDA POWER & LIGHT COMPANY CONSOLIDATED BALANCE SHEETS (millions)
December 31, 2005          2004 ELECTRIC UTILITY PLANT Plant in service                                                                                  $ 23,251      $ 21,860 Nuclear fuel                                                                                            380            370 Construction work in progress                                                                            776          1,285 Less accumulated depreciation and amortization                                                        (9,530)        (9,467 )
Electric utility plant - net                                                                      14,877          14,048 CURRENT ASSETS Cash and cash equivalents                                                                                56              65 Customer receivables, net of allowances of $20 and $18, respectively                                    653            585 Other receivables, net of allowances of $1 and $1, respectively                                          313            216 Materials, supplies and fossil fuel inventory - at average cost                                          449            315 Regulatory assets:
Deferred clause and franchise expenses                                                                795            230 Storm reserve deficiency                                                                              156            163 Derivatives                                                                                            -              9 Other                                                                                                  7              -
Derivatives                                                                                              828              26 Other                                                                                                    212            146 Total current assets                                                                                3,469          1,755 OTHER ASSETS Nuclear decommissioning reserve funds                                                                  2,083          1,971 Regulatory assets:
Storm reserve deficiency                                                                              957            373 Deferred clause expenses                                                                              307              -
Unamortized loss on reacquired debt                                                                    42              45 Litigation settlement                                                                                    -              45 Other                                                                                                  37              38 Other                                                                                                    954            839 Total other assets                                                                                  4,380          3,311 TOTAL ASSETS                                                                                          $ 22,726      $ 19,114 CAPITALIZATION Common shareholders equity                                                                        $  6,737      $    6,150 Long-term debt                                                                                        3,271          2,813 Total capitalization                                                                              10,008          8,963 CURRENT LIABILITIES Commercial paper                                                                                      1,159            492 Current maturities of long-term debt and preferred stock                                                135            523 Accounts payable                                                                                        863            606 Customers deposits                                                                                      423            388 Margin cash deposits                                                                                    382              -
Accrued interest and taxes                                                                              174            158 Regulatory liabilities:
Deferred clause and franchise revenues                                                                32              30 Derivatives                                                                                          757              -
Other                                                                                                    929            826 Total current liabilities                                                                          4,854          3,023 OTHER LIABILITIES AND DEFERRED CREDITS Asset retirement obligations                                                                          1,474          2,015 Accumulated deferred income taxes                                                                      2,647          1,949 Regulatory liabilities:
Accrued asset removal costs                                                                        2,033          2,012 Asset retirement obligation regulatory expense difference                                            786            266 Unamortized investment tax credits                                                                    62              81 Other                                                                                                  90            106 Other                                                                                                    772            699 Total other liabilities and deferred credits                                                        7,864          7,128 COMMITMENTS AND CONTINGENCIES TOTAL CAPITALIZATION AND LIABILITIES                                                                  $ 22,726      $ 19,114 The accompanying Notes to Consolidated Financial Statements are an integral part of these statements.
52
 
FLORIDA POWER & LIGHT COMPANY CONSOLIDATED STATEMENTS OF CASH FLOWS (millions)
Years Ended December 31, 2005        2004      2003 CASH FLOWS FROM OPERATING ACTIVITIES Net income                                                                            $    748    $    750  $    755 Adjustments to reconcile net income to net cash provided by operating activities:
Depreciation and amortization                                                            909        870      853 Nuclear fuel amortization                                                                  72          66        33 Storm-related costs, net of insurance advances                                          (659)      (627)        -
Amortization of storm reserve deficiency                                                  155          -        -
Deferred income taxes and related regulatory credit                                      531        553      172 Cost recovery clauses and franchise fees                                                (825)        144      (186)
Changes in operating assets and liabilities:
Customer receivables                                                                  (82)        51      (132)
Other receivables                                                                      (26)        (5)      (2)
Material, supplies and fossil fuel inventory                                          (133)        39        (6)
Other current assets                                                                    (9)        (8)      (10)
Deferred pension cost                                                                  (52)        (78)      (99)
Accounts payable                                                                      221        171        84 Customers deposits                                                                    35          42        30 Margin cash deposits                                                                  382          -        -
Income taxes                                                                          (71)        (61)      (52)
Interest and other taxes                                                                17          (1)      29 Other current liabilities                                                              (44)        27        74 Other liabilities                                                                      33          33      (27)
Other - net                                                                                36        (18)      41 Net cash provided by operating activities                                        1,238      1,948    1,557 CASH FLOWS FROM INVESTING ACTIVITIES Capital expenditures                                                                      (1,616)    (1,394)  (1,383)
Proceeds from sale of securities                                                          2,759      2.072    2.702 Purchases of securities                                                                  (2,759)    (2,072)  (2,702)
Contributions to special use funds                                                          (111)      (134)    (157)
Reimbursements from special use funds                                                          8        218        -
Nuclear fuel purchases                                                                      (95)        (90)      (26)
Other - net                                                                                  (2)          -        1 Net cash used in investing activities                                                  (1,816)    (1,400)  (1,565)
CASH FLOWS FROM FINANCING ACTIVITIES Issuances of long-term debt                                                                  588        236      877 Retirements of long-term debt                                                              (500)          -      (388)
Issuances of preferred stock                                                                  -          20        -
Retirements of preferred stock                                                              (25)          -      (228)
Net change in short-term debt                                                                667        (139)    (121)
Capital contributions from FPL Group                                                          -          -      600 Dividends                                                                                  (161)      (604)    (728)
Net cash provided by (used in) financing activities                                      569        (487)      12 Net increase (decrease) in cash and cash equivalents                                            (9)        61        4 Cash and cash equivalents at beginning of year                                                  65          4        -
Cash and cash equivalents at end of year                                                $      56    $    65  $      4 SUPPLEMENTAL DISCLOSURES OF CASH FLOW INFORMATION Cash paid for interest (net of amount capitalized)                                    $    217    $    167  $    155 Cash paid (received) for income taxes - net                                            $    (46)  $    (60) $    292 SUPPLEMENTAL SCHEDULE OF NONCASH INVESTING AND FINANCING ACTIVITIES Additions to capital lease obligations                                                $      -    $      -  $    41 Additions to debt through the adoption of FIN 46                                      $      -    $      -  $    164 The accompanying Notes to Consolidated Financial Statements are an integral part of these statements.
53
 
