{{#Wiki_filter:ES-301 | {{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | ||
System / JPM Title Type Code* | |||
Function | Safety Function | ||
: a. ANO-2-JPM-NRC-CVCS2 | : a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S 1 | ||
: b. ANO-2-JPM-NRC-EOP01 | Reactivity | ||
026 A2.03 RO 3.2 SRO 3.7 | : b. ANO-2-JPM-NRC-EOP01 026 A2.03 RO 3.2 SRO 3.7 Secure Containment Spray System (inadvertent) | ||
: c. ANO-2-JPM-NRC-CREV01 | D/L/S (ESF) 5 Containment | ||
073 A3.01 RO- 2.9 SRO-3.1 | : c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO-2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentation | ||
: d. ANO-2-JPM-NRC-IA02 | : d. ANO-2-JPM-NRC-IA02 078 A3.01 RO 3.1 SRO 3.2 Perform actions required by low Instrument Air Header Pressure M/S 8 | ||
: e. ANO-2-JPM-NRC-MTG05 | Plant Service Systems | ||
: f. ANO-2-JPM-NRC-SIT01 | : e. ANO-2-JPM-NRC-MTG05 045 K3.01 RO 2.9 SRO 3.2 Synchronize MTG to grid with failure of speed./load control results in excess steam demand A/D/L/S 4 | ||
006 A2.03 RO-3.3 SRO-3.7 | RCS Heat Removal | ||
: g. ANO-2-JPM-NRC-LTOP | : f. ANO-2-JPM-NRC-SIT01 006 A2.03 RO-3.3 SRO-3.7 High pressure fill of Safety Injection Tank A/D/S 2 | ||
: h. ANO-2-JPM-NRC-ELEC001 | RCS Inventory | ||
062 A2.11 RO 3.7 SRO 4.1 | : g. ANO-2-JPM-NRC-LTOP 010 K4.03 RO 3.8 SRO 4.1 Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve alignment incorrect D/L/S/P 3 | ||
: i. ANO-2-JPM-NRC-AACGLS | Reactor Pressure Control | ||
064 A3.06 RO 3.3 SRO 3.4 | : h. ANO-2-JPM-NRC-ELEC001 062 A2.11 RO 3.7 SRO 4.1 Back feed a non-vital bus from a vital bus D/S 6 | ||
: j. ANO-2-JPM-NRC-FPEM1 | Electrical In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | ||
: k. ANO-2-JPM-NRC-LOF01 | : i. ANO-2-JPM-NRC-AACGLS 064 A3.06 RO 3.3 SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6 | ||
Electrical | |||
: j. ANO-2-JPM-NRC-FPEM1 033 A2.03 RO 3.1 SRO 3.5 Add Water from Loop I SW to SFP D/R 8 | |||
Plant Service Systems | |||
: k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4 | |||
RCS Heat Removal All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | |||
*Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) | |||
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 | |||
< 9 / < 8 / < 4 | |||
> 1 / > 1 / > 1 | |||
> 1 / > 1 / > 1 | |||
> 2 / > 2 / > 1 | |||
< 3 | |||
< 3 / < 2 (randomly selected) | |||
> 1 / > 1 / > 1 ES-301, Page 23 of 27 | |||
ES-301 | ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | ||
System / JPM Title Type Code* | |||
Function | Safety Function | ||
: a. ANO-2-JPM-NRC-CVCS2 | : a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S 1 | ||
: c. ANO-2-JPM-NRC-CREV01 | Reactivity | ||
073 A3.01 RO- 2.9 SRO-3.1 | : b. | ||
e. | : c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO-2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentation | ||
f. | : d. | ||
g. | : e. | ||
h. | : f. | ||
: g. | |||
: h. | |||
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | ||
: i. ANO-2-JPM-NRC-AACGLS | : i. ANO-2-JPM-NRC-AACGLS 064 A3.06 RO 3.3 SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6 | ||
064 A3.06 RO 3.3 SRO 3.4 | Electrical | ||
: j. ANO-2-JPM-NRC-FPEM1 | : j. ANO-2-JPM-NRC-FPEM1 033 A2.03 RO 3.1 SRO 3.5 Add Water from Loop I SW to SFP D/R 8 | ||
: k. ANO-2-JPM-NRC-LOF01 | Plant Service Systems | ||
: k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4 | |||
RCS Heat Removal All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | |||
*Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) | |||
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 | |||
< 9 / < 8 / < 4 | |||
> 1 / > 1 / > 1 | |||
> 1 / > 1 / > 1 | |||
> 2 / > 2 / > 1 | |||
< 3 | |||
< 3 / < 2 (randomly selected) | |||
> 1 / > 1 / > 1 ES-301, Page 23 of 27 | |||
ES-301 | ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | ||
System / JPM Title Type Code* | |||
Function | Safety Function | ||
: a. ANO-2-JPM-NRC-CVCS2 | : a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S 1 | ||
: b. ANO-2-JPM-NRC-EOP01 | Reactivity | ||
026 A2.03 RO 3.2 SRO 3.7 | : b. ANO-2-JPM-NRC-EOP01 026 A2.03 RO 3.2 SRO 3.7 Secure Containment Spray System (inadvertent) | ||
: c. ANO-2-JPM-NRC-CREV01 | D/L/S (ESF) 5 Containment | ||
073 A3.01 RO- 2.9 SRO-3.1 | : c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO-2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentation | ||
: d. ANO-2-JPM-NRC-IA02 | : d. ANO-2-JPM-NRC-IA02 078 AA2.06 RO 3.1 SRO 3.2 Perform actions required by low Instrument Air Header Pressure M/S 8 | ||
: e. ANO-2-JPM-NRC-MTG05 | Plant Service Systems | ||
: f. ANO-2-JPM-NRC-SIT01 | : e. ANO-2-JPM-NRC-MTG05 045 K3.01 RO 2.9 SRO 3.2 Synchronize MTG to grid with failure of speed./load control results in excess steam demand A/D/L/S 4 | ||
006 A2.03 RO-3.3 SRO-3.7 | RCS Heat Removal | ||
: g. ANO-2-JPM-NRC-LTOP | : f. ANO-2-JPM-NRC-SIT01 006 A2.03 RO-3.3 SRO-3.7 High pressure fill of Safety Injection Tank A/D/S 2 | ||
