ML11242A067: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:. 0,   4. -                                                  ORIGINAL                                                 UNIT    d SONGS MAINTENANCE ORDER NO:               08021808000 111lIll 1111111            111ll 11111 11ii ilI l111111111111111111111            gýýX3&
{{#Wiki_filter:.
"AT'3GORY: 70 - Work In Progress IEP]E"TITIVI: MAINT. NO. - 30002002000                         INTERVAL    -  01      FREQUENCY - W tES:?ONSIBILE ORG:ELECTRICAL UNIT 2                                                               MAINTENANCE TYPE:     SV QLQUIPMENT ID: S21806EB007                                     RC:CB             CONST. CODE:N/A                     PRIORITY: DD
0,
;U SYSTEM: PKA                   ACCOUNTING DISTRIBUTION:0121 7221                                   QC WITNESS/HOLD REQD: N
: 4.
'UNC DESC: 125VDC STATION BATTERY 2D1
ORIGINAL SONGS MAINTENANCE ORDER NO:
,OCATION.           AREA: CB               ROOM: 306E     ELEVATION:       050 COLUMN: 18.5N1 IQUAL CLASS:2
08021808000 1111111 111lIll ilI l111111111111111111111 111ll 11111 11ii UNIT d
                                                ****    NOTE:     WORKLIST ATTACHED
gýýX3&
* JESCRIPTION:
"AT'3GORY: 70 -
WEEKLY 1E BATTERIES INSP.-                     UNI- 2 RCY-CRITIAL/TS/RCM/PMO/AR040201281-97 REMARKS:
Work In Progress IEP]E"TITIVI: MAINT.
NO.
30002002000 tES:?ONSIBILE ORG:ELECTRICAL UNIT 2 INTERVAL 01 FREQUENCY -
W MAINTENANCE TYPE:
SV QLQUIPMENT ID: S21806EB007 RC:CB CONST.
CODE:N/A
;U SYSTEM:
PKA ACCOUNTING DISTRIBUTION:0121 7221
'UNC DESC:
125VDC STATION BATTERY 2D1
,OCATION.
AREA:
CB ROOM:
306E ELEVATION:
050 COLUMN:
18.5N1 PRIORITY: DD QC WITNESS/HOLD REQD:
N IQUAL CLASS:2 NOTE:
WORKLIST ATTACHED JESCRIPTION:
WEEKLY 1E BATTERIES INSP.-
UNI-2 RCY-CRITIAL/TS/RCM/PMO/AR040201281-97 REMARKS:
New Add BJOX.
New Add BJOX.
REQUESTOGR DATA:
REQUESTOGR DATA:
CREW CODE:                       EWO                                           DCP:                         ENVIRN QUAL:   N PROJECT CODE:                                                                                                         SEIS: 1 REQUESTING DEPT:                 EL2                                                 [b)-
CREW CODE:
REQUESTOR NAME!:               (b)(6)                                         PAX:
EWO DCP:
REQUIR*EKNTS:                                                                                       FIRE PROT. ADMIN. REQD?   Y WORK AUTH REQD?                   N                                                                       SECURITY REQD?     N WORK AUTH TYPE?                   N                                                                           SSR REQD?
ENVIRN QUAL:
ASME CODE WORK?                   N   NO. NIA                                                       ENGINEERING REQD?     N HO TO DISP NCR?                   N   NO. N/A                                                       FME REQUIREMENTS?     N TEMPORARY MOD.?                   N   NO. N/A                                                     R.E.P. EVAL. REQD?     N CREACUS BREACH?     N FCN REQ0?                             NO:
N PROJECT CODE:
ECP REQD?                             NO.
SEIS:
1 REQUESTING DEPT:
EL2
[b)-
REQUESTOR NAME!:
(b)(6)
PAX:
REQUIR*EKNTS:
FIRE PROT.
ADMIN.
REQD?
Y WORK AUTH REQD?
N SECURITY REQD?
N WORK AUTH TYPE?
N SSR REQD?
ASME CODE WORK?
N NO.
NIA ENGINEERING REQD?
N HO TO DISP NCR?
N NO.
N/A FME REQUIREMENTS?
N TEMPORARY MOD.?
N NO.
N/A R.E.P.
EVAL.
REQD?
N CREACUS BREACH?
N FCN REQ0?
NO:
ECP REQD?
NO.
SCHEDULING:
SCHEDULING:
W-*         1(6ý1
R.M.
                                                                                                                                  ý(6)
DUE DATE FITTS:
R.M. DUE DATE                          2/26/2008     00:00 FITTS: DUE DATE                        2/26/2008     07 :00      VIOLATION DATE        2/28/2008   01:00          z SCHEDULED START DATE                    2/26/2008     00:30 SCHEDULED COMP DATE                     2/27/2008     18:00 MO OBJECTIV'E:
DUE DATE SCHEDULED START DATE SCHEDULED COMP DATE W-*
Per   ~orm   wE~ekly inspection of 1E batterys.
1(6ý1
08021 808-0 PCOR QUALITY DOCUMENT l..bi BEST AVAILABLE COPY ...........
ý(6) z 2/26/2008 2/26/2008 2/26/2008 2/27/2008 00:00 07 :00 00:30 18:00 VIOLATION DATE 2/28/2008 01:00 MO OBJECTIV'E:
SIGNE__---OU_-A"                               'T DOCUMEIW 0C""NATOR               DATE     r?)       Page 1 07       &F
Per ~orm wE~ekly inspection of 1E batterys.
08021 808-0 PCOR QUALITY DOCUMENT BEST AVAILABLE COPY l..bi SIGNE__---OU_-A"  
'T DOCUMEIW 0C""NATOR DATE r?)
Page 1 07 & F