FLORIDA POWER & LIGHT COMPANY CONSOLIDATED STATEMENTS OF COMMON SHAREHOLDERS EQUITY (millions)
Accumulated Other                                Common Common          Additional        Comprehensive          Retained        Shareholders Stock (a)    Paid-In Capital    Income (Loss) (b)        Earnings            Equity Balances, December 31, 2002                                        $  1,373        $ 3,716            $        (2)          $ 295 Net income available to FPL Group                                        -              -                      -              733 Capital contributions from FPL Group                                      -          600                      -                -
Dividends to FPL Group                                                    -              -                      -            (715)
Other comprehensive income                                                -              -                    2 (c)              -
Other                                                                    -            2                      -                -
Balances, December 31, 2003                                            1,373            4,318                      -              313          $    6,004 Net income available to FPL Group                                        -              -                      -              749 Dividends to FPL Group                                                    -              -                      -            (603)
Balances, December 31, 2004                                            1,373            4,318                      -              459          $    6,150 Net income available to FPL Group                                        -              -                      -              748 Dividends to FPL Group                                                    -              -                      -            (161)
Balances, December 31, 2005                                        $  1,373        $ 4,318            $          -          $ 1,046          $    6,737 (a)  Common stock, no par value, 1,000 shares authorized, issued and outstanding.
(b)  Comprehensive income, which includes net income and other comprehensive income (loss), totaled approximately $748 million, $749 million and $735 million for 2005, 2004 and 2003, respectively.
(c)  Minimum supplemental employee retirement plan liability adjustment.
The accompanying Notes to Consolidated Financial Statements are an integral part of these statements.
54
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS Years Ended December 31, 2005, 2004 and 2003
: 1. Summary of Significant Accounting and Reporting Policies Basis of Presentation - FPL Group, Inc.'s (FPL Group) operations are conducted primarily through its wholly-owned subsidiary Florida Power & Light Company (FPL) and its wholly-owned indirect subsidiary FPL Energy, LLC (FPL Energy). FPL, a rate-regulated public utility, supplies electric service to approximately 4.3 million customer accounts throughout most of the east and lower west coasts of Florida. FPL Energy invests in independent power projects through both controlled and consolidated entities and non-controlling ownership interests in joint ventures essentially all of which are accounted for under the equity method.
The consolidated financial statements of FPL Group and FPL include the accounts of their respective majority-owned and controlled subsidiaries. All significant intercompany balances and transactions have been eliminated in consolidation. Certain amounts included in prior years' consolidated financial statements have been reclassified to conform to the current year's presentation. The preparation of financial statements requires the use of estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses and the disclosure of contingent assets and liabilities. Actual results could differ from those estimates.
Regulation - FPL is subject to regulation by the Florida Public Service Commission (FPSC) and the Federal Energy Regulatory Commission (FERC). Its rates are designed to recover the cost of providing electric service to its customers including a reasonable rate of return on invested capital. As a result of this cost-based regulation, FPL follows the accounting practices set forth in Statement of Financial Accounting Standards No. (FAS) 71, "Accounting for the Effects of Certain Types of Regulation." FAS 71 indicates that regulators can create assets and impose liabilities that would not be recorded by non-rate regulated entities. Regulatory assets and liabilities represent probable future revenues that will be recovered from or refunded to customers through the ratemaking process.
Cost recovery clauses, which are designed to permit full recovery of certain costs and provide a return on certain assets allowed to be recovered through the various clauses, include substantially all fuel, purchased power and interchange expenses, conservation and certain environmental-related expenses, certain revenue taxes and franchise fees. Revenues from cost recovery clauses are recorded when billed; FPL achieves matching of costs and related revenues by deferring the net under- or over-recovery. Any under-recovered costs or over-recovered revenues are collected from or returned to customers in subsequent periods. Although deferred clause revenues and expenses do not significantly affect net income, the under- or over-recoveries can significantly affect FPL Group's and FPL's operating cash flows.
Beginning in 2004, in order to comply with a U.S. Nuclear Regulatory Commission (NRC) order, FPL incurred additional cost to modify its security systems at its St. Lucie and Turkey Point nuclear units. During 2005 and 2004, FPL incurred and deferred pursuant to an FPSC order approximately $12 million and $25 million, respectively, in additional costs as a regulatory asset (included in regulatory assets - other) and, in 2005, accrued interest on the deferred amount at an FPSC-approved rate of 7.29%. During 2005, FPL reduced the regulatory asset by the amount of the reduction in the decommissioning accrual approved by the FPSC in the 2005 rate agreement discussed below. Effective January 1, 2006, the remaining balance of approximately $13 million will be included in rate base, amortized over a four-year period and included in depreciation expense.
In 2000, a bankruptcy court approved a $222.5 million settlement of a contract dispute between FPL and two qualifying facilities. As approved by the FPSC, FPL is recovering the cost of the settlement through the fuel and purchased power cost recovery clause (fuel clause) and capacity cost recovery clause (capacity clause) over a five-year period which began January 1, 2002. The settlement cost is included in deferred clause and franchise expenses and litigation settlement on FPL Group's and FPL's consolidated balance sheets.
If FPL were no longer subject to cost-based rate regulation, the regulatory assets and liabilities would be written off unless regulators specify an alternative means of recovery or refund. In addition, the FPSC has the authority to disallow recovery of costs that it considers excessive or imprudently incurred. The continued applicability of FAS 71 is assessed at each reporting period.
Revenues and Rates - FPL's retail and wholesale utility rate schedules are approved by the FPSC and the FERC, respectively. FPL records unbilled base revenues for the estimated amount of energy delivered to customers but not yet billed. Unbilled base revenues are included in customer receivables and amounted to approximately $123 million and $135 million at December 31, 2005 and 2004, respectively. FPL's operating revenues also include amounts resulting from cost recovery clauses (see Regulation), franchise fees, gross receipts taxes and beginning in 2005 a surcharge related to the recovery of storm restoration costs associated with the 2004 hurricanes (see Storm Reserve Deficiency). Franchise fees and gross receipts taxes are imposed on FPL; however, the FPSC allows FPL to include in the amounts charged to customers the amount of the gross receipts tax for all customers and the franchise amount for those customers located in the jurisdiction that imposes the fee. Accordingly, franchise fees and gross receipts taxes are reported gross in operating revenues and taxes other than income taxes on FPL Group's and FPL's consolidated statements of income and were approximately $604 million, $558 million and $527 million in 2005, 2004 and 2003, respectively. FPL also collects municipal utility taxes which are reported gross in customer receivables and accounts payable on FPL Group's and FPL's consolidated balance sheets.
55
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
In August 2005, FPL and all of the interveners in its 2005 rate case filing signed a stipulation and settlement agreement regarding FPLs retail base rates, which was subsequently approved by the FPSC (2005 rate agreement). The 2005 rate agreement will be in effect through December 31, 2009, and thereafter shall remain in effect until terminated on the date new retail base rates become effective pursuant to an FPSC order. The 2005 rate agreement replaced a rate agreement that was effective April 15, 2002 through December 31, 2005 (2002 rate agreement).
The 2005 rate agreement provides that retail base rates will not increase during the term of the agreement except to allow recovery of the revenue requirements of any power plant approved pursuant to the Florida Power Plant Siting Act (Siting Act) that achieves commercial operation during the term of the 2005 rate agreement. The 2005 rate agreement also continues the revenue sharing mechanism in FPLs 2002 rate agreement, whereby revenues from retail base operations in excess of certain thresholds will be shared with customers on the basis of two-thirds refunded to customers and one-third retained by FPL. Revenues from retail base operations in excess of a second, higher threshold (cap) will be refunded 100% to customers. The revenue sharing threshold and cap for 2006 will be $3,991 million and $4,156 million, respectively, which was established by using the 2005 revenue sharing threshold and cap of $3,880 million and $4,040 million, respectively, and increasing them by the average annual growth rate in retail kilowatt-hour (kwh) sales for the ten-year period ending December 31, 2005. For each succeeding year, retail base rate revenue sharing threshold and cap amounts will be established by increasing the prior years threshold and cap by the sum of the following: (i) the average annual growth rate in retail kwh sales for the ten-year period ending December 31 of the preceding year multiplied by the prior years retail base rate revenue sharing threshold and cap and (ii) the amount of any incremental base rate increases for power plants approved pursuant to the Siting Act that achieve commercial operation during the term of the 2005 rate agreement.
Under both the 2005 and 2002 rate agreements, the accrual for the refund associated with the revenue sharing mechanism is computed monthly for each twelve-month period of the rate agreement. At the beginning of each twelve-month period, planned revenues are reviewed to determine if it is probable that the threshold will be exceeded. If so, an accrual is recorded each month for a portion of the anticipated refund based on the relative percentage of year-to-date planned revenues to the total estimated revenues for the twelve-month period, plus accrued interest. In addition, if in any month actual revenues are above or below planned revenues, the accrual is increased or decreased as necessary to recognize the effect of this variance on the expected refund amount. Under both the 2005 and 2002 rate agreements, the annual refund (including interest) is paid to customers as a credit to their February electric bill. At December 31, 2005 and 2004, there was no refund due to customers.
Under the terms of the 2005 rate agreement: (i) FPLs electric property depreciation rates will be based upon the comprehensive depreciation studies it filed with the FPSC in March 2005; however, FPL may reduce depreciation by up to
$125 million annually, (ii) FPL suspended contributions of approximately $79 million per year to its nuclear decommissioning fund beginning in September 2005, (iii) FPL suspended contributions of $20.3 million per year to its storm and property insurance reserve beginning in January 2006 and has the ability to recover prudently incurred storm restoration costs, either through securitization pursuant to Section 366.8260 of the Florida Statutes or through surcharges, and (iv) FPL will be allowed to recover through a cost recovery clause prudently incurred incremental costs associated with complying with an FPSC or FERC order regarding a regional transmission organization.
FPL will not have an authorized regulatory ROE under the 2005 rate agreement for the purpose of addressing earnings levels. For all other regulatory purposes, FPL will have an ROE of 11.75%. The revenue sharing mechanism described above will be the appropriate and exclusive mechanism to address earnings levels. However, if FPLs regulatory ROE, as reported to the FPSC in FPLs monthly earnings surveillance report, falls below 10% during the term of the 2005 rate agreement, FPL may petition the FPSC to amend its base rates.
The 2002 rate agreement provided for a $250 million annual reduction in retail base revenues allocated to all customers by reducing customers base rates and service charges by approximately 7% as well as a revenue sharing mechanism based on stated thresholds. During the term of the 2002 rate agreement, FPL did not have an authorized regulatory ROE range for the purpose of addressing earnings levels and FPL reduced depreciation on its plant in service by $125 million each year.
FPL Energys revenue is recorded as electricity is delivered, which is when revenue is earned. FPL Energys retail energy business records unbilled revenues for the estimated amount of energy delivered to customers but not yet billed. Unbilled revenues are included in customer receivables and amounted to approximately $30 million at December 31, 2005.
Electric Plant, Depreciation and Amortization - The cost of additions to units of utility property of FPL and FPL Energy is added to electric utility plant. In accordance with regulatory accounting, the cost of FPL's units of utility property retired, less estimated net salvage value, is charged to accumulated depreciation. Maintenance and repairs of property as well as replacements and renewals of items determined to be less than units of utility property are charged to other operations and maintenance (O&M) expenses. At December 31, 2005, the electric generating, transmission, distribution and general facilities of FPL represented approximately 45%, 12%, 37% and 6%, respectively, of FPL's gross investment in electric utility plant in service. Substantially all of FPL's properties are subject to the lien of FPL's mortgage, which secures most debt securities issued by FPL. A number of FPL Energy's generating facilities are encumbered by liens against their assets securing various financings. The total amount of FPL Energy's assets serving as collateral was approximately $3.7 billion at December 31, 2005.
56
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
Depreciation of FPLs electric property is primarily provided on a straight-line average remaining life basis. FPL includes in depreciation expense a provision for fossil plant dismantlement and nuclear plant decommissioning (see Decommissioning of Nuclear Plants, Dismantlement of Plants and Other Accrued Asset Removal Costs). For substantially all of FPLs property, depreciation studies are performed and filed with the FPSC at least every four years; however, the 2002 rate agreement required FPL to continue to depreciate its electric property based on rates approved in April 1999 that became effective January 1, 1998. The weighted annual composite depreciation rate for FPLs electric plant in service, including intangible software, but excluding the effects of decommissioning and dismantlement, was approximately 4.3%, 4.2% and 4.3% for 2005, 2004 and 2003, respectively. These rates exclude the depreciation adjustments discussed below. Pursuant to the 2005 rate agreement, FPL implemented new depreciation rates on January 1, 2006. FPL Energys electric plants in service less salvage value are depreciated using the straight-line method over their estimated useful lives. FPL Energys effective depreciation rates were 3.9%, 3.9% and 3.9% for 2005, 2004 and 2003, respectively.
Under the 2002 and 2005 rate agreements (see Revenues and Rates), FPL may reduce depreciation by up to $125 million annually during the term of the rate agreements. These depreciation adjustments are included in earnings. The amounts recorded during the 2002 rate agreement were allocated primarily to the nuclear depreciation reserve. The amounts to be recorded during the 2005 rate agreement will be allocated to the appropriate assets when FPL files its comprehensive depreciation studies at the end of the 2005 rate agreement.
Nuclear Fuel - FPL leases nuclear fuel for all four of its nuclear units. Beginning July 1, 2003, the lessor was consolidated by FPL as a result of adopting the Financial Accounting Standards Board's (FASB) Interpretation No. (FIN) 46, "Consolidation of Variable Interest Entities." See Note 9 - FPL. For ratemaking purposes, these leases are treated similar to operating leases. For financial reporting, prior to July 1, 2003, these leases were recorded as capital leases. Nuclear fuel lease expense was $31 million for the six months ended June 30, 2003. Included in this expense was an interest component of $1 million for the six months ended June 30, 2003. Until July 1, 2003, the lease payments were charged to fuel expense on a unit of production method. Beginning July 1, 2003, the cost of nuclear fuel was capitalized and is being amortized to fuel expense on a unit of production method except for the interest component, which is recorded as interest expense. These charges, as well as a charge for spent nuclear fuel, are recovered through the fuel clause. FPL makes quarterly payments to the lessor for the lease commitments. Under certain circumstances of lease termination, the associated debt ($194 million at December 31, 2005), which was recorded in commercial paper and long-term debt on FPL Group's and FPL's consolidated balance sheets, would become due.
Seabrook Station (Seabrook) has several contracts for the supply, conversion, enrichment and fabrication of nuclear fuel. See Note 16 - Contracts. Seabrook's nuclear fuel costs are charged to fuel expense on a unit of production method.
Construction Activity - Allowance for funds used during construction (AFUDC) is a non-cash item which represents the allowed cost of capital, including an ROE, used to finance construction projects. The portion of AFUDC attributable to borrowed funds is recorded as a reduction of interest expense and the remainder is recorded as other income. The FPSC rules limit the recording of AFUDC to projects that cost in excess of 0.5% of a utility's plant in service balance and require more than one year to complete. The FPSC rules allow construction projects below the 0.5% threshold as a component of rate base. During 2005, 2004 and 2003, AFUDC was capitalized at a rate of 7.42%, 7.29% and 7.84%, respectively, and amounted to approximately $41 million, $48 million and $18 million, respectively. See Note 16 - Commitments.
FPL's construction work in progress at December 31, 2005 includes construction materials, progress payments on major equipment contracts, third party engineering costs and other costs directly associated with the construction of various projects. Upon completion of the projects, these costs are transferred to electric utility plant in service. At December 31, 2005 and 2004, FPL recorded approximately $156 million and $135 million, respectively, of construction accruals, which are included in other current liabilities on FPL Group's and FPL's consolidated balance sheets.
FPL Energy capitalizes project development costs once it is probable that such costs will be realized through the ultimate construction of a power plant. At December 31, 2005 and 2004, FPL Energy's capitalized development costs totaled approximately $19 million and $15 million, respectively, which are included in other assets on FPL Group's consolidated balance sheets. These costs include emission reduction credits, land rights and other third party costs directly associated with the development of a new project. Upon commencement of construction, these costs either are transferred to construction work in progress or remain in other assets, depending upon the nature of the cost. Capitalized development costs are charged to O&M expenses when the development of a project is no longer probable. In addition to capitalized development costs, FPL Energy capitalizes interest on its construction projects. Interest capitalized on construction projects amounted to $8 million, $43 million and $83 million during 2005, 2004 and 2003, respectively. FPL Energy's interest charges are based on a deemed capital structure of 50% debt for operating projects and 100% debt for projects under construction.
FPL Energy's construction work in progress includes construction materials, prepayments on turbine generators, third party engineering costs, interest and other costs directly associated with the construction and development of the project. Upon commencement of plant operation, these costs are transferred to electric utility plant in service and other property. At December 31, 2005 and 2004, FPL Energy recorded approximately $73 million and $55 million, respectively, of construction accruals, which are included in other current liabilities on FPL Group's consolidated balance sheets.
57
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
Asset Retirement Obligations - FPL Group and FPL adopted FAS 143, Accounting for Asset Retirement Obligations and FIN 47, Accounting for Conditional Asset Retirement Obligations effective January 1, 2003 and December 31, 2005, respectively. See Note 15.
Decommissioning of Nuclear Plants, Dismantlement of Plants and Other Accrued Asset Removal Costs - Following are the components of FPL Group's and FPL's decommissioning of nuclear plants, dismantlement of plants and other accrued asset removal costs:
FPL Interim Removal Nuclear                  Fossil                    Costs Decommissioning          Dismantlement              and Other            FPL Energy        FPL Group December 31,            December 31,            December 31,            December 31,      December 31, 2005        2004        2005        2004        2005        2004      2005      2004    2005      2004 (millions)
Asset retirement obligations (ARO)                  $ 1,460    $ 2,013    $    11    $      2    $      3    $      -  $  211  $    192 $ 1,685  $ 2,207 Less capitalized ARO asset net of accumulated depreciation                              57        214          2            1            1            -        -        -      60      215 Accrued asset removal costs (a)                          178          158        277        291        1,578        1,563        -        -  2,033    2,012 Asset retirement obligation regulatory expense difference (a)                              770          267          16          (1)            -            -        -        -    786      266 Accrued decommissioning, dismantlement and other accrued asset removal costs                              $ 2,351 (b) $ 2,224 (b) $    302 (b) $  291 (b) $ 1,580 (b) $ 1,563 (b) $  211  $    192 $ 4,444  $ 4,270 (a)  Regulatory liability on FPL Groups and FPLs consolidated balance sheets.
(b)  Represents total amount accrued for ratemaking purposes.
FPL - For ratemaking purposes, FPL accrues for the cost of end of life retirement and disposal of its nuclear and fossil plants over the expected service life of each unit based on nuclear decommissioning and fossil dismantlement studies periodically filed with the FPSC. In addition, FPL accrues for interim removal costs over the life of the related assets based on depreciation studies approved by the FPSC. For financial reporting purposes, FPL recognizes decommissioning and dismantlement liabilities in accordance with FAS 143 and FIN 47. Any differences between expense recognized under FAS 143 and FIN 47 and the amount recoverable through rates are deferred in accordance with FAS 71. See Electric Plant, Depreciation and Amortization and Note 15.
Nuclear decommissioning studies are performed at least every five years and are submitted to the FPSC for approval. FPL filed updated nuclear decommissioning studies with the FPSC in December 2005. The studies filed in December 2005 support the suspension, effective September 2005, of the $79 million annual decommissioning accrual as indicated in the 2005 rate agreement. These studies reflect FPLs current plans, under the extended operating licenses, for prompt dismantlement of Turkey Point Units Nos. 3 and 4 with decommissioning activities commencing in 2032 and 2033, respectively, and provide for St. Lucie Unit No. 1 to be mothballed beginning in 2036 with decommissioning activities to be integrated with the prompt dismantlement of St. Lucie Unit No. 2 at the end of its useful life in 2043. These studies also assume that FPL will be storing spent fuel on site pending removal to a U.S. government facility. The studies indicate FPLs portion of the ultimate costs of decommissioning its four nuclear units, including costs associated with spent fuel storage, to be $10.9 billion. FPLs portion of the ultimate cost of decommissioning its four units, expressed in 2005 dollars, is estimated by the studies to aggregate $2.0 billion.
During 2005, with respect to costs associated with nuclear decommissioning, FPL recognized approximately $112 million related to ARO accretion expense, approximately $7 million related to depreciation of the capitalized ARO asset, approximately $4 million related to the non-legal obligation included in accrued asset removal costs and an approximately $70 million credit to adjust the total accrual to the $53 million approved by the FPSC for decommissioning expense (included in depreciation and amortization expense in FPL Groups and FPLs consolidated statements of income). During 2004, with respect to costs associated with nuclear decommissioning, FPL recognized approximately $106 million related to ARO accretion expense, approximately $8 million related to depreciation of the capitalized ARO asset, approximately $6 million related to the non-legal obligation included in accrued asset removal costs and an approximate $41 million credit to adjust the total accrual to the $79 million approved by the FPSC for decommissioning expense (included in depreciation and amortization expense in FPL Groups and FPLs consolidated statements of income). During 2003, FPL recognized approximately $101 million related to ARO accretion expense, approximately $8 million related to depreciation of the capitalized ARO asset, approximately $6 million related to the non-legal obligation included in accrued asset removal costs and an approximate $36 million credit to adjust the total accrual to the $79 million approved by the FPSC for decommissioning expense.
Restricted trust funds for the payment of future expenditures to decommission FPL's nuclear units are included in nuclear decommissioning reserve funds of FPL. Consistent with regulatory treatment, marketable securities held in the decommissioning funds are classified as available for sale and are carried at market value with market adjustments, including any other-than-temporary impairment losses, resulting in a corresponding adjustment to the related regulatory liability 58
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued) accounts. See Note 10. Contributions to the funds were based on current period decommissioning expense and were suspended beginning September 2005. Additionally, fund earnings, net of taxes, are reinvested in the funds. Earnings are recognized as income and an offsetting expense is recorded to reflect a corresponding increase in the related regulatory liability accounts. As a result, there is no effect on net income. The tax effects of amounts not yet recognized for tax purposes are included in accumulated deferred income taxes.
Fossil fuel plant dismantlement studies are performed and filed with the FPSC at least every four years. FPLs latest fossil fuel plant dismantlement studies became effective January 1, 2003. The studies indicate that FPLs portion of the ultimate cost to dismantle its fossil units is $668 million. FPL recognized fossil dismantlement expense of approximately $19 million in each of 2005, 2004 and 2003, which is included in depreciation and amortization expense.
FPL Energy - FPL Energy also records a nuclear decommissioning liability for Seabrook in accordance with FAS 143 and FIN
: 47. See Note 15. Seabrook's current decommissioning funding plan is based on an operating license expiration date of 2026. The funding plan is based on a comprehensive nuclear decommissioning study reviewed by the New Hampshire Nuclear Decommissioning Financing Committee (NDFC) in 2003 and is effective for four years. This study assumes that Seabrook would begin decommissioning in 2026 and that FPL Energy's 88.23% portion of the ultimate cost of decommissioning Seabrook, including costs associated with spent fuel storage, is approximately $1.5 billion, or $604 million expressed in 2005 dollars. In December 2005, FPL Energy obtained NRC approval to extend the unit's operating license from 2026 to 2030 to recapture the period of non-operation from 1986 to 1990. FPL Energy intends to seek approval from the NRC to renew the unit's operating license for an additional 20 years. At December 31, 2005 and 2004, FPL Energy had an ARO related to nuclear decommissioning of $189 million and $175 million, respectively.
FPL Energy's 88.23% portion of Seabrook's restricted trust fund for the payment of future expenditures to decommission Seabrook is included in FPL Group's nuclear decommissioning reserve funds. Marketable securities held in the decommissioning fund are classified as available for sale and are carried at market value with market adjustments resulting in a corresponding adjustment to other comprehensive income. Any unrealized losses associated with marketable securities that are determined to be other-than-temporarily impaired would be recognized as an expense in FPL Group's consolidated statements of income. Fund earnings are recognized in income and are reinvested in the funds either on a pretax or after-tax basis. The tax effects of amounts not yet recognized for tax purposes are included in accumulated deferred income taxes. See Note 10.
Accrual for Major Maintenance Costs - Consistent with regulatory treatment, FPLs estimated nuclear maintenance costs for each nuclear units next planned outage are accrued over the period from the end of the last outage to the end of the next planned outage. Any difference between the estimated and actual costs is included in O&M expenses when known. The estimated costs for inspection and repair of FPLs four reactor vessel heads were deferred and are being amortized on a levelized basis over a five-year period beginning in 2002 as authorized by the FPSC, and amounted to approximately $11 million in 2005, $10 million in 2004 and $13 million in 2003. The accrued liability for nuclear maintenance costs, including those for the reactor vessel heads, at December 31, 2005 and 2004 totaled approximately $79 million and $74 million, respectively, and is included in other liabilities. For the years ended December 31, 2005, 2004 and 2003, FPL recognized approximately $160 million, $164 million and $157 million, respectively, in nuclear maintenance costs (including reactor vessel head inspection and repair costs) which are included in O&M expenses in FPL Groups and FPLs consolidated income statements.
FPL Energy's estimated major maintenance costs for its combustion turbine and nuclear generating units' next planned outage are accrued over the period from the end of the last outage to the end of the next planned outage. Any difference between the estimated and actual costs is included in O&M expenses when known. The accrued liability for FPL Energy's major maintenance costs totaled approximately $114 million and $83 million at December 31, 2005 and 2004, respectively, and is included in other liabilities. For the years ended December 31, 2005, 2004 and 2003, FPL Energy recognized approximately $78 million, $80 million and $54 million in major maintenance costs which are included in O&M expenses in FPL Group's consolidated income statements.
Cash Equivalents - Cash equivalents consist of short-term, highly liquid investments with original maturities of three months or less.
Restricted Cash - At both December 31, 2005 and 2004, FPL Group had approximately $56 million of restricted cash included in other current assets on FPL Group's consolidated balance sheets, essentially all of which is restricted for debt service payments and O&M expenses, as well as for margin collateral in 2005 and construction liabilities in 2004.
Allowance for Doubtful Accounts - FPL maintains an accumulated provision for uncollectible customer accounts receivable that is determined by multiplying the previous six months of revenues by a bad debt percentage, which represents an average of the past two years' actual write-offs. Additional amounts are included in the provision to address specific items that are not considered in the calculation described above. FPL Energy regularly reviews collectibility of its receivables and establishes a provision for losses estimated as a percentage of revenue based on the historical bad debt write-off trends for its retail energy business, and when necessary using the specific identification method for all other receivables.
59
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
Inventory - FPL values materials, supplies and fossil fuel inventory using a weighted-average cost method. FPL Energy's materials, supplies and oil and gas inventories are carried at the lower of weighted-average cost or market.
Energy Trading - FPL Group and FPL engage in limited energy trading activities to optimize the value of electricity and fuel contracts and generating facilities, as well as to take advantage of expected favorable commodity price movements. In accordance with Emerging Issues Task Force Issue No. (EITF) 02-3, trading contracts that meet the definition of a derivative are accounted for at market value and realized gains and losses from all trading contracts, including those where physical delivery is required, are recorded net for all periods presented. See Note 4.
Storm Reserve Deficiency - The storm reserve deficiency represents storm restoration costs incurred by FPL that exceeded the amounts in the storm and property insurance reserve, which provided FPL coverage toward storm damage costs and possible retrospective premium assessments stemming from a nuclear incident under the various insurance programs covering FPL's nuclear generating plants. The storm restoration costs were associated with hurricanes that affected FPL's service territory in 2004 and 2005. At December 31, 2005 and 2004, FPL's storm reserve deficiency totaled approximately
$1.1 billion and $536 million, respectively, a portion of which is included in current assets.
The storm reserve deficiency associated with the 2004 hurricanes, plus interest, is being recovered primarily through a storm damage surcharge applied to retail customer bills over a 36-month period that began in February 2005, and totaled approximately $297 million at December 31, 2005. During 2005, FPL billed to customers approximately $155 million through the storm damage surcharge, which is included in operating revenues on the consolidated statements of income. A corresponding expense for the amortization of the storm reserve deficiency is shown as a separate line on the consolidated statements of income. The remaining balance of the storm reserve deficiency primarily relates to the storm restoration costs associated with Hurricanes Dennis, Katrina, Rita and Wilma that struck FPL's service territory in 2005. In January 2006, FPL petitioned the FPSC for approval to recover approximately $1.7 billion of storm costs through the issuance of $1,050 million of storm recovery bonds pursuant to the securitization provisions of Section 366.8260 of the Florida Statutes. The storm bond proceeds will provide for the net-of-tax recovery of the remaining balance of the unrecovered hurricane costs of $1,040 million (estimated balance as of July 31, 2006) and the replenishment of the storm reserve to approximately $650 million. If the FPSC determines that the storm restoration costs should not be securitized and instead should be recovered through another means, FPL has recommended as an alternative recovering the 2005 hurricane costs through a surcharge over approximately three years and implementing a separate surcharge to fund a $650 million storm reserve. The FPSC's decision is expected in May 2006. On February 2, 2006, several interested parties filed a motion to dismiss FPLs petition, claiming that the petition did not satisfy certain technical requirements. FPL filed its response to the motion on February 6, 2006, asserting that the requirements cited are not applicable to FPL's petition and which were met in any event. The FPSC has the right to review FPL's storm charges for prudence, and has the authority to determine the manner and timing of recovery.
Investments in Leveraged Leases - Subsidiaries of FPL Group, other than FPL, have investments in leveraged leases, which at December 31, 2005 and 2004 totaled $28 million and $81 million, respectively, and are included in other investments on FPL Group's consolidated balance sheets. The related deferred tax liabilities totaled $28 million and $80 million at December 31, 2005 and 2004, respectively, and are included in accumulated deferred income taxes.
Impairment of Long-Lived Assets - FPL Group evaluates on an ongoing basis the recoverability of its assets for impairment whenever events or changes in circumstances indicate that the carrying amount may not be recoverable as described in FAS 144, "Accounting for the Impairment or Disposal of Long-Lived Assets." See Note 6.
Goodwill and Other Intangible Assets - At December 31, 2005, FPL Energy had recorded, after certain purchase price allocation adjustments, approximately $72 million of goodwill within its merchant reporting unit, and approximately $27 million of intangible assets for customer lists (net of accumulated amortization of approximately $2 million) in connection with the 2005 acquisition of Gexa Corp. The intangible asset for customer lists is being amortized on a straight-line basis over its estimated economic life of 8 years. The acquisition of Gexa Corp. was accounted for using the purchase method of accounting.
FPL Energy's other intangible assets consist primarily of power purchase agreements, transmission and land rights, permits and licenses and totaled approximately $75 million and $79 million at December 31, 2005 and 2004, respectively, net of accumulated amortization. Other intangible assets are amortized over their estimated useful lives.
FPL Energy's goodwill and other intangible assets are included in other assets on FPL Group's consolidated balance sheets. In accordance with FAS 142, "Goodwill and Other Intangible Assets," goodwill is assessed for impairment at least annually by applying a fair value based test. Other intangible assets are periodically reviewed when impairment indicators are present to assess recoverability from future operations using undiscounted future cash flows in accordance with FAS 144.
Stock-Based Compensation - Effective January 1, 2004, FPL Group adopted the fair value recognition provisions of FAS 123, "Accounting for Stock-Based Compensation." FPL Group selected the modified prospective method of adoption described in FAS 148, "Accounting for Stock-Based Compensation - Transition and Disclosure." Under that method, stock-based employee compensation cost recognized in 2004 is the same as that which would have been recognized had the fair value 60
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued) recognition provisions of FAS 123 been applied from its original effective date. Prior to 2004, FPL Group accounted for its stock-based compensation plans under the intrinsic value based method as permitted by FAS 123.
The following table illustrates the effect on net income and earnings per share of common stock as if FPL Groups compensation expense had been determined using the fair value based method in each period:
Years Ended December 31, 2005          2004          2003 (millions, except per share amounts)
Net income, as reported                                                                    $  885        $  887      $  890 Add: total stock-based employee compensation expense included in reported net income, net of related income tax effects                                                              18            17          12 Deduct: total stock-based employee compensation expense determined under fair value based method, net of related income tax effects                                                                    (18)          (17)        (19)
Pro forma net income                                                                        $  885        $  887      $  883 Earnings per share of common stock:
Basic - as reported                                                                      $ 2.33        $ 2.47        $ 2.51 Basic - pro forma                                                                        $ 2.33        $ 2.47        $ 2.49 Assuming dilution - as reported                                                          $ 2.29        $ 2.45        $ 2.50 Assuming dilution - pro forma                                                            $ 2.29        $ 2.45        $ 2.48 On January 1, 2006, FPL Group adopted FAS 123(R), "Share-Based Payment." The statement requires costs related to share-based payment transactions to be recognized in the financial statements based on grant-date fair value. Because FPL Group adopted the fair value recognition provisions of FAS 123, "Accounting for Stock-Based Compensation," on January 1, 2004, the adoption of FAS 123(R) will not have a significant financial impact for the year ending December 31, 2006.
Retirement of Long-Term Debt - Gains and losses that result from differences in FPL's reacquisition cost and the book value of long-term debt which is retired are deferred and amortized to interest expense ratably over the remaining life of the original issue, which is consistent with its treatment in the ratemaking process. FPL Group Capital Inc (FPL Group Capital) recognizes as expense any such excess at time of retirement.
Retirement of Preferred Stock - Gains and losses that result from differences in FPL's reacquisition cost and the book value of preferred stock which is retired are recognized as gains or losses by FPL Group and as an addition or reduction to net income available to FPL Group by FPL.
Income Taxes - Deferred income taxes are provided on all significant temporary differences between the financial statement and tax bases of assets and liabilities. In connection with the tax sharing agreement with FPL Group, FPL's income tax provision reflects the use of the "separate return method." Included in other regulatory liabilities on FPL Group's and FPL's consolidated balance sheets is the revenue equivalent of the difference in accumulated deferred income taxes computed under FAS 109, "Accounting for Income Taxes," as compared to regulatory accounting rules. This amount is being amortized in accordance with the regulatory treatment over the estimated lives of the assets or liabilities which resulted in the initial recognition of the deferred tax amount. Investment tax credits (ITC) for FPL are deferred and amortized to income over the approximate lives of the related property in accordance with the regulatory treatment. Production tax credits (PTCs) are recognized as wind energy is generated based on a per kwh rate prescribed in applicable federal and state statutes. PTCs generated by certain wind operations of FPL Energy are recorded as a reduction of current income taxes payable, unless limited by tax law in which instance they are recorded as deferred tax assets. A valuation allowance is recorded to reduce the carrying amounts of deferred tax assets unless it is more likely than not that such assets will be realized. Accruals for estimated losses from federal and state income tax contingencies are established when it is probable that an income tax liability has been incurred and the amount of such loss is reasonably estimable. See Note 5.
Guarantees - FPL Group and FPL each account for payment guarantees and related contracts, for which it or a subsidiary is the guarantor, under FIN 45, "Guarantor's Accounting and Disclosure Requirements for Guarantees Including Indirect Guarantees of Indebtedness of Others," which requires that the fair value of guarantees provided to unconsolidated entities entered into after December 31, 2002 be recorded on the balance sheet. See Note 16 - Commitments.
Variable Interest Entities (VIEs) - FIN 46, "Consolidation of Variable Interest Entities," requires FPL Group and FPL to assess the variable interests they hold and determine if those entities are VIEs. See Note 9.
61
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
: 2. Proposed Merger In December 2005, FPL Group and Constellation Energy Group, Inc. (Constellation Energy) entered into an agreement and plan of merger (the merger agreement). In a tax free, stock-for-stock exchange, each share of Constellation Energy common stock outstanding immediately prior to the merger will be converted into 1.444 shares of Constellation Energy common stock and each share of FPL Group common stock outstanding immediately prior to the merger will be converted into one share of Constellation Energy common stock. Upon completion of the merger, former FPL Group shareholders will own approximately 60 percent and Constellation Energys shareholders will own approximately 40 percent of the combined company. FPL Group will account for the merger as an acquisition of Constellation Energy under the purchase method of accounting. The companies are working to complete the merger by the end of 2006. However, completion of the merger and the actual closing date depend upon the satisfaction of a number of conditions, including shareholder approvals and the receipt of required regulatory approvals. The merger agreement contains certain termination rights for FPL Group and Constellation Energy and provides that, upon termination of the merger agreement under specified circumstances, one of the parties may be required to pay a termination fee. In the event a termination fee is payable by Constellation Energy to FPL Group, it would equal $425 million. In the event a termination fee is payable by FPL Group to Constellation Energy, it would equal $650 million.
: 3. Employee Retirement Benefits Employee Benefit Plans and Other Postretirement Plan - FPL Group sponsors a qualified noncontributory defined benefit pension plan for substantially all employees of FPL Group and its subsidiaries. FPL Group also has a non-qualified supplemental defined benefit pension plan that provides benefits to higher-level employees. See Supplemental Retirement Plan below. In addition to pension benefits, FPL Group sponsors a substantially contributory postretirement plan for health care and life insurance benefits (other benefits) for retirees of FPL Group and its subsidiaries meeting certain eligibility requirements.
Benefit Obligations - FPL Group uses a measurement date of September 30 for its pension and other benefits plans. The following table provides a reconciliation of the changes in the benefit obligations of the plans:
Pension Benefits                Other Benefits 2005          2004            2005        2004 (millions)
Obligation at October 1 of prior year                                                                      $ 1,581 $ 1,516                $      468 $      488 Service cost                                                                                                  52            52                8            8 Interest cost                                                                                                  87            84              25          27 Participant contributions                                                                                        -            -              5            4 Plan amendments (a)                                                                                              9            3                -          -
Actuarial (gains) losses - net                                                                                (27)          12              (42)        (25)
Benefit payments                                                                                            (103)          (86)            (29)        (34)
Obligation at September 30                                                                                $ 1,599 $ 1,581                $      435 $      468 (a)
Relates to union negotiated credits and, for 2005, also relates to Internal Revenue Code (IRC) transfers and various Supplemental Retirement Plan changes.
FPL Group's accumulated benefit obligation, which includes no assumption about future compensation levels, for its pension plans at September 30, 2005 and 2004 was $1,548 million and $1,525 million, respectively.
The following table provides the weighted-average assumptions used to determine benefit obligations for the plans. These rates are used in determining net periodic benefit cost in the following year.
Pension Benefits              Other Benefits 2005          2004          2005        2004 Discount rate                                                                                                      5.5%          5.5%          5.5%        5.5%
Rate of compensation increase                                                                                      4.0%          4.0%          4.0%        4.0%
An 8.5% annual rate of increase in the per capita cost of covered medical benefits and a 10.5% annual rate of increase in the per capita cost of covered prescription drug benefits was assumed for 2006. The rates are assumed to decrease gradually to 5.0% by 2013 and 2017 for medical and prescription drug benefits, respectively, and remain at that level thereafter. Assumed health care cost trend rates have a significant effect on the amounts reported for postretirement plans providing health care benefits. An increase or decrease of one percentage point in assumed health care cost trend rates would have a corresponding effect on the other benefits accumulated obligation of approximately $9 million and $(8) million, respectively, at September 30, 2005.
62
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
Plan Assets - The following table provides a reconciliation of the fair value of assets of the plans. Employer contributions and benefits paid in the table below include only those amounts contributed directly to, or paid directly from, plan assets.
Pension Benefits                Other Benefits 2005          2004            2005        2004 (millions)
Fair value of plan assets at October 1 of prior year                                                    $ 2,907 $ 2,697                $      50 $          54 Actual return on plan assets                                                                                331          296                2            6 Employer contributions                                                                                        6              -            21            20 IRC transfers (a)                                                                                            (21)            -              -            -
Participant contributions                                                                                      -            -              5            4 Benefit payments                                                                                          (103)          (86)            (29)          (34)
Fair value of plan assets at September 30                                                              $ 3,120 $ 2,907                $      49 $          50 (a)  Represents amounts that were transferred from the qualified pension plan as reimbursement for eligible retiree medical expenses paid by FPL Group pursuant to the provisions of the IRC.
FPL Group's current investment policy for the pension plan recognizes the benefit of protecting the plan's funded status, thereby avoiding the necessity of future employer contributions. Its broad objectives are to achieve a high rate of total return with a prudent level of risk taking while maintaining sufficient liquidity and diversification to avoid large losses while preserving capital.
FPL Group's pension plan fund has a strategic asset allocation that targets a mix of 50% equity investments and 50% fixed income investments. The fund's investment strategy emphasizes traditional investments, broadly diversified across the global equity and fixed income markets, utilizing a combination of different investment styles and vehicles. The pension fund's equity investments include direct equity holdings and assets classified as equity commingled vehicles. Similarly, its fixed income investments include direct debt security holdings and assets classified as debt security commingled vehicles. These equity and debt security commingled vehicles include common and collective trusts, pooled separate accounts, registered investment companies or other forms of pooled investment arrangements.
At September 30, the asset allocation for FPL Group's pension fund is as follows:
2005          2004 Asset Category Equity                                                                                                                                  12%            14%
Equity commingled vehicles                                                                                                              39              34 Debt securities                                                                                                                          30              30 Debt security commingled vehicles                                                                                                        19              22 Total                                                                                                                                  100%            100%
With regard to its other benefits, FPL Group's policy is to fund claims as incurred during the year through FPL Group contributions, participant contributions and plan assets. The other benefits' assets are invested with a focus on assuring the availability of funds to pay benefits while maintaining sufficient diversification to avoid large losses and preserve capital. The other benefits plan fund has a strategic asset allocation that targets a mix of 55% equity investments and 45% fixed income investments. The fund's investment strategy emphasizes traditional investments, diversified among equity and fixed income investments. The fund's equity investments include direct equity holdings and assets classified as equity commingled vehicles. Similarly, its fixed income investments include direct debt security holdings and assets classified as debt security commingled vehicles. These equity and debt commingled vehicles include common and collective trusts, pooled separate accounts, registered investment companies or other forms of pooled investment arrangements.
At September 30, the asset allocation for FPL Group's other benefits fund is as follows:
2005          2004 Asset Category Equity                                                                                                                                  36%            38%
Equity commingled vehicles                                                                                                              21              18 Debt securities                                                                                                                            1              2 Debt security commingled vehicles                                                                                                        42              42 Total                                                                                                                                  100%            100%
63
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
Funded Status - The following table reconciles the funded status of the plans to the amounts on the consolidated balance sheets:
Pension Benefits            Other Benefits 2005        2004            2005        2004 (millions)
Fair value of plan assets                                                        $ 3,120 $ 2,907            $      49 $      50 Benefit obligation                                                                  (1,599)    (1,581)          (435)      (468)
Funded status at September 30                                                        1,521      1,326            (386)      (418)
Unrecognized prior service (benefit) cost                                              (14)        (27)            -          -
Unrecognized transition (asset) obligation                                                -          -            25        28 Unrecognized (gain) loss                                                              (644)      (509)            43        87 Other                                                                                  (23)        (21)            10          8 Prepaid (accrued) benefit cost at FPL Group at December 31                        $    840 $      769      $    (308) $    (295)
Prepaid (accrued) benefit cost at FPL at December 31                              $    798 $      746      $    (282) $    (271)
FPL Group's and FPL's prepaid (accrued) benefit cost shown above are included in the consolidated balance sheets as follows:
FPL Group                                        FPL Pension Benefits      Other Benefits      Pension Benefits          Other Benefits 2005      2004    2005      2004        2005      2004        2005      2004 (millions)
Prepaid benefit cost included in other assets                            $  849    $  779  $    -  $      -    $  803    $  750      $      -  $      -
Accrued benefit cost included in other liabilities                          (14)      (19)    (308)    (295)          (6)        (5)      (282)    (271)
Intangible asset included in other assets                                  3          3        -          -          1          1            -        -
Accumulated other comprehensive income                            2          6        -          -          -            -          -        -
Prepaid (accrued) benefit cost at December 31                            $  840    $  769  $ (308) $ (295)        $  798    $  746      $ (282) $ (271)
Expected Cash Flows - In December 2005, $24 million was transferred from the qualified pension plan as reimbursement for eligible retiree medical expenses paid by FPL Group during the year pursuant to the provisions of the Internal Revenue Code. FPL Group anticipates paying approximately $27 million for eligible retiree medical expenses on behalf of the other benefits plan during 2006 with substantially all amounts being reimbursed through a transfer of assets from the qualified pension plan pursuant to the provisions of the Internal Revenue Code.
The following table provides information about gross benefit payments expected to be paid by the plans for each of the following calendar years:
Pension              Other Benefits          Benefits (millions) 2006                                                                                                  $121              $ 34 2007                                                                                                  $127              $ 37 2008                                                                                                  $133              $ 40 2009                                                                                                  $139              $ 40 2010                                                                                                  $139              $ 40 2011-2015                                                                                              $731              $ 187 64
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
Net Periodic Cost - The following table provides the components of net periodic benefit (income) cost for the plans:
Pension Benefits                                Other Benefits Years Ended December 31,                      Years Ended December 31, 2005          2004          2003              2005          2004          2003 (millions)
Service cost                                                                  $    52        $    52      $    52          $    8      $      8      $      7 Interest cost                                                                      87            84            84                25            27              27 Expected return on plan assets                                                  (211)          (207)        (199)              (3)            (4)            (4)
Amortization of transition (asset) obligation                                        -          (23)          (23)                3              3              3 Amortization of prior service (benefit) cost                                        (5)          (5)            (5)                -            -                -
Amortization of (gains) losses                                                    (15)          (21)          (28)                4              5              6 Supplemental Retirement Plan settlements                                              3              -              2                -              -              -
Net periodic benefit (income) cost at FPL Group                                $ (89)        $ (120)      $ (117)          $    37      $    39        $    39 Net periodic benefit (income) cost at FPL                                      $ (71)        $ (97)        $ (95)            $    32      $    35        $    35 The following table provides the weighted-average assumptions used to determine net periodic benefit (income) cost for the plans:
Pension Benefits                                Other Benefits Years Ended December 31,                      Years Ended December 31, 2005          2004          2003              2005          2004          2003 Discount rate                                                                  5.50%          5.50%          6.00%            5.50%        5.50%          6.00%
Salary increase                                                                4.00%          4.00%          4.50%            4.00%        4.00%          4.50%
Expected long-term rate of return (a)                                          7.75%          7.75%          7.75%            7.75%        7.75%          7.75%
(a) In developing the expected long-term rate of return on assets assumption for its plans, FPL Group evaluated input from its actuaries as well as information available in the marketplace. FPL Group considered the 10-year and 20-year historical median returns for a portfolio with an equity/bond asset mix similar to its funds. FPL Group also considered its funds historical compounded returns. No specific adjustments were made to reflect expectations of future returns.
Assumed health care cost trend rates can have a significant effect on the amounts reported for postretirement plans providing health care benefits. An increase or decrease of one percentage point in assumed health care cost trend rates would have affected the total service and interest cost recognized at September 30, 2005 by less than $1 million.
Supplemental Retirement Plan - FPL Group also has a non-qualified supplemental defined benefit pension plan that provides benefits to higher-level employees. The cost of this plan is included in the determination of net periodic benefit income for pension benefits in the preceding tables and amounted to $5 million, $2 million and $5 million for FPL Group for years ended December 31, 2005, 2004 and 2003, respectively. The projected benefit obligation is included in the pension benefits obligation in the preceding tables and amounted to $21 million and $22 million for FPL Group at December 31, 2005 and 2004, respectively. Further, the accumulated benefit obligation was $13 million and $19 million for FPL Group ($6 million and
$5 million for FPL) at December 31, 2005 and 2004, respectively.
FPL Group established a trust to provide assets that may be used for the benefits payable under the non-qualified supplemental defined benefit pension plan. The trust is irrevocable and, although subject to creditors' claims, assets contributed to the trust can only be used to pay such benefits with certain exceptions. These assets are included in other investments on the consolidated balance sheets and amounted to $5 million and $11 million for FPL Group ($3 million and
$3 million for FPL) at December 31, 2005 and December 31, 2004, respectively.
Employee Contribution Plans - FPL Group offers employee retirement savings plans which allow eligible participants to contribute a percentage of qualified compensation through payroll deductions. FPL Group makes matching contributions to participants' accounts. Defined contribution expense pursuant to these plans was approximately $27 million, $27 million and
$25 million for FPL Group ($25 million, $23 million and $21 million for FPL) for years ended December 31, 2005, 2004 and 2003, respectively. See Note 12 - Employee Stock Ownership Plan (ESOP).
: 4. Derivative Instruments Derivative instruments, when required to be marked to market under FAS 133, "Accounting for Derivative Instruments and Hedging Activities," as amended, are recorded on FPL Group's and FPL's consolidated balance sheets as either an asset or liability measured at fair value.
65
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
FPL Groups and FPLs mark-to-market derivative instrument assets (liabilities) are included in the consolidated balance sheets as follows:
FPL Group                        FPL December 31,                  December 31, 2005          2004            2005          2004 (millions)
Current derivative assets                                                      $ 1,074      $ 110          $ 828        $    26 Other assets                                                                        62            24              -            -
Current derivative liabilities                                                    (463)        (118)              -          (6)
Other liabilities                                                                  (387)        (111)              -            -
Total mark-to-market derivative instrument assets (liabilities)                                                        $    286      $    (95)      $    828      $    20 FPL Group and FPL use derivative instruments (primarily swaps, options and forwards) to manage the commodity price risk inherent in the purchase and sale of fuel and electricity, as well as interest rate risk associated with long-term debt. In addition, FPL Group uses derivatives to optimize the value of power generation assets. At FPL, substantially all changes in fair value are deferred as a regulatory asset or liability until the contracts are settled. Upon settlement, any gains or losses are passed through the fuel clause and the capacity clause. For FPL Groups non-rate regulated operations, predominantly FPL Energy, essentially all changes in the derivatives fair value for power purchases and sales and trading activities are recognized on a net basis in operating revenues; fuel purchases and sales are recognized on a net basis in fuel, purchased power and interchange expense; and the equity method investees related activity is recognized in equity in earnings of equity method investees in FPL Groups consolidated statements of income unless hedge accounting is applied. While substantially all of FPL Energys derivative transactions are entered into for the purposes described above, hedge accounting is only applied where specific criteria are met and it is practicable to do so. In order to apply hedge accounting, the transaction must be designated as a hedge and it must be highly effective in offsetting the hedged risk. Additionally, for hedges of commodity price risk physical delivery for forecasted commodity transactions must be probable. FPL Group believes that where offsetting positions exist at the same location for the same time, the transactions are considered to have been netted and therefore physical delivery has not occurred. Transactions for which physical delivery is deemed to have not occurred are presented on a net basis. Generally, the hedging instruments effectiveness is assessed utilizing regression analysis at the inception of the hedge and on at least a quarterly basis throughout its life.
At December 31, 2005, FPL Group had cash flow hedges with expiration dates through December 2010 for energy contract derivative instruments, and interest rate cash flow hedges with expiration dates through November 2019. The effective portion of the gain or loss on a derivative instrument designated as a cash flow hedge is reported as a component of other comprehensive income and is reclassified into earnings in the period(s) during which the transaction being hedged affects earnings. The ineffective portion of net unrealized losses on these hedges flows through earnings in the current period and amounted to $33 million, $7 million and $2 million for the years ended December 31, 2005, 2004 and 2003, respectively. Settlement gains and losses are included within the line items in the statements of income to which they relate.
Unrealized mark-to-market gains (losses) on derivative transactions for both consolidated subsidiaries and equity method investees are as follows:
Years Ended December 31, 2005            2004        2003 (millions)
Consolidated subsidiaries                                                                    $    (191)    $      (23)  $      16 Equity method investees                                                                      $        1    $      13    $      21 66
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
: 5. Income Taxes The components of income taxes, including deferred regulatory credit, are as follows:
FPL Group                                      FPL Years Ended December 31,                  Years Ended December 31, 2005        2004          2003            2005          2004        2003 (millions)
Federal:
Current                                                  $    26      $ (207)      $ (181)        $    (80)      $ (125)      $ 214 Deferred                                                    225          464          507              445          490        145 ITC                                                          (19)        (20)          (20)            (19)          (20)        (20)
Total federal                                            232          237          306              346          345        339 State:
Current                                                      (67)          66          (21)            (24)            -          37 Deferred                                                    107          (36)          83              86            64          27 Total state                                                40          30            62              62            64          64 Total income taxes                                          $ 272        $  267        $  368        $    408      $  409      $ 403 A reconciliation between the effective income tax rates and the applicable statutory rates is as follows:
FPL Group                                      FPL Years Ended December 31,                  Years Ended December 31, 2005        2004          2003          2005          2004        2003 Statutory federal income tax rate                                35.0%        35.0%        35.0%          35.0%        35.0%        35.0%
Increases (reductions) resulting from:
State income taxes - net of federal income tax benefit          2.3          1.7          3.2            3.5          3.6          3.6 Allowance for other funds used during construction            (1.0)        (1.1)        (0.4)          (1.0)        (1.1)        (0.4)
Amortization of ITC                                            (1.7)        (1.7)        (1.6)          (1.7)        (1.7)        (1.7)
Production tax credits - FPL Energy                          (10.8)        (9.2)        (6.2)              -              -          -
Amortization of deferred regulatory credit - income taxes      (0.6)        (0.6)        (0.8)          (0.6)        (0.6)        (0.8)
Adjustments of prior years' tax matters                          -        (0.9)        (0.6)              -          (0.2)        (0.7)
Preferred stock dividends - FPL                                  -            -          0.4              -              -          -
Other - net                                                    0.3        (0.1)          0.2            0.1          0.3        (0.2)
Effective income tax rate                                        23.5%        23.1%        29.2%          35.3%        35.3%        34.8%
The income tax effects of temporary differences giving rise to consolidated deferred income tax liabilities and assets are as follows:
FPL Group                            FPL December 31,                    December 31, 2005            2004            2005          2004 (millions)
Deferred tax liabilities:
Property-related                                                                $ 3,498        $ 2,996        $ 2,451        $ 2,105 Investment-related                                                                  177            274                -              -
Pension                                                                              324            298              310          289 Deferred fuel costs                                                                  406              57            406            57 Storm reserve deficiency                                                            417            174              417          174 Other                                                                                347            378              156          160 Total deferred tax liabilities                                                  5,169          4,177          3,740          2,785 Deferred tax assets and valuation allowance:
Unamortized ITC and deferred regulatory credit - income taxes                        15              35              15            35 Decommissioning reserves                                                            268            253              268          253 Postretirement benefits                                                              130            126              120          115 Net operating loss carryforwards                                                    680            213              381              -
Tax credit carryforwards                                                            404            235                -              -
Other                                                                                915            763              413          378 Valuation allowance                                                                  (35)            (23)              -              -
Net deferred tax assets                                                        2,377          1,602          1,197            781 Net accumulated deferred income taxes                                              $ 2,792        $ 2,575        $ 2,543        $ 2,004 67
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
Deferred tax liabilities associated with property- and investment-related assets reflect additional first year depreciation as allowed by tax legislation. During 2005 and 2004, FPL Group recognized net tax benefits of approximately $25 million and $30 million, respectively, related to certain state tax benefits resulting from the growth of FPL Energy outside the state of Florida and, in 2004, from the resolution of various tax issues. Valuation allowances for 2005 and 2004 relate to the deferral of production tax credits and operating loss carryforwards.
Deferred tax assets and liabilities are included in the consolidated balance sheets as follows:
FPL Group                        FPL December 31,                  December 31, 2005          2004            2005        2004 (millions)
Other current assets                                                              $ 223          $ 110          $ 104        $      -
Other current liabilities                                                                  -              -            -          55 Accumulated deferred income taxes                                                    3,015        2,685            2,647        1,949 Net accumulated deferred income taxes                                              $ 2,792        $ 2,575        $ 2,543      $ 2,004 The components of FPL Groups deferred tax assets relating to net operating loss carryforwards and tax credit carryforwards at December 31, 2005 are as follows:
Expiration Amount              Date (millions)
Net operating loss carryforwards:
Federal                                                                                              $      539        2024-2025 State                                                                                                        141        2007-2025 Total net operating loss carryforwards                                                                  $      680 Tax credit carryforwards:
Federal                                                                                              $      378        2023-2025 State                                                                                                        26        2008-2013 Total tax credit carryforwards                                                                          $      404
: 6. Restructuring and Impairment Charges During 2005, FPL Energy recorded a net gain of approximately $13 million ($8 million after-tax) related to the termination of a gas supply contract at one of its investments in joint ventures. The gain is included in equity in earnings of equity method investees in FPL Group's consolidated statements of income. This agreement was terminated in connection with an amended power purchase agreement that allows the investee to source power from the wholesale market.
Restructuring charges in 2004 reflect contract restructuring to take advantage of changed market conditions. FPL Energy recorded a net gain of approximately $52 million ($31 million after tax) related to the termination of a gas supply contract and a steam agreement at one of its investments in joint ventures. These agreements were terminated in connection with an amended power purchase agreement that allows the investee to source power from the wholesale market. In addition, FPL Energy recorded an impairment loss of approximately $47 million ($29 million after tax) to write down its investment in a combined-cycle power plant in Texas to its fair value as a result of agreeing to sell its interest in the project. The sale was completed in the second quarter of 2004. The results of the above transactions are reflected in equity in earnings of equity method investees in FPL Group's consolidated statements of income. Also in 2004, FPL Energy restructured a steam sales agreement on a natural gas-fired facility in Pennsylvania due to a downturn in market conditions where the plant is operating. The restructuring resulted in a loss of approximately $81 million ($48 million after tax) which includes the write-off of an auxiliary boiler of approximately $33 million and a $48 million contract termination payment which was included in other current liabilities on FPL Group's consolidated balance sheet at December 31, 2004 and was paid in 2005.
68
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
: 7. Comprehensive Income The following table provides the components of comprehensive income and accumulated other comprehensive income (loss):
Accumulated Other Comprehensive Income (Loss)
Net Unrealized Gains (Losses)
Net            On Cash                                    Comprehensive Income        Flow Hedges          Other      Total            Income (millions)
Balances, December 31, 2002                                                                                  $    19          $    (3)  $    16 Net income of FPL Group                                                                $    890                                                          $    890 Net unrealized gains (losses) on commodity cash flow hedges:
Effective portion of net unrealized gain:
Consolidated subsidiaries (net of $7 tax expense)                                                        11                  -        11                11 Equity method investees (net of $7 tax expense)                                                          11                  -        11                11 Reclassification adjustment: (a)
Consolidated subsidiaries (net of $23 tax benefit)                                                      (35)                -        (35)              (35)
Equity method investees (net of $7 tax benefit)                                                          (12)                -        (12)              (12)
Net unrealized gains (losses) on interest rate cash flow hedges:
Effective portion of net unrealized loss on interest rate swaps (net of $5 tax benefit)                                                                              (8)                -          (8)                (8)
Reclassification from other comprehensive income (OCI) to net income (net of $3 tax expense)                                                                      4                -          4                  4 Net unrealized gains on available for sale securities (net of $11 tax expense)                                                                                      -                17        17                17 Balances, December 31, 2003                                                                                      (10)                14          4        $    878 Net income of FPL Group                                                                $    887                                                          $    887 Net unrealized gains (losses) on commodity cash flow hedges:
Effective portion of net unrealized losses:
Consolidated subsidiaries (net of $40 tax benefit)                                                      (61)                -        (61)              (61)
Net unrealized gains (losses) on interest rate cash flow hedges:
Effective portion of net unrealized loss on interest rate swaps (net of $4 tax benefit)                                                                              (6)                -          (6)                (6)
Reclassification from OCI to net income (net of $6 tax expense)                                                                                  10                  -        10                10 Net unrealized gains on available for sale securities (net of $4 tax expense)                                                                                        -                7          7                  7 Balances, December 31, 2004                                                                                      (67)                21        (46)        $    837 Net income of FPL Group                                                                $    885                                                          $    885 Net unrealized gains (losses) on commodity cash flow hedges:
Effective portion of net unrealized losses:
Consolidated subsidiaries (net of $143 tax benefit)                                                    (209)                -      (209)              (209)
Reclassification from OCI to net income (net of $37 tax expense)                                                                                  55                  -        55                55 Net unrealized gains (losses) on interest rate cash flow hedges:
Effective portion of net unrealized gain on interest rate swaps (net of $3 tax expense)                                                                                    4                -          4                  4 Reclassification from OCI to net income (net of $1 tax expense)                                                                                    2                -          2                  2 Net unrealized losses on available for sale securities (net of $0.4 tax benefit)                                                                                      -                (1)        (1)                (1)
Supplemental retirement plan liability adjustment (net of $2 tax expense)                                                                                        -                2          2                  2 Balances, December 31, 2005                                                                                  $ (215) (b)      $    22    $ (193)          $    738 (a)  Includes amounts reclassified into earnings due to settlements of approximately $44 million and discontinuance of cash flow hedges of approximately $3 million for which the hedged transaction is no longer probable of occurring.
(b)  Approximately $62 million of losses included in FPL Groups accumulated other comprehensive income at December 31, 2005 will be reclassified into earnings within the next 12 months as either the hedged fuel is consumed, electricity is sold or interest payments are made. Such amount assumes no change in fuel prices, power prices or interest rates.
69
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
: 8. Jointly-Owned Electric Plants The following FPL Group subsidiaries own undivided interests in the jointly-owned facilities described below, and are entitled to a proportionate share of the output from those facilities. FPL and FPL Energy are responsible for their share of the operating costs, as well as providing their own financing. Accordingly, each subsidiary includes its proportionate share of the facilities and related revenues and expenses in the appropriate balance sheet and income statement captions. FPL Groups and FPLs share of direct expenses for these facilities are included in fuel, purchased power and interchange, other operations and maintenance, depreciation and amortization and taxes other than income taxes on FPL Groups and FPLs consolidated statements of income.
FPL Groups and FPLs proportionate ownership interest in jointly-owned facilities is as follows:
December 31, 2005 Ownership                Gross                Accumulated            Construction Work Interest            Investment                Depreciation              in Progress (millions)
FPL:
St. Lucie Unit No. 2                                        85%                $ 1,174                  $  832                    $    106 St. Johns River Power Park units and coal terminal                                            20%                $    327                  $  197                    $        2 Scherer Unit No. 4                                          76%                $    588                  $  362                    $        -
Transmission substation assets located in Seabrook, New Hampshire                            88.23%                $      30                $    10                    $        -
FPL Energy: (a)
Seabrook                                                  88.23%                $    941                  $  134                    $      18 Wyman Station Unit No. 4                                  61.78%                $      76                $    25                  $        -
(a)  In January 2006, FPL Energy purchased a 70% interest, or approximately 415 megawatts (mw), in the Duane Arnold Energy Center (Duane Arnold), a nuclear power plant located in Iowa.
: 9. Variable Interest Entities FIN 46, as revised (FIN 46R), requires the consolidation of entities which are determined to be VIEs when the reporting company determines that it will absorb a majority of the VIEs expected losses, receive a majority of the VIEs residual returns, or both. The company that is required to consolidate the VIE is called the primary beneficiary. Conversely, the reporting company would not consolidate VIEs in which it has a majority ownership interest when the company is not considered to be the primary beneficiary. Variable interests are contractual, ownership or other monetary interests in an entity that change as the fair value of the entitys net assets, excluding variable interests, change. An entity is considered to be a VIE when its capital is insufficient to permit it to finance its activities without additional subordinated financial support or its equity investors, as a group, lack the characteristics of having a controlling financial interest.
FPL Group adopted the requirements of FIN 46R in two phases. At the original effective date, July 1, 2003, FPL Group identified two VIEs which were consolidated. Revised guidance was issued and became effective March 31, 2004. As discussed below, no additional VIEs were identified for consolidation. The cumulative effect of a change in accounting principle of implementing FIN 46 at July 1, 2003 for the VIEs discussed below was approximately a $3 million loss (net of income tax benefit of $2 million) for FPL Group and zero for FPL.
FPL - Effective July 1, 2003, FPL consolidates a VIE from which it leases nuclear fuel for its nuclear units. For ratemaking purposes, these leases are treated as operating leases. For financial reporting, prior to July 1, 2003 the capital lease obligation was recorded at the amount due to the lessor in the event of lease termination. FPL makes quarterly payments to the lessor for the lease commitments. The lessor has issued senior secured notes to fund the procurement of nuclear fuel and has established a revolving credit facility to support its commercial paper program. FPL has provided an unconditional guarantee of the payment obligations of the lessor under the notes and credit facility. The consolidated assets of the VIE consist primarily of nuclear fuel, which had a carrying value of $380 million and $370 million at December 31, 2005 and 2004, respectively.
In its evaluation of the revised guidance as of March 31, 2004, FPL identified two potential VIEs, both of which are considered qualifying facilities (QFs) as defined by the Public Utility Regulatory Policies Act of 1978, as amended (PURPA). In November 2005, the purchased power agreement (PPA) with one of the projects expired and was not renewed. Therefore, FPL has no further involvement with this project. PURPA requires FPL to purchase the electricity output of the remaining project. As a result, FPL has entered into a PPA with this QF to purchase substantially all of the project's electrical output over a substantial portion of its estimated useful life. For each megawatt-hour (mwh) provided, FPL pays a per mwh price (energy payment) based upon FPL's avoided cost, which is determined at the time the PPA is executed, and is based on the cost of avoiding the construction and operation of a coal unit. The energy component is primarily based on the cost of coal at an FPL jointly-owned coal-fired facility. The avoided cost is the incremental cost to the utility of the electric energy or 70
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued) capacity, or both, which is avoided by neither generating the electricity nor purchasing it from another source. The project has a capacity of 250 mw. After making exhaustive efforts, FPL was unable to obtain the information from the project necessary to determine whether the project is a VIE or whether FPL is the primary beneficiary of the project. The PPA with the project contains no provision which legally obligates the project to release this information to FPL. The energy payments paid by FPL will fluctuate as coal prices change. This does not expose FPL to losses since the energy payments paid by FPL to the project are passed on to FPLs customers through the fuel clause as approved by the FPSC. Notwithstanding the fact that FPLs energy payments are recovered through the fuel clause, if the project was determined to be a VIE, the absorption of some of the projects fuel price variability might cause FPL to be considered the primary beneficiary. During the years ended December 31, 2005 and 2004, FPL purchased 1,813,114 mwh and 1,802,467 mwh, respectively, from the project at a total cost of approximately $144 million and $141 million, respectively. FPL will continue to make exhaustive efforts to obtain the necessary information from the project in order to determine if it is a VIE and, if so, whether FPL is the primary beneficiary.
Additionally, FPL entered into a PPA with a 330 mw coal-fired cogeneration facility (the Facility) in 1995 to purchase substantially all of the Facilitys electrical output through 2025. The Facility is considered a QF as defined by PURPA. In November 2004, FPL and the Facility reached an agreement to change the index related to the energy payment, triggering a new analysis under FIN 46R. FPL determined that (a) the Facility is a VIE and (b) the PPA represents a variable interest in the Facility. However, FPL determined that it is not the Facilitys primary beneficiary. During the first quarter of 2005, a change in ownership of the facility occurred, triggering the need to reevaluate whether FPL is the facilitys primary beneficiary. After making exhaustive efforts, FPL was unable to obtain the information necessary to perform this reevaluation. The PPA with the Facility contains no provisions which legally obligate the Facility to release this information to FPL. During the years ended December 31, 2005 and 2004, FPL purchased 2,332,000 mwh and 2,265,371 mwh, respectively, from the Facility at a total cost of approximately $191 million and $186 million, respectively. Additionally, the PPA does not expose FPL to losses since the energy payments made by FPL to the Facility are passed on to FPLs customers through the fuel clause as approved by the FPSC. FPL will continue to make exhaustive efforts to obtain the necessary information from the Facility in order to determine if FPL is the Facilitys primary beneficiary.
FPL Energy - In 2000, an FPL Energy subsidiary entered into an operating lease agreement with a special purpose entity (SPE) lessor to lease a 550 mw combined-cycle power generation plant through 2007. The FPL Energy subsidiary began making quarterly lease payments on March 31, 2003. The quarterly lease payments are intended to cover the lessor's debt service, which includes a stated yield to equity holders and certain other costs. The FPL Energy subsidiary has the option to purchase the plant at any time during the remaining lease term for 100% of the outstanding principal balance of the loans and equity contributions made to the SPE, all accrued and unpaid interest and yield, and all other fees, costs and amounts then due and owing pursuant to the provisions of the related financing documents. However, under certain limited events of default, the FPL Energy subsidiary can be required to purchase the plant for the same cost. If the FPL Energy subsidiary does not elect to purchase the plant at the end of the lease term, a residual value guarantee must be paid, and the plant will be sold. Any sale proceeds received by the lessor in excess of the outstanding debt and equity will be given to the FPL Energy subsidiary. FPL Group Capital has guaranteed certain obligations of the FPL Energy subsidiary under the lease agreement.
In the initial implementation of FIN 46, the FPL Energy subsidiary was determined to be the primary beneficiary of the lessor and, accordingly, effective July 1, 2003, consolidates the assets and liabilities of the lessor on FPL Group's consolidated financial statements. The assets of the lessor primarily consist of the power generation plant, which had a carrying value of
$331 million and $343 million at December 31, 2005 and 2004, respectively, and is reported in electric utility plant in service and other property in FPL Group's consolidated balance sheets. The liabilities of the lessor consist primarily of debt (which is secured by the power generation plant), which had a carrying value of $333 million and $345 million at December 31, 2005 and 2004, respectively, and is reported in long-term debt in FPL Group's consolidated balance sheets. The equity interests of the lessor not owned by the FPL Energy subsidiary are reported as minority interest.
FPL Group - In March 2004, a trust created by FPL Group sold 12 million 5 7/8% preferred trust securities to the public and common trust securities to FPL Group. The trust is considered a VIE because FPL Group's investment through the common trust securities is not considered equity at risk in accordance with FIN 46R. The proceeds from the sale of the preferred and common trust securities were used to buy 5 7/8% junior subordinated debentures maturing in March 2044, from FPL Group Capital. The trust exists only to issue its preferred trust securities and common trust securities and to hold the junior subordinated debentures of FPL Group Capital as trust assets. Since FPL Group, as the common security holder, is not considered to have equity at risk and will therefore not absorb any variability of the trust, FPL Group is not the primary beneficiary and does not consolidate the trust in accordance with FIN 46R. FPL Group includes the junior subordinated debentures issued by FPL Group Capital on its consolidated balance sheets. See Note 11 - FPL Group.
FPL Group and FPL expect additional implementation guidance to be issued regarding FIN 46R and are unable to determine what effect, if any, this additional guidance might have on FPL Group's and FPL's financial statements.
: 10. Financial Instruments The carrying amounts of cash equivalents, commercial paper and notes payable approximate fair values. At December 31, 2005 and 2004, other investments of FPL Group included financial instruments of approximately $43 million and $294 million, 71
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued) respectively, and primarily consist of notes receivable that are carried at estimated fair value or cost, which approximates fair value. See Note 11.
The following estimates of the fair value of financial instruments have been made using available market information. However, the use of different market assumptions or methods of valuation could result in different estimated fair values.
December 31, 2005                        December 31, 2004 Carrying          Estimated              Carrying        Estimated Amount          Fair Value            Amount          Fair Value (millions)
FPL Group:
Long-term debt, including current maturities                                          $  9,443        $  9,540 (a)        $    9,247      $    9,611 (a)
Nuclear decommissioning reserve funds                                                  $  2,401        $  2,401 (b)        $    2,271      $    2,271 (b)
Other investments                                                                      $      80        $      80 (b)        $        72      $        72 (b)
Interest rate swaps - net unrealized loss                                              $      (9)      $        (9) (c)    $      (11)    $      (11) (c)
FPL:
Long-term debt, including current maturities                                          $  3,406        $  3,416 (a)        $    3,311      $    3,438 (a)
Nuclear decommissioning reserve funds                                                  $  2,083        $  2,083 (b)        $    1,971      $    1,971 (b)
Interest rates swaps - net unrealized loss                                            $          -      $          -          $        (2)    $        (2) (c)
(a)  Based on market prices provided by external sources.
(b)  Based on quoted market prices for these or similar issues.
(c)  Based on market prices modeled internally.
Nuclear Decommissioning Reserve Funds and Other Investments - Securities held in the nuclear decommissioning reserve funds and other investments are carried at estimated fair value based on quoted market prices. FPL Group's nuclear decommissioning funds consist of approximately 46% equity securities and 54% municipal, government, corporate and mortgage- and other asset-backed debt securities (45% and 55% for FPL, respectively) with a weighted-average maturity of approximately 7 years at December 31, 2005. The cost of securities sold is determined on the specific identification method.
The following tables provide the nuclear decommissioning and storm reserve funds and other investments approximate gains and losses and proceeds from the sale of securities:
FPL Group                                          FPL Years Ended December 31,                        Years Ended December 31, 2005          2004            2003              2005          2004          2003 (millions)
Realized gains                                                            $    18      $    11        $    26        $    14        $    9      $ 25 Realized losses                                                            $    17      $    13        $    20        $    16        $    12      $ 19 Proceeds from sale of securities                                          $ 2,928        $ 2,207          $ 2,735        $ 2,759        $ 2,072      $2,702 The following tables provide the unrealized gains and losses for the nuclear decommissioning reserve funds and other investments. There were no storm reserve funds at December 31, 2005 or at December 31, 2004.
FPL Group                                FPL December 31,                        December 31, 2005              2004                2005            2004 (millions)
Unrealized gains Equity securities                                                                  $    382        $      345        $      342        $    304 Debt securities                                                                    $      27        $      49        $      26        $    46 Unrealized losses (a)
Equity securities                                                                  $      1        $        -        $        -      $      -
Debt securities                                                                    $      4        $        6        $        3        $      5 (a)  At December 31, 2005, FPL Group had 22 securities in an unrealized loss position for greater than twelve months. The total unrealized loss on these securities was less than $1 million and the fair value was approximately $21 million for FPL Group. For accounting treatment description, see Note 1 - Decommissioning of Nuclear Plants, Dismantlement of Plants and Other Accrued Asset Removal Costs and Note 1 - Storm Reserve Deficiency.
Regulations issued by the FERC and the NRC provide general risk management guidelines to protect nuclear decommissioning trust funds and to allow such funds to earn a reasonable return. The FERC regulations prohibit investments in any securities of FPL Group or its subsidiaries, affiliates or associates, excluding investments tied to market indices or other mutual funds. Similar restrictions applicable to the decommissioning trust fund for FPL Energys Seabrook nuclear plant are contained in the NRC operating license for that facility. NRC regulations applicable to NRC licensees not in cost-of-service environments require similar investment restrictions. The NRCs regulations permit licensees with operating licenses containing conditions restricting the use of decommissioning trust funds to rely on those conditions in lieu of compliance with NRC regulations. FPL Energys Seabrook nuclear plant contains such restrictions in its NRC operating license. With respect to the decommissioning trust fund for FPL 72
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
Energys Seabrook nuclear plant, decommissioning trust fund withdrawals are also regulated by the NDFC pursuant to New Hampshire law.
The nuclear decommissioning reserve funds are managed by investment managers who must comply with the guidelines and rules of the applicable regulatory authorities, FPL Group and FPL. The funds assets are invested in order to optimize the after-tax earnings of these funds, giving consideration to liquidity, risk, diversification and other prudent investment objectives.
Interest Rate Swaps - FPL Group and its subsidiaries use a combination of fixed rate and variable rate debt to manage interest rate exposure. Interest rate swaps are used to adjust and mitigate interest rate exposure when deemed appropriate based upon market conditions or when required by financing agreements. At December 31, 2005, the estimated fair value for FPL Group interest rate swaps was as follows:
Notional                  Effective          Maturity                  Rate                Rate            Estimated Amount                      Date                Date                    Paid            Received            Fair Value (millions)                                                                                                    (millions)
Fair value hedges - FPL Group Capital:
      $ 150              July 2003            September 2006                variable (a)        7.625%            $    (3)
      $ 150              July 2003            September 2006                variable (b)        7.625%                  (3)
      $ 195              October 2004        April 2006                    variable (c)        3.250%                  (2)
      $ 55              October 2004        April 2006                    variable (d)        3.250%                  -
      $ 195              October 2004        April 2006                    variable (e)        3.250%                  (2)
      $ 55              October 2004        April 2006                    variable (f)        3.250%                  -
      $ 300              November 2004        February 2007                variable (g)        4.086%                  (5)
      $ 275              December 2004        February 2007                variable (h)        4.086%                  (4)
Total fair value hedges                                                                                                (19)
Cash flow hedges - FPL Energy:
      $ 90              August 2002          December 2007                    4.410%        variable (i)                1
      $ 185              August 2003          November 2007                    3.557%        variable (i)                4
      $    6            February 2005        June 2008                        4.255%        variable (i)                1
      $ 85              December 2003        December 2017                    4.245%        variable (i)                3
      $ 28              April 2004          December 2017                    3.845%        variable (i)                1
      $ 266              December 2005        November 2019                    4.905%        variable (i)                -
Total cash flow hedges                                                                                                  10 Total interest rate hedges                                                                                        $    (9)
(a)  Six-month LIBOR plus 4.9900%
(b)  Six-month LIBOR plus 4.9925%
(c)  Six-month LIBOR plus 0.0153%
(d)  Six-month LIBOR plus 0.0100%
(e)  Six-month LIBOR plus 0.1500%
(f)  Six-month LIBOR plus 0.1525%
(g)  Three-month LIBOR plus 0.50577%
(h)  Three-month LIBOR plus 0.4025%
(i)  Three-month LIBOR
: 11. Investments in Partnerships and Joint Ventures FPL Energy - FPL Energy has non-controlling non-majority owned interests in various partnerships and joint ventures, essentially all of which are electricity producers. At December 31, 2005 and 2004, FPL Energy's investment in partnerships and joint ventures totaled approximately $313 million and $288 million, respectively, which is included in other investments on FPL Group's consolidated balance sheets. FPL Energy's interest in these partnerships and joint ventures range from approximately 5.5% to 50%. At December 31, 2005, the principal entities included in FPL Energy's investments in partnerships and joint ventures were Northeast Energy, LP, Cherokee County Cogeneration Partners, LP, Green Ridge Power, LLC, Mojave 16/17/18 LLC, Windpower Partners 1993, LP and, in 2004, included Cameron Ridge LLC. FPL Energy's interest in Cameron Ridge was sold in 2005.
73
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
Summarized combined information for these principal entities is as follows:
2005                2004 (millions)
Net income                                                                                                                          $      176            $    227 Total assets                                                                                                                        $    1,313            $ 1,369 Total liabilities                                                                                                                  $      711            $    791 Partners/members equity                                                                                                          $      602            $    578 FPL Energys share of underlying equity in the principal entities                                                                  $      301            $    289 Difference between investment carrying amount and underlying equity in net assets (a)                                                      (33)                (49)
FPL Energys investment carrying amount for the principal entities                                                                  $      268            $    240 (a)  The majority of the difference between the investment carrying amount and the underlying equity in net assets is being amortized over the remaining life of the investees assets.
Certain subsidiaries of FPL Energy provide services to the partnerships and joint ventures, including O&M expenses and business management services. FPL Groups operating revenues for the years ended December 31, 2005, 2004 and 2003 include approximately $19 million, $16 million and $16 million, respectively, related to such services. The net receivables at December 31, 2005 and 2004, for these services, as well as for affiliate energy commodity transactions, payroll and other payments made on behalf of these investees, were approximately $65 million and $23 million, respectively, and are included in other current assets on FPL Groups consolidated balance sheets.
Notes receivable (long- and short-term) include approximately $21 million and $99 million at December 31, 2005 and 2004, respectively, due from partnerships and joint ventures in which FPL Energy has an ownership interest. The notes receivable balance at December 31, 2005 matures in 2011 and bears interest at a fixed rate of 8.5%. The majority of the notes receivable balance at December 31, 2004 bear interest at variable rates, which ranged from approximately 6.1% to 8.5%. Interest income related to notes receivable totaled approximately $7 million, $7 million and $6 million for the years ended December 31, 2005, 2004 and 2003, respectively, and is included in interest income in FPL Groups consolidated statements of income. There was no interest receivable associated with these notes as of December 31, 2005 and 2004.
FPL Group - In March 2004, a trust created by FPL Group sold $300 million of preferred trust securities to the public and $9 million of common trust securities to FPL Group. The trust is an unconsolidated 100%-owned finance subsidiary. The trust used the proceeds to purchase $309 million of 5 7/8% junior subordinated debentures maturing in March 2044 from FPL Group Capital. FPL Group has fully and unconditionally guaranteed the preferred trust securities and the junior subordinated debentures.
: 12. Common Stock Earnings Per Share - The reconciliation of FPL Group's basic and diluted earnings per share of common stock is shown below:
Years Ended December 31, 2005                2004              2003 (millions, except per share amounts)
Numerator - net income                                                                                                  $      885        $      887          $    890 Denominator:
Weighted-average number of common shares outstanding - basic                                                            380.1              358.6              355.1 Restricted stock, performance share and shareholder value awards, options, warrants and equity units (a)                                                                                  5.6                3.1                1.2 Weighted-average number of common shares outstanding - assuming dilution                                                385.7              361.7              356.3 Earnings per share of common stock:
Basic                                                                                                              $    2.33        $    2.47          $    2.51 Assuming dilution                                                                                                  $    2.29        $    2.45          $    2.50 (a)  Performance share awards and shareholder value awards are included in diluted weighted-average number of shares outstanding based upon what would be issued if the end of the reporting period were the end of the term of the award. Restricted stock, performance share awards, shareholder value awards, options, warrants and equity units (known as Corporate Units, see Note 14) are included in diluted weighted-average number of common shares outstanding by applying the treasury stock method.
In 2005, 2004 and 2003, there were no securities that could potentially dilute basic earnings per share in the future that were not included in the computation of diluted earnings per share because to do so would have been antidilutive.
74
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
In February 2005, FPL Groups board of directors approved a two-for-one stock split of FPL Groups common stock effective March 15, 2005 (2005 stock split). FPL Groups authorized common stock increased from 400 million to 800 million shares. All share or per share information included in FPL Groups consolidated financial statements reflect the effect of the 2005 stock split.
Common Stock Dividend Restrictions - FPL Group's charter does not limit the dividends that may be paid on its common stock. FPL's mortgage securing FPL's first mortgage bonds contains provisions that, under certain conditions, restrict the payment of dividends and other distributions to FPL Group. These restrictions do not currently limit FPL's ability to pay dividends to FPL Group.
Employee Stock Ownership Plan (ESOP) - The employee thrift plans of FPL Group include a leveraged ESOP feature. Shares of common stock held by the trust for the thrift plans (Trust) are used to provide all or a portion of the employers' matching contributions. Dividends received on all shares, along with cash contributions from the employers, are used to pay principal and interest on an ESOP loan held by FPL Group Capital. Dividends on shares allocated to employee accounts and used by the Trust for debt service are replaced with an equivalent amount of shares of common stock at prevailing market prices. For purposes of computing basic and fully diluted earnings per share, ESOP shares that have been committed to be released are considered outstanding.
ESOP-related compensation expense of approximately $27 million, $27 million and $25 million in 2005, 2004 and 2003, respectively, was recognized based on the fair value of shares allocated to employee accounts during the period. Interest income on the ESOP loan is eliminated in consolidation. ESOP-related unearned compensation included as a reduction of common shareholders' equity at December 31, 2005 was approximately $140 million, representing unallocated shares at the original issue price. The fair value of the ESOP-related unearned compensation account using the closing price of FPL Group common stock at December 31, 2005 was approximately $401 million.
Incentive Plans - At December 31, 2005, approximately 26.6 million shares of common stock were authorized and 19.7 million were available for awards (including outstanding awards) to officers, employees and non-employee directors of FPL Group and its subsidiaries under FPL Group's long-term incentive plan (LTIP) and non-employee directors stock plan. Restricted stock is issued at market value at the date of grant, typically vests within four years and is subject to, among other things, restrictions on transferability. Performance share awards and shareholder value awards are typically payable at the end of a three- or four-year performance period if the specified performance criteria are met. The exercise price of each option granted in 2005, 2004 and 2003 equaled the market price of FPL Group common stock on the date of grant. Options typically vest within three years and have a maximum term of ten years. See Note 1 - Stock-Based Compensation.
The changes in awards under the incentive plans are as follows:
Performance Share and Shareholder                              Options Restricted                Value                                    Weighted-Average Stock                Awards              Number                  Exercise Price Balances, December 31, 2002                                      597,410                836,978            7,290,260                  $  28.65 Granted                                                      468,690 (a)              420,866 (b)      3,211,940 (c)              $  28.07 Paid/released/exercised                                      (225,836)              (338,190)            (236,602)                $  23.94 Forfeited                                                      (74,888)              (128,362)            (704,774)                $  27.82 Balances, December 31, 2003                                      765,376                791,292            9,560,824                  $  28.62 Granted                                                      310,910 (a)              481,752 (b)          790,000 (c)            $  32.46 Paid/released/exercised                                      (229,040)              (185,554)            (987,350)                $  29.41 Forfeited                                                      (25,890)                (49,080)            (190,448)                $  28.15 Balances, December 31, 2004                                      821,356              1,038,410            9,173,026                  $  28.92 Granted                                                      565,950 (a)              483,293 (b)          421,000 (c)            $  36.95 Paid/released/exercised                                      (302,317)              (256,348)          (2,078,533)                $  28.65 Forfeited                                                      (62,444)              (119,853)            (286,876)                $  29.98 Balances, December 31, 2005                                    1,022,545              1,145,502            7,228,617 (d)              $  27.48 (a)  The weighted-average grant date fair value of restricted stock granted in 2005, 2004 and 2003 was $39.92, $32.58 and $29.50 per share, respectively.
(b)  The weighted-average grant date fair value of performance share and shareholder value awards in 2005, 2004 and 2003 was $39.38, $32.52 and $30.67 per share, respectively.
(c)  The weighted-average fair value of options granted was $6.30, $5.10 and $4.19 in 2005, 2004 and 2003, respectively. The fair value of the options granted in 2005, 2004 and 2003 were estimated on the date of the grant using the Black-Scholes option-pricing model with a weighted-average expected dividend yield of 3.68%,
3.93% and 3.97%, a weighted-average expected volatility of 20.00%, 20.11% and 19.99%, a weighted-average risk-free interest rate of 4.08%, 3.78% and 3.48%,
respectively, and a weighted-average expected term of 7 years.
(d)  Of the options outstanding at December 31, 2005, 4,587,394 options were exercisable and had exercise prices ranging from $19.06 to $36.95 per share with a weighted-average exercise price of $29.04 per share and a weighted-average remaining contractual life of 6.0 years. The remainder of the outstanding options had exercise prices ranging from $27.56 to $36.95 per share with a weighted-average exercise price of $30.08 per share and a weighted-average remaining contractual life of 7.6 years.
75
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
In addition, as a result of certain employees voluntarily electing to convert a cash bonus, net of taxes, into fully-vested shares of FPL Group common stock, approximately 36 thousand common shares were issued under the LTIP during 2004.
Other - Each share of common stock has been granted a Preferred Share Purchase Right (Right), at an exercise price of $120, subject to adjustment, in the event of certain attempted business combinations. The Rights will cause substantial dilution to a person or group attempting to acquire FPL Group on terms not approved by FPL Group's board of directors.
In June 2005, a wholly-owned subsidiary of FPL Group completed the acquisition of Gexa Corp., a retail electric provider in Texas, which serves approximately 1,200 mw of peak load to over 160,000 commercial and residential customers as of December 31, 2005. Each share of Gexa Corp.'s outstanding common stock was converted into 0.1682 of a share of FPL Group common stock. Assuming the exercise of Gexa Corp.'s options and warrants net of cash to be received upon exercise, the aggregate value of the consideration for the acquisition of Gexa Corp. was approximately $73 million, payable in shares of FPL Group common stock. At December 31, 2005, there were Gexa Corp. options and warrants outstanding for a total of 219,086 shares of FPL Group common stock.
: 13. Preferred Stock FPL Group's charter authorizes the issuance of 100 million shares of serial preferred stock, $0.01 par value. None of these shares are outstanding. FPL Group has reserved 3 million shares for issuance upon exercise of preferred share purchase rights which expire in June 2006. At December 31, 2005, FPL had no preferred stock outstanding. Preferred stock of FPL at December 31, 2004 consisted of the following: (a)
December 31, 2004 Shares              Redemption Outstanding (b)            Price            December 31, 2004 (millions)
Cumulative, $100 Par Value, without sinking fund requirements, authorized 10,664,100 shares:
4 1/2% Series A                                                                          50,000          $ 103.25                    $        5 4 1/2% Series V                                                                        200,000          $ 100.00                            20 Total preferred stock of FPL                                                                  250,000                                              25 (c)
Less 4 1/2% Series V preferred stock held by FPL Group (eliminated in consolidation)                                                          200,000                                              20 Total preferred stock of FPL reported at FPL Group                                              50,000                                      $        5 (c)
(a)  FPLs charter also authorizes the issuance of 5 million shares of subordinated preferred stock, no par value. None of these shares are outstanding. In November 2003, FPL redeemed 2.2 million shares of preferred stock with an aggregate par value of $221 million for redemption prices per share ranging from $101.00 to
    $103.52. In January 2004, FPL sold 200,000 shares of 4 1/2% Series V preferred stock with an aggregate par value of $20 million to FPL Group. In January 2005, FPL redeemed all 250,000 shares of its $100 Par Value 4 1/2% (Series A and Series V) preferred stock outstanding at December 31, 2004.
(b)  FPLs preferred shares are entitled to dividends at the stated rates in preference to FPLs common stockholder, FPL Group. In the event of voluntary liquidation, the outstanding preferred shares have preference over common shares until an amount equal to the current redemption price of all shares has been paid. In the event of involuntary liquidation, outstanding preferred shares shall have preference over common shares until the full par value of all shares and all unpaid accumulated dividends thereon have been paid.
(c)  Included in current maturities of long-term debt and preferred stock on the consolidated balance sheets.
76
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
: 14. Debt Long-term debt consists of the following:
December 31, 2005              2004 FPL:                                                                                                                                        (millions)
First mortgage bonds:
Maturing in 2005 - 6 7/8%                                                                                                    $      -          $    500 Maturing 2008 through 2013 - 4.85% to 6.00%                                                                                      825                825 Maturing 2033 through 2035 - 4.95% to 5.95%                                                                                    1,840              1,240 Medium-term note - maturing 2006 - 2.34%                                                                                            135                135 Pollution control, solid waste disposal and industrial development revenue bonds - maturing 2020 through 2029 - variable, 3.5% and 2.1% weighted-average annual interest rates, respectively                                      633                633 Fair value swaps (see Note 10)                                                                                                          -                (2)
Unamortized discount                                                                                                                  (27)              (20)
Total long-term debt of FPL                                                                                                    3,406              3,311 Less current maturities of long-term debt                                                                                      135                500 Less fair value swaps on current maturities of long-term debt (see Note 10)                                                      -                (2)
Long-term debt of FPL, excluding current maturities                                                                          3,271              2,813 FPL Group Capital:
Debentures - maturing 2005 - variable, 2.86%                                                                                            -              400 Debentures - maturing 2006 through 2009 - 3 1/4% to 7 5/8%                                                                        2,800              3,000 Debentures, related to FPL Group's equity units - maturing 2008 - 5.551% and 5.00%, respectively (a)                                506                506 Junior Subordinated Debentures - maturing 2044 - 5 7/8%                                                                              309                309 Other long-term debt - maturing 2013 - 7.35% (b)                                                                                        -                5 Fair value swaps (see Note 10)                                                                                                        (15)              (9)
Unamortized discount                                                                                                                  (3)              (4)
Total long-term debt of FPL Group Capital                                                                                      3,597              4,207 Less current maturities of long-term debt                                                                                    1,100                605 Less fair value swap on current maturities of long-term debt (see Note 10)                                                      (7)              (1)
Long-term debt of FPL Group Capital, excluding current maturities                                                            2,504              3,603 FPL Energy:
Senior secured bonds - maturing 2017 through 2024 - 5.608% to 7.52%                                                                1,189                789 Senior secured notes - maturing 2020 - 7.11%                                                                                        107                111 Construction term facility - maturing 2008 - variable, 5.70% and 4.31%
weighted-average annual interest rates, respectively                                                                              381                349 Other long-term debt - maturing 2007 through 2017 - variable, 5.765% and 3.89%
weighted-average annual interest rates, respectively                                                                              751                468 Other long-term debt - maturing 2018 through 2020 - 6.65% to 10.63%                                                                    12                12 Total long-term debt of FPL Energy                                                                                              2,440              1,729 Less current maturities of long-term debt                                                                                      176                118 Long-term debt of FPL Energy, excluding current maturities                                                                  2,264              1,611 Total long-term debt                                                                                                                $ 8,039            $ 8,027 (a)  During 2005, these debentures were remarketed. See discussion below.
(b)  The other long-term debt was redeemed in January 2005 and is included in current maturities of long-term debt and preferred stock on FPL Groups consolidated balance sheet at December 31, 2004.
Minimum annual maturities of long-term debt for FPL Group are approximately $1,411 million, $1,617 million, $1,155 million, $976 million and $127 million for 2006, 2007, 2008, 2009 and 2010, respectively. The amounts for FPL are $135 million, $200 million, and $225 million for 2006, 2008 and 2009, respectively, with no long-term debt scheduled to mature in 2007 and 2010.
At December 31, 2005, commercial paper borrowings had a weighted-average interest rate of 4.36% for FPL Group (4.36%
for FPL). Available lines of credit aggregated approximately $4.6 billion ($2.5 billion for FPL Group Capital and $2.1 billion for FPL) at December 31, 2005, all of which were based on firm commitments. These facilities provide for the issuance of letters of credit of up to $4.5 billion. The issuance of letters of credit is subject to the aggregate commitment under the applicable facility. While no direct borrowings were outstanding at December 31, 2005, letters of credit totaling $598 million were outstanding under the FPL Group Capital credit facilities. No letters of credit were outstanding under the FPL credit facilities.
FPL Group Capital has guaranteed certain debt and other obligations of FPL Energy and its subsidiaries. FPL Group has guaranteed certain payment obligations of FPL Group Capital, including most of those under FPL Group Capitals debt, including all of its debentures and commercial paper issuances, as well as most of its guarantees.
In June 2002, FPL Group sold concurrently a total of 11.5 million shares of common stock and 10.12 million 8% Corporate Units. In connection with the corporate units financing, FPL Group Capital issued $506 million principal amount of 5%
debentures due February 16, 2008. During 2005, FPL Group Capital remarketed these debentures and the annual interest rate was reset to 5.551%. Payment of FPL Group Capital debentures is absolutely, irrevocably and unconditionally guaranteed by FPL Group. Each 8% Corporate Unit initially consisted of a $50 FPL Group Capital debenture and a purchase 77
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued) contract pursuant to which the holder will purchase $50 of FPL Group common shares on or before February 16, 2006, and FPL Group will make payments of 3% of the units $50 stated value until the shares are purchased. In February 2006, FPL Group paid net approximately $48 million to cancel approximately 4.2 million of its Corporate Units sold in June 2002. Also in February 2006, FPL Group issued approximately 8.7 million shares of common stock in return for approximately $296 million in proceeds, upon settlement of the stock purchase contracts issued in connection with its Corporate Units sold in June 2002. In addition, in February 2005, FPL Group received approximately $575 million in settlement of the purchase contracts associated with the Corporate Units sold in February 2002 and issued approximately 18.5 million shares of FPL Group common stock.
Prior to the issuance of FPL Groups common stock, the purchase contracts are reflected in FPL Groups diluted earnings per share calculations using the treasury stock method. Under this method, the number of shares of FPL Group common stock used in calculating diluted earnings per share is deemed to be increased by the excess, if any, of the number of shares that would be issued upon settlement of the purchase contracts over the number of shares that could be purchased by FPL Group in the market, at the average market price during the period, using the proceeds receivable upon settlement.
In January 2006, FPL issued $400 million principal amount of 5.65% first mortgage bonds maturing in February 2037. The proceeds were used to repay FPLs short-term borrowings and for other corporate purposes.
: 15. Asset Retirement Obligations FPL Group and FPL adopted FAS 143, Accounting for Asset Retirement Obligations and FIN 47, Accounting for Conditional Asset Retirement Obligations effective January 1, 2003 and December 31, 2005, respectively. FAS 143 and FIN 47 require that a liability for the fair value of an ARO be recognized in the period in which it is incurred if it can be reasonably estimated, with the offsetting associated asset retirement costs capitalized as part of the carrying amount of the long-lived assets. The asset retirement cost is subsequently allocated to expense using a systematic and rational method over its useful life. Changes in the ARO resulting from the passage of time are recognized as an increase in the carrying amount of the liability and as accretion expense, which is included in depreciation and amortization expense in the consolidated statements of income. Changes resulting from revisions to the timing or amount of the original estimate of cash flows are recognized as an increase or a decrease in the asset retirement cost and ARO. Prior to the adoption of FIN 47, FPL Group and FPL recognized obligations related to conditional AROs when the condition occurred.
FPL Group and FPL have identified but not recognized ARO liabilities related to electric transmission and distribution and telecommunications assets resulting from easements over property not owned by FPL Group or FPL. In addition, FPL Group has identified but not recognized ARO liabilities related to the majority of FPL Energy's hydro facilities. These easements are generally perpetual and, along with the hydro facilities, only require retirement action upon abandonment or cessation of use of the property or facility for its specified purpose. The ARO liability is not estimable for such easements and hydro facilities as FPL Group and FPL intend to utilize these properties and facilities indefinitely. In the event FPL Group and FPL decide to abandon or cease the use of a particular easement and/or hydro facility, an ARO liability would be recorded at that time.
The cumulative effect of a change in accounting principle of adopting each of FAS 143 and FIN 47 was not material to FPL Groups net income in the period of adoption and had no effect on FPLs net income due to the regulatory treatment discussed below. Had FIN 47 been applied in 2004 and 2003, FPL Group would have recorded conditional AROs of approximately $12 million ($10 million FPL) and $12 million ($11 million FPL), respectively. Pro forma net income for FPL Group and FPL and earnings per share for FPL Group have not been presented for the years ended December 31, 2004 and 2003 because the pro forma application of FIN 47 to prior periods would result in the same net income and earnings per share as actual reported amounts.
FPL - FPLs ARO relates primarily to the nuclear decommissioning obligation of its nuclear units. FPLs AROs other than nuclear decommissioning are not significant. The provisions of FAS 143 and FIN 47 result in timing differences in the recognition of legal asset retirement costs for financial reporting purposes and the method the FPSC allows FPL to recover in rates. Accordingly, any differences between the ongoing expense recognized under FAS 143 and FIN 47 and the amount recoverable through rates are deferred in accordance with FAS 71. See Note 1 - Decommissioning of Nuclear Plants, Dismantlement of Plants and Other Accrued Asset Removal Costs.
Upon adoption of FIN 47, FPL recorded a conditional ARO of approximately $12 million, capitalized a net asset related to the ARO of approximately $2 million and reversed the approximately $27 million it had previously recorded in accumulated depreciation. The difference, approximately $17 million, was deferred as a regulatory liability. FPL's conditional AROs are related to the removal of asbestos primarily from its fossil generating plants.
At December 31, 2005 and 2004, FPLs ARO was approximately $1,474 million and $2,015 million, respectively. During 2005, FPL recognized accretion expense of approximately $112 million, reduced the ARO by approximately $665 million, primarily as a result of changing the useful lives of the nuclear units to reflect their extended license terms, and increased the ARO approximately $12 million as a result of implementing FIN 47. During 2004, FPL recognized accretion expense of $106 million. No other adjustments were made to FPLs ARO during the year ended December 31, 2004. Restricted trust funds for the payment of future expenditures to decommission FPLs nuclear units are included in nuclear decommissioning reserve 78
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued) funds of FPL and approximated $2,083 million and $1,971 million at December 31, 2005 and 2004, respectively. See Note 10.
FPL Energy - FPL Energy's ARO relates primarily to the nuclear decommissioning obligation of Seabrook and also includes the current estimated fair value of obligations to dismantle its wind facilities located on leased property and certain hydro facilities. See Note 1 - Decommissioning of Nuclear Plants, Dismantlements of Plants and Other Accrued Asset Removal Costs.
In addition to the amounts recorded by FPL, upon adoption of FIN 47, FPL Energy recorded a conditional ARO of approximately $1 million, which primarily relates to the removal of asbestos and lead paint from its generating facilities, and capitalized a net asset related to the ARO of approximately $1 million.
At December 31, 2005 and 2004, FPL Energy's ARO was approximately $211 million and $192 million, respectively. The nuclear decommissioning liability for Seabrook represents the fair value of FPL Energy's ultimate decommissioning liability as determined by an independent study. The liability is being accreted using the interest method over an assumed license extension period that runs through 2050. FPL Energy recorded accretion expense of approximately $15 million and $13 million for the years ended December 31, 2005 and 2004, respectively. Further, FPL Energy recorded approximately $3 million and $1 million for the years ended December 31, 2005 and 2004, respectively, in additional ARO liabilities relating to new wind assets. A restricted trust fund for the payment of future expenditures to decommission Seabrook is included in FPL Group's nuclear decommissioning reserve funds and approximated $318 million and $299 million at December 31, 2005 and 2004, respectively. See Note 10.
: 16. Commitments and Contingencies Commitments - FPL Group and its subsidiaries have made commitments in connection with a portion of their projected capital expenditures. Capital expenditures at FPL include, among other things, the cost for construction or acquisition of additional facilities and equipment to meet customer demand, as well as capital improvements to and maintenance of existing facilities. At FPL Energy, capital expenditures include, among other things, the cost, including capitalized interest, for construction of wind projects and the procurement of nuclear fuel, as well as announced acquisitions. FPL FiberNet's capital expenditures primarily include costs to meet customer specific requirements and sustain its fiber-optic network. At December 31, 2005, planned capital expenditures for 2006 through 2010 are estimated as follows:
2006          2007            2008            2009            2010          Total FPL:                                                                                                          (millions)
Generation: (a)
New (b)                                                          $    255      $    520        $    605        $    660        $    500      $ 2,540 Existing                                                                450          455            330            395            285        1,915 Transmission and distribution                                              750          665            640            640            645        3,340 Nuclear fuel                                                                75          120              85            125            135          540 General and other                                                          145          170            165            160            165          805 Total                                                            $ 1,675        $ 1,930        $ 1,825        $ 1,980        $ 1,730      $ 9,140 FPL Energy:
Wind (c)                                                            $    960      $    930        $      5      $        5      $      5    $ 1,905 Nuclear (d)                                                                495            85            40              85            100          805 Gas                                                                        45            15            15                5              -          80 Other                                                                      10            10            10              10              10          50 Total                                                            $ 1,510        $ 1,040        $    70        $    105        $    115      $ 2,840 FPL FiberNet                                                            $      11      $      11      $    11        $      11      $      11    $    55 (a)
Includes AFUDC of approximately $39 million, $30 million, $51 million, $72 million and $71 million in 2006, 2007, 2008, 2009 and 2010, respectively.
(b)
Includes generating structures, transmission interconnection and integration, licensing and AFUDC.
(c)
Capital expenditures for new wind projects are estimated through 2007, when eligibility for PTCs for new wind projects is scheduled to expire.
(d)
Includes nuclear fuel and, in 2006, the acquisition of a 70% interest in Duane Arnold.
In addition to estimated capital expenditures listed above, FPL and FPL Energy have long-term contracts related to purchased power and/or fuel (see Contracts below). At December 31, 2005, FPL Energy had approximately $2.9 billion in firm commitments primarily for the supply of wind turbines and towers, natural gas transportation, supply and storage, firm transmission service, nuclear fuel and a portion of its projected capital expenditures, including the acquisition of a 70%
interest in Duane Arnold for approximately $373 million. In addition, FPL Group has guaranteed certain payment obligations of FPL Group Capital, including most payment obligations under FPL Group Capital's debt.
FPL Group and FPL each account for payment guarantees and related contracts, for which it or a subsidiary is the guarantor, under FIN 45, "Guarantor's Accounting and Disclosure Requirements for Guarantees Including Indirect Guarantees of Indebtedness of Others," which requires that the fair value of guarantees provided to unconsolidated entities entered into after December 31, 2002, be recorded on the balance sheet. At December 31, 2005, subsidiaries of FPL Group, other than FPL, 79
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued) have guaranteed debt service payments relating to agreements that existed at December 31, 2002. The term of the guarantees is equal to the term of the related debt, with remaining terms ranging from 1 year to 14 years. The maximum potential amount of future payments that could be required under these guarantees at December 31, 2005 was approximately $14 million. At December 31, 2005, FPL Group did not have any liabilities recorded for these guarantees. In certain instances, FPL Group can seek recourse from third parties for 50% of any amount paid under the guarantees. Guarantees provided to unconsolidated entities entered into subsequent to December 31, 2002, and the related fair value, were not material as of December 31, 2005.
FPL Energy has guaranteed certain performance obligations of a power plant owned by a wholly-owned subsidiary as part of a power purchase agreement that expires in 2027. Under this agreement, the subsidiary could incur market-based liquidated damages for failure to meet contractual minimum outputs. In addition, certain subsidiaries of FPL Energy have contracts that require certain projects to meet annual minimum generation amounts. Failure to meet the annual minimum generation amounts would result in the FPL Energy subsidiary incurring specified liquidated damages. Based on past performance of these and similar projects and current forward prices, management believes that the exposure associated with these guarantees is not material.
Contracts - FPL Group has entered into a long-term agreement for the supply of wind, combustion and steam turbines, as well as parts, repairs and on-site services through 2021. The related commitments as of December 31, 2005 are included in FPL Energys and Corporate and Others minimum payments shown in the table below and in FPL Energy's estimated capital expenditures shown in the table above.
FPL has entered into long-term purchased power and fuel contracts. FPL is obligated under take-or-pay purchased power contracts with JEA and with subsidiaries of The Southern Company (Southern subsidiaries) to pay for approximately 1,300 mw of power annually through mid-2015 and 381 mw annually thereafter through 2021, and one of the Southern subsidiaries' contracts is subject to minimum quantities. FPL also has various firm pay-for-performance contracts to purchase approximately 700 mw from certain cogenerators and small power producers (qualifying facilities) with expiration dates ranging from 2009 through 2026. The purchased power contracts provide for capacity and energy payments. Energy payments are based on the actual power taken under these contracts. Capacity payments for the pay-for-performance contracts are subject to the qualifying facilities meeting certain contract conditions. FPL has various agreements with several electricity suppliers to purchase an aggregate of up to approximately 1,500 mw (including approximately 575 mw beginning in January 2006) of power with expiration dates ranging from 2007 through 2009. In general, the agreements require FPL to make capacity payments and supply the fuel consumed by the plants under the contracts. FPL has contracts with expiration dates through 2028 for the supply of natural gas, coal and oil, transportation of natural gas and coal, and storage of natural gas.
FPL Energy has entered into several contracts for the supply of wind turbines and towers in support of a portion of its planned new wind generation. In addition, FPL Energy has contracts primarily for the supply, transportation and storage of natural gas and firm transmission service with expiration dates ranging from 2007 through 2033. FPL Energy also has several contracts for the supply, conversion, enrichment and fabrication of Seabrook's nuclear fuel with expiration dates ranging from 2006 to 2014.
The required capacity and minimum payments under these contracts as of December 31, 2005 are estimated as follows:
2006        2007        2008          2009        2010      Thereafter FPL:                                                                                                                  (millions)
Capacity payments: (a)
JEA and Southern subsidiaries (b)                                            $  190      $ 200      $    200      $ 210        $  190      $ 1,060 Qualifying facilities (b)                                                    $  310      $ 320      $    320      $ 320        $  290      $ 3,500 Other electricity suppliers (b)                                              $    95      $    45    $    35      $    30      $      -    $        -
Minimum payments, at projected prices:
Southern subsidiaries - energy (b)                                          $    60      $    60    $    60      $    70      $    30      $        -
Natural gas, including transportation and storage (c)                        $ 2,510      $ 1,285    $    260      $ 260        $  260      $ 2,405 Coal (c)                                                                    $    55      $    40    $    30      $    10      $      -    $        -
Oil (c)                                                                      $ 905        $      -    $      -      $    -      $      -    $        -
FPL Energy                                                                        $  895      $ 590      $    50      $    50      $    50      $    700 Corporate and Other                                                                $    52      $      -    $      -      $    -      $      -    $        -
(a)  Capacity payments under these contracts, the majority of which are recoverable through the capacity clause, totaled approximately $616 million, $656 million and $641 million for the years ended December 31, 2005, 2004 and 2003, respectively.
(b)  Energy payments under these contracts, which are recoverable through the fuel clause, totaled approximately $363 million, $376 million and $346 million for the years ended December 31, 2005, 2004 and 2003, respectively.
(c)  Recoverable through the fuel clause.
80
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
Insurance - Liability for accidents at nuclear power plants is governed by the Price-Anderson Act, which limits the liability of nuclear reactor owners to the amount of insurance available from both private sources and an industry retrospective payment plan. In accordance with this act, FPL Group maintains $300 million of private liability insurance per site, which is the maximum obtainable, and participates in a secondary financial protection system under which it is subject to retrospective assessments of up to $503 million ($402 million for FPL), plus any applicable taxes, per incident at any nuclear reactor in the United States, payable at a rate not to exceed $75 million ($60 million for FPL) per incident per year. FPL Group and FPL are contractually entitled to recover a proportionate share of such assessments from the owners of minority interests in Seabrook and St. Lucie Unit No. 2, which approximates $12 million and $15 million, plus any applicable taxes, per incident, respectively.
FPL Group participates in nuclear insurance mutual companies that provide $2.75 billion of limited insurance coverage per occurrence per site for property damage, decontamination and premature decommissioning risks at its nuclear plants. The proceeds from such insurance, however, must first be used for reactor stabilization and site decontamination before they can be used for plant repair. FPL Group also participates in an insurance program that provides limited coverage for replacement power costs if a nuclear plant is out of service for an extended period of time because of an accident. In the event of an accident at one of FPL Group's or another participating insured's nuclear plants, FPL Group could be assessed up to $112 million ($89 million for FPL) in retrospective premiums. FPL Group and FPL are contractually entitled to recover a proportionate share of such assessments from the owners of minority interests in Seabrook and St. Lucie Unit No. 2, which approximates $2 million and $3 million, respectively.
Due to the high cost and limited coverage available from third-party insurers, FPL has essentially no insurance coverage on its transmission and distribution property and FPL Group has no insurance coverage for FPL FiberNet's fiber-optic cable located throughout Florida. Under the terms of the 2005 rate agreement, FPL may recover prudently incurred storm restoration costs either through securitization pursuant to Section 366.8260 of the Florida Statutes or through surcharges. See Note 1  Storm Reserve Deficiency.
In the event of a loss, the amount of insurance available might not be adequate to cover property damage and other expenses incurred. Uninsured losses, to the extent not recovered from customers in the case of FPL, would be borne by FPL Group and FPL and could have a material adverse effect on FPL Group's and FPL's financial condition and results of operations.
Litigation - In 1999, the Attorney General of the United States, on behalf of the U.S. Environmental Protection Agency (EPA),
brought an action against Georgia Power Company and other subsidiaries of The Southern Company for certain alleged violations of the Clean Air Act. In May 2001, the EPA amended its complaint. The amended complaint alleges, among other things, that Georgia Power Company constructed and is continuing to operate Scherer Unit No. 4, in which FPL owns a 76%
interest, without obtaining proper permitting, and without complying with performance and technology standards as required by the Clean Air Act. It also alleges that unspecified major modifications have been made at Scherer Unit No. 4 that require its compliance with the aforementioned Clean Air Act provisions. The EPA seeks injunctive relief requiring the installation of best available control technology and civil penalties of up to $25,000 per day for each violation from an unspecified date after June 1, 1975 through January 30, 1997 and $27,500 per day for each violation thereafter. The EPA further revised its civil penalty rule in February 2004, such that the maximum penalty is $32,500 per day for each violation after March 15, 2004. Georgia Power Company has answered the amended complaint, asserting that it has complied with all requirements of the Clean Air Act, denying the plaintiff's allegations of liability, denying that the plaintiff is entitled to any of the relief that it seeks and raising various other defenses. In June 2001, a federal district court stayed discovery and administratively closed the case pending resolution of the EPA's motion for consolidation of discovery in several Clean Air Act cases that was filed with a Multi-District Litigation (MDL) panel. In August 2001, the MDL panel denied the motion for consolidation. In September 2001, the EPA moved that the federal district court reopen this case for purposes of discovery. Georgia Power Company opposed that motion asking that the case remain closed until the Eleventh Circuit Court of Appeals ruled on the Tennessee Valley Authority's (TVA) appeal of an EPA administrative compliance order relating to legal issues that are also central to this case. In August 2002, the federal district court denied without prejudice the EPA's motion to reopen. In June 2003, the Eleventh Circuit issued its order dismissing the TVA's appeal because it found the provision of the Clean Air Act allowing the EPA to issue binding administrative compliance orders was unconstitutional, and hence found that the TVA order was a non-final order that courts of appeal do not have jurisdiction to review. In September 2003, the Eleventh Circuit denied the EPA's motion for rehearing. In May 2004, the U.S. Supreme Court denied the EPA's petition for review of the Eleventh Circuit order. The EPA has not yet moved to reopen the Georgia Power Company case.
In 2001, Florida Municipal Power Agency (FMPA) filed with the U.S. Court of Appeals for the District of Columbia (DC Circuit) a petition for review asking the DC Circuit to reverse and remand orders of the FERC denying FMPA's request for credits for transmission facilities owned by FMPA members. The transmission credits sought by FMPA would offset the transmission charges that FPL bills FMPA for network transmission service to FMPA's member cities. FMPA member cities have been taking network transmission service under FPL's open access transmission tariff since 1996. In the orders appealed by FMPA, the FERC ruled that FMPA would be entitled to credits for any FMPA facilities that were "integrated" with the FPL transmission system. Based on the evidence submitted, the FERC concluded that none of the FMPA facilities met the integration test and, therefore, FMPA was not entitled to credits against FPL's charges for transmission service. In January 2003, the DC Circuit upheld the FERC's order denying FMPA credits for its facilities; in March 2003, the DC Circuit denied 81
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
FMPAs rehearing request of the DC Circuits decision; and in October 2003, the U.S. Supreme Court denied FMPAs petition for review of the DC Circuits decision.
FMPA also has requested that the FERC decide the same crediting issue in a separate FERC proceeding. That proceeding dates back to a filing by FPL in 1993 of a comprehensive restructuring of its then-existing tariff structure. All issues in that case were settled in September 2000 except for three issues reserved by FMPA: (i) the crediting issue, (ii) treatment of behind-the-meter generation and load ratio pricing for network integration transmission service, and (iii) exclusions from FPLs transmission rates of the costs of FPLs facilities that failed to meet the same integration test that was applied to FMPAs facilities with respect to the crediting issue. In December 2003, the FERC issued an order addressing the three reserved issues. With respect to the crediting issue, the FERC stated that it had previously determined that FMPA was not entitled to credits for its facilities in the related proceeding discussed above and saw no persuasive reason to revisit that determination in this proceeding. Regarding the issue of behind-the-meter generation, the FERC stated that it had addressed the issue of load ratio pricing for network integration transmission service and the related issue of behind-the-meter generation in Order Nos. 888 and 888-A, and saw no persuasive reason to revisit that determination in this proceeding. With respect to the third issue, the FERC directed FPL to make a compliance filing of a proposed rate schedule that does not include those facilities of FPL that fail to meet the same integration test applied to the FMPA facilities.
In January 2004, FMPA requested a "conditional rehearing on the Commissions failure to order rate credits solely in the event that Commission does not adequately reduce FPLs rate base to achieve comparability," and challenging the FERCs determination not to revisit the issue of behind-the-meter generation and load ratio pricing for network integration transmission service. In March 2004, the FERC issued an order denying FMPAs rehearing request. In April 2004, FMPA petitioned the DC Circuit for review of the FERCs December 2003 order and March 2004 order. FMPA filed its initial brief in that proceeding in October 2004. FMPAs arguments are limited to the issue of behind-the-meter generation and load ratio pricing for network integration transmission service in instances when, according to FMPA, FPL cannot provide transmission service because of "physical transmission limitations." In June 2005, the DC Circuit remanded the case to the FERC for further consideration. The DC Circuit concluded that the FERC failed to explain in its orders why network customers should be charged by the transmission provider for network service that the provider is physically constrained from offering and why physical impossibility should not be recognized as an exception to the general rule against permitting partial load ratio pricing for network customers. The DC Circuit noted that it was not reaching a determination on whether charging on a full load basis in fact is unjust and unreasonable under the circumstances, that it was not defining what constitutes physical impossibility, and that it was not determining whether FMPA made a showing of impossibility. In December 2005, the FERC issued an order on remand answering the DC Circuits question by finding that FPL is entitled to load ratio share pricing, notwithstanding constraints on a third-partys system. In January 2006, FMPA filed a rehearing request of this order with the FERC.
In May 2004, FPL made a compliance filing of a proposed rate schedule that does not include those facilities of FPL that fail to meet the same integration test that was applied to the FMPA facilities. Pursuant to this filing, 1.63% of FPL's transmission facilities do not satisfy the integration standard and FPL's current network transmission rate would be reduced by $0.02 per kilowatt (kw) per month. In June 2004, FMPA filed a protest to FPL's compliance filing, which protest would exclude approximately 30% of FPL's transmission facilities and reduce FPL's current network transmission rate by approximately
$0.41 per kw per month. In January 2005, the FERC issued an order on FPL's compliance filing. In the order, the FERC accepted FPL's standards for analyzing the transmission system and agreed that FPL's "Georgia Ties" and "Turkey Point Lines" are part of FPL's integrated grid. The FERC required FPL to make an additional compliance filing removing the cost of all radial transmission lines from transmission rates, rather than only radial lines that serve one customer, analyzing the FPL transmission system to remove the cost of any transmission facilities that provide only "unneeded redundancy," and calculating rate adjustments using 1993 data rather than 1998 data. FPL made this compliance filing in April 2005, reducing FPLs rate $0.04 per kw per month resulting in a refund obligation to FMPA of approximately $3 million at December 31, 2005. In May 2005, FMPA protested FPLs compliance filing, claiming that FPL had not followed the FERCs mandate and argued that FPLs rates should be reduced by an additional $0.20, potentially resulting in a refund obligation to FMPA of approximately $18 million at December 31, 2005. Any reduction in FPLs network service rate also would apply effective January 1, 2004 to Seminole Electric Cooperative Inc. (Seminole), FPLs other network customer. The refund obligation to Seminole at December 31, 2005 would be approximately $1 million under FPLs filing and approximately $5 million based on FMPAs position.
In December 2005, the FERC issued an order accepting FPLs April 2005 compliance filing in part, rejecting it in part, and directing the submission of a further compliance filing. The FERC accepted FPLs compliance filing wherein FPL proposed a reduction in its rate base created by the exclusion of certain radial lines valued at $29 million net plant. However, the FERC concluded that it is not clear whether FPL failed to test its non-radial facilities in a manner comparable to the way it tested FMPAs facilities. The December 2005 order asks FPL to make a further compliance filing in 60 days to explain the meaning of "unserved load" as it applies to Florida Reliability Coordinating Council (FRCC) standards, and to remove from rates any facility where the unserved load occurred only as a result of the contingency facility. The FERC noted that FRCC and North American Electric Reliability Council (NERC) standards allow for the controlled loss of load on radial facilities and that FPL tested FMPA facilities for loss of local load as well as load at other load centers. FPL filed a rehearing request in January 2006, contending that the FERC misapplied FRCC/NERC planning criteria for radial facilities to network systems and misinterpreted the test FPL applied to FMPA facilities. FPL also filed a request to delay the compliance filing pending FERC action on FPLs rehearing request.
82
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
In 1995 and 1996, FPL Group, through an indirect subsidiary, purchased from Adelphia Communications Corporation (Adelphia) 1,091,524 shares of Adelphia common stock and 20,000 shares of Adelphia preferred stock (convertible into 2,358,490 shares of Adelphia common stock) for an aggregate price of approximately $35,900,000. On January 29, 1999, Adelphia repurchased all of these shares for $149,213,130 in cash. On June 24, 2004, Adelphia, Adelphia Cablevision, L.L.C. and the Official Committee of Unsecured Creditors of Adelphia filed a complaint against FPL Group and its indirect subsidiary in the U.S. Bankruptcy Court, Southern District of New York. The complaint alleges that the repurchase of these shares by Adelphia was a fraudulent transfer, in that at the time of the transaction Adelphia (i) was insolvent or was rendered insolvent, (ii) did not receive reasonably equivalent value in exchange for the cash it paid, and (iii) was engaged or about to engage in a business or transaction for which any property remaining with Adelphia had unreasonably small capital. The complaint seeks the recovery for the benefit of Adelphias bankruptcy estate of the cash paid for the repurchased shares, plus interest. FPL Group has filed an answer to the complaint and discovery has commenced. FPL Group believes that the complaint is without merit because, among other reasons, Adelphia will be unable to demonstrate that (i) Adelphias repurchase of shares from FPL Group, which repurchase was at the market value for those shares, was not for reasonably equivalent value, (ii) Adelphia was insolvent at the time of the repurchase, or (iii) the repurchase left Adelphia with unreasonably small capital. The case has been set for trial in August 2007.
In 2003, Scott and Rebecca Finestone brought an action on behalf of themselves and their son Zachary Finestone in the U.S.
District Court for the Southern District of Florida alleging that their son has developed cancer (neuroblastoma) as a result of the release and/or dissipation into the air, water, soil and underground areas of radioactive and non-radioactive hazardous materials, including strontium 90, and the release of other toxic materials from FPLs St. Lucie nuclear power plant. The complaint, as subsequently amended, includes counts against FPL for strict liability for allegedly engaging in an ultra-hazardous activity and for alleged negligence in operating the plant in a manner that allowed emissions of the foregoing materials and failing to limit its release of nuclear fission products as prescribed by federal and state laws and regulations. The plaintiffs seek damages in excess of $1 million. In January 2006, the court granted FPLs motion for final summary judgment and dismissed the case. On February 8, 2006, the plaintiffs filed a notice of appeal of the courts decision granting final summary judgment for FPL.
In 2003, Tish Blake and John Lowe, as personal representatives of the Estate of Ashton Lowe, on behalf of the estate and themselves, as surviving parents, brought an action in the U.S. District Court for the Southern District of Florida alleging that their son developed cancer (medulo-blastoma) as a result of the release and/or dissipation into the air, water, soil and underground areas of radioactive and non-radioactive hazardous materials, including strontium 90, and the release of other toxic materials from FPLs St. Lucie nuclear power plant. The allegations, counts and damages demanded in the complaint, as subsequently amended, are virtually identical to those contained in the Finestone lawsuit described above. In January 2006, the court granted FPLs motion for final summary judgment and dismissed the case. On February 8, 2006, the plaintiffs filed a notice of appeal of the courts decision granting final summary judgment for FPL.
In 2003, Pedro C. and Emilia Roig brought an action on behalf of themselves and their son, Pedro Anthony Roig, in the Circuit Court of the 11th Judicial Circuit in and for Miami-Dade County, Florida (the state court), which was removed in October 2003 to the U.S. District Court for the Southern District of Florida, against Aventis Pasteur and a number of other named and unnamed drug manufacturing and distribution companies and FPL, alleging that their son has suffered toxic neurological effects from mercury poisoning. The sources of mercury exposure are alleged to be vaccines containing a preservative called thimerosal that were allegedly manufactured and distributed by the drug companies, mercury amalgam dental fillings, and emissions from FPL power plants in southeast Florida. The complaint includes counts against all defendants for civil battery and against FPL for alleged negligence in operating the plants such that the son was exposed to mercury and other heavy metals emissions. The damages demanded from FPL are for injuries and losses allegedly suffered by the son as a result of his exposure to the plants mercury emissions and the parents alleged pain and suffering, medical expenses, loss of wages, and loss of their sons services and companionship. No amount of damages is specified. The U.S. District Court remanded the action back to the state court. The drug manufacturing and distribution companies have moved to dismiss the action. Plaintiffs and FPL have agreed that FPL will not respond to the complaint until the state court rules on those motions.
In 2003, Edward and Janis Shiflett brought an action on behalf of themselves and their son, Phillip Benjamin Shiflett, in the th Circuit Court of the 18 Judicial Circuit in and for Brevard County, Florida (the state court), which was removed in January 2004 to the U.S. District Court for the Middle District of Florida, against Aventis Pasteur and a number of other named and unnamed drug manufacturing and distribution companies, FPL and the Orlando Utilities Commission, alleging that their son has suffered toxic neurological effects from mercury poisoning. The allegations, counts and damages demanded in the complaint with respect to FPL are virtually identical to those contained in the Roig lawsuit described above. FPLs motion to dismiss the complaint was denied. The U.S. District Court subsequently remanded the action back to the state court. All parties anticipate that the drug manufacturing and distribution companies will move to dismiss the action. Plaintiffs and FPL have agreed that FPL will not respond to the complaint until the state court rules on those motions.
In October 2004, TXU Portfolio Management Company (TXU) served FPL Energy Pecos Wind I, LP, FPL Energy Pecos Wind I GP, LLC, FPL Energy Pecos Wind II, LP, FPL Energy Pecos Wind II GP, LLC and Indian Mesa Wind Farm, LP (FPL Energy Affiliates) as defendants in a civil action filed in the District Court in Dallas County, Texas. The petition alleges that the FPL Energy Affiliates had a contractual obligation to produce and sell to TXU a minimum quantity of energy each year and that the 83
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
FPL Energy Affiliates failed to meet this obligation. The plaintiff has asserted claims for breach of contract and declaratory judgment and seeks damages of approximately $21 million. The FPL Energy Affiliates filed their answer and counterclaim in November 2004, denying the allegations. The counterclaim, as now amended, asserts claims for conversion, breach of fiduciary duty, breach of warranty, conspiracy, breach of contract and fraud and seeks termination of the contract and damages. At the end of 2005, TXU amended its complaint to add FPL Group, FPL Energy, FPL Group Capital and ESI Energy, LLC, as defendants. Motions to dismiss those entities as defendants have been filed. The case is in discovery and has been set for trial in October 2006.
In November 2005, Peter Rabbino and Legal Computer Consultants, Inc. brought a civil action against FPL in the Circuit Court for Broward County, Florida. This action is purportedly on behalf of all customers of FPL that lost power due to Hurricane Wilma. No class certification motion has been filed to date. The two count complaint alleges, in Count I, breach of contract and, in Count II, violation of a statute. Count I alleges that FPL failed to sufficiently maintain its system to prevent power outages due to inclement weather, including hurricanes. This count seeks injunctive relief requiring FPL to bury its lines or install stronger poles and consequential damages. Count II alleges that FPL is statutorily obligated to provide sufficient, adequate and efficient service and that FPL was grossly negligent in carrying out this obligation resulting in damages to its customers due to Hurricane Wilma. This count seeks injunctive relief and consequential damages identical to that sought in Count I. FPL filed a motion to dismiss based on a number of legal grounds, including the exclusive jurisdiction of the FPSC to govern these types of disputes. On February 8, 2006, the court granted FPLs motion to dismiss, dismissing all claims in Count I with prejudice, and dismissing Count II without prejudice except as to any claims for injunctive relief, which were dismissed with prejudice.
In addition to those legal proceedings discussed above, FPL Group and its subsidiaries, including FPL, are involved in a number of other legal proceedings and claims in the ordinary course of their businesses. In addition, generating plants in which FPL Group or FPL have an ownership interest are involved in legal proceedings and claims, the liabilities from which, if any, would be shared by FPL Group or FPL.
FPL Group and FPL believe that they have meritorious defenses to all the pending litigation and proceedings discussed above under the heading Litigation and are vigorously defending the lawsuits. While management is unable to predict with certainty the outcome of the legal proceedings and claims discussed or described herein, based on current knowledge it is not expected that their ultimate resolution, individually or collectively, will have a material adverse effect on the financial statements.
: 17. Segment Information FPL Group's reportable segments include FPL, a rate-regulated utility, and FPL Energy, a competitive energy subsidiary. Corporate and Other represents other business activities, other segments that are not separately reportable and eliminating entries. FPL Group's operating revenues derived from the sale of electricity represented approximately 98% of FPL Group's operating revenues for each of the three years ended December 31, 2005, 2004 and 2003. Less than 1% of operating revenues were from foreign sources for each of the three years ended December 31, 2005, 2004 and 2003. At December 31, 2005 and 2004, less than 1% of long-lived assets were located in foreign countries.
84
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
FPL Groups segment information is as follows:
2005                                                2004                                            2003 Corp.                                              Corp.                                        Corp.
FPL            and                                FPL              and                            FPL        and (a)                                                  (a)
FPL        Energy          Other    Total        FPL        Energy            Other      Total      FPL    Energy (a)    Other        Total (millions)
Operating revenues                        $ 9,528 $        2,221      $ 97 $ 11,846 $ 8,734 $ 1,705                      $    83 $ 10,522 $ 8,293 $ 1,252              $ 85      $ 9,630 Operating expenses                        $ 8,181 $        2,093      $ 108 $ 10,382 $ 7,419 $ 1,541                      $    90 $ 9,050 $ 6,964 $ 1,059              $ 76      $ 8,099 Interest charges                          $    224 $          223      $ 146 $      593 $        183 $      180          $ 126 $        489 $    173 $      124      $ 82      $    379 Depreciation and amortization              $    951 $          311      $ 23 $ 1,285 $            915 $      264          $    19 $ 1,198 $        898 $      187      $ 20      $ 1,105 Equity in earnings of equity method investees                      $      - $          124      $    - $    124 $          - $        94        $      - $      94 $        - $      89      $      -  $      89 Income tax expense (b)
(benefit)                              $    408 $          (65) $ (71) $          272 $        409 $        (65)        $ (77) $        267 $    403 $      (4)    $ (31)    $    368 Income (loss) before cumulative effect of changes in (c) accounting principle                  $    748 $          187      $ (50) $      885 $        749 $      172          $ (34) $        887 $    733 $      197      $ (37)    $    893 Cumulative effect of changes in accounting principle, net of income taxes                    $      - $              -    $    - $        - $        - $          -      $      - $        - $      - $      (3) (d) $      -  $      (3)
Net income (loss)                          $    748 $          187      $ (50) $      885 $        749 $      172 (c) $ (34) $            887 $    733 $      194      $ (37)    $    890 Capital expenditures, independent power investments and nuclear fuel purchases                $ 1,711 $            822      $ 13 $ 2,546 $ 1,484 $                527          $      6 $ 2,017 $ 1,409 $ 1,478            $    7  $ 2,894 Property, plant and equipment              $ 24,407 $        8,611      $ 333 $ 33,351 $ 23,515 $ 7,888                    $ 317 $ 31,720 $ 22,489 $ 7,495              $ 288    $ 30,272 Accumulated depreciation                  $ 9,530 $        1,253      $ 105 $ 10,888 $ 9,467 $              940          $    87 $ 10,494 $ 9,237 $          671      $ 67      $ 9,975 Total assets (d)                          $ 22,726 $        9,408      $ 870 $ 33,004 $ 19,114 $ 8,507                    $ 712 $ 28,333 $ 17,817 $ 8,446              $ 672    $ 26,935 Investment in equity method investees                      $      - $          313      $ 10 $        323 $          - $      288          $      9 $    297 $        - $    346      $      -  $    346 (a)    FPL Energys interest charges are based on a deemed capital structure of 50% debt for operating projects and 100% debt for projects under construction. Residual            non-utility interest charges are included in Corporate and Other.
(b)    FPL Energys tax benefits relate primarily to production tax credits that were recognized based on its tax sharing agreement with FPL Group.
(c)    Includes contract restructuring and impairment charges of $46 million after tax. See Note 6.
(d)    Reflects the adoption of FIN 46 in July 2003. See Note 9.
: 18. Summarized Financial Information of FPL Group Capital FPL Group Capital, a 100% owned subsidiary of FPL Group, provides funding for and holds ownership interest in FPL Groups operating subsidiaries other than FPL. Most of FPL Group Capitals debt, including its debentures, and payment guarantees are fully and unconditionally guaranteed by FPL Group. Condensed consolidating financial information is as follows:
Condensed Consolidating Statements of Income Year Ended                                          Year Ended                                        Year Ended December 31, 2005                                  December 31, 2004                                  December 31, 2003 FPL                                                    FPL                                            FPL FPL                      Group                      FPL                        Group                  FPL                    Group FPL        Group                    Consoli-        FPL        Group                      Consoli-      FPL      Group                  Consoli-Group      Capital        Other(a)    dated        Group      Capital          Other(a)    dated      Group    Capital      Other(a)    dated (millions)
Operating revenues                      $      - $ 2,323 $ 9,523 $ 11,846 $                        - $ 1,789 $ 8,733 $ 10,522 $                        - $ 1,337 $ 8,293 $ 9,630 Operating expenses                              -      (2,205)      (8,177)    (10,382)            -      (1,632)        (7,418)      (9,050)        -    (1,135)    (6,964)    (8,099)
Interest charges                              (25)        (366)        (202)      (593)        (28)        (303)            (158)        (489)      (28)      (204)      (147)      (379)
Other income (de-ductions) - net                          893          273          (880)        286          905          163            (897)        171      903        154        (948)        109 Income (loss) before income taxes and cumulative effect of changes in accounting principle                    868            25          264      1,157          877          17              260        1,154      875        152        234      1,261 Income tax expense (benefit)                                (17)        (119)          408        272          (10)        (132)            409          267      (15)      (20)        403        368 Net income (loss) before cumulative effect of changes in accounting principle                                885          144          (144)        885          887          149            (149)        887      890        172      (169)        893 Cumulative effect of changes in accounting principle, net of income taxes                        -            -              -          -          -            -              -            -        -        (3)            -        (3)
Net income (loss)                      $    885    $    144    $    (144) $      885    $    887    $    149        $    (149) $      887  $    890  $    169 $      (169) $      890 (a)    Represents FPL and consolidating adjustments.
85
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
Condensed Consolidating Balance Sheets December 31, 2005                              December 31, 2004 FPL                                            FPL FPL                  Group                    FPL                    Group FPL      Group                Consoli-      FPL      Group                  Consoli-Group    Capital  Other(a)    dated        Group      Capital  Other(a)      dated (millions)
PROPERTY, PLANT AND EQUIPMENT Electric utility plant in service and other property      $      -  $ 8,945 $ 24,406 $ 33,351 $              -  $ 8,204 $ 23,516 $        31,720 Less accumulated depreciation and amortization                  -    (1,359)    (9,529)  (10,888)          -    (1,026 )  (9,468 )    (10,494 )
Total property, plant and equipment - net                    -    7,586    14,877    22,463            -      7,178    14,048      21,226 CURRENT ASSETS Cash and cash equivalents                                        7      467        56        530          26        134        65          225 Receivables                                                      5      584        841      1,430          32        423        590        1,045 Other                                                          63      518      2,446      3,027          137        285        835        1,257 Total current assets                                        75    1,569      3,343      4,987          195        842      1,490        2,527 OTHER ASSETS Investment in subsidiaries                                  8,647          -  (8,647)          -      7,674            -  (7,674 )          -
Other                                                          140    1,339      4,075      5,554          121      1,448      3,011        4,580 Total other assets                                        8,787    1,339    (4,572)    5,554        7,795      1,448    (4,663 )      4,580 TOTAL ASSETS                                                  $ 8,862  $ 10,494  $ 13,648 $ 33,004      $ 7,990    $ 9,468    $ 10,875 $    28,333 CAPITALIZATION Common shareholders' equity                              $ 8,499  $ 1,911    $ (1,911) $ 8,499      $ 7,537    $ 1,525    $ (1,525 ) $    7,537 Long-term debt                                                  -    4,768      3,271      8,039            -      5,214      2,813        8,027 Total capitalization                                      8,499    6,679      1,360    16,538        7,537      6,739      1,288      15,564 CURRENT LIABILITIES Debt due within one year                                        -    1,269      1,294      2,563            -        722        995        1,717 Accounts payable                                                17      365        863      1,245            -        156        606          762 Other                                                          85      803      2,571      3,459          155        458      1,156        1,769 Total current liabilities                                  102    2,437      4,728      7,267          155      1,336      2,757        4,248 OTHER LIABILITIES AND DEFERRED CREDITS Asset retirement obligations                                    -      211      1,474      1,685            -        192      2,015        2,207 Accumulated deferred income taxes                              (5)      464      2,556      3,015          (5 )      816      1,874        2,685 Regulatory liabilities                                          -          -    2,971      2,971            -          -    2,465        2,465 Other                                                          266      703        559      1,528          303        385        476        1,164 Total other liabilities and deferred credits                261    1,378      7,560      9,199          298      1,393      6,830        8,521 COMMITMENTS AND CONTINGENCIES TOTAL CAPITALIZATION AND LIABILITIES                          $ 8,862  $ 10,494  $ 13,648  $ 33,004      $ 7,990    $ 9,468    $ 10,875  $  28,333 (a)  Represents FPL and consolidating adjustments.
86
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)
Condensed Consolidating Statements of Cash Flows Year Ended                                    Year Ended                                    Year Ended December 31, 2005                              December 31, 2004                            December 31, 2003 FPL                                              FPL                                        FPL FPL                  Group                    FPL                    Group                FPL                  Group FPL        Group                Consoli-      FPL      Group                  Consoli-    FPL      Group                Consoli-Group      Capital    Other(a)    dated        Group    Capital      Other(a)    dated    Group    Capital    Other(a)    dated (millions)
NET CASH PROVIDED BY OPERATING ACTIVITIES            $    191  $    278  $ 1,078    $    1,547  $    437  $    868      $ 1,345    $    2,650  $ 1,028  $    397  $    829  $ 2,254 CASH FLOWS FROM INVESTING ACTIVITIES Capital expenditures, independent power Investments and nuclear fuel purchases                -      (834)    (1,712)      (2,546)          -      (533)      (1,484)      (2,017)      -    (1,486)    (1,408)    (2,894)
Capital contributions to FPL            -          -          -          -          -          -            -          -    (600)          -      600          -
Other - net                          (299)        478        202          381        (29)        89            85          145        -        (18)      (177)      (195)
Net cash used in investing activities          (299)      (356)    (1,510)      (2,165)      (29)      (444)      (1,399)      (1,872)    (600)    (1,504)      (985)    (3,089)
CASH FLOWS FROM FINANCING ACTIVITIES Issuances of long-term debt                              -        803        588        1,391          -      334          235          569        -      2,118        877      2,995 Retirements of long-term debt                        -      (715)      (500)      (1,215)          -      (432)              -      (432)      -        (43)      (388)      (431)
Retirements of preferred stock - FPL                          -          -        (5)        (5)          -          -            -          -      -          -      (228)      (228)
Net change in short-term debt                      -          -      667          667          -      (284)        (139)        (423)      -    (1,116)      (122)    (1,238)
Issuances of common stock            639            -          -        639        110            -            -        110      73          -          -      73 Dividends on common stock            (544)          -          -      (544)      (467)          -            -      (467)    (425)          -          -    (425)
Other - net                            (6)        323      (327)        (10)      (52)        (6)          19          (39)    (54)      (15)        21        (48)
Net cash provided by (used in) financing activities                          89        411        423          923      (409)      (388)          115        (682)    (406)      944        160        698 Net increase (decrease) in cash and cash equivalents            (19)        333          (9)        305          (1)      36            61          96      22      (163)          4      (137)
Cash and cash equivalents at beginning of year                  26        134        65          225        27        98              4        129        5        261            -      266 Cash and cash equivalents at end of year                  $      7  $    467  $    56  $      530  $    26  $    134      $    65  $      225  $    27  $      98  $      4  $    129 (a)    Represents FPL and consolidating adjustments.
87
 
