ML080700308: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ES-301                                   Control Room/In-Plant Systems Outline                               Form ES-301-2 Facility: Arkansas Nuclear One -2                                                   Date of Examination: 2/25/2008 Exam Level: RO               SRO-I         SRO-U                                   Operating Test Number:     1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
{{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title                                         Type Code*
System / JPM Title Type Code*
Function
Safety Function
: a. ANO-2-JPM-NRC-CVCS2                                                                               A/D/L/S              1 004 A4.07 RO 3.9/SRO 3.7 Reactivity Perform Emergency Boration
: a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S 1
: b. ANO-2-JPM-NRC-EOP01 5
Reactivity
026 A2.03 RO 3.2 SRO 3.7                                                                       D/L/S (ESF)       Containment Secure Containment Spray System (inadvertent)
: b. ANO-2-JPM-NRC-EOP01 026 A2.03 RO 3.2 SRO 3.7 Secure Containment Spray System (inadvertent)
: c. ANO-2-JPM-NRC-CREV01 7
D/L/S (ESF) 5 Containment
073 A3.01 RO- 2.9 SRO-3.1                                                                     A/N/S (ESF)     Instrumentation Manually actuate control room ventilation
: c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO-2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentation
: d. ANO-2-JPM-NRC-IA02                                                                                                     8 078 A3.01 RO 3.1 SRO 3.2                                                                           M/S        Plant Service Perform actions required by low Instrument Air Header Pressure                                                     Systems
: d. ANO-2-JPM-NRC-IA02 078 A3.01 RO 3.1 SRO 3.2 Perform actions required by low Instrument Air Header Pressure M/S 8
: e. ANO-2-JPM-NRC-MTG05                                                                                                     4 045 K3.01 RO 2.9 SRO 3.2                                                                         A/D/L/S        RCS Heat Synchronize MTG to grid with failure of speed./load control results in excess steam demand                         Removal
Plant Service Systems
: f. ANO-2-JPM-NRC-SIT01 2
: e. ANO-2-JPM-NRC-MTG05 045 K3.01 RO 2.9 SRO 3.2 Synchronize MTG to grid with failure of speed./load control results in excess steam demand A/D/L/S 4
006 A2.03 RO-3.3 SRO-3.7                                                                           A/D/S       RCS Inventory High pressure fill of Safety Injection Tank
RCS Heat Removal
: g. ANO-2-JPM-NRC-LTOP                                                                                                     3 010 K4.03 RO 3.8 SRO 4.1                                                                                           Reactor Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve                 D/L/S/P         Pressure alignment incorrect                                                                                                Control
: f. ANO-2-JPM-NRC-SIT01 006 A2.03 RO-3.3 SRO-3.7 High pressure fill of Safety Injection Tank A/D/S 2
: h. ANO-2-JPM-NRC-ELEC001 6
RCS Inventory
062 A2.11 RO 3.7 SRO 4.1                                                                           D/S            Electrical Back feed a non-vital bus from a vital bus In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: g. ANO-2-JPM-NRC-LTOP 010 K4.03 RO 3.8 SRO 4.1 Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve alignment incorrect D/L/S/P 3
: i. ANO-2-JPM-NRC-AACGLS 6
Reactor Pressure Control
064 A3.06 RO 3.3 SRO 3.4                                                                         A/D/E/P        Electrical Local start of AAC diesel generator manually and locally
: h. ANO-2-JPM-NRC-ELEC001 062 A2.11 RO 3.7 SRO 4.1 Back feed a non-vital bus from a vital bus D/S 6
: j. ANO-2-JPM-NRC-FPEM1                                                                                                   8 033 A2.03 RO 3.1 SRO 3.5                                                                             D/R        Plant Service Add Water from Loop I SW to SFP                                                                                   Systems
Electrical In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: k. ANO-2-JPM-NRC-LOF01                                                                                                   4 CE E06 EA1.1 RO 4.0 SRO 3.9                                                                         D/L/E        RCS Heat Align Condensate pump for start during a loss of all Feed water event                                             Removal
: i. ANO-2-JPM-NRC-AACGLS 064 A3.06 RO 3.3 SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6
  @        All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
Electrical
                        *Type Codes                                             Criteria for RO / SRO-I / SRO-U (A)lternate path                                                                       4-6 /  4-6 / 2-3 (C)ontrol room (D)irect from bank                                                                     <9  /  <8    / <4 (E)mergency or abnormal in-plant                                                       >1  /  >1    / >1 (L)ow-Power / Shutdown                                                                 >1  /  >1    / >1 (N)ew or (M)odified from bank including 1(A)                                           >2 / >2   / >1 (P)revious 2 exams                                                                    <3     <3   / < 2 (randomly selected)
: j. ANO-2-JPM-NRC-FPEM1 033 A2.03 RO 3.1 SRO 3.5 Add Water from Loop I SW to SFP D/R 8
(R)CA                                                                                  >1 / >1   / >1 (S)imulator ES-301, Page 23 of 27
Plant Service Systems
: k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4
RCS Heat Removal All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.  
*Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3
< 9 / < 8 / < 4
> 1 / > 1 / > 1
> 1 / > 1 / > 1
> 2 / > 2 / > 1  
< 3  
< 3 / < 2 (randomly selected)  
> 1 / > 1 / > 1 ES-301, Page 23 of 27  