I             -
I (WORK PLAN DETAIL CONTINUED)
(WORK PLAN DETAIL CONTINUED)
WITH THE EXCEPTION OF SECTION 6.9, ON ALL WORK LISTED COMPONENTS.
WITH THE EXCEPTION OF SECTION 6.9,               ON ALL WORK LISTED COMPONENTS.
: 2.
: 2. VISUALLY INSPECT THE GENERAL APPEARANCE AND CLEANLINESS OF EACH BATTERY AND BAITERY AREA AS FOLLOWS:
VISUALLY INSPECT THE GENERAL APPEARANCE AND CLEANLINESS OF EACH BATTERY AND BAITERY AREA AS FOLLOWS:
A. AS NECESSARY, WIPE THE CbLL JARS, BATTERY RACKS, AND FLOOR WITH A SOLJTION OF BICARBONATE SODA AND COLD, DISTILLED OR DI WATER.
A.
B. WIPE AGAIN USING CLEAN DISTILLED OR DI WATER.
AS NECESSARY, WIPE THE CbLL JARS, BATTERY RACKS, AND FLOOR WITH A SOLJTION OF BICARBONATE SODA AND COLD, DISTILLED OR DI WATER.
C. VEREFY NON-ESSENTIAL EQUIPMENT AND DEBRIS HAS BEEN REMOVED FROM EACi BATTERY ROOM.
B.
?LANNING APPROVALS:
WIPE AGAIN USING CLEAN DISTILLED OR DI WATER.
BY                            DATE          TIME FIRE       PROTECTION REVIEW                                         02/12/96       14:14:00 WORK      PLANNED                                                  02/12/96      14:13:59 WORN PLANNED REVIEW                                                  02/12/96      14:26:45 WORK      SCHEDULED                                                02/20/08      07 :54 : 52 PROCEDURE LIST:
C.
PROCEDURE        ID                 REV TCN I   - SO123-I-2.2                       007 002 Desc:         125 VDC PILOT   CELL BATTERY INSPECTION CRAFT INFORMAT ION:
VEREFY NON-ESSENTIAL EQUIPMENT AND DEBRIS HAS BEEN REMOVED FROM EACi BATTERY ROOM.
CRAFT CODE             CRAFT DESCRIPTION                           QTY   ESTIMATED HOURS         ACTUAL HOURS 1    -  EL              ELECTRICIAN                                  2.0                 6.0           _
?LANNING APPROVALS:
2    - SP              FIRST LINE SUPERVISOR                        1.0                 2.0 WORK DONE:
FIRE PROTECTION REVIEW WORK PLANNED WORN PLANNED REVIEW WORK SCHEDULED PROCEDURE LIST:
Work Started:                 Date           /  7- & / 0         Time - 0 7       -,3
BY DATE 02/12/96 02/12/96 02/12/96 02/20/08 TIME 14:14:00 14:13:59 14:26:45 07 :54 : 52 PROCEDURE ID REV TCN I
_____                      1 -1     1     Plu 6C-c1eo             IgdvP-/ 6V)
SO123-I-2.2 007 002 Desc:
C,~'            G A'-rr~.t6-   A-0802i 808-0 Paqe 5
125 VDC PILOT CELL BATTERY INSPECTION CRAFT INFORMAT ION:
CRAFT CODE CRAFT DESCRIPTION 1
EL ELECTRICIAN 2
SP FIRST LINE SUPERVISOR WORK DONE:
QTY ESTIMATED HOURS ACTUAL HOURS 2.0 6.0 1.0 2.0 Work Started:
Date 7- &  
/
/ 0 Time -
0 7  
-,3 1 1 1
Plu 6C-c1eo C,~'
I gdvP-/ 6V)
G A'-rr~.t6-A-
0802i 808-0 Paqe 5