FPL GROUP, INC. AND FLORIDA POWER & LIGHT COMPANY NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Concluded)
: 19. Quarterly Data (Unaudited)
Condensed consolidated quarterly financial information is as follows:
(a)                    (a)                      (a)                    (a)
March 31                  June 30                September 30        December 31 (millions, except per share amounts)
FPL GROUP:
2005 Operating revenues (b)                                                      $2,437                  $2,741                      $3,504            $3,164 Operating income (b)                                                        $ 234                    $ 320                      $ 559            $ 351 Net income (b)                                                              $ 137                    $ 203                      $ 339            $ 206 Earnings per share (c)                                                      $ 0.37                  $ 0.53                      $ 0.88            $ 0.54 Earnings per share - assuming dilution (c)                                  $ 0.36                  $ 0.52                      $ 0.87            $ 0.53 Dividends per share                                                        $0.355                  $0.355                      $0.355            $0.355 High-low common stock sales prices                                          $41.38-35.90            $42.72-39.16                $48.11-40.30      $48.05-40.75 2004 Operating revenues (b)                                                      $2,331                  $2,619                      $2,983            $2,589 Operating income (b)                                                        $ 261                    $ 434                      $ 523            $ 254 Net income (b)                                                              $ 138                    $ 257                      $ 320            $ 173 Earnings per share (c)                                                      $ 0.39                  $ 0.72                      $ .89            $ 0.48 Earnings per share - assuming dilution (c)                                  $ 0.39                  $ 0.71                      $ .88            $ 0.47 Dividends per share                                                        $ 0.31                  $ 0.31                      $ 0.34            $ 0.34 High-low common stock sales prices                                          $34.41-31.67            $33.63-30.10                $34.93-31.21      $38.05-33.67 FPL:
2005 Operating revenues (b)                                                      $2,041                  $2,298                      $2,891            $2,298 Operating income (b)                                                        $ 201                    $ 343                      $ 551            $ 252 Net income (b)                                                              $ 111                    $ 201                      $ 311            $ 124 2004 Operating revenues (b)                                                      $1,942                  $2,172                      $2,485            $2,135 Operating income (b)                                                        $ 199                    $ 357                      $ 466            $ 294 Net income (b)                                                              $ 105                    $ 205                      $ 275            $ 164 Net income available to FPL Group (b)                                      $ 105                    $ 205                      $ 275            $ 164 (a) In the opinion of FPL Group and FPL, all adjustments, which consist of normal recurring accruals necessary to present a fair statement of the amounts shown for such periods, have been made. Results of operations for an interim period generally will not give a true indication of results for the year.
(b) The sum of the quarterly amounts may not equal the total for the year due to rounding.
(c) The sum of the quarterly amounts may not equal the total for the year due to rounding and changes in weighted-average number of common shares outstanding.
88
 