ES-301                               Control Room/In-Plant Systems Outline                           Form ES-301-2 Facility: Arkansas Nuclear One -2                                           Date of Examination: 2/25/2008 Exam Level: RO             SRO-I       SRO-U                               Operating Test Number:     1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title                                     Type Code*
System / JPM Title Type Code*
Function
Safety Function
: a. ANO-2-JPM-NRC-CVCS2                                                                         A/D/L/S              1 004 A4.07 RO 3.9/SRO 3.7 Reactivity Perform Emergency Boration b.
: a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S 1
: c. ANO-2-JPM-NRC-CREV01 7
Reactivity
073 A3.01 RO- 2.9 SRO-3.1                                                               A/N/S (ESF)     Instrumentation Manually actuate control room ventilation d.
: b.
e.
: c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO-2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentation
f.
: d.
g.
: e.
h.
: f.
: g.
: h.
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. ANO-2-JPM-NRC-AACGLS 6
: i. ANO-2-JPM-NRC-AACGLS 064 A3.06 RO 3.3 SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6
064 A3.06 RO 3.3 SRO 3.4                                                                   A/D/E/P        Electrical Local start of AAC diesel generator manually and locally
Electrical
: j. ANO-2-JPM-NRC-FPEM1                                                                                             8 033 A2.03 RO 3.1 SRO 3.5                                                                     D/R        Plant Service Add Water from Loop I SW to SFP                                                                             Systems
: j. ANO-2-JPM-NRC-FPEM1 033 A2.03 RO 3.1 SRO 3.5 Add Water from Loop I SW to SFP D/R 8
: k. ANO-2-JPM-NRC-LOF01                                                                                             4 CE E06 EA1.1 RO 4.0 SRO 3.9                                                                 D/L/E        RCS Heat Align Condensate pump for start during a loss of all Feed water event                                       Removal
Plant Service Systems
  @        All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
: k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4
                      *Type Codes                                         Criteria for RO / SRO-I / SRO-U (A)lternate path                                                               4-6 /  4-6 / 2-3 (C)ontrol room (D)irect from bank                                                             <9  /  <8    / <4 (E)mergency or abnormal in-plant                                               >1  /  >1    / >1 (L)ow-Power / Shutdown                                                         >1  /  >1    / >1 (N)ew or (M)odified from bank including 1(A)                                   >2 / >2   / >1 (P)revious 2 exams                                                              <3     <3   / < 2 (randomly selected)
RCS Heat Removal All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.  
(R)CA                                                                          >1 / >1   / >1 (S)imulator ES-301, Page 23 of 27
*Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3
< 9 / < 8 / < 4
> 1 / > 1 / > 1
> 1 / > 1 / > 1
> 2 / > 2 / > 1  
< 3  
< 3 / < 2 (randomly selected)  
> 1 / > 1 / > 1 ES-301, Page 23 of 27  