RCS Inventory | |||
: g. ANO-2-JPM-NRC-LTOP 010 K4.03 RO 3.8 SRO 4.1 Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve alignment incorrect D/L/S/P 3 | |||
Reactor Pressure Control | |||
: h. NA In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | : h. NA In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | ||
: i. ANO-2-JPM-NRC-AACGLS | : i. ANO-2-JPM-NRC-AACGLS 064 A3.06 RO 3.3 SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6 | ||
064 A3.06 RO 3.3 SRO 3.4 | Electrical | ||
: j. ANO-2-JPM-NRC-FPEM1 | : j. ANO-2-JPM-NRC-FPEM1 033 A2.03 RO 3.1 SRO 3.5 Add Water from Loop I SW to SFP D/R 8 | ||
: k. ANO-2-JPM-NRC-LOF01 | Plant Service Systems | ||
: k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4 | |||
RCS Heat Removal All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | |||
*Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) | |||
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 | |||
< 9 / < 8 / < 4 | |||
> 1 / > 1 / > 1 | |||
> 1 / > 1 / > 1 | |||
> 2 / > 2 / > 1 | |||
< 3 | |||
< 3 / < 2 (randomly selected) | |||
> 1 / > 1 / > 1 ES-301, Page 23 of 27}} | |||
Latest revision as of 17:47, 14 January 2025
| ML080700308 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 02/29/2008 |
| From: | Garchow S Operations Branch IV |
| To: | Entergy Operations |
| References | |
| 50-313/08-301, 50-368/08-301, ES-301-2 50-313/08-301, 50-368/08-301 | |
| Download: ML080700308 (3) | |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S 1
Reactivity
- b. ANO-2-JPM-NRC-EOP01 026 A2.03 RO 3.2 SRO 3.7 Secure Containment Spray System (inadvertent)
D/L/S (ESF) 5 Containment
- c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO-2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentation
- d. ANO-2-JPM-NRC-IA02 078 A3.01 RO 3.1 SRO 3.2 Perform actions required by low Instrument Air Header Pressure M/S 8
Plant Service Systems
- e. ANO-2-JPM-NRC-MTG05 045 K3.01 RO 2.9 SRO 3.2 Synchronize MTG to grid with failure of speed./load control results in excess steam demand A/D/L/S 4
RCS Heat Removal
- f. ANO-2-JPM-NRC-SIT01 006 A2.03 RO-3.3 SRO-3.7 High pressure fill of Safety Injection Tank A/D/S 2
RCS Inventory
- g. ANO-2-JPM-NRC-LTOP 010 K4.03 RO 3.8 SRO 4.1 Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve alignment incorrect D/L/S/P 3
Reactor Pressure Control
Electrical In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. ANO-2-JPM-NRC-AACGLS 064 A3.06 RO 3.3 SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6
Electrical
Plant Service Systems
- k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4
RCS Heat Removal All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3
< 9 / < 8 / < 4
> 1 / > 1 / > 1
> 1 / > 1 / > 1
> 2 / > 2 / > 1
< 3
< 3 / < 2 (randomly selected)
> 1 / > 1 / > 1 ES-301, Page 23 of 27
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S 1
Reactivity
- b.
- c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO-2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentation
- d.
- e.
- f.
- g.
- h.
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. ANO-2-JPM-NRC-AACGLS 064 A3.06 RO 3.3 SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6
Electrical
Plant Service Systems
- k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4
RCS Heat Removal All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3
< 9 / < 8 / < 4
> 1 / > 1 / > 1
> 1 / > 1 / > 1
> 2 / > 2 / > 1
< 3
< 3 / < 2 (randomly selected)
> 1 / > 1 / > 1 ES-301, Page 23 of 27
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S 1
Reactivity
- b. ANO-2-JPM-NRC-EOP01 026 A2.03 RO 3.2 SRO 3.7 Secure Containment Spray System (inadvertent)
D/L/S (ESF) 5 Containment
- c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO-2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentation
- d. ANO-2-JPM-NRC-IA02 078 AA2.06 RO 3.1 SRO 3.2 Perform actions required by low Instrument Air Header Pressure M/S 8
Plant Service Systems
- e. ANO-2-JPM-NRC-MTG05 045 K3.01 RO 2.9 SRO 3.2 Synchronize MTG to grid with failure of speed./load control results in excess steam demand A/D/L/S 4
RCS Heat Removal
- f. ANO-2-JPM-NRC-SIT01 006 A2.03 RO-3.3 SRO-3.7 High pressure fill of Safety Injection Tank A/D/S 2
RCS Inventory
- g. ANO-2-JPM-NRC-LTOP 010 K4.03 RO 3.8 SRO 4.1 Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve alignment incorrect D/L/S/P 3
Reactor Pressure Control
- h. NA In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. ANO-2-JPM-NRC-AACGLS 064 A3.06 RO 3.3 SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6
Electrical
Plant Service Systems
- k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4
RCS Heat Removal All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3
< 9 / < 8 / < 4
> 1 / > 1 / > 1
> 1 / > 1 / > 1
> 2 / > 2 / > 1
< 3
< 3 / < 2 (randomly selected)
> 1 / > 1 / > 1 ES-301, Page 23 of 27