Item 9. Changes in and Disagreements with Accountants on Accounting and Financial Disclosure None Item 9A. Controls and Procedures Disclosure Controls and Procedures As of December 31, 2005, each of FPL Group and FPL had performed an evaluation, under the supervision and with the participation of its management, including FPL Groups and FPLs chief executive officer and chief financial officer, of the effectiveness of the design and operation of each companys disclosure controls and procedures (as defined in Exchange Act Rule 13a-15(e) or 15d-15(e)). Based upon that evaluation, the chief executive officer and chief financial officer of each of FPL Group and FPL concluded that the companys disclosure controls and procedures are effective in timely alerting them to material information relating to the company and its consolidated subsidiaries required to be included in the companys reports filed or submitted under the Exchange Act and ensuring that information required to be disclosed in the companys reports filed or submitted under the Exchange Act is accumulated and communicated to management, including its principal executive and principal financial officers, to allow timely decisions regarding required disclosure. FPL Group and FPL each have a Disclosure Committee, which is made up of several key management employees and reports directly to the chief executive officer and chief financial officer of each company, to monitor and evaluate these disclosure controls and procedures. Due to the inherent limitations of the effectiveness of any established disclosure controls and procedures, management of FPL Group and FPL cannot provide absolute assurance that the objectives of their respective disclosure controls and procedures will be met.
Internal Control Over Financial Reporting (a)    Managements Annual Report on Internal Control Over Financial Reporting See Item 8. Financial Statements and Supplementary Data.
(b)    Attestation Report of the Independent Registered Public Accounting Firm See Item 8. Financial Statements and Supplementary Data.
(c)    Changes in Internal Control Over Financial Reporting FPL Group and FPL are continuously seeking to improve the efficiency and effectiveness of their operations and of their internal controls. This results in refinements to processes throughout FPL Group and FPL. However, there has been no change in FPL Groups or FPLs internal control over financial reporting that occurred during FPL Groups and FPLs most recent fiscal quarter that has materially affected, or is reasonably likely to materially affect, FPL Groups or FPLs internal control over financial reporting.
In June 2005, a wholly-owned subsidiary of FPL Group completed the acquisition of Gexa Corp., which was valued at approximately $73 million, payable in shares of FPL Group common stock. FPL Groups management elected to exclude from its assessment of internal control over financial reporting for the year ended December 31, 2005 the entities that directly own the interests in each of the entities acquired in connection with the acquisition of Gexa Corp., and whose financial statements reflect total assets and operating revenues representing less than 1% and approximately 3%, respectively, of FPL Groups consolidated total assets and total operating revenues as of and for the year ended December 31, 2005. FPL Group does not consider the acquisition of Gexa Corp. material to FPL Groups results of operations, financial position and cash flows. FPL Group is in the process of evaluating the impact of Gexas business on FPL Groups internal control over financial reporting and has noted numerous inadequacies throughout Gexas operations, including the contract approval and administration process, the customer enrollment process, billing system security and accounting and financial controls. FPL Group is in the process of remediating these inadequacies and expects to complete this process in 2006. FPL Groups management does not believe these inadequacies affect the adequacy of FPL Groups internal control over financial reporting because of the relative immateriality of Gexas activities.
Item 9B. Other Information On February 16, 2006, Frank G. Zarb announced his retirement from FPL Groups board of directors effective at FPL Groups 2006 Annual Meeting of Shareholders. In addition, H. Jesse Arnelle has reached mandatory retirement age and will also retire from the board of directors effective at FPL Groups 2006 Annual Meeting of Shareholders. The board has adopted a resolution reducing its size from twelve to ten effective upon the retirements of Messrs. Arnelle and Zarb.
89
 