0 -
0 (WORK DONE CONTINUED)
(WORK   DONE CONTINUED)
Z6~~-/?$v24 (b)(6)__
Z6~~-/?$v24 (b)(6)__                     _ _ _ _ _ _ _ _ _ _
08021808-0 Page 6
08021808-0 Page 6


    *
4 NUCLEAR ORGANIZATION UNITS 1,2 AND 3 MAINTENANCE PROCEDURE REVISION 7 S0123-1-2.2 PAGE 2 OF 47 TCN 7-2 1.0 OBJECTIVES 1.1 T-his procedure provides guidance for performing the Weekly 125 volt Battery Bank and Charger operability verification checks.
* 4 NUCLEAR ORGANIZATION                                     MAINTENANCE PROCEDURE                 S0123-1-2.2 UNITS 1,2 AND 3                                          REVISION 7                            PAGE 2 OF 47 TCN 7-2 1.0     OBJECTIVES 1.1       T-his procedure provides guidance for performing the Weekly 125 volt Battery Bank and Charger operability verification checks.
1.2 This procedure satisfies the surveillance requirements specified in the Unit 2 and Unit 3 Technical Specifications, LCO - SR, Sections 3.8.4.1, 3.8.5.1, 3.8.6.1, and Table 3.8.6-1 Category "A" Limits.
1.2     This procedure satisfies the surveillance requirements specified in the Unit 2 and Unit 3 Technical Specifications, LCO - SR, Sections 3.8.4.1, 3.8.5.1, 3.8.6.1, and Table 3.8.6-1 Category "A" Limits.
1.3 This procedure performed at least monthly, satisfies the requirements stated in IEEE Std. 450-1980.
1.3     This procedure performed at least monthly, satisfies the requirements stated in IEEE Std. 450-1980.
1.4 This procedure Is applicable to the 125 VDC Station Battery Banks.
1.4     This procedure Is applicable to the 125 VDC Station Battery Banks.


==2.0       REFERENCES==
==2.0 REFERENCES==
 
2.1 Refer to Attachment 1 for the Procedure Resource List.
2.1       Refer to Attachment 1 for the Procedure Resource List.
3.0 PREREQUISITES 3.1 Before starting work, the user SHALL verify this procedure is current by referring to NDMS or one of the other methods listed in S0123-1-1.3.
3.0       PREREQUISITES 3.1       Before starting work, the user SHALL verify this procedure is current by referring to NDMS or one of the other methods listed in S0123-1-1 .3.
3.2 Enter the following data:
3.2       Enter the following data:
MOA#
MOA# 1   ~c7 t %OS 00                 IUni tI         Equip Id: Is 2180("e-6       00 3.3     This procedure MAY be performed while Equalize Charging the Battery Bank unless one of the conditions listed in Section 3.4 is true.
1  
~c7 t % OS 00 IUni tI Equip Id: Is 2180("e-6 0 0 3.3 This procedure MAY be performed while Equalize Charging the Battery Bank unless one of the conditions listed in Section 3.4 is true.
08021808-0
08021808-0