ES-301                                   Control Room/In-Plant Systems Outline                               Form ES-301-2 Facility: Arkansas Nuclear One -2                                                   Date of Examination: 2/25/2008 Exam Level: RO               SRO-I         SRO-U                                   Operating Test Number:     1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title                                         Type Code*
System / JPM Title Type Code*
Function
Safety Function
: a. ANO-2-JPM-NRC-CVCS2                                                                               A/D/L/S              1 004 A4.07 RO 3.9/SRO 3.7 Reactivity Perform Emergency Boration
: a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S 1
: b. ANO-2-JPM-NRC-EOP01 5
Reactivity
026 A2.03 RO 3.2 SRO 3.7                                                                       D/L/S (ESF)       Containment Secure Containment Spray System (inadvertent)
: b. ANO-2-JPM-NRC-EOP01 026 A2.03 RO 3.2 SRO 3.7 Secure Containment Spray System (inadvertent)
: c. ANO-2-JPM-NRC-CREV01 7
D/L/S (ESF) 5 Containment
073 A3.01 RO- 2.9 SRO-3.1                                                                     A/N/S (ESF)     Instrumentation Manually actuate control room ventilation
: c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO-2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentation
: d. ANO-2-JPM-NRC-IA02                                                                                                     8 078 AA2.06 RO 3.1 SRO 3.2                                                                           M/S        Plant Service Perform actions required by low Instrument Air Header Pressure                                                     Systems
: d. ANO-2-JPM-NRC-IA02 078 AA2.06 RO 3.1 SRO 3.2 Perform actions required by low Instrument Air Header Pressure M/S 8
: e. ANO-2-JPM-NRC-MTG05                                                                                                     4 045 K3.01 RO 2.9 SRO 3.2                                                                         A/D/L/S        RCS Heat Synchronize MTG to grid with failure of speed./load control results in excess steam demand                         Removal
Plant Service Systems
: f. ANO-2-JPM-NRC-SIT01 2
: e. ANO-2-JPM-NRC-MTG05 045 K3.01 RO 2.9 SRO 3.2 Synchronize MTG to grid with failure of speed./load control results in excess steam demand A/D/L/S 4
006 A2.03 RO-3.3 SRO-3.7                                                                           A/D/S       RCS Inventory High pressure fill of Safety Injection Tank
RCS Heat Removal
: g. ANO-2-JPM-NRC-LTOP                                                                                                     3 010 K4.03 RO 3.8 SRO 4.1                                                                                           Reactor Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve                 D/L/S/P         Pressure alignment incorrect                                                                                                Control
: f. ANO-2-JPM-NRC-SIT01 006 A2.03 RO-3.3 SRO-3.7 High pressure fill of Safety Injection Tank A/D/S 2
RCS Inventory
: g. ANO-2-JPM-NRC-LTOP 010 K4.03 RO 3.8 SRO 4.1 Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve alignment incorrect D/L/S/P 3
Reactor Pressure Control
: h. NA In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: h. NA In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. ANO-2-JPM-NRC-AACGLS 6
: i. ANO-2-JPM-NRC-AACGLS 064 A3.06 RO 3.3 SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6
064 A3.06 RO 3.3 SRO 3.4                                                                         A/D/E/P        Electrical Local start of AAC diesel generator manually and locally
Electrical
: j. ANO-2-JPM-NRC-FPEM1                                                                                                   8 033 A2.03 RO 3.1 SRO 3.5                                                                             D/R        Plant Service Add Water from Loop I SW to SFP                                                                                   Systems
: j. ANO-2-JPM-NRC-FPEM1 033 A2.03 RO 3.1 SRO 3.5 Add Water from Loop I SW to SFP D/R 8
: k. ANO-2-JPM-NRC-LOF01                                                                                                   4 CE E06 EA1.1 RO 4.0 SRO 3.9                                                                         D/L/E        RCS Heat Align Condensate pump for start during a loss of all Feed water event                                             Removal
Plant Service Systems
  @        All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
: k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4
                        *Type Codes                                             Criteria for RO / SRO-I / SRO-U (A)lternate path                                                                       4-6 /  4-6 / 2-3 (C)ontrol room (D)irect from bank                                                                     <9  /  <8    / <4 (E)mergency or abnormal in-plant                                                       >1  /  >1    / >1 (L)ow-Power / Shutdown                                                                 >1  /  >1    / >1 (N)ew or (M)odified from bank including 1(A)                                           >2 / >2   / >1 (P)revious 2 exams                                                                    <3     <3   / < 2 (randomly selected)
RCS Heat Removal All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.  
(R)CA                                                                                  >1 / >1   / >1 (S)imulator ES-301, Page 23 of 27}}
*Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3
< 9 / < 8 / < 4
> 1 / > 1 / > 1
> 1 / > 1 / > 1
> 2 / > 2 / > 1  
< 3  
< 3 / < 2 (randomly selected)  
> 1 / > 1 / > 1 ES-301, Page 23 of 27}}