PART III Item 10. Directors and Executive Officers of Registrant The information required by this item will be included in FPL Groups Proxy Statement which will be filed with the SEC in connection with the 2006 Annual Meeting of Shareholders (FPL Groups Proxy Statement) and is incorporated herein by reference, or is included in Item 1. Business - Executive Officers of FPL Group.
Item 11. Executive Compensation The information required by this item will be included in FPL Group's Proxy Statement and is incorporated herein by reference, provided that the Compensation Committee Report, the Audit Committee Report (to the extent permitted by the rules of the SEC) and Performance Graph which are contained in FPL Group's Proxy Statement shall not be deemed to be incorporated herein by reference.
Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters The information required by this item relating to security ownership of certain beneficial owners and management will be included in FPL Group's Proxy Statement and is incorporated herein by reference.
SECURITIES AUTHORIZED FOR ISSUANCE UNDER EQUITY COMPENSATION PLANS FPL Group's equity compensation plan information as of December 31, 2005 is as follows:
Number of securities remaining Number of securities to be                                                    available for future issuance issued upon exercise of                Weighted-average exercise              under equity compensation outstanding options, warrants            price of outstanding options,          plans (excluding securities and rights                        warrants and rights                  reflected in column (a))
Plan category                                  (a)                                    (b)                                      (c)
Equity compensation plans approved by security holders                                  7,228,617                                $27.48                              12,477,628 (a)
Equity compensation plans not approved by security holders (b)                                79,614                                  $17.77                                      -
(a)  These shares are also available for issuance as restricted stock and as performance-based stock awards.
(b)  Represents options granted by Gexa Corp. under its Amended and Restated 2004 Incentive Plan and pursuant to various individual grants, all of which were made prior to the acquisition of Gexa Corp. All such options were assumed by FPL Group in connection with the acquisition of Gexa Corp. and are fully vested and exercisable for shares of FPL Group common stock. No further grants of stock options will be made under this plan.
Item 13. Certain Relationships and Related Transactions The information required by this item will be included in FPL Group's Proxy Statement under a similar heading, if applicable, and under the headings Executive Compensation, Employment Agreements and Director Compensation and is incorporated herein by reference.
Item 14. Principal Accountant Fees and Services FPL Group - The information required by this item will be included in FPL Group's Proxy Statement under the headings "Fees Paid to Deloitte & Touche LLP" and "Policy on Audit Committee Pre-Approval of Audit and Non-Audit Services of Independent Auditor" and is incorporated herein by reference.
90
 
