ML100360656
| ML100360656 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/16/2010 |
| From: | Jason Paige Plant Licensing Branch II |
| To: | Nazar M Florida Power & Light Co |
| Paige, Jason C, NRR/DORL,301-415-5888 | |
| References | |
| TAC ME2458, TAC ME2459 | |
| Download: ML100360656 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 16, 2010 Mr. Mano Nazar Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420 SUB..IECT:
TURKEY POINT UNITS 3 AND 4 - REQUEST FOR ADDITIONAL INFORMATION REGARDING EXEMPTION REQUEST FROM CERTAIN REQUIREMENTS OF 10 CFR PART 26 (TAC NOS. ME2458 AND ME2459)
Dear Mr. Nazar:
By letter dated October 13, 2009, Florida Power & Light Company (FPL), requested an exemption to permit Turkey Point, Units 3 and 4 to not meet the Title10 of the Code of Federal Regulations (CFR), Sections 26.205(c) and 26.205(d) work hour control requirements when defined conditions (tropical storm force winds and other conditions) are present prior to the declaration of a plant emergency. The request would have the effect of extending the applicability of the existing exemption from declared plant emergencies, 10 CFR 26.207(d).
The U.S. Nuclear Regulatory Commission staff has reviewed your submittal and finds that the additional information contained in the enclosed Request for Additional Information is needed before we can complete the review. This was discussed with members of the FPL staff and, on February 4, 2010, Mr. Bob Tomonto indicated that a response would be provided within 3 weeks of the date of this letter.
If you have any questions, please contact me at (301) 415-5888.
..cere>u...--
I ason C. Jai~e, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION PROPOSED EXEMPTION REQUEST FLORIDA POWER AND LIGHT COMPANY TURKEY POINT UNITS 3 AND 4 DOCKET NUMBERS 50-250 AND 50-251 By letter dated October 13, 2009, Florida Power & Light Company, requested an exemption to permit Turkey Point, Units 3 and 4 to not meet the Title10 of the Code of Federal Regulations, Sections 26.205(c) and 26.205(d) work hour control requirements when defined conditions (tropical storm force winds and other conditions) are present prior to the declaration of a plant emergency. To complete its review of the exemption request, the Nuclear Regulatory Commission staff requests the following additional information.
- 1.
The exemption requests states that, "Specifically, the letter requests exemption from certain specified requirements of Part 26 during preparations for severe weather conditions." Please indicate if the request is to include any period of time during the recovery phase, after the storm has passed.
- 2.
The supporting justification to the Turkey Point exemption request states that, "The hurricane staffing procedure provides specific guidance for crew staffing levels and for the process of sequestering storm crews." Does the hurricane staffing procedure or other site procedures define the conditions necessary to sequester site personnel?
Please provide that procedural reference and guidance.
Enclosure
February 16, 2010 Mr. Mano Nazar Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420
SUBJECT:
TURKEY POINT UNITS 3 AND 4 - REQUEST FOR ADDITIONAL INFORMATION REGARDING EXEMPTION REQUEST FROM CERTAIN REQUIREMENTS OF 10 CFR PART 26 (TAC NOS. ME2458 AND ME2459)
Dear Mr. Nazar:
By letter dated October 13,2009, Florida Power & Light Company (FPL), requested an exemption to permit Turkey Point, Units 3 and 4 to not meet the Title1 0 of the Code of Federal Regulations (CFR), Sections 26.205(c) and 26.205(d) work hour control requirements when defined conditions (tropical storm force winds and other conditions) are present prior to the declaration of a plant emergency. The request would have the effect of extending the applicability of the existing exemption from declared plant emergencies, 10 CFR 26.207(d).
The U.S. Nuclear Regulatory Commission staff has reviewed your submittal and finds that the additional information contained in the enclosed Request for Additional Information is needed before we can complete the review. This was discussed with members of the FPL staff and, on February 4, 2010, Mr. Bob Tomonto indicated that a response would be provided within 3 weeks of the date of this letter.
If you have any questions, please contact me at (301) 415-5888.
Sincerely, IRA!
Jason C. Paige, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket l\\Ios. 50-250 and 50-251
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsOgcRp RidsNrrDorlDpr LPL2-2 R/F RidsAcrsAcnw_MaiICTR Resource RidsNrrDirslhpb RidsNrrPMTurkey Point RidsRgn2MailCenter MBoggi, NRR RidsNrrLABClayton (Hard Copy)
RidsNrrDorlLpl2-2 ADAMS Accession Number: ML100360656
- via memo OFFICE LPL2-2/PE LPL2-2/LA IHPB/BC LPL2-2/BC(A)
NAME JPaiQe BClayton UShoop*
BMozafari DATE 2/12/2010 2/5/2010 01/25/2010 2/16/2010 OFFICIAL RECORD COpy