NUCL1--AR ORGANIZATION                                 MAINTENANCE PROCEDURE             S0123-1-2.2 UNITS 1, 2 AND 3                                        REVISION 7                        PAGE 7 OF 47 TCN 7-2 NOTE:     When taking Battery Bank Terminal Voltage, use a Fluke 187
NUCL1--AR ORGANIZATION UNITS 1, 2 AND 3 MAINTENANCE PROCEDURE REVISION 7 S0123-1-2.2 PAGE 7 OF 47 TCN 7-2 NOTE:
When taking Battery Bank Terminal Voltage, use a Fluke 187
( equivalent or better) set on the 500V range. It necessary, reference Design Calc' E4C-O 17.
( equivalent or better) set on the 500V range. It necessary, reference Design Calc' E4C-O 17.
6.2   Battery Bank Voltage TIS RUIEMENT 63.2.1       Measure Battery Bank Terminal voltage, Record readings below.
6.2 Battery Bank Voltage TIS RUIEMENT 63.2.1 Measure Battery Bank Terminal voltage, Record readings below.
SACCEPTANCE CRITERIA All 125 VDC Battery Banks: [!       129.17   VDC 131.40       Voc SAT         Go to Step 6.2.2. UNSAT     Perfons Cb)Forrect Actions as Follows.             IN,(6F
SACCEPTANCE CRITERIA All 125 VDC Battery Banks: [!
              .1   Immediately notify your Supervisor of the "UNSAT"condition.                       ACPL
129.17 VDC 131.40 Voc SAT Go to Step 6.2.2.
              .2   This Supervisor SHALL report a failed Surveillance according to Procedure SO 123-1-1.3.                                                           CHK CPL
UNSAT Perfons Cb)Forrect Actions as Follows.
              .3   Notify the Engineer, and generate an AR.                                       ) CHK CPL 08021808-0
IN,(6F
* 4Em
.1 Immediately notify your Supervisor of the "UNSAT"condition.
                                                            /I.)}}
ACPL
.2 This Supervisor SHALL report a failed Surveillance according to Procedure SO 123-1-1.3.
CHK CPL
.3 Notify the Engineer, and generate an AR.  
)
CHK CPL 08021808-0 4Em
/I.)}}

Latest revision as of 02:18, 13 January 2025

Maintenance Order No. 08021808000
ML11242A067
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/26/2008
From:
- No Known Affiliation
To:
Office of Information Services
References
FOIA/PA-2011-0157
Download: ML11242A067 (5)


Text

.

0,

4.

ORIGINAL SONGS MAINTENANCE ORDER NO:

08021808000 1111111 111lIll ilI l111111111111111111111 111ll 11111 11ii UNIT d

gýýX3&

"AT'3GORY: 70 -

Work In Progress IEP]E"TITIVI: MAINT.

NO.

30002002000 tES:?ONSIBILE ORG:ELECTRICAL UNIT 2 INTERVAL 01 FREQUENCY -

W MAINTENANCE TYPE:

SV QLQUIPMENT ID: S21806EB007 RC:CB CONST.

CODE:N/A

U SYSTEM

PKA ACCOUNTING DISTRIBUTION:0121 7221

'UNC DESC:

125VDC STATION BATTERY 2D1

,OCATION.

AREA:

CB ROOM:

306E ELEVATION:

050 COLUMN:

18.5N1 PRIORITY: DD QC WITNESS/HOLD REQD:

N IQUAL CLASS:2 NOTE:

WORKLIST ATTACHED JESCRIPTION:

WEEKLY 1E BATTERIES INSP.-

UNI-2 RCY-CRITIAL/TS/RCM/PMO/AR040201281-97 REMARKS:

New Add BJOX.

REQUESTOGR DATA:

CREW CODE:

EWO DCP:

ENVIRN QUAL:

N PROJECT CODE:

SEIS:

1 REQUESTING DEPT:

EL2

[b)-

REQUESTOR NAME!:

(b)(6)

PAX:

REQUIR*EKNTS:

FIRE PROT.

ADMIN.

REQD?

Y WORK AUTH REQD?

N SECURITY REQD?

N WORK AUTH TYPE?

N SSR REQD?

ASME CODE WORK?

N NO.

NIA ENGINEERING REQD?

N HO TO DISP NCR?

N NO.

N/A FME REQUIREMENTS?

N TEMPORARY MOD.?

N NO.

N/A R.E.P.

EVAL.

REQD?

N CREACUS BREACH?

N FCN REQ0?

NO:

ECP REQD?

NO.

SCHEDULING:

R.M.

DUE DATE FITTS:

DUE DATE SCHEDULED START DATE SCHEDULED COMP DATE W-*

1(6ý1

ý(6) z 2/26/2008 2/26/2008 2/26/2008 2/27/2008 00:00 07 :00 00:30 18:00 VIOLATION DATE 2/28/2008 01:00 MO OBJECTIV'E:

Per ~orm wE~ekly inspection of 1E batterys.

08021 808-0 PCOR QUALITY DOCUMENT BEST AVAILABLE COPY l..bi SIGNE__---OU_-A"

'T DOCUMEIW 0C""NATOR DATE r?)