FPL - The following table presents fees billed for professional services rendered by Deloitte & Touche LLP, the member firms of Deloitte Touche Tohmatsu, and their respective affiliates (collectively, Deloitte & Touche) for the fiscal years ended December 31, 2005 and 2004. The amounts presented below reflect allocations from FPL Group for FPL's portion of the fees, as well as amounts billed directly to FPL.
2005                        2004 Audit fees    (a)
                                                $ 2,410,000                $ 2,340,000 Audit-related fees (b)                                237,000                    308,000 Tax fees (c)                                          101,000                      86,000 All other fees (d)                                              -                            -
Total                                          $ 2,748,000                $ 2,734,000 (a) Audit fees consist of fees billed for professional services rendered for the audit of FPLs and FPL Groups annual consolidated financial statements for the fiscal year, the reviews of the financial statements included in FPLs and FPL Groups Quarterly Reports on Form 10-Q for the fiscal year, attestation of managements assessment of internal control over financial reporting and the audit of the effectiveness of internal control over financial reporting, comfort letters, consents, and other services related to SEC matters, services in connection with annual and semi-annual filings of FPL Groups financial statements with the Japanese Ministry of Finance and accounting consultations to the extent necessary for Deloitte & Touche to fulfill their responsibility under Public Company Accounting Oversight Board standards.
(b) Audit-related fees consist of fees billed for assurance and related services that are reasonably related to the performance of the audit or review of FPLs and FPL Groups consolidated financial statements and are not reported under "Audit Fees." These fees primarily related to audits of subsidiary financial statements, comfort letters, consents and other services related to subsidiary (non-SEC registrant) financing activities, audits of employee benefit plans and consultation on accounting standards and on transactions.
(c) Tax fees consist of fees billed for professional services rendered for tax compliance, tax advice and tax planning. In 2005, approximately $21,000 was paid related to tax advice and planning services. All other tax fees in 2005 and all tax fees in 2004 related to tax compliance services.
(d) All other fees consist of fees for products and services other than the services reported under the other named categories. In 2005 and 2004, there were no other fees incurred in this category.
In accordance with the requirements of Section 404 of the Sarbanes-Oxley Act of 2002 (Sarbanes-Oxley), FPL Group's Audit Committee's pre-approval policy for services provided by the independent auditor, and the Charter of the Audit Committee, all services performed by Deloitte & Touche are approved in advance by the Audit Committee. Audit and audit-related services specifically identified in an appendix to the pre-approval policy are pre-approved by the Audit Committee each year. This pre-approval allows management to request the specified audit and audit-related services on an as-needed basis during the year, provided any such services are reviewed with the Audit Committee at its next regularly scheduled meeting. Any audit or audit-related service for which the fee is expected to exceed $250,000, or that involves a service not listed on the pre-approval list, must be specifically approved by the Audit Committee prior to commencement of such work. In addition, the Audit Committee approves all services other than audit and audit-related services performed by Deloitte & Touche in advance of the commencement of such work or, in cases which meet the de minimus pre-approval exception established by Sarbanes-Oxley, prior to completion of the audit. The Audit Committee has delegated to the chairman of the committee the right to approve audit, audit-related, tax and other services, within certain limitations, between meetings of the Audit Committee, provided any such decision is presented to the Audit Committee at its next regularly scheduled meeting. The Audit Committee reviews on a quarterly basis a schedule of all services for which Deloitte & Touche has been engaged and the estimated fees for those services. In fiscal years 2005 and 2004, no services provided by Deloitte & Touche to FPL or allocated to FPL under the categories Audit-related, Tax and All other fees described above were approved by the Audit Committee after services were rendered pursuant to the de minimus exception established by Sarbanes-Oxley.
91
 
PART IV Item 15. Exhibits and Financial Statement Schedules Page(s)
(a) 1. Financial Statements Managements Report on Internal Control Over Financial Reporting                                            44 Attestation Report of Independent Registered Public Accounting Firm                                        45 Report of Independent Registered Public Accounting Firm                                                    46 FPL Group:
Consolidated Statements of Income                                                                      47 Consolidated Balance Sheets                                                                            48 Consolidated Statements of Cash Flows                                                                  49 Consolidated Statements of Common Shareholders Equity                                                  50 FPL:
Consolidated Statements of Income                                                                      51 Consolidated Balance Sheets                                                                            52 Consolidated Statements of Cash Flows                                                                  53 Consolidated Statements of Common Shareholders Equity                                                  54 Notes to Consolidated Financial Statements                                                                55-88
: 2. Financial Statement Schedules - Schedules are omitted as not applicable or not required.
: 3. Exhibits (including those incorporated by reference)
Exhibit                                                                                          FPL Number                                                Description                                Group  FPL
            *2      Agreement and Plan of Merger among FPL Group, Inc., Constellation Energy Group,        x    x Inc. and CF Merger Corporation dated as of December 18, 2005 (filed as Exhibit 2.1 to Form 8-K dated December 19, 2005, File No. 1-8841)
          *3(i)a    Restated Articles of Incorporation of FPL Group dated December 31, 1984,                x as amended through March 10, 2005 (filed as Exhibit 3(i) to Form S-4, File No. 333-124438)
          *3(i)b    Restated Articles of Incorporation of FPL dated March 23, 1992 (filed as                      x Exhibit 3(i)a to Form 10-K for the year ended December 31, 1993, File No.
1-3545)
          *3(i)c    Amendment to FPL's Restated Articles of Incorporation dated March 23, 1992                    x (filed as Exhibit 3(i)b to Form 10-K for the year ended December 31, 1993, File No. 1-3545)
          *3(i)d    Amendment to FPL's Restated Articles of Incorporation dated May 11, 1992                      x (filed as Exhibit 3(i)c to Form 10-K for the year ended December 31, 1993, File No. 1-3545)
          *3(i)e    Amendment to FPL's Restated Articles of Incorporation dated March 12, 1993                    x (filed as Exhibit 3(i)d to Form 10-K for the year ended December 31, 1993, File No. 1-3545)
          *3(i)f    Amendment to FPL's Restated Articles of Incorporation dated June 16, 1993                    x (filed as Exhibit 3(i)e to Form 10-K for the year ended December 31, 1993, File No. 1-3545)
          *3(i)g    Amendment to FPL's Restated Articles of Incorporation dated August 31, 1993                  x (filed as Exhibit 3(i)f to Form 10-K for the year ended December 31, 1993, File No. 1-3545)
          *3(i)h    Amendment to FPL's Restated Articles of Incorporation dated November 30,                      x 1993 (filed as Exhibit 3(i)g to Form 10-K for the year ended December 31, 1993, File No. 1-3545) 92
 
Exhibit                                                                                          FPL Number                                            Description                                  Group FPL
  *3(i)i Amendment to FPLs Restated Articles of Incorporation dated January 20, 2004                  x (filed as Exhibit 3(i)j to Form 10-K dated December 31, 2003, File No. 2-27612)
  *3(i)j Amendment to FPLs Restated Articles of Incorporation dated January 20, 2004                  x (filed as Exhibit 3(i)k to Form 10-K dated December 31, 2003, File No. 2-27612)
*3(i)k  Amendment to FPLs Restated Articles of Incorporation dated February 11, 2005                  x (filed as Exhibit 3(i)m to Form 10-K for the year ended December 31, 2004, File No. 1-8841)
*3(ii)a Bylaws of FPL Group as amended February 12, 2001 (filed as Exhibit 3(ii)a                x to Form 10-K for the year ended December 31, 2000, File No. 1-8841)
*3(ii)b Bylaws of FPL dated May 11, 1992 (filed as Exhibit 3 to Form 8-K dated                        x May 1, 1992, File No. 1-3545)
  *4(a)  Form of Rights Agreement, dated as of July 1, 1996, between FPL Group                    x and EquiServe Trust Company, N.A. as successor to Fleet National Bank (f/k/a The First National Bank of Boston), as Rights Agent (filed as Exhibit 4 to Form 8-K dated June 17, 1996, File No. 1-8841)
  *4(b)  Second Amendment to Rights Agreement, dated as of December 26, 2002,                      x between FPL Group and EquiServe Trust Company, N.A. as successor to Fleet National Bank (f/k/a The First National Bank of Boston), as the Rights Agent (filed as Exhibit 3 to Form 8-A/A dated January 3, 2003, File No. 1-8841)
  *4(c)  Third Amendment to Rights Agreement, dated as of January 1, 2004, between                x FPL Group, Computershare Investor Services, LLC as successor rights agent, and EquiServe Trust Company, N.A. as predecessor rights agent (filed as Exhibit 4 to Form 8-A/A dated December 19, 2003, File No. 1-8841)
  *4(d)  Fourth Amendment to Rights Agreement, dated as of December 18, 2005,                      x between FPL Group, Inc. and Computershare Investor Services, LLC, as successor rights agent to EquiServe Trust Company, N.A., predecessor rights agent (filed as Exhibit 5 to Form 8-A/A dated December 19, 2005, File No. 1-8841)
  *4(e)  Certificate of Adjustment, dated March 15, 2005, to the Rights Agreement, dated          x July 1, 1996, as amended, between FPL Group, Inc. and Computershare Investor Services, LLC, as successor rights agent (filed as Exhibit 4(b) to Form 8-K dated March 11, 2005, File No. 1-8841)
  *4(f)  Mortgage and Deed of Trust dated as of January 1, 1944, and One hundred and              x    x nine Supplements thereto, between FPL and Deutsche Bank Trust Company Americas, Trustee (filed as Exhibit B-3, File No. 2-4845; Exhibit 7(a), File No. 2-7126; Exhibit 7(a), File No. 2-7523; Exhibit 7(a), File No. 2-7990; Exhibit 7(a),
File No. 2-9217; Exhibit 4(a)-5, File No. 2-10093; Exhibit 4(c), File No. 2-11491; Exhibit 4(b)-1, File No. 2-12900; Exhibit 4(b)-1, File No. 2-13255; Exhibit 4(b)-1, File No. 2-13705; Exhibit 4(b)-1, File No. 2-13925; Exhibit 4(b)-1, File No. 2-15088; Exhibit 4(b)-1, File No. 2-15677; Exhibit 4(b)-1, File No. 2-20501; Exhibit 4(b)-1, File No. 2-22104; Exhibit 2(c), File No. 2-23142; Exhibit 2(c), File No. 2-24195; Exhibit 4(b)-1, File No. 2-25677; Exhibit 2(c), File No. 2-27612; Exhibit 2(c), File No. 2-29001; Exhibit 2(c), File No. 2-30542; Exhibit 2(c), File No. 2-33038; Exhibit 2(c), File No. 2-37679; Exhibit 2(c), File No. 2-39006; Exhibit 2(c), File No. 2-41312; Exhibit 2(c), File No. 2-44234; Exhibit 2(c), File No. 2-46502; Exhibit 2(c), File No. 2-48679; Exhibit 2(c), File No. 2-49726; Exhibit 2(c), File No. 2-50712; Exhibit 2(c), File No. 2-52826; Exhibit 2(c), File No. 2-53272; Exhibit 2(c), File No. 2-54242; Exhibit 2(c), File No. 2-56228; Exhibits 2(c) and 2(d), File No. 2-60413; Exhibits 2(c) and 2(d), File No. 2-65701; Exhibit 2(c), File No. 2-66524; Exhibit 2(c), File No. 2-67239; Exhibit 4(c), File No. 2-69716; Exhibit 4(c), File No. 2-70767; Exhibit 4(b), File No. 2-71542; Exhibit 4(b),
File No. 2-73799; Exhibits 4(c), 4(d) and 4(e), File No. 2-75762; Exhibit 4(c),
File No. 2-77629; Exhibit 4(c), File No. 2-79557; Exhibit 99(a) to Post-Effective Amendment No. 5 to Form S-8, File No. 33-18669; Exhibit 99(a) to Post-Effective Amendment No. 1 to Form S-3, File No. 33-46076; Exhibit 4(b) to Form 10-K 93
 
Exhibit                                                                                            FPL Number                                            Description                                    Group FPL for the year ended December 31, 1993, File No. 1-3545; Exhibit 4(i) to Form 10-Q for the quarter ended June 30, 1994, File No. 1-3545; Exhibit 4(b) to Form 10-Q for the quarter ended June 30, 1995, File No. 1-3545; Exhibit 4(a) to Form 10-Q for the quarter ended March 31,1996, File No. 1-3545; Exhibit 4 to Form 10-Q for the quarter ended June 30, 1998, File No. 1-3545; Exhibit 4 to Form 10-Q for the quarter ended March 31, 1999, File No. 1-3545; Exhibit 4(f) to Form 10-K for the year ended December 31, 2000, File No. 1-3545; Exhibit 4(g) to Form 10-K for the year ended December 31, 2000, File No. 1-3545; Exhibit 4(o), File No. 333-102169; Exhibit 4(k) to Post-Effective Amendment No. 1 to Form S-3, File No. 333-102172; Exhibit 4(l) to Post-Effective Amendment No. 2 to Form S-3, File No. 333-102172; Exhibit 4(m) to Post-Effective Amendment No. 3 to Form S-3, File No. 333-102172; Exhibit 4(a) to Form 10-Q for the quarter ended September 30, 2004, File No. 2-27612); Exhibit 4(f) to Amendment No. 1 to Form S-3, File No.333-125275; Exhibit 4(y) to Post-Effective Amendment No. 2 to Form S-3, File Nos. 333-116300, 333-116300-01 and 333-116300-02; and Exhibit 4(z) to Post-Effective Amendment No. 3 to Form S-3, File Nos. 333-116300, 333-116300-01 and 333-116300-02)
*4(g)  Indenture, dated as of June 1, 1999, between FPL Group Capital and                          x The Bank of New York, as Trustee (filed as Exhibit 4(a) to Form 8-K dated July 16, 1999, File No. 1-8841)
*4(h)  Guarantee Agreement between FPL Group (as Guarantor) and                                    x The Bank of New York (as Guarantee Trustee) dated as of June 1, 1999 (filed as Exhibit 4(b) to Form 8-K dated July 16, 1999, File No. 1-8841)
  *4(i) Officers Certificate of FPL Group Capital, dated June 29, 1999,                            x creating the 7 3/8% Debentures, Series due June 1, 2009 (filed as Exhibit 4(d) to Form 8-K dated July 16, 1999, File No. 1-8841)
  *4(j) Officers Certificate of FPL Group Capital, dated September 7, 1999,                        x creating the 7 5/8% Debentures, Series due September 15, 2006 (filed as Exhibit 4 to Form 10-Q for the quarter ended September 30, 1999, File No. 1-8841)
*4(k)  Officers Certificate of FPL Group Capital, dated May 11, 2001, creating                    x the 6 1/8% Debentures, Series due May 15, 2007 (filed as Exhibit 4 to Form 10-Q for the quarter ended June 30, 2001, File No. 1-8841)
  *4(l) Officers Certificate of FPL Group Capital, dated February 4, 2002,                          x creating the Series A Debentures due February 16, 2007 (filed as Exhibit 4(j) to Form 10-K for the year ended December 31, 2001, File No. 1-8841)
*4(m)  Supplemental Officers Certificate of FPL Group Capital, dated October 27, 2004,            x to the Officers Certificate creating the Series A Debentures due February 16, 2007 (filed as Exhibit 4(b) to Form 10-Q for the quarter ended September 30, 2004, File No. 1-8841)
*4(n)  Officers Certificate of FPL Group Capital, dated April 11, 2003, creating the              x 3 1/4% Debentures, Series due April 11, 2006 (filed as Exhibit 4(ao) to Post-Effective Amendment No. 1 to Form S-3, File Nos. 333-102173, 333-102173-01, 333-102173-02 and 333-102173-03)
*4(o)  Officers Certificate of FPL Group Capital, dated June 12, 2002, creating                    x the Series B Debentures due February 16, 2008 (filed as Exhibit 4(a) to Form 10-Q for the quarter ended June 30, 2002, File No. 1-8841)
*4(p)  Indenture (For Unsecured Subordinated Debt Securities relating to Trust Securities) of FPL  x Group Capital, dated as of March 1, 2004 (filed as Exhibit 4(au) to Post-Effective Amendment No. 3 to Form S-3, File Nos. 333-102173, 333-102173-01, 333-102173-02 and 333-102173-03) 94
 
Exhibit                                                                                              FPL Number                                              Description                                    Group FPL
  *4(q)  Officers Certificate of FPL Group Capital, dated March 15, 2004, creating the 5 7/8%        x Junior Subordinated Debentures, Series due March 15, 2044 (filed as Exhibit 4(av) to Post-Effective Amendment No. 3 to Form S-3, File Nos. 333-102173, 333-102173-01, 333-102173-02 and 333-102173-03)
  *4(r)  Preferred Trust Securities Guarantee Agreement between FPL Group (as Guarantor) and          x The Bank of New York (as Guarantee Trustee), dated as of March 15, 2004 (filed as Exhibit 4(aw) to Post-Effective Amendment No. 3 to Form S-3, File Nos. 333-102173, 333-102173-01, 333-102173-02 and 333-102173-03)
  *4(s)  Amended and Restated Trust Agreement relating to FPL Group Capital Trust I, dated            x as of March 15, 2004 (filed as Exhibit 4(at) to Post-Effective Amendment No. 3 to Form S-3, File No. 333-102173, 333-102173-01, 333-102173-02 and 333-102173-03)
  *4(t) Agreement as to Expenses and Liabilities of FPL Group Capital Trust I, dated as of March    x 15, 2004 (filed as Exhibit 4(ax) to Post-Effective Amendment No. 3 to Form S-3, File No.
333-102173, 333-102173-01, 333-102173-02 and 333-102173-03)
  *4(u)  Warrant Agreement by and between Gexa Corp. and Highbridge/Zwirn Special                    x Opportunities Fund, L.P., dated as of July 8, 2004, assumed by FPL Group effective June 17, 2005 (filed by Gexa Corp. as Exhibit 4.1 to Form 8-K dated July 8, 2004, File No. 1-31435)
  *4(v)  Warrant Agreement by and between Gexa Corp. and Cappello Capital Corp., dated                x as of November 1, 2004, assumed by FPL Group effective June 17, 2005 (filed by Gexa Corp. as Exhibit 4.1 to Form 8-K dated December 3, 2004, File No. 1-31435)
  *4(w)  Warrant Agreement by and between Gexa Corp. and Prospect Street Ventures Ltd.,              x dated as of July 19, 2004, assumed by FPL Group effective June 17, 2005 (filed as Exhibit 4(d) to Form 10-Q for the quarter ended June 30, 2005, File No. 1-8841)
  *4(x)  Warrant Agreement by and between Gexa Corp. and Prospect Street Ventures I LLC,              x dated as of September 9, 2004, assumed by FPL Group effective June 17, 2005 (filed as Exhibit 4(e) to Form 10-Q for the quarter ended June 30, 2005, File No.
1-8841)
  *4(y)  Form of Warrant Agreement to Purchase Shares of Common Stock of Gexa Corp.,                  x dated as of November 23, 2004, assumed by FPL Group effective June 17, 2005 (filed as Exhibit 4(f) to Form 10-Q for the quarter ended June 30, 2005, File No.
1-8841)
*10(a)  FPL Group Supplemental Executive Retirement Plan, amended and restated                      x    x effective April 1, 1997 (filed as Exhibit 10(a) to Form 10-K for the year ended December 31, 1999, File No. 1-8841)
*10(b)  Amendments # 1 and 2 effective January 1, 1998 to FPL Group Supplemental                    x    x Executive Retirement Plan, amended and restated effective April 1, 1997 (filed as Exhibit 10(b) to Form 10-K for the year ended December 31, 1999, File No. 1-8841)
*10(c)  Amendment #3 effective January 1, 1999 to FPL Group Supplemental                            x    x Executive Retirement Plan, amended and restated effective April 1, 1997 (filed as Exhibit 10(c) to Form 10-K for the year ended December 31, 1999, File No. 1-8841)
*10(d)  Amendment #4 adopted October 13, 2005 to FPL Group Supplemental Executive                    x    x Retirement Plan, amended and restated effective April 1, 1997 (filed as Exhibit 10(a) to Form 10-Q for the quarter ended September 30, 2005, File No. 1-8841)
*10(e)  Supplement to the FPL Group Supplemental Executive Retirement Plan                          x    x as it applies to Lewis Hay, III effective March 22, 2002 (filed as Exhibit 10(g) to Form 10-K for the year ended December 31, 2001, File No. 1-8841) 95
 
Exhibit                                                                                      FPL Number                                            Description                                Group FPL
*10(f) FPL Group, Inc. Amended and Restated Long Term Incentive Plan, as amended and          x    x restated October 14, 2005 (filed as Exhibit 10(b) to Form 10-Q for the quarter ended September 30, 2005, File No. 1-8841)
*10(g) Form of FPL Group, Inc. Amended and Restated Long-Term Incentive Plan                  x    x Performance Share Award Agreement (filed as Exhibit 10(a) to Form 8-K dated December 29, 2004, File No. 1-8841)
*10(h) Form of FPL Group, Inc. Amended and Restated Long-Term Incentive Plan                  x    x Restricted Stock Award Agreement (filed as Exhibit 10(b) to Form 8-K dated December 29, 2004, File No. 1-8841)
*10(i) Form of FPL Group, Inc. Amended and Restated Long-Term Incentive Plan                  x    x Restricted Stock Award Agreement (filed as Exhibit 10 to Form 8-K dated January 28, 2005, File No. 1-8841)
*10(j) Form of FPL Group, Inc. Amended and Restated Long Term Incentive Plan                  x    x Stock Option Award - Non-Qualified Stock Option Agreement (filed as Exhibit 10(c) to Form 8-K dated December 29, 2004, File No. 1-8841)
*10(k) Form of FPL Group, Inc. Amended and Restated Long Term Incentive Plan Stock            x    x Option Award - Non-Qualified Stock Option Agreement (filed as Exhibit 10(d) to to Form 8-K dated December 29, 2004, File No. 1-8841)
*10(l) Form of FPL Group, Inc. Amended and Restated Long-Term Incentive Plan                  x    x Shareholder Value Award Agreement (filed as Exhibit 10(l) to Form 10-K for the year ended December 31, 2004, File No. 1-8841)
*10(m)  Form of 2004 Annual Incentive Plan (filed as Exhibit 10(h) to Form 10-K for the year  x    x ended December 31, 2003, File No. 1-8841)
*10(n) Form of FPL Group, Inc. Annual Incentive Plan (filed as Exhibit 10(n) to Form 10-K    x    x for the year ended December 31, 2004, File No. 1-8841)
*10(o) FPL Group Deferred Compensation Plan, amended and restated                            x    x effective January 1, 2001 (filed as Exhibit 10(a) to Form 10-Q for the quarter ended June 30, 2001, File No. 1-8841)
*10(p) FPL Group Deferred Compensation Plan, amended and restated effective                  x    x January 1, 2003 (filed as Exhibit 10(k) to Form 10-K for the year ended December 31, 2002, File No. 1-8841)
*10(q) FPL Group Executive Long Term Disability Plan effective January 1, 1995                x    x (filed as Exhibit 10(g) to Form 10-K for the year ended December 31, 1995, File No. 1-8841)
*10(r) FPL Group Non-Employee Directors Stock Plan dated as of March 17,                      x 1997 (filed as Appendix A to FPL Groups 1997 Proxy Statement, File No.
1-8841)
*10(s) Summary of Non-Employee Director Compensation effective January 1, 2006 (filed as      x Exhibit 10(c) to Form 10-Q for the quarter ended September 30, 2005, File No.
1-8841)
*10(t) Form of Split Dollar Agreement between FPL Group and each of its                      x    x executive officers who elect to participate, including provisions relating to Certain Officers (as of February 25, 2005 all executive officers participate except Moray P. Dewhurst, and "Certain Officers" include Armando J. Olivera and Antonio Rodriguez (filed as Exhibit 10(s) to Form 10-K for the year ended December 31, 2004, File No. 1-8841) 96
 
Exhibit                                                                                        FPL Number                                            Description                                Group FPL
*10(u)  Form of Executive Retention Employment Agreement between                                x    x FPL Group and each of Lewis Hay, III, Armando J. Olivera and Antonio Rodriguez (filed as Exhibit 10(a) to Form 10-Q for the quarter ended June 30, 2002, File No. 1-8841)
*10(v)  Form of Executive Retention Employment Agreement between                                x    x FPL Group and each of Moray P. Dewhurst, John A. Stall and James L. Robo (filed as Exhibit 10(b) to Form 10-Q for the quarter ended June 30, 2002, File No. 1-8841)
*10(w)  Amendment to Executive Retention Employment Agreement between FPL Group                x    x and Armando J. Olivera, dated as of October 17, 2003 (filed as Exhibit 10(a) to Form 10-Q for the quarter ended September 30, 2003, File No. 1-8841)
*10(x)  Form of Executive Retention Employment Agreement between FPL Group                      x    x and each of Robert H. Escoto, Robert L. McGrath and Edward F. Tancer (filed as Exhibit 10(x) to Form 10-K for the year ended December 31, 2004, File No. 1-8841) 10(y)  Amendment dated as of December 18, 2005 to the Executive Retention Employment          x    x Agreement dated as of June 17, 2002 by and between FPL Group, Inc. and Lewis Hay, III 10(z)  Amendment dated as of December 18, 2005 to the Executive Retention Employment          x    x Agreement dated as of June 10, 2002 by and between FPL Group, Inc. and Moray P.
Dewhurst 10(aa)  Form of Amendment dated as of December 18, 2005 to the Executive Retention              x    x Employment Agreement between FPL Group, Inc. and each of Robert H. Escoto, Robert L.
McGrath, Armando J. Olivera, James L. Robo, Antonio Rodriguez, John A. Stall, and Edward F. Tancer
*10(bb)  Employment Agreement between FPL Group, Inc. and Lewis Hay, III dated                  x    x February 25, 2005 (filed as Exhibit 10(y) to Form 10-K for the year ended December 31, 2004, File No. 1-8841) 10(cc)  Amendment dated as of December 15, 2005 to the Employment Agreement dated as of        x    x February 25, 2005 between FPL Group, Inc. and Lewis Hay, III 10(dd)  Form of FPL Group, Inc. Amended and Restated Long-Term Incentive Plan                  x    x Deferred Stock Award Agreement 10(ee)  FPL Group, Inc. Employee Retention Bonus Plan                                          x    x 10(ff) Form of FPL Group, Inc. Employee Retention Bonus Plan Agreement                        x    x
*10(gg)  Guarantee Agreement between FPL Group and FPL Group Capital,                            x dated as of October 14, 1998 (filed as Exhibit 10(y) to Form 10-K for the year ended December 31, 2001, File No. 1-8841) 12(a)  Computation of Ratios                                                                  x 12(b)  Computation of Ratios                                                                        x 21    Subsidiaries of FPL Group, Inc.                                                        x 23    Consent of Independent Registered Public Accounting Firm                                x    x 31(a)  Rule 13a-14(a)/15d-14(a) Certification of Chief Executive Officer of FPL Group          x 31(b)  Rule 13a-14(a)/15d-14(a) Certification of Chief Financial Officer of FPL Group          x 31(c)  Rule 13a-14(a)/15d-14(a) Certification of Chief Executive Officer of FPL                    x 31(d)  Rule 13a-14(a)/15d-14(a) Certification of Chief Financial Officer of FPL                    x 97
 
Exhibit                                                                                                FPL Number                                                Description                                      Group  FPL 32(a)        Section 1350 Certification of FPL Group                                                  x 32(b)        Section 1350 Certification of FPL                                                              x
*Incorporated herein by reference FPL Group and FPL agree to furnish to the SEC upon request any instrument with respect to long-term debt that FPL Group and FPL have not filed as an exhibit pursuant to the exemption provided by Item 601(b)(4)(iii)(A) of Regulation S-K.
98
 
FPL GROUP, INC. SIGNATURES Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
FPL Group, Inc.
LEWIS HAY, III Lewis Hay, III Chairman of the Board, President, Chief Executive Officer and Director (Principal Executive Officer)
Date: February 22, 2006 Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities and on the date indicated.
Signature and Title as of February 23, 2006:
MORAY P. DEWHURST                                                                      K. MICHAEL DAVIS Moray P. Dewhurst                                                                      K. Michael Davis Vice President, Finance and                                                            Controller and Chief Accounting Officer Chief Financial Officer                                                                (Principal Accounting Officer)
(Principal Financial Officer)
Directors:
H. JESSE ARNELLE                                                                      RUDY E. SCHUPP H. Jesse Arnelle                                                                      Rudy E. Schupp SHERRY S. BARRAT                                                                      MICHAEL H. THAMAN Sherry S. Barrat                                                                      Michael H. Thaman ROBERT M. BEALL, II                                                                    HANSEL E. TOOKES, II Robert M. Beall, II                                                                    Hansel E. Tookes, II J. HYATT BROWN                                                                        PAUL R. TREGURTHA J. Hyatt Brown                                                                        Paul R. Tregurtha JAMES L. CAMAREN                                                                      FRANK G. ZARB James L. Camaren                                                                      Frank G. Zarb J. BRIAN FERGUSON J. Brian Ferguson 99
 
FLORIDA POWER & LIGHT COMPANY SIGNATURES Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
Florida Power & Light Company ARMANDO J. OLIVERA Armando J. Olivera President and Director Date: February 22, 2006 Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities and on the date indicated.
Signature and Title as of February 22, 2006:
LEWIS HAY, III Lewis Hay, III Chairman of the Board, Chief Executive Officer and Director (Principal Executive Officer)
MORAY P. DEWHURST Moray P. Dewhurst Senior Vice President, Finance and Chief Financial Officer and Director (Principal Financial Officer)
K. MICHAEL DAVIS K. Michael Davis Vice President, Accounting, Controller and Chief Accounting Officer (Principal Accounting Officer)
Directors:
ANTONIO RODRIGUEZ Antonio Rodriguez JOHN A. STALL John A. Stall EDWARD F. TANCER Edward F. Tancer 100
 
Enclosure 4 Application for Order and Conforming License Amendments to Transfer Facility Operating Licenses Resume of J. A. Stall JOHN A. STALL Senior Vice President, Nuclear Art Stall is Senior Vice President, Nuclear and Chief Nuclear Officer for Florida Power & Light Company. He reports to the chief executive officer and is responsible for all nuclear activities at Florida Power & Light Company and FPL Energy. Mr. Stall also is Senior Vice President, Nuclear and Chief Nuclear Officer for FPL Energy Seabrook, LLC, FPL Energy Duane Arnold, LLC, and FPL Energy Point Beach, LLC.
Mr. Stall joined FPL in May 1996 at the St. Lucie nuclear plant where he served as Site Vice President. He reported to the Nuclear Division President and oversaw the operation of the two nuclear units at the St. Lucie site located on Hutchinson Island, approximately 50 miles north of West Palm Beach.
Mr. Stall previously served as Station Manager for Virginia Power Company at the North Anna nuclear plant. He joined Virginia Power in 1977 and held various positions of increasing responsibility, including superintendent of operations, assistant station manager for safety and licensing, and superintendent of technical services. A career nuclear professional, Mr. Stall brings his extensive experience to FPL Groups nuclear power program and plays an important role in continued performance and efficiency improvements.
Mr. Stall earned his Bachelor of Science degree in nuclear engineering from the University of Florida in 1977, and achieved his Master of Business Administration from Virginia Commonwealth University in 1983. Mr. Stall held a senior reactor operator license while at Virginia Power Company.
 