Latest revision as of 17:47, 14 January 2025

2008-02-Final Operating Exam Outline
ML080700308
Person / Time
Site: Arkansas Nuclear  
Issue date: 02/29/2008
From: Garchow S
Operations Branch IV
To:
Entergy Operations
References
50-313/08-301, 50-368/08-301, ES-301-2 50-313/08-301, 50-368/08-301
Download: ML080700308 (3)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S 1

Reactivity

b. ANO-2-JPM-NRC-EOP01 026 A2.03 RO 3.2 SRO 3.7 Secure Containment Spray System (inadvertent)

D/L/S (ESF) 5 Containment

c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO-2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentation
d. ANO-2-JPM-NRC-IA02 078 A3.01 RO 3.1 SRO 3.2 Perform actions required by low Instrument Air Header Pressure M/S 8

Plant Service Systems

e. ANO-2-JPM-NRC-MTG05 045 K3.01 RO 2.9 SRO 3.2 Synchronize MTG to grid with failure of speed./load control results in excess steam demand A/D/L/S 4

RCS Heat Removal

f. ANO-2-JPM-NRC-SIT01 006 A2.03 RO-3.3 SRO-3.7 High pressure fill of Safety Injection Tank A/D/S 2

RCS Inventory

g. ANO-2-JPM-NRC-LTOP 010 K4.03 RO 3.8 SRO 4.1 Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve alignment incorrect D/L/S/P 3

Reactor Pressure Control

h. ANO-2-JPM-NRC-ELEC001 062 A2.11 RO 3.7 SRO 4.1 Back feed a non-vital bus from a vital bus D/S 6

Electrical In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. ANO-2-JPM-NRC-AACGLS 064 A3.06 RO 3.3 SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6

Electrical

j. ANO-2-JPM-NRC-FPEM1 033 A2.03 RO 3.1 SRO 3.5 Add Water from Loop I SW to SFP D/R 8

Plant Service Systems

k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4

RCS Heat Removal All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3

< 9 / < 8 / < 4

> 1 / > 1 / > 1

> 1 / > 1 / > 1

> 2 / > 2 / > 1

< 3

< 3 / < 2 (randomly selected)

> 1 / > 1 / > 1 ES-301, Page 23 of 27

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S 1

Reactivity

b.
c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO-2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentation
d.
e.
f.
g.
h.

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. ANO-2-JPM-NRC-AACGLS 064 A3.06 RO 3.3 SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6

Electrical

j. ANO-2-JPM-NRC-FPEM1 033 A2.03 RO 3.1 SRO 3.5 Add Water from Loop I SW to SFP D/R 8

Plant Service Systems

k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4

RCS Heat Removal All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3

< 9 / < 8 / < 4

> 1 / > 1 / > 1

> 1 / > 1 / > 1

> 2 / > 2 / > 1

< 3

< 3 / < 2 (randomly selected)

> 1 / > 1 / > 1 ES-301, Page 23 of 27

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S 1

Reactivity

b. ANO-2-JPM-NRC-EOP01 026 A2.03 RO 3.2 SRO 3.7 Secure Containment Spray System (inadvertent)

D/L/S (ESF) 5 Containment

c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO-2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentation
d. ANO-2-JPM-NRC-IA02 078 AA2.06 RO 3.1 SRO 3.2 Perform actions required by low Instrument Air Header Pressure M/S 8

Plant Service Systems

e. ANO-2-JPM-NRC-MTG05 045 K3.01 RO 2.9 SRO 3.2 Synchronize MTG to grid with failure of speed./load control results in excess steam demand A/D/L/S 4

RCS Heat Removal

f. ANO-2-JPM-NRC-SIT01 006 A2.03 RO-3.3 SRO-3.7 High pressure fill of Safety Injection Tank A/D/S 2

RCS Inventory

g. ANO-2-JPM-NRC-LTOP 010 K4.03 RO 3.8 SRO 4.1 Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve alignment incorrect D/L/S/P 3

Reactor Pressure Control

h. NA In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. ANO-2-JPM-NRC-AACGLS 064 A3.06 RO 3.3 SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6

Electrical

j. ANO-2-JPM-NRC-FPEM1 033 A2.03 RO 3.1 SRO 3.5 Add Water from Loop I SW to SFP D/R 8

Plant Service Systems

k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4

RCS Heat Removal All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3

< 9 / < 8 / < 4

> 1 / > 1 / > 1

> 1 / > 1 / > 1

> 2 / > 2 / > 1

< 3

< 3 / < 2 (randomly selected)

> 1 / > 1 / > 1 ES-301, Page 23 of 27