L-2010-242, Licensee Commitment Re Request for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:OCT 20 2010 L-2010-242 FPL. | {{#Wiki_filter:OCT 20 2010 L-2010-242 FPL. | ||
U. S, Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 RE: | 10 CFR 26.9 POWERING TODAY. | ||
10OCFR 26.205 EMPOWERING TOMORROW. | |||
U. S, Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 RE: | |||
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Licensee Commitment Regarding-Request for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue By letter L-2009-219 dated October 13, 2009, as supplemented by letters L-2010-045, dated March 9, 2010, and L-2010-161 dated September 2, 2010, Florida Power and Light Co. (FPL) requested an exemption from certain requirements of the Fitness for Duty Rule for Managing Fatigue. Specifically, the letters requested exemption from certain specified requirements of Part 26 during preparations for severe weather conditions (i.e., tropical storm or hurricane force winds) and the recovery from severe weather conditions. | |||
On October 15, 2010, the NRC requested FPL to commit to maintain certain information discussed in the referenced correspondence above, in site procedures. | On October 15, 2010, the NRC requested FPL to commit to maintain certain information discussed in the referenced correspondence above, in site procedures. | ||
The attachment to this letter documents the FPL commitment. | The attachment to this letter documents the FPL commitment. | ||
If there are any questions regarding this request, please contact Robert Tomonto at (305) 246-7327. | If there are any questions regarding this request, please contact Robert Tomonto at (305) 246-7327. | ||
Sincerely, Michael Kiley Site Vice-President Turkey Point Nuclear Plant Attachments cc: | Sincerely, Michael Kiley Site Vice-President Turkey Point Nuclear Plant Attachments cc: | ||
Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company | |||
Turkey Point Units 3 and 4 | Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2010-242 Attachment Page 1 of 1 Commitment Regarding Exemption Request from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue Commitment Expected Completion Date CAP AR No. | ||
The following information will be maintained in site procedures: | The following information will be maintained in site procedures: | ||
: 1. The conditions necessary to sequester site | : 1. The conditions necessary to sequester site personnel that are consistent with the conditions specified in the Turkey Point exemption request. | ||
2. | |||
: | Provisions for ensuring that personnel who are not performing duties are provided an opportunity as well as accommodations for restorative rest. | ||
: 1. Information already included in 0-ADM-1 16. | |||
: 3. The condition for departure from the | Upon approval of the Request for Exemption, 0-ADM-116 will be revised to reflect that the inclusion of the information is a commitment to the NRC. | ||
: 2. Information already included in 0-ADM-116. | |||
Upon approval of the Request for Exemption, 0-ADM-116 will be revised to reflect that the inclusion of the information is a commitment to the NRC. | |||
: 3. Upon approval of the Request for Exemption, 0-ADM-116 will be revised to incorporate this information and to reflect that the inclusion of the information is a commitment to the NRC. | |||
AR 574197 AR 574197 AR 574197 | |||
: 3. The condition for departure from the exemption is based on the Emergency Coordinator's determination that adequate staffing is available to meet the requirements of 10 CFR 26.205(c) and (d).}} | |||
Latest revision as of 01:42, 14 January 2025
| ML103060463 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/20/2010 |
| From: | Kiley M Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-2010-242 | |
| Download: ML103060463 (2) | |
Text
OCT 20 2010 L-2010-242 FPL.
10 CFR 26.9 POWERING TODAY.
10OCFR 26.205 EMPOWERING TOMORROW.
U. S, Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 RE:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Licensee Commitment Regarding-Request for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue By letter L-2009-219 dated October 13, 2009, as supplemented by letters L-2010-045, dated March 9, 2010, and L-2010-161 dated September 2, 2010, Florida Power and Light Co. (FPL) requested an exemption from certain requirements of the Fitness for Duty Rule for Managing Fatigue. Specifically, the letters requested exemption from certain specified requirements of Part 26 during preparations for severe weather conditions (i.e., tropical storm or hurricane force winds) and the recovery from severe weather conditions.
On October 15, 2010, the NRC requested FPL to commit to maintain certain information discussed in the referenced correspondence above, in site procedures.
The attachment to this letter documents the FPL commitment.
If there are any questions regarding this request, please contact Robert Tomonto at (305) 246-7327.
Sincerely, Michael Kiley Site Vice-President Turkey Point Nuclear Plant Attachments cc:
Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2010-242 Attachment Page 1 of 1 Commitment Regarding Exemption Request from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue Commitment Expected Completion Date CAP AR No.
The following information will be maintained in site procedures:
- 1. The conditions necessary to sequester site personnel that are consistent with the conditions specified in the Turkey Point exemption request.
2.
Provisions for ensuring that personnel who are not performing duties are provided an opportunity as well as accommodations for restorative rest.
- 1. Information already included in 0-ADM-1 16.
Upon approval of the Request for Exemption, 0-ADM-116 will be revised to reflect that the inclusion of the information is a commitment to the NRC.
- 2. Information already included in 0-ADM-116.
Upon approval of the Request for Exemption, 0-ADM-116 will be revised to reflect that the inclusion of the information is a commitment to the NRC.
- 3. Upon approval of the Request for Exemption, 0-ADM-116 will be revised to incorporate this information and to reflect that the inclusion of the information is a commitment to the NRC.
AR 574197574197AR 574197 AR 574197574197: 3. The condition for departure from the exemption is based on the Emergency Coordinator's determination that adequate staffing is available to meet the requirements of 10 CFR 26.205(c) and (d).