Page 1 07 & F

I (WORK PLAN DETAIL CONTINUED)

WITH THE EXCEPTION OF SECTION 6.9, ON ALL WORK LISTED COMPONENTS.

2.

VISUALLY INSPECT THE GENERAL APPEARANCE AND CLEANLINESS OF EACH BATTERY AND BAITERY AREA AS FOLLOWS:

A.

AS NECESSARY, WIPE THE CbLL JARS, BATTERY RACKS, AND FLOOR WITH A SOLJTION OF BICARBONATE SODA AND COLD, DISTILLED OR DI WATER.

B.

WIPE AGAIN USING CLEAN DISTILLED OR DI WATER.

C.

VEREFY NON-ESSENTIAL EQUIPMENT AND DEBRIS HAS BEEN REMOVED FROM EACi BATTERY ROOM.

?LANNING APPROVALS:

FIRE PROTECTION REVIEW WORK PLANNED WORN PLANNED REVIEW WORK SCHEDULED PROCEDURE LIST:

BY DATE 02/12/96 02/12/96 02/12/96 02/20/08 TIME 14:14:00 14:13:59 14:26:45 07 :54 : 52 PROCEDURE ID REV TCN I

SO123-I-2.2 007 002 Desc:

125 VDC PILOT CELL BATTERY INSPECTION CRAFT INFORMAT ION:

CRAFT CODE CRAFT DESCRIPTION 1

EL ELECTRICIAN 2

SP FIRST LINE SUPERVISOR WORK DONE:

QTY ESTIMATED HOURS ACTUAL HOURS 2.0 6.0 1.0 2.0 Work Started:

Date 7- &

/

/ 0 Time -

0 7

-,3 1 1 1

Plu 6C-c1eo C,~'

I gdvP-/ 6V)

G A'-rr~.t6-A-

0802i 808-0 Paqe 5

0 (WORK DONE CONTINUED)

Z6~~-/?$v24 (b)(6)__

08021808-0 Page 6

4 NUCLEAR ORGANIZATION UNITS 1,2 AND 3 MAINTENANCE PROCEDURE REVISION 7 S0123-1-2.2 PAGE 2 OF 47 TCN 7-2 1.0 OBJECTIVES 1.1 T-his procedure provides guidance for performing the Weekly 125 volt Battery Bank and Charger operability verification checks.

1.2 This procedure satisfies the surveillance requirements specified in the Unit 2 and Unit 3 Technical Specifications, LCO - SR, Sections 3.8.4.1, 3.8.5.1, 3.8.6.1, and Table 3.8.6-1 Category "A" Limits.

1.3 This procedure performed at least monthly, satisfies the requirements stated in IEEE Std. 450-1980.

1.4 This procedure Is applicable to the 125 VDC Station Battery Banks.

2.0 REFERENCES

2.1 Refer to Attachment 1 for the Procedure Resource List.

3.0 PREREQUISITES 3.1 Before starting work, the user SHALL verify this procedure is current by referring to NDMS or one of the other methods listed in S0123-1-1.3.

3.2 Enter the following data:

MOA#

1

~c7 t % OS 00 IUni tI Equip Id: Is 2180("e-6 0 0 3.3 This procedure MAY be performed while Equalize Charging the Battery Bank unless one of the conditions listed in Section 3.4 is true.

08021808-0

NUCL1--AR ORGANIZATION UNITS 1, 2 AND 3 MAINTENANCE PROCEDURE REVISION 7 S0123-1-2.2 PAGE 7 OF 47 TCN 7-2 NOTE:

When taking Battery Bank Terminal Voltage, use a Fluke 187

( equivalent or better) set on the 500V range. It necessary, reference Design Calc' E4C-O 17.

6.2 Battery Bank Voltage TIS RUIEMENT 63.2.1 Measure Battery Bank Terminal voltage, Record readings below.

SACCEPTANCE CRITERIA All 125 VDC Battery Banks: [!

129.17 VDC 131.40 Voc SAT Go to Step 6.2.2.

UNSAT Perfons Cb)Forrect Actions as Follows.

IN,(6F

.1 Immediately notify your Supervisor of the "UNSAT"condition.

ACPL

.2 This Supervisor SHALL report a failed Surveillance according to Procedure SO 123-1-1.3.

CHK CPL

.3 Notify the Engineer, and generate an AR.

)

CHK CPL 08021808-0 4Em

/I.)