Enclosure 5P Application for Order and Conforming License Amendments to Transfer Facility Operating Licenses Projected Income Statement for FPL Energy Point Beach, LLC (Proprietary - provided under separate cover)
Enclosure 5NP Projected Income Statement for FPL Energy Point Beach, LLC (Non-Proprietary)
 
FPL ENERGY POINT BEACH, LLC PROJECTED INCOME STATEMENT
($ THOUSANDS) 2008              2009            2010        2011 2012    Total (1)
Operating Revenue                                                                                              $          -
Operating Expense Operating and Maintenance Expense                                                                          $          -
Spent Fuel Expense                                                                                                    -
Nuclear Fuel Amortization                                                                                            -
Refueling Outage Amortization                                                                                        -
Administrative and General Expense                                                                                    -
Total                                                                                                  $          -
Operating Income                                                                                              $          -
Other Income/(Expense)
Decommissioning Fund Earnings                                                                              $          -
(2)
Decommissioning Accrual                                                                                              -
Total                                                                                                  $          -
EBITDA                                                                                                        $          -
Depreciation and Amortization                                                                                  $        -
Income/(Loss) Before Taxes                                                                                    $          -
Income Taxes                                                                                                  $          -
Net Income                                                                                                    $          -
(1)
Revenue projections based on power purchase agreement with Wisconsin Electric Power Company:                Average Capacity Factor Generation (GWh)
Effective Energy Price ($/MWh)
(2)
Estimated decommissioning expense based on SFAS 143, Accounting for Asset Retirement Obligations
 
Enclosure 6P Application for Order and Conforming License Amendments to Transfer Facility Operating Licenses FPL Energy Point Beach, LLC Projected Opening Balance Sheet (Proprietary - provided under separate cover)
Enclosure 6NP FPL Energy Point Beach, LLC Projected Opening Balance Sheet (Non-Proprietary)
 
FPL ENERGY POINT BEACH, LLC PROJECTED BALANCE SHEET AT AUGUST 31, 2007 (1)
($ THOUSANDS)
Current Assets                                                          Current Liabilities M&S Inventory                                                            Accounts Payable and Accrued Liabilites Other Current Assets                                                    Other Current Liabilities Fixed Assets                                                            Other Liabilities Land                                                                    Asset Retirement Obligation (2)
Plant and Equipment                                                      Pension/Post-Retirement Liability (3)
Nuclear Fuel Decommissioning Funds                                                    Owner's Equity Total Assets                                                            Total Liabilities and Owner's Equity (1)
Opening balance sheet assuming close of sale on August 31, 2007 (2)
Estimated Accounting for Asset Retirement Obligations in accordance with SFAS 143 (3)
Estimated Pension/Post-Retirement Obligations in accordance with SFAS 87 and 106
 
Enclosure 7 Application for Order and Conforming License Amendments to Transfer Facility Operating Licenses Form of Support Agreement between FPL Group Capital Inc.
and FPL Energy Point Beach, LLC
 
SUPPORT AGREEMENT BETWEEN FPL GROUP CAPITAL INC AND FPL ENERGY POINT BEACH, LLC THIS SUPPORT AGREEMENT, dated as of [____________,] 2007 between FPL Group Capital Inc, a Florida corporation (FPL), and FPL Energy Point Beach, LLC, a Wisconsin limited liability company (the Subsidiary).
W I T N E S S E T H:
WHEREAS, FPL is the indirect owner of 100% of the outstanding shares of the Subsidiary; and WHEREAS, the Subsidiary intends to purchase certain assets located at the Point Beach Nuclear Plant in Two Rivers, Wisconsin (the Facility) pursuant to an Asset Sale Agreement dated December 19, 2006, by and among FPL, the Subsidiary, and Wisconsin Electric Power Company; and WHEREAS, FPL and the Subsidiary desire to take certain actions to ensure the Subsidiarys ability to pay the expenses of operating the Facility, maintaining the Facility safely and protecting the public health and safety (the Operating Expenses), and to meet U.S. Nuclear Regulatory Commission (NRC) requirements during the operating life of the Facility (the NRC Requirements).
NOW, THEREFORE, in consideration of the mutual promises herein contained, the parties hereto agree as follows:
: 1. Availability of Funding. From time to time, upon request of the Subsidiary, FPL shall provide or cause to be provided to the Subsidiary such funds as the Subsidiary determines to be necessary to pay the Operating Expenses and meet the NRC Page 1 of 3
 
Requirements; provided, however, in no event shall the aggregate amount which FPL is obligated to provide under this Agreement exceed $70 million.
: 2. No Guarantee. This Support Agreement is not, and nothing herein contained, and no action taken pursuant hereto by FPL shall be construed as, or deemed to constitute, a direct or indirect guarantee by FPL to any person of the payment of the Operating Expenses or of any liability or obligation of any kind or character whatsoever of the Subsidiary or of any affiliate of the Subsidiary. This Agreement may, however, be relied upon by the NRC in determining the financial qualifications of the Subsidiary to hold an operating license for the Facility.
: 3. Waivers. FPL hereby waives any failure or delay on the part of the Subsidiary in asserting or enforcing any of its rights or in making any claims or demands hereunder.
: 4. Amendments and Termination. This Agreement may not be amended or modified at any time without thirty (30) days prior written notice to the NRC. This Agreement shall terminate at such time as FPL is no longer the direct or indirect owner of the Facility. This Agreement shall also terminate at such time as the Facility permanently ceases commercial operations.
: 5. Successors. This Agreement shall be binding upon the parties hereto and their respective successors and assigns.
: 6. Third Parties. Except as expressly provided in Section 4 with respect to the NRC, this Agreement is not intended for the benefit of any person other than the parties hereto, and shall not confer or be deemed to confer upon any other such person any benefits, rights or remedies hereunder.
Page 2 of 3
: 7. Governing Law. This Agreement shall be governed by the laws of the State of Florida without giving effect to any choice or conflict-of-law provision or rule (whether of Florida or any other jurisdiction) that would cause the application of the laws of any jurisdiction other than Florida.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed and delivered by their respective officers thereunto duly authorized as of the day and year first above written.
FPL GROUP CAPITAL INC By:
Name:________________________
 
==Title:==
FPL ENERGY POINT BEACH, LLC By:
Name:________________________
 
==Title:==
Page 3 of 3
 
Enclosure 8 Application for Order and Conforming License Amendments to Transfer Facility Operating Licenses Form of Post-Closing Decommissioning Trust Agreement
 
FPL ENERGY POINT BEACH, LLC QUALIFIED DECOMMISSIONING TRUST AGREEMENT FOR THE POINT BEACH NUCLEAR PLANT TABLE OF CONTENTS I. DEFINITIONS......................................................................................................................2 1.01 Definitions.....................................................................................................................2 II. TRUST PURPOSES, NAME AND ADMINISTRATIVE MATTERS...............................6 2.01 Trust Purposes...............................................................................................................6 2.02 Establishment of Trusts.................................................................................................6 2.03 Acceptance of Appointment .........................................................................................6 2.04 Name of Trusts..............................................................................................................6 2.05 Segregation of Trusts ....................................................................................................6 2.06 Designation of Trusts....................................................................................................6 2.07 Duties of Authorized Representatives ..........................................................................7 2.08 Alterations and Amendments........................................................................................7 2.09 No Authority to Conduct Business ...............................................................................8 2.10 No Transferability of Trusts..........................................................................................8 2.11 Use of Trusts .................................................................................................................8 III. CONTRIBUTIONS AND INCOME....................................................................................8 3.01 Initial Contribution........................................................................................................8 3.02 Additional Contributions ..............................................................................................8 3.03 Subsequent Adjustments...............................................................................................9 IV. DISTRIBUTIONS ................................................................................................................9 4.01 Payment of Decommissioning Costs ............................................................................9 4.02 Payment of Expenses of Administration.......................................................................9 4.03 Allocation of Income ..................................................................................................10 4.04 Fees. ............................................................................................................................10 4.05 Liquidation of Investments .........................................................................................10 4.06 NRC Notice.................................................................................................................10 V. TERMINATION.................................................................................................................11 5.01 Termination of Trusts in General................................................................................11 5.02 Termination of Trusts Upon Disqualification.............................................................11 5.03 Termination of Trusts on Sale of Plant .......................................................................11 5.04 Distribution of Trusts Upon Termination ...................................................................11 VI. TRUSTEES.........................................................................................................................11 6.01 Designation and Qualification of Successor Trustee(s)..............................................11 6.02 Exoneration from Bond...............................................................................................12 6.03 Resignation .................................................................................................................12 6.04 Transactions With Third Parties .................................................................................12 6.05 Accounts and Reports .................................................................................................13 6.06 Tax Returns and Other Reports...................................................................................13 6.07 Liability.......................................................................................................................14
-i-
 
VII. INVESTMENTS.................................................................................................................16 7.01 Appointment of Investment Manager(s).....................................................................16 7.02 Direction by Investment Manager(s) ..........................................................................17 7.03 Investment Restrictions. .............................................................................................18 7.04 Investment Direction...................................................................................................19 VIII.TRUSTEES GENERAL POWERS...................................................................................19 8.01 Extension of Obligations and Negotiation of Claims .................................................19 8.02 Investment of Trusts ...................................................................................................19 8.03 Registration of Securities............................................................................................20 8.04 Borrowing ...................................................................................................................20 8.05 Retention of Professional and Employee Services .....................................................21 8.06 Delegation of Ministerial Powers ...............................................................................21 8.07 Powers of Trustee to Continue Until Final Distribution.............................................21 8.08 Discretion in Exercise of Powers................................................................................21 8.09 Settlement of Authorized Transactions.......................................................................21 IX. MISCELLANEOUS ...........................................................................................................22 9.01 Headings .....................................................................................................................22 9.02 Particular Words .........................................................................................................22 9.03 Severability of Provisions ...........................................................................................22 9.04 Delivery of Notices Under Agreement .......................................................................22 9.05 Successors and Assigns...............................................................................................23 9.06 Governing Jurisdiction................................................................................................23 9.07 Accounting Year .........................................................................................................23 9.08 Counterparts................................................................................................................23 9.09 Guarantee ....................................................................................................................24 9.10 Representations ...........................................................................................................24 ATTACHMENT A - Form of Certificate for Disbursements ATTACHMENT B - Cross-Trading Information ATTACHMENT C - Customer Identification Program Notice
- ii -
 
QUALIFIED DECOMMISSIONING TRUST AGREEMENT This Agreement is entered into as of the ___ day of _________, 2007, by and between FPL Energy Point Beach, LLC, a limited liability company duly organized and existing under the laws of the State of Wisconsin and having its principal office at 700 Universe Blvd.,
Juno Beach, Florida (the Company), Mellon Bank, N.A., and Mellon Trust of Delaware, National Association, a wholly-owned subsidiary of Mellon Bank, N.A., as Trustee (the Trustee).
RECITALS OF THE COMPANY WHEREAS, pursuant to the Asset Sale Agreement by and between Wisconsin Electric Power Company (the Prior Owner), the Company and FPL Group Capital, Inc. dated as of December 19, 2006 (the ASA), the Company will acquire the Point Beach Nuclear Plant (the Plant) from the Prior Owner; and WHEREAS, the ASA provides that the Company shall establish a Post-Closing Decommissioning Trust Agreement pursuant to which assets of the Prior Owners decommissioning funds will be transferred at Closing; and WHEREAS, this Agreement shall constitute the Post-Closing Decommissioning Trust Agreement and shall receive the decommissioning funds transferred pursuant to the ASA; and WHEREAS, the Company is subject to regulation by the Nuclear Regulatory Commission (the NRC), which is an agency of the United States government created and existing pursuant to 42 U.S.C. § 5841; and WHEREAS, pursuant to section 468A of the Internal Revenue Code of 1986, as amended (the Code), as most recently amended by the Energy Policy Act of 2005, certain Federal income tax benefits are available to the Company by creating and contributing monies to qualified nuclear decommissioning reserve trusts associated with the Plant: and WHEREAS, the Prior Owner and Northern Trust Company have entered into that certain Amended and Restated Decommissioning Trust Agreement for the Plant dated December 19, 2003 (the Prior Agreement), pursuant to which, among other things, the Prior Owner established trusts for the exclusive purpose of providing for the radiological decommissioning of the Plant which trusts include qualified nuclear decommissioning reserve funds under Code section 468A (collectively the Prior Trusts);
WHEREAS, the Company will receive a transfer of funds from the Prior Trusts contained in the Prior Agreement and wishes to allocate these funds under this Agreement to the Point Beach Unit No. 1 Qualified Trust and the Point Beach Unit No. 2 Qualified Trust; WHEREAS, Mellon Trust of Delaware, National Association is a national banking association with trust powers; WHEREAS, Mellon Trust of Delaware, National Association is willing to serve as trustee to the Trust on the terms and conditions herein set forth; and NOW, THEREFORE, in consideration of the mutual promises herein contained, the parties hereby agree as follows:
The Company hereby agrees to deliver to the Trustee and the Trustee hereby agrees to receive contributions of monies to the Trusts beginning on the date first written above; and TO HAVE AND TO HOLD such assets; and TO INVEST AND REINVEST the assets of the Trusts as provided herein; and TO PAY OR DISTRIBUTE from the Trusts as provided herein; IN TRUST NEVERTHELESS, for the uses and purposes and upon the terms and conditions, as hereinafter set forth.
I. DEFINITIONS 1.01    Definitions. As used in this Qualified Trust Agreement, the following terms shall have the following meanings:
Agreement shall mean this Qualified Trust Agreement as the same may from time to time be amended, modified, or supplemented.
Authorized Representative shall mean the President, any Vice President, the Treasurer, or any Assistant Treasurer of the Companys indirect parent FPL Group, Inc.
Certificate shall mean a document properly completed and executed by an Authorized Representative and substantially in the form of Attachment A hereto.
Code shall mean the Internal Revenue Code of 1986, as the same may be amended from time to time.
Company shall mean FPL Energy Point Beach, LLC or its successor.
Contribution shall mean any contribution, cash or otherwise, made to either of the Trusts (including the initial transfer from the Prior Trusts).
Decommissioning Costs shall mean the expenses incurred in decommissioning the Plant.
Excess Contribution shall have the meaning set forth in Section 3.03 hereof.
Fair Market Value for any security held by the Trusts shall be determined as follows:
(a)    securities listed on the New York Stock Exchange, the American Stock Exchange or any other recognized U.S. exchange shall be valued at their last sale price on the exchange on which securities are principally traded on the valuation date (NYSE-Composite Transactions or AMEX-Composite Transactions prices to prevail on any security listed on either of these exchanges as well as on another exchange); and where no sale is reported for that date, the last quoted sale price shall be used; (b)    all other securities and assets shall be valued at their market values as fixed by the Trustees staff regularly engaged in such activities; provided, however, that at the request of the Trustee, an Investment Manager shall determine the value of any securities or other property held in an Investment Account managed by that Investment Manager and such determination shall be regarded as a direction binding upon the Trustee for purposes of the Fair Market Value of such securities.
Investment Account shall have the meaning set forth in Section 7.01 hereof.
Investment Manager(s) shall be designated from time to time by the Company and may be, to the extent permissible by applicable law: (i) an investment counselor(s) who is an employee(s) of the Company or its affiliated companies; or (ii) a fiduciary appointed in an Investment Manager Agreement(s).
Investment Manager Agreement(s) shall mean an agreement(s) between the Company and a fiduciary selected by the Company, which agreement(s) governs the management of the Investment Account(s).
NRC shall mean the Nuclear Regulatory Commission created and existing pursuant to 42 U.S.C. §5841.
Order shall mean any order relating to or including Decommissioning Costs of the Plant issued by the NRC.
Plant shall mean the Point Beach Nuclear Plant.
Point Beach Nuclear Plant consists of Point Beach Unit No. 1 and Point Beach Unit No. 2.
Point Beach Unit No. 1 shall mean Unit One of the Point Beach Nuclear Plant.
Point Beach Unit No. 1 Qualified Trust shall mean the Qualified Trust established by the Company for Point Beach Unit No. 1 and shall consist of Contributions designated by the Company for decommissioning Point Beach Unit No. 1 plus earnings on such Contributions, which contributions are specified in a Schedule of Ruling Amounts with respect to Point Beach Unit No. 1, less expenses and disbursements.
Point Beach Unit No.2 shall mean Unit Two of the Point Beach Nuclear Plant.
Point Beach Unit No. 2 Qualified Trust shall mean the Qualified Trust established by the Company for the Point Beach Unit No. 2 and shall consist of Contributions designated by the Company for decommissioning Point Beach Unit No. 1 plus earnings on such Contributions, which contributions are specified in a Schedule of Ruling Amounts with respect to Point Beach Unit No. 1, less expenses and disbursements.
Prior Trusts shall mean the qualified nuclear decommissioning reserve funds under Code section 468A established by the Prior Owner pursuant to the Prior Agreement.
Qualified Trusts shall mean the trusts established by the Company for Decommissioning Costs with respect to the Companys interests in the Plant, which trust satisfies the requirements of Code section 468A.
Schedule of Ruling Amounts shall have the meaning set forth in Code section 468A.
Service shall mean the Internal Revenue Service.
Successor Trustee shall mean any entity appointed as a successor to the Trustee pursuant to Section 6.01 hereof.
Trusts shall mean the Qualified Trusts established under the Agreement, collectively.
Trustee shall mean Mellon Trust of Delaware, National Association or any Successor Trustee.
II. TRUST PURPOSES, NAME AND ADMINISTRATIVE MATTERS 2.01    Trust Purposes. The exclusive purposes of the Trusts are to hold funds for the contemplated decommissioning of the Plant, to constitute Qualified Trusts for the Plant and to comply with any Order.
2.02    Establishment of Trusts. By execution of this Agreement, the Company:
(a)    establishes the Trusts, which shall consist of Contributions designated by the Company, plus earnings on such Contributions less expenses and disbursements; and (b)    appoints the Trustee as Trustee of the Trusts.
2.03    Acceptance of Appointment. Upon the terms and conditions herein set forth, the Trustee accepts the appointment as the Trustee of the Trusts. The Trustee shall receive any Contributions transferred to it by the Company and shall hold, manage, invest and administer such Contributions, plus earnings on such Contributions, in accordance with this Agreement.
2.04    Name of Trusts. The Contributions received by the Trustee from the Company plus earnings on such Contributions shall constitute the FPL Energy Point Beach, LLC Qualified Decommissioning Trusts for the Point Beach Nuclear Plant.
2.05    Segregation of Trusts. The Trusts shall be segregated by the Trustee as follows:
(a) Point Beach Unit No. 1 Qualified Trust; (b) Point Beach Unit No. 2 Qualified Trust; and The Trustee shall maintain such records as are necessary to maintain each Trust separately from each other Trust. The Trustee shall maintain any subaccounts within the Trusts as agreed to from time to time by the Trustee and the Company.
2.06    Designation of Trusts. Upon (i) the initial Contribution to the Trusts as specified in Section 3.01; (ii) any additional Contribution to the Trusts pursuant to Section 3.02; (iii) any adjustment to the Trusts pursuant to Section 3.04; or (iv) any withdrawal from the Trusts for Decommissioning Costs pursuant to Section 4.01 or for administrative costs pursuant to Section 4.02 the Company shall designate to the Trust(s) which is to be credited or debited by such Contribution, addition, adjustment, or withdrawal, and the Trustee shall credit or debit the Trust(s) in accordance with such designation.
2.07    Duties of Authorized Representatives. The Company has empowered the Authorized Representatives to act for the Company in all respects hereunder. The Authorized Representatives may act as a group or may designate one or more Authorized Representative(s) to perform the duties described in the foregoing sentence. The Company shall provide the Trustee with a written statement setting forth the names and specimen signatures of the Authorized Representatives. Until otherwise notified in writing by the Company, the Trustee may rely upon any written notice, instruction, direction, certificate or other communication reasonably believed by it to be genuine and to be signed or certified by any one or more Authorized Representatives, and the Trustee shall be under no duty to make any investigation or inquiry as to the truth or accuracy of any statement contained therein.
2.08    Alterations and Amendments. The Trustee and the Company understand and agree that modifications or amendments may be required to this Agreement from time to time to effectuate the purpose of the Trust and to comply with any Order, any changes in tax laws, regulations or rulings (whether published or private) of the Service and any similar state taxing authority, and any other changes in the laws applicable to the Company or the Plant. The Trustee and the Company may alter or amend this Agreement to the extent necessary or advisable to effectuate such purposes or to comply with such Order or changes. The Trustee and the Company also may alter or amend this Agreement to encompass decommissioning collections with respect to other nuclear power plants owned now or in the future by the Company. Any alteration or amendment to this Agreement must be in writing and signed by the Company and the Trustee. The Trustee shall have no duty to inquire or make any investigation as to whether any proposed amendment, modification or alteration is consistent with this section 2.08. Notwithstanding the foregoing, this Agreement shall not be amended so as to violate Code section 468A or the Treasury Regulations thereunder, as amended from time to time. All such amendments, modifications or alterations shall be approved by all required governmental agencies, including the NRC, if applicable, or shall be accompanied by an opinion of counsel provided by the Company that no such approval is required. The Trust may not be amended in any material respect without written notification to the Director, Office of Nuclear Reactor Regulation, or the Director, Office of Nuclear Material Safety and Safeguards, as applicable, at least 30 working days before the proposed effective date of the amendment or if written notice of objection is received from the Director, Office of Nuclear Reactor Regulation, or the Director, Office of Nuclear Material Safety and Safeguards, as applicable, within the notice period.
2.09  No Authority to Conduct Business. The purposes of the Trust are limited specifically to the matters set forth in Section 2.01 hereof, and there is no objective to carry on any business unrelated to the purposes of the Trust set forth in Section 2.01 hereof, or divide the gains therefrom.
2.10  No Transferability of Trust. The interest of the Company in the Trust is not transferable, whether voluntarily or involuntarily, by the Company unless such transfer is in compliance with Code section 468A and the Treasury Regulations thereunder, including Treasury Regulation section 1.468A-6, and such transfer does not disqualify the Trust under Code section 468A.
The interest of the Company in the Trust is not subject to the claims of creditors of the Company; provided, however, that any creditor of the Company as to which a Certificate has been properly completed and submitted to the Trustee may assert a claim directly against the Trust in an amount(s) not to exceed the amount(s) specified in such Certificate.
2.11  Use of Trust. The assets of the Trust shall be used only as authorized by Code section 468A and the Treasury Regulations thereunder, as amended from time to time.
III. CONTRIBUTIONS AND INCOME 3.01  Initial Contribution. Upon the establishment of the Trust on the date first written above, the Company shall cause to be delivered to the Trustee an initial Contribution which shall consist of all amounts previously held in the Prior Trusts with respect to the Companys interests in the Plant.
3.02  Additional Contributions. From time to time after the initial Contribution to the Trust and prior to the termination of the Trust, the Company may make, and the Trustee shall accept, additional Contributions to the Trust to satisfy the purposes of the Trust as set forth in Section 2.01.
3.03    Subsequent Adjustments. The Trustee and the Company understand and agree that the Contributions made by the Company to the Trust from time to time may exceed the amount permitted to be paid into the Trust pursuant to Code section 468A and any Treasury Regulations thereunder, based upon changes in estimates, subsequent developments or any other event or occurrence which could not reasonably have been foreseen by the Company at the time such Contribution was made (Excess Contribution). Upon receipt of a written statement from the Company setting forth the amount of an Excess Contribution and stating that such Excess Contribution should be transferred to or paid to any person or entity, including the Company, the Trustee shall transfer or pay such Excess Contribution, as the case may be, to the person or entity specified by the Company in the written statement. Such written statement shall affirm that the Company has either (i) obtained an opinion of legal counsel stating that such distribution will not lead to disqualification of the Trust from the application of Code section 468A and that such distribution will not constitute a violation of any Order; or (ii) determined that no such legal opinion is required.
The Trustee and the Company further understand and agree that a transfer of assets between the Trust and other persons or entities may be necessary to effectuate the purposes of the Trust.
IV. DISTRIBUTIONS 4.01    Payment of Decommissioning Costs Upon receipt of a Certificate, the Trustee shall make payments of Decommissioning Costs to any person (including the Company) for goods provided or labor or other services rendered in connection with the decommissioning of the Plant.
4.02    Payment of Expenses of Administration          Upon the direction of the Company, the Trustee shall make payments of all reasonable administrative costs (including taxes, reasonable out-of-pocket expenses and trustees fees as specified in the fee schedule referred to in Section 4.04 hereof) in connection with the operation of the Trust pursuant to this Agreement. All such administrative costs and incidental expenses which relate to the Trust shall be allocated among the Trust in accordance with generally accepted accounting principles and any applicable Treasury Regulations or rulings. The Trustee shall maintain such records as are necessary to reflect the proper allocation of costs and expenses in accordance with this Section 4.02.
4.03    Allocation of Income. Upon receipt of a written opinion of legal counsel of the Company or written instructions from the Company, the Trustee may pool, for investment purposes, the assets of the Trusts with one another. Any pooling arrangement undertaken pursuant to this Section 3.03 can be terminated at any time by the Trust. No Trust in a pooling arrangement may substitute for itself in such arrangement any person that is not a member of that pooling arrangement. Whether the assts of the Trusts are pooled, the Trustee shall allocate the income among such Trusts in accordance with generally accepted accounting principles and any applicable Treasury Regulations or rulings. The Trustee shall maintain such records as are necessary to reflect the proper allocation of income among the Trusts in accordance with this Section 4.03.
4.04    Fees. The Trustee shall receive as exclusive compensation for its services pursuant to this Agreement those amounts (including reasonable out-of-pocket expenses) specified in the fee schedule as may from time to time be agreed upon in writing by the Trustee and the Company.
4.05    Liquidation of Investments. At the direction of the Company or any Investment Manager, the Trustee shall sell or liquidate such investments of the Trust as may be requested or required in order to make any payment or distribution, and shall until disbursement, restore the proceeds to the Trust.
4.06    NRC Notice. Notwithstanding anything herein to the contrary, except for withdrawals being made under 10 C.F.R.§50.82(a)(8) or for payments of ordinary administrative costs (including taxes) and other incidental expenses of the Trusts (including legal, accounting, actuarial, and Trustee expenses) in connection with the operation of the Trust, no disbursements or payments from the Trust shall be made: (1) unless 30 working days prior written notice of such disbursement or payment has been made to the NRC by the Company or its designee; or (2) if the Trustee or the Company receives written notice of an objection from the NRCs Director of the Office of Nuclear Reactor Regulation or the Director of the Office of Nuclear Material Safety and Safeguards, as applicable.
V.      TERMINATION 5.01    Termination of Trusts in General. The Trusts established hereunder shall terminate upon the substantial completion (as defined in Treasury Regulations promulgated under Code section 468A) of the nuclear decommissioning of the unit to which the respective Qualified Trust relates.
5.02    Termination of Trusts Upon Disqualification.          Notwithstanding the provisions of Section 5.01 hereof, the applicable portion of the Trusts shall terminate upon its disqualification from the application of Code section 468A, whether pursuant to an administrative action on the part of the Service or the decision of any court of competent jurisdiction, but in no event earlier than the date on which all available appeals have been either fully prosecuted or abandoned.
5.03    Termination of Trusts on Sale of Plant. Notwithstanding the provisions of Section 5.01 hereof, and to the extent provided in Treasury Regulations promulgated under Code section 468A, the applicable portion of the Trusts shall terminate upon the Companys sale or other disposition of all or a portion of its ownership interests in the Plant.
5.04    Distribution of Trusts Upon Termination. Upon termination of all or a portion the Trusts, the Trustee shall assist the Investment Manager in liquidating assets of the Trusts (if so directed by the Company), and distributing the then-existing assets of the Trusts (either the liquidation proceeds or the Trust assets in-kind, including accrued, accumulated and undistributed net income) less final Trust administration expenses (including accrued taxes) to the Company; provided, however, that no such distribution shall be made unless the Trustee has received an opinion of legal counsel from the Company stating that the distribution does not violate Code section 468A, any Treasury Regulation promulgated thereunder, or any Order.
VI. TRUSTEES 6.01    Designation and Qualification of Successor Trustee(s).        At any time during the term of the Trusts, the Company shall have the right to remove the Trustee (at the Companys sole discretion) acting hereunder and appoint another qualified entity as a Successor Trustee upon thirty (30) days notice in writing to the Trustee, or upon such shorter notice as may be acceptable to the Trustee. In this event, the Company shall represent to the Trustee that the Successor Trustee is qualified to act as a trustee hereunder. In the event that the Trustee or any Successor Trustee shall: (a) become insolvent or admit in writing its insolvency; (b) be unable or admit in writing its inability to pay its debts as such debts mature; (c) make a general assignment for the benefit of creditors; (d) have an involuntary petition in bankruptcy filed against it; (e) commence a case under or otherwise seek to take advantage of any bankruptcy, reorganization, insolvency, readjustment of debt, dissolution or liquidation law, statute, or proceeding; or (f) resign, the Company shall appoint a Successor Trustee as soon as practicable.
In the event of any such removal or resignation, the Trustee or Successor Trustee shall have the right to have its accounts settled as provided in Section 6.05 hereof.
Any Successor Trustee shall qualify by a duly acknowledged acceptance of the Trusts, delivered to the Company. Upon acceptance of such appointment by the Successor Trustee, the Trustee shall assign, transfer and pay over to such Successor Trustee the assets then constituting the Trusts. Any Successor Trustee shall have all the rights, powers, duties and obligations herein granted to the Trustee.
6.02  Exoneration from Bond. No bond or other security shall be exacted or required of any Trustee or Successor Trustee appointed pursuant to this Agreement.
6.03  Resignation. The Trustee or any Successor Trustee hereof may resign and be relieved as Trustee at any time without prior application to or approval by or order of any court by a duly acknowledged instrument, which shall be delivered to the Company by the Trustee no less than sixty (60) days prior to the effective date of the Trustees resignation or upon such shorter notice as may be acceptable to the Company. If for any reason the Company cannot or does not act in the event of the resignation of the Trustee, the Trustee may apply to a court of competent jurisdiction for the appointment of a Successor Trustee.
6.04  Transactions With Third Parties. No person or organization dealing with the Trustee with respect to the Trusts shall be required to inquire into or to investigate its authority for entering into any transaction or to see to the application of the proceeds of any such transaction.
6.05    Accounts and Reports.      The Trustee shall keep accurate and detailed accounts of all investments, receipts and disbursements and other transactions hereunder as agreed to by the Company and the Trustee, and all accounts, books and records relating thereto shall be open to inspection and audit at all reasonable times by any person designated by the Company. The Trustee shall be entitled to reimbursement from the Trusts for any extraordinary expenses reasonably incurred in complying with such inspection and audit. Within 3 days following the close of each month, the Trustee shall file with the Company a written report setting forth all investments, receipts and disbursements and other transactions effected by it during the month and identifying all Contributions, purchases, sales or distributions and the cost or net proceeds of sale, and showing all cash, securities and other investments held at the end of such month and the cost and Fair Market Value of each item thereof. In addition, the Trustee shall consolidate the monthly reports each year into a certified annual report which shall be provided to the Company within 60 days following the end of the calendar year. All such accounts and reports shall be based on the accrual method of reporting income and expenses and shall show the portion of the assets applicable to each Trust and also identify all disbursements made to pay for expenses of administration of the Trusts.
All certified annual reports and supporting records maintained by the Trustee with respect to the Trusts shall be preserved for a period of seven years. Upon the expiration of this period, the Trustee shall have the right to destroy such reports after first notifying the Company in writing of its intention and transferring to the Company any reports requested by the Company.
6.06    Tax Returns and Other Reports. The Trustee shall prepare and timely file all Federal income tax returns or other reports (including estimated tax returns and information returns) as may be required from time to time with respect to the Trusts, and the Company agrees to provide the Trustee in a timely manner with any information within its possession, and to cause the Investment Manager(s) to provide the Trustee with any information in its possession, which is necessary to such filings.
The Trustee shall prepare and submit to the Company in a timely manner all information requested by the Company regarding the Trusts required to be included in Federal, state and local income tax returns or other reports (including estimated tax returns and information returns), if any.
Subject to the limitations contained in Section 8.05 hereof, the Trustee may employ independent certified public accountants or other tax counsel to prepare or review such returns and reports.
The Trustee agrees, as directed by the Company, to sign any tax returns or other reports where required by law to do so or arising out of the Trustees responsibilities hereunder, and to remit from the Trusts appropriate payments or deposits of Federal, state and local income or franchise taxes directly to the taxing agencies or authorized depositaries in a timely manner.
Notwithstanding Section 6.07 hereof, any interest or penalty charges assessed against the Trusts pursuant to Chapters 67 or 68 of the Code, or pursuant to any similar state or local tax provisions, as a result of the Trustees failure to comply with this Section 6.06 shall be borne by the Trustee and not the Trusts, to the extent permissible under the Code.
The Trustee agrees to notify the Company in writing within thirty days of its receipt of a notice of audit relating to the Trusts, but in no event later than fifteen days prior to the commencement of any audit of the Trusts Federal, state, or local tax returns, and to participate with the Company on behalf of the Trust(s) in such audits and related inquiries. The Trustee further agrees to provide the Company with any additional information in its possession regarding the Trusts which may be reasonably requested by the Company to be furnished in an audit of the Companys Federal, state, or local tax returns.
6.07  Liability. The Trustee shall not be liable for any acts, omissions or defaults of any agent (other than its officers and employees) appointed or selected with reasonable care or for any acts taken or not taken at the direction of or upon instructions of the Company or an Investment Manager. The Trustee shall be liable only for such Trustees own acts or omissions (and those of its officers and employees) occasioned by the willfulness or negligence of such Trustee (or that of its officers and employees). The Trustee shall not be liable for the use or application of any monies held in the Trusts when disbursed by the Trustee in accordance with this Agreement. The Trustee may rely upon the written opinion(s) of legal counsel to the Company with respect to any question(s) arising hereunder and shall not be liable for any action taken in good faith in accordance with the advice of such counsel.
Notwithstanding anything contained in this Agreement to the contrary, the Trustee may not authorize or carry out any sale, exchange or other transaction which would constitute an act of self-dealing within the meaning of Code section 4951, as such section is made applicable to the Trusts by Code section 468A(e)(5), any Treasury Regulations thereunder, and any applicable successor provision. If the Trustee engages in an act of self-dealing in violation of this Agreement, the Trustee (and not the Trusts) shall be liable for any tax imposed pursuant to Code section 4951 (or any applicable successor provision) as such section is made applicable to the Trusts or the Trustee.
The Trustee reserves the right not to comply with any written instructions of the Company or an Investment Manager, which the Trustee deems will constitute an act of self-dealing under Code section 4951, until the Company provides the Trustee with an opinion of the Companys legal counsel that the actions directed in such instructions do not constitute an act of self-dealing within the meaning of Code section 4951. The opinion of such counsel shall be full and complete authorization and protection in respect of any action taken in accordance with the written instructions of the Company or an Investment Manager and, notwithstanding anything contained in this Agreement to the contrary, the Trustee shall not be liable thereafter in following such instructions.
The Trustee shall not be responsible or liable for any losses or damages suffered by the Trusts arising as a result of the insolvency of any custodian, sub-trustee or sub-custodian, except to the extent the Trustee was negligent in its selection or continued retention of such entity. Settlements of transactions may be effected in trading and processing practices customary in the jurisdiction or market where the transaction occurs. The Company acknowledges that this may, in certain circumstances, require the delivery of cash or securities (or other property) without the concurrent receipt of securities (or other property) or cash and, in such circumstances, the Company shall have sole responsibility for non-receipt of payment (or late payment) by the counterparty. Under no circumstances shall the Trustee be liable for any consequential or special damages with respect to its role as Trustee.
The Company shall indemnify and hold harmless the Trustee from all claims, liabilities, losses, damages and expenses, including reasonable attorneys' fees and expenses, incurred by the Trustee in connection with this Agreement, except as a result of the Trustee's own acts or omissions (and those of its officers and employees) caused by the negligence or willful misconduct of the Trustee (or its officers or employees).
Notwithstanding anything in this Agreement to the contrary contained herein, the Trustee shall not be responsible or liable for its failure to perform under this Agreement or for any losses to the Trusts resulting from any event beyond the reasonable control of the Trustee, its agents or sub-custodians.
This Section 6.07 shall survive the termination of this Agreement.
VII. INVESTMENTS 7.01  Appointment of Investment Manager(s). The Company may appoint one or more Investment Managers (including one or more employee(s) of the Company or its affiliated companies) to the extent permissible by applicable law or regulations, to direct the investment of all or part of the Trusts. The Company also shall have the right to remove any such Investment Manager(s). Whenever such appointment is made, the Company shall provide written notice of such appointment to the Trustee, shall specify the portion of the Trusts with respect to which an Investment Manager has been designated, and shall instruct the Trustee to segregate into a separate investment account (Investment Account) those assets with respect to which that specific Investment Manager has been designated. Except as otherwise provided in Section 8.02 hereof, to the extent that the Company appoints an Investment Manager to direct the investment of an Investment Account, the Trustee shall be released and relieved of all investment duties, responsibilities and liabilities customarily or statutorily incident to a trustee with respect to the Investment Account, and as to such Investment Account, the Trustee shall act as custodian.
Any Investment Manager which is not an employee of the Company or its affiliated companies shall certify in writing to the Trustee that it is qualified to act in the capacity provided under an Investment Manager Agreement, shall accept its appointment as Investment Manager, shall certify the identity of the person or persons authorized to give instructions or directions to the Trustee on its behalf, including specimen signatures, and shall undertake to perform the duties imposed on it under an Investment Manager Agreement. The Trustee may rely upon all such certifications unless otherwise notified in writing by the Company or an Investment Manager, as the case may be.
7.02    Direction by Investment Manager(s). An Investment Manager shall have authority to manage and to direct the acquisition and disposition of the assets of the Trusts, or a portion thereof, as the case may be, and the Trustee shall exercise the powers set forth in Section 8.02 hereof only in the manner directed by the Company in writing, and shall not be under any obligation to invest or otherwise manage any assets in the Investment Account. The Trustee recognizes the authority of an Investment Manager to manage, invest and reinvest the assets of an Investment Account as provided in this Article VII, and the Trustee agrees to cooperate with any Investment Manager as deemed necessary to accomplish these tasks.              An Investment Manager shall have the power and authority, exercisable in its sole discretion at any time, and from time to time, to issue and place orders for the purchase or sale of portfolio securities directly with qualified brokers or dealers.      The Trustee, upon proper notification from an Investment Manager, shall settle the transaction in accordance with the appropriate trading authorizations. Written notification of the issuance of each such authorization shall be given promptly to the Trustee by an Investment Manager, or in the case where such Investment Manager is an employee(s) of the Company, by an Authorized Representative, and such Investment Manager shall cause the settlement of such transaction to be confirmed in writing to the Trustee, and to the Company by the broker or dealer. An Investment Manager may cause brokers and dealers to confirm trades to the Trustee through the Institutional Delivery System or equivalent system and the Trustee shall be entitled to rely upon such confirmations to settle purchases or sales of securities, provided that such confirmations are consistent with written trading instructions from an Investment Manager, or in the case where such Investment Manager is an employee(s) of the Company, by an Authorized Representative. Such notification, when consistent with written trading instructions from an Investment Manager or Authorized Representative, shall be proper authority for the Trustee to pay for portfolio securities purchased and to deliver portfolio securities sold in accordance with the customary and established procedures for such securities transactions. All directions to the Trustee by an Investment Manager shall be in writing and shall be signed by an Authorized Representative of the Company or by a person who has been certified by such Investment Manager pursuant to Section 7.01 hereof as authorized to give instructions or directions to the Trustee.
Should an Investment Manager at any time elect to place security transactions directly with a broker or dealer, the Trustee shall not recognize such transaction unless and until it has received instructions or confirmation of such fact from an Investment Manager. Should an Investment Manager direct the Trustee to utilize the services of any person with regard to the assets under its management or control, such instructions shall be in writing and shall specifically set forth the actions to be taken by the Trustee as to such services. In the event that an Investment Manager places security transactions directly or directs the utilization of a service, such Investment Manager shall be solely responsible for the acts of such persons. The sole duty of the Trustee as to such transactions shall be incident to its duties as custodian.
The authority of an Investment Manager and the terms and conditions of the appointment and retention of an Investment Manager(s) shall be the responsibility solely of the Company, and the Trustee shall not be deemed to be a party or to have any obligations under any agreement with an Investment Manager.          Any duty of supervision or review of the acts, omissions or overall performance of the Investment Manager(s), shall be the exclusive responsibility of the Company, and the Trustee shall have no duty to review any securities or other assets purchased by an Investment Manager, or to make suggestions to an Investment Manager or to the Company with respect to the exercise or non-exercise of any power by an Investment Manager.
7.03    Investment Restrictions. The person directing investment of the Trusts:
(a) Is prohibited from investing in securities or other obligations of the licensee or any other owner or operator of any nuclear power reactor or their affiliates, subsidiaries, successors or assigns, or in a mutual fund in which at least 50 percent of the fund is invested in the securities of a licensee or parent company whose subsidiary is an owner or operator of a foreign or domestic nuclear power plant. However, the funds may be invested in securities tied to market indices or other non-nuclear sector collective, commingled, or mutual funds, provided that this subsection shall not operate in such a way as to require the sale or transfer either in whole or in part, or other disposition of any such prohibited investment that was made before December 24, 2002, and provided further that no more than 10 percent of trusts assets may be indirectly invested in securities of any entity owning or operating one or more nuclear power plants.
(b) Is obligated at all times to adhere to a standard of care that a prudent investor would use in the same circumstances. The term "prudent investor" shall have the same meaning as set forth in the Federal Energy Regulatory Commission's "Regulations Governing Nuclear Plant Decommissioning Trusts Funds" at 18 CFR 35.32(a)(3), or any successor regulation.
7.04    Investment Direction. The Company, its affiliates, and its subsidiaries are prohibited from being engaged as investment manager for the Trusts or from giving day-to-day management direction of the Trusts' investments or direction on individual investments by the Trusts, except in the case of passive fund management of trust funds where management is limited to investments tracking market indices.
VIII. TRUSTEES GENERAL POWERS The Trustee shall have, with respect to the Trusts, the following powers, all of which powers are fiduciary powers to be exercised in a fiduciary capacity and in the best interests of the Trusts and the purposes hereof, namely:
8.01    Extension of Obligations and Negotiation of Claims. To renew or extend the time of payment of any obligation, secured or unsecured, payable to or by the Trusts, for as long a period or periods of time and on such terms as the Company shall determine, and to adjust, settle, compromise, and arbitrate claims or demands in favor of or against the Trusts, including claims for taxes, upon such terms as the Company shall determine, subject to the limitations contained in Section 6.07 hereof (regarding self-dealing).
8.02    Investment of Trusts. To the extent that the assets of the Trusts have not been invested by an Investment Manager on any given day, to invest such un-invested assets of the Trusts as the Company may direct in writing, subject to the limitations contained in Section 6.07 hereof (regarding self-dealing). No portion of the Trusts shall be invested in any direct interest in real property, leaseholds or mineral interests. The Trustee may settle transactions in futures and/or options contracts, short-selling programs, swaps and other derivatives investments with third parties and for foreign exchange or foreign exchange contracts, and may invest in any collective, common or pooled trust fund operated or maintained exclusively for the commingling and collective investment of monies or other assets including any such fund operated or maintained by the Trustee or its affiliates, as permitted by applicable law or regulations.
Notwithstanding the provisions of this Agreement which place restrictions upon the actions of the Trustee or an Investment Manager, to the extent monies or other assets are utilized to acquire units of any collective trust, the terms of the collective trust indenture shall solely govern the investment duties, responsibilities and powers of the trustee of such collective trust and, to the extent required by law, such terms, responsibilities and powers shall be incorporated herein by reference and shall be part of this Agreement. For purposes of valuation, the value of the interest maintained by the Trusts in such collective trust shall be the fair market value of the collective fund units held, determined in accordance with generally recognized valuation procedures. The Company expressly understands and agrees that any such collective fund may provide for the lending of its securities by the collective fund trustee and that such collective fund's trustee will receive compensation from such collective fund for the lending of securities that is separate from any compensation of the Trustee hereunder, or any compensation of the collective fund trustee for the management of such collective fund. The Trustee is authorized to invest in a collective fund which invests in Mellon Financial Corporation stock in accordance with the terms and conditions of the Department of Labor Prohibited Transaction Exemption 95-56 (the Exemption) granted to the Trustee and its affiliates and to use a cross-trading program in accordance with the Exemption. The Company acknowledges receipt of the notice entitled Cross-Trading Information, a copy of which is attached to this Agreement as Attachment B.
8.03    Registration of Securities. To hold any stocks, bonds, securities, and/or other property in the name of a nominee, in a street name, or by other title-holding device, without indication of trust; provided however, the Trustee shall not be liable for any losses resulting from the deposit or maintenance of securities or other property (in accordance with market practice, custom, or regulation) with any recognized foreign clearing facility, book-entry system, centralized custodial depository, or similar organization.
8.04    Borrowing. To borrow money in such amounts and upon such terms as the Company may authorize in writing as necessary to carry out the purposes of the Trusts, and to pledge any securities or other property for the repayment of any such loan as the Company may direct.
8.05    Retention of Professional and Employee Services. To employ attorneys, accountants, custodians, engineers, contractors, clerks, and agents, as reasonably necessary to carry out the purposes of the Trusts.
8.06    Delegation of Ministerial Powers.      To delegate to other persons such ministerial powers and duties as the Trustee may deem to be advisable.
8.07    Powers of Trustee to Continue Until Final Distribution. To exercise any of the powers described herein after the date on which the principal and income of the Trusts shall have become distributable and until such time as the entire principal of, and income from, the Trusts shall have been actually distributed by the Trustee. It is intended that distribution of each of the Trusts will occur as soon as possible upon termination of such Trust, subject, however, to the limitations contained in Article V hereof.
8.08    Discretion in Exercise of Powers. To do any and all other acts which the Trustee shall deem proper to effectuate the powers specifically conferred upon it by this Agreement: provided, however, that the Trustee may not do any act or participate in any transaction which the Trustee knew or should have known would:
(1)    Disqualify the Trusts from the application of section 468A (or any applicable successor provision) of the Code, except any disqualification (other than that arising from an act of self-dealing) resulting from the Trustee following written directions or instructions of the Company or an Investment Manager; or (2)    Contravene any provision of this Agreement.
8.09    Settlement of Authorized Transactions. The Trustee may take all action necessary to pay for, and settle, authorized transactions, including exercising the power to borrow or raise monies on an arms length basis from the Trustee in its corporate capacity or an affiliate. To secure expenses and advances made to settle or pay for authorized transactions, including payment for securities and disbursements, the Company grants to the Trustee a first priority security interest in the account, all property therein, all income, substitutions and proceeds, whether now owned or hereafter acquired (the Collateral); provided that the Company does not grant the Trustee a security interest in any securities issued by an affiliate of the Trustee (as defined in Section 23A of the Federal Reserve Act). The parties intend that as the securities intermediary with respect to the Collateral, the Trustees security interest shall automatically be perfected when it attaches. To the extent the Trustee advances funds to the Trust for disbursements or to effect the settlement of purchase transactions, the Trustee shall be entitled to collect from the Trusts reasonable charges established under the Trustees standard overdraft terms, conditions and procedures.
IX. MISCELLANEOUS 9.01    Headings. The section headings set forth in this Agreement and the Table of Contents are inserted for convenience of reference only and shall be disregarded in the construction or interpretation of any of the provisions of this Agreement.
9.02    Particular Words. Any word contained in the text of this Agreement shall be read as the singular or plural and as the masculine, feminine, or neuter as may be applicable or permissible in the particular context. Unless otherwise specifically stated, the word person shall be taken to mean and include an individual, partnership, association, trust, company, or corporation.
9.03    Severability of Provisions. If any provision of this Agreement or its application to any person or entity or in any circumstances shall be invalid and unenforceable, the application of such provision to persons and in circumstances other than those as to which it is invalid or unenforceable and the other provisions of this Agreement shall not be affected by such invalidity or unenforceability.
9.04    Delivery of Notices Under Agreement.        Any notice required by this Agreement to be given to the Company or the Trustee shall be deemed to have been properly given when mailed, postage prepaid, to the person to be notified as set forth below:
If to the Company by regular mail:
FPL ENERGY POINT BEACH, LLC 700 Universe Boulevard P.O. Box 14000 Juno Beach, Florida 33408-0420 Attention: Trust Fund Investments (FTF/JB)
If to the Company by express mail:
FPL ENERGY POINT BEACH, LLC 700 Universe Boulevard Juno Beach, Florida 33408-0420 Attention: Trust Fund Investments (FTF/JB)
If to the Trustee by regular or express mail:
Mellon Trust of Delaware, National Association 4005 Kennett Pike Greenville, DE 19807 Attention: ______________________
The Company or the Trustee may change the above address by delivering notice thereof in writing to the other party.
9.05    Successors and Assigns. Subject to the provisions of Sections 2.10, 5.01 and 6.01, this Agreement shall be binding upon and inure to the benefit of the Company, the Trustee and their respective successors and assigns.
9.06    Governing Jurisdiction.        All questions pertaining to the validity, construction, and administration of this Agreement shall be determined in accordance with the laws of the State of Delaware without regard to conflict of law provisions, to the extent not superseded by Federal law. The Company expressly reserves the right to unilaterally amend this Section 9.06.
9.07    Accounting Year. The Trusts shall operate on an accounting year which coincides with the calendar year, January 1 through December 31.
9.08    Counterparts. This Agreement may be executed in any number of counterparts, each of which shall be an original, with the same effect as if the signatures thereto and hereto were upon the same instrument.
9.09    Guarantee. Mellon Bank, N. A. hereby guarantees the prompt payment and performance by the Trustee of all liabilities and obligations of Trustee contained in this Agreement.
9.10    Representations. Each party represents and warrants to the other that it has full authority to enter into this Agreement upon the terms and conditions hereof and that the individual executing this Agreement on its behalf has the requisite authority to bind the Company or the Trustee to this Agreement. The Company has received and read the Customer Identification Program Notice, a copy of which is attached to this Agreement as Attachment C.
IN WITNESS WHEREOF, the Company and the Trustee have set their hands to this Agreement as of the day and year first above written.
FPL ENERGY POINT BEACH, LLC By:
Title Attest:
Title MELLON TRUST OF DELAWARE, NATIONAL ASSOCIATION By:
Title Attest:
Title Agreed to:
Mellon Bank, N.A.
By:
Title Attest:
Title DC 202042v3 ATTACHMENT A FORM OF CERTIFICATE FOR DISBURSEMENTS CERTIFICATE NO.
The undersigned Authorized Representative of FPL Energy Point Beach, LLC (the Company), being duly authorized and empowered to execute and deliver this Certificate, hereby certifies to the Trustee of the FPL Energy Point Beach, LLC Qualified Decommissioning Trusts for the Point Beach Nuclear Plant (the Trusts), established on
[insert date] (the Agreement), between Mellon Trust of Delaware, National Association, and the Company as follows:
(1)    Exhibit 1, attached hereto, sets forth the amounts either invoiced to, incurred by, or to be incurred by the Company or the Trusts that are/will be due and owing to each payee listed (Payees) for:
(a)      goods or services provided or to be provided in connection with decommissioning the Plant; (b)      administrative costs of the Trusts (excluding administrative costs arising from the Companys furnishing of goods, services, or facilities to the Trusts and excluding compensation which is excessive or unnecessary to carry out the purposes of the Trusts) as evidenced by the invoice(s),
contracts, or agreements attached hereto; (2)    all such amounts constitute Decommissioning Costs or administrative expenses as described in Sections 4.01 and 4.02 of the Agreement; (3)    all such amounts may be paid without causing the Qualified Trusts to become disqualified from the application of Code section 468A or any applicable successor provision; and (4)    all conditions precedent to the making of this withdrawal and disbursement set forth in any agreement between such Payees and the Company, if applicable, have been fulfilled or will be fulfilled by the payment date specified in Exhibit 1.
Accordingly, direction is hereby given that the Trustee provide for the withdrawal of $________ from the Point Beach [Unit 1] [Unit 2] Qualified Trust in order to permit payment of such sum to the Payees. You are further directed to disburse such sum, once withdrawn, directly to such Payees in the following manner:
[DESCRIBE: CHECK, WIRE TRANSFER, ETC.] on or before the date specified in Exhibit 1.
WITNESS my hand this _____day of __________, 20__.
FPL ENERGY POINT BEACH, LLC By:
Authorized Representative ATTACHMENT B CROSS-TRADING INFORMATION As part of the cross-trading program covered by the Exemption for the Trustee and its affiliates, the Trustee is to provide to the Trusts the following information:
I.      The existence of the cross-trading program The Trustee has developed and intends to utilize, wherever practicable, a cross-trading program for Indexed Accounts and Large Accounts as those terms are defined in the Exemption.
II. The triggering events creating cross-trading opportunities In accordance with the Exemption three triggering events may create opportunities for cross-trading transactions.          They are generally the following (see the Exemption for more information):
A change in the composition or weighting of the index by the independent organization creating and maintaining the index; A change in the overall level of investment in an Indexed Account as a result of investments and withdrawals on the accounts opening date, where the account is a bank collective fund, or on any relevant date for a non-bank collective fund; provided, however, that a change in an Indexed Account resulting from investments or withdrawals of assets of the Trustees own plans (other than the Trustees defined contribution plans under which participants may direct among various investment options, including Indexed Accounts) is excluded as a triggering event; or A recorded declaration by the Trustee that an accumulation of cash in an Indexed Account attributable to interest or dividends on, and/or tender offers for, portfolio securities equal to not more than 0.5% of the accounts total value has occurred.
III. The pricing mechanism utilized for securities purchased or sold Securities will be valued at the current market value for the securities on the date of the cross-trading transaction.
Equity securities - the current market value of the equity security will be the closing price on the day of trading as determined by an independent pricing service unless the security was added to or deleted from an index after the close of trading, in which case the price will be the opening price for that security on the next business day after the announcement of the addition or deletion.
Debt securities - the current market value of the debt security will be the price determined by the Trustee as of the close of the day of trading according to the Securities and Exchange Commissions Rule 17a-7(b)(4) under the Investment Company Act of 1940. Debt securities that are not reported securities or traded on an exchange will be valued based on an average of the highest current independent bids and the lowest current independent offers on the day of cross trading. The Trustee will make reasonable inquiry to obtain such prices from at least three independent sources from which that are brokers or market makers. If there are fewer than three independent sources to price a certain debt security, the closing price quotations will be obtained from all available sources.
IV. The allocation methods Direct cross-trading opportunities will be allocated among potential buyers or sellers of debt or equity securities on a prorata basis. With respect to equity securities, the Trustee imposes a trivial share constraint to reduce excessive custody ticket charges to participating accounts.
V. Other procedures implemented by the Trustee for its cross-trading practices The Trustee has developed certain internal operational procedures for cross-trading debt and equity securities. These procedures are available from the Trustee upon request.
ATTACHMENT C MELLON CUSTOMER IDENTIFICATION PROGRAM NOTICE IMPORTANT INFORMATION ABOUT PROCEDURES FOR OPENING A NEW ACCOUNT To help the government fight the funding of terrorism and money laundering activities, all financial institutions are required by law to obtain, verify and record information that identifies each individual or entity that opens an account.
What this means for you: When you open an account, we will ask you for your name, address, taxpayer or other government identification number and other information, such as date of birth for individuals that will allow us to identify you. We may also ask to see identification documents such as a drivers license, passport or documents showing existence of the entity.
Enclosure 9 Application for Order and Conforming License Amendments to Transfer Facility Operating Licenses Point Beach Nuclear Plant Estimated Decommissioning Funds Required By 10 CFR 50.75 (b) and (c)
 
==Reference:==
10 CFR 50.75 (c) (2)
(1)              (2)              (3)            (2)              (4)            (5)
Current Year    Current Year  Current Year      Escalation      Escalated Reactor                    MWt      1986 Base $    Adjusted "L" Adjusted "E" Adjusted "B"              Factor        Obligation Point Beach 1              1540    88,552,000          2.07            1.89        7.9340            3.34        295,560,010 Years Until Decommissioning                                                              10/5/2030      12/12/2006      23.83 NRC Real Rate of Return                                                                                                    2.0%
NRC Minimum for Point Beach Unit 1                                                                                      184,375,157 Point Beach 2              1540    88,552,000          2.07            1.89        7.9340            3.34        295,560,010 Years Until Decommissioning                                                                3/8/2033      12/12/2006      26.25 NRC Real Rate of Return                                                                                                    2.0%
NRC Minimum for Point Beach Unit 2                                                                                      175,731,627 TOTAL              360,106,784 (1)  1986 Base (000,000's) = (.0088 x MWt) + 75 (2)  Calculation of Adjusted Values                      (A)              (B)          (C)          (D) = (B)x(C)    (D) / (A)
Most Recent        Index 1986 Statistic  2006 Statistic  Adjustment      Adjusted 2006 Value            Value        Value        Statistic Value Adjusted Value Labor Statistic "L" - ecu13302i                  125.0          183.82        1.409              259.0          2.072 Burial "B" - NUREG 1307 Rev 11                    1.000          7.9340          N/A              7.934          7.934 Electric Power "P" - wpu0543                      114.2            171.2          N/A              171.2          1.50 Fuel Oil "F" - wpu0573                            82.0            198.9          N/A              198.9          2.43 (3)  E = .58P + .42F (4)  Escalation Factor = .65(Adjusted L) + .13(Adjusted E) + .22(Adjusted B)
(5)  Escalated Obligation = 1986 Base $
* Escalation Factor Estimated Decommissioning Funds Required By 10 CFR 50.75 (b) and (c)
Input Sheet L      ecu13302i                            183.8 (4thQtr 2005=100: indexed to 1989=54.4: reset in 1989$s=100/54.4x100)
P      wpu0543                              171.2 October 2006 - Preliminary F      wpu0573                              198.9 October 2006 - Preliminary B      NUREG 1307 Rev 11                    7.934}}

Latest revision as of 03:51, 15 January 2025

Application for Order and Conforming License Amendments to Transfer Facility Operating Licenses
ML070290206
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/26/2007
From: Koehl D, Kuester F, Rajiv Kundalkar
Florida Power & Light Energy Point Beach, Nuclear Management Co, Wisconsin Electric Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2007-0007
Download: ML070290206 (254